CN102477717A - 一种桥梁顶推施工方法 - Google Patents

一种桥梁顶推施工方法 Download PDF

Info

Publication number
CN102477717A
CN102477717A CN2010105668745A CN201010566874A CN102477717A CN 102477717 A CN102477717 A CN 102477717A CN 2010105668745 A CN2010105668745 A CN 2010105668745A CN 201010566874 A CN201010566874 A CN 201010566874A CN 102477717 A CN102477717 A CN 102477717A
Authority
CN
China
Prior art keywords
bridge
jack
interim
pier
curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105668745A
Other languages
English (en)
Other versions
CN102477717B (zh
Inventor
郝维索
吴东升
张剑英
沈洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201010566874.5A priority Critical patent/CN102477717B/zh
Publication of CN102477717A publication Critical patent/CN102477717A/zh
Application granted granted Critical
Publication of CN102477717B publication Critical patent/CN102477717B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种桥梁顶推施工方法,该方法对临时墩支座标高根据需要进行调整,使梁底与临时墩支座有效密贴接触,从而对临时墩反力和桥梁内力进行主动控制,以达到与直线或同半径竖曲线桥梁梁顶推施工相同的效果。具体方法是:在梁段拼装的间隙内,利用同步千斤顶,对梁底曲线上凸处起顶升高,对下凹处起顶降低。这样顶推施工可以适用于梁底竖曲线曲率变化的桥,包括变高度梁或设置多段复合竖曲线的桥梁。本发明突破和发展了现行桥梁施工规范,扩大了顶推施工的使用范围;与其它方法相比,可以节约材料,施工快速、安全,技术、经济和社会效益显著。

Description

一种桥梁顶推施工方法
技术领域
本发明涉及桥梁施工领域,具体涉及一种桥梁顶推施工方法。
背景技术
顶推施工是一种常用的桥梁施工方法,在顺桥向后台设置预制拼装平台,分节段施工拼装,并与已经顶推施工完成的梁体联成整体,然后通过水平液压千斤顶施力,借助不锈钢与聚四氟乙烯板组成的滑动装置,将梁体顶推出预制拼装场地,之后继续下一轮梁段的预制拼装,直至施工完成。目前采用顶推法安装的桥梁,其预制线形大多为直线或同半径圆形竖曲线;《公路桥涵施工技术规范》(JTJ041-2000)第15.5.7条规定,“用顶推法安装的竖曲线桥只适用于同曲率的竖曲线桥”。
当桥梁为直线或者同半径圆曲线时,在顶推过程中临时墩顶支座与梁底曲线吻合,可以认为是理想接触;当桥梁为变高度或设置多段复合竖曲线时,在顶推施工过程中各临时支墩顶支座与梁底曲线不吻合,接触条件随梁体与临时支墩的相对位置变化而变化,会引起部分临时墩脱空或反力过大,进而引起桥梁内力过大,对顶推施工安全不利。
为此,通常在梁底设置楔形垫块把梁底填平补齐,然后采用常规顶推法施工;但这种方法存在材料耗费量大、施工过程繁琐、底板开孔过多削弱结构等缺点。
发明内容
本发明的目的在于提供一种桥梁顶推施工方法,该方法克服传统顶推施工法只适用于同曲率的竖曲线桥的局限性,对于变高度桥梁或设置多段复合竖曲线的桥梁也可适用。
为了实现这一目的,本发明的技术方案为:一种桥梁顶推施工方法,其特征在于在临时墩上设置支座,在桥梁梁段拼装的间隙,调节临时墩支座标高,使桥梁梁底与临时墩支座有效密贴接触。具体方法是在临时墩支座中设有一千斤顶,桥梁梁段拼装的间隙,调节千斤顶顶升高度,使桥梁梁底与临时墩支座有效密贴接触。根据本发明的一个实施例,临时墩支座包括设在临时墩墩顶的下分配梁,下分配梁上设有千斤顶,千斤顶与可调支座连接,可调支座与上分配梁底部连接,上分配梁与轨道梁连接,轨道梁位于桥梁梁底,调节千斤顶的顶升高度,使得桥梁梁底与临时墩支座有效紧密接触,千斤顶的受力达到控制计算反力。
本发明技术方案是对临时墩支座标高根据需要进行调整,使梁底与临时墩支座有效密贴接触,从而对临时墩反力和桥梁内力进行主动控制,以达到与直线或同半径竖曲线桥梁梁顶推施工相同的效果。利用同步千斤顶,对梁底曲线上凸处起顶升高,对下凹处起顶降低;临时墩标高调整,不是在顶推施工动态过程中进行的,而是在桥梁梁段拼装的间隙内静态进行的,对工期基本没有影响。这样顶推施工可以适用于梁底竖曲线曲率变化的桥,包括变高度梁或设置多段复合竖曲线的桥梁。本发明突破了现有桥梁施工规范的束缚,扩大了顶推施工的使用范围;与其它方法相比,可以节约材料,施工快速、安全,技术、经济和社会效益显著。
附图说明
图1为预拱度线形与临时墩布置示意图
图2a~2d为施工程序示意图
图3为竖向调整装置示意图
图4为竖向调整装置的侧向示意图
图5为图4的局部放大图
具体实施方法
一种桥梁顶推施工方法,其特征在于在临时墩上设置支座,在桥梁梁段拼装的间隙,调节临时墩支座标高,使桥梁梁底与临时墩支座有效密贴接触。
图1为预拱度线形与临时墩布置示意图,桥梁的一端为顶推端12,在桥梁的另一端为顶推接收端13,中间设有七个临时墩。为了方便比较预拱度曲线与桥梁施工之间的对应关系,特在桥墩上方示出了预拱度曲线图。图中14为预拱度曲线,15为道路设计线形。
图2a为顶推到3#临时墩时的顶升示意图,从图中可以看出,由于此时近顶推端1#临时墩上方的梁底曲线相比上一次调节时是下降的,因此需要向下调节该临时墩支座的标高,顶推到2#临时墩上方的梁底曲线相比上一次调节时是上升的,因此需要向上调节2#临时墩的标高,使得桥梁梁底与临时墩有效密贴接触。图2b为顶推到5#临时墩时的顶升示意图,从图中可以看出,由于此时近顶推端1#临时墩上方的梁底曲线相比上一次调节时是上升的,因此需要向上调节该临时墩支座的标高,此时顶推到2#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是上升的,因此需要向上调节该临时墩支座的标高;此时顶推到3#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是下降的,因此需要向下调节该临时墩支座的标高;此时顶推到4#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是下降的,因此需要向下调节该临时墩支座的标高;此时顶推到5#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是上升的,因此需要向上调节该临时墩支座的标高。图2c为顶推到7#临时墩的顶升示意图,由于此时1#临时墩上方的梁底曲线相比上一次调节时是下降的,因此需要向下调节该临时墩的标高,此时顶推到2#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是下降的,因此需要向下调该临时墩支座的标高;此时顶推到3#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是上升的,因此需要向上调节该临时墩支座的标高;此时顶推到4#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是上升的,因此需要向上调节该临时墩支座的标高;此时顶推到5#临时墩上方的梁底曲线相比上一次调节时的梁底曲线来说是下降的,因此需要向下调节该临时墩支座的标高,此时6#临时墩上方的梁底曲线相比上一次调节时是上升的,因此需要向上调节该临时墩支座的标高。
如图所示,根据本发明的一个实施例,临时墩支座包括设在临时墩1墩顶的下分配梁2,下分配梁2上设有一千斤顶3,千斤顶3通过可调支座4与上分配梁5底部连接,上分配梁5与轨道梁6连接,轨道梁6位于桥梁梁底7下方,调节千斤顶的顶升高度,使得桥梁梁底7与临时墩支座顶部即轨道梁6梁顶有效紧密接触,使千斤顶3的受力达到控制计算反力。可调支座4包括位于支座底部中央的顶柱8和两侧的撑脚9,顶柱8底部高度高于撑脚9高度,顶柱8位于千斤顶的上方。在下分配梁上还设有限位牛腿10,该限位牛腿10位于可调支座两侧。可调支座撑脚9下方垫有钢垫块11,钢垫块11在千斤顶顶升后再垫设。
根据本发明的一个实施例,该施工方法的具体步骤为,A、得出桥梁梁底预拱度曲线;B、进行桥梁梁段拼装,拼装完成后,顶推至第一个临时墩;C、进行下一步桥梁梁段拼装,与此同时根据桥梁梁底预拱度曲线,确定已顶推到的各个临时墩上千斤顶的顶升高度,同步升高或降低各个临时墩的千斤顶,使得各个千斤顶的受力均达到控制计算反力,保证桥梁梁底与临时墩有效密贴接触,拼装完成后,顶推至下一临时墩;D、重复步骤C,直至全部顶推到位。顶推到位后顶推施工即算完成,下一步根据结构体系确定。
控制计算反力的计算属于现有技术,在此不再赘述。各临时墩支反力一般为不调整临时支座标高时临时墩最大反力的55%~65%之内。
根据本发明的一个实施例:某双塔三跨空间自锚式悬索桥,跨径组合为83+260+83m,主梁采用钢箱梁,单幅桥宽度21m,高度3.5m。钢箱梁线形为五段连续曲线,边跨拱度约+140mm,中跨拱度约+240mm,中跨主塔附近拱度约-10mm。钢箱梁采用分幅顶推法施工,临时墩跨径布置为:60m(平台)+13+5×52+41.5+31.5m。经施工过程分析,常规顶推施工方法无法适应,采用调整临时支座标高的方法对临时墩反力和钢箱梁内力进行主动控制,保证顶推施工安全可靠。
经计算分析,如果采用常规顶推方法直接顶推,不调整临时支座标高,临时墩最大反力约为15000kN,钢箱梁最大总体应力达到370Mp,对结构安全十分不利。如果按本发明提出的方法进行顶推,对临时支座标高进行调整,各临时墩支反力均控制在9000kN以内,最大总体应力为150MPa,能够较好地控制临时墩支反力和主梁弯矩,确保施工安全。标高调整范围为向上最大+14cm,向下最大-15cm。

Claims (3)

1.一种桥梁顶推施工方法,其特征在于在临时墩上设置支座,在桥梁梁段拼装的间隙,调节临时墩支座标高,使桥梁梁底与临时墩支座有效密贴接触。
2.按权利要求1所述的施工方法,其特征在于该临时墩支座中设有千斤顶,桥梁梁段拼装的间隙,调节千斤顶顶升高度,使桥梁梁底与临时墩支座有效密贴接触。
3.按权利要求2所述的施工方法,其特征在于临时墩支座包括设在临时墩墩顶的下分配梁,下分配梁上设有千斤顶,千斤顶与可调支座连接,可调支座与上分配梁底部连接,上分配梁与轨道梁连接,调节千斤顶的顶升高度,使得桥梁梁底与临时墩支座有效紧密接触,千斤顶的受力达到控制计算反力。
CN201010566874.5A 2010-11-30 2010-11-30 一种桥梁顶推施工方法 Active CN102477717B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010566874.5A CN102477717B (zh) 2010-11-30 2010-11-30 一种桥梁顶推施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010566874.5A CN102477717B (zh) 2010-11-30 2010-11-30 一种桥梁顶推施工方法

Publications (2)

Publication Number Publication Date
CN102477717A true CN102477717A (zh) 2012-05-30
CN102477717B CN102477717B (zh) 2016-03-09

Family

ID=46090488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010566874.5A Active CN102477717B (zh) 2010-11-30 2010-11-30 一种桥梁顶推施工方法

Country Status (1)

Country Link
CN (1) CN102477717B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704414A (zh) * 2012-06-25 2012-10-03 上海同罡建筑工程有限公司 一种拱桥顶升的施工方法
CN103205940A (zh) * 2013-04-22 2013-07-17 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN104179127A (zh) * 2014-09-03 2014-12-03 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN107066724A (zh) * 2017-04-10 2017-08-18 中铁二院工程集团有限责任公司 一种用于多线斜拉铁路桥的轨道线形控制方法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN110644377A (zh) * 2019-09-30 2020-01-03 中铁二院工程集团有限责任公司 滚轮式梁体顶推施工装置
CN111877183A (zh) * 2020-06-17 2020-11-03 中铁桥隧技术有限公司 双向纵坡竖曲线桥梁顶推梁体转动自适应控制方法
CN112609586A (zh) * 2020-12-18 2021-04-06 中建三局集团有限公司 一种钢箱梁自锚悬索桥塔梁同步施工方法
CN113718662A (zh) * 2021-09-18 2021-11-30 中铁大桥局集团有限公司 一种适用于复杂竖曲线钢桁梁顶推滑移方法
CN114016438A (zh) * 2021-12-28 2022-02-08 中鹏联合重工集团有限公司 一种桥梁顶推施工方法
CN114837103A (zh) * 2022-04-27 2022-08-02 中交路桥建设有限公司 钢箱梁双顶托举顶推安装方法
CN115652859A (zh) * 2022-11-10 2023-01-31 中交第二航务工程局有限公司 一种离岸式桩基海工建筑物上部结构整体式安装方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030039259A (ko) * 2001-11-12 2003-05-17 심찬구 세그먼트지지용 가설부재를 이용한 아이엘엠 교량가설공법및 교량가설구조
JP2004019126A (ja) * 2002-06-12 2004-01-22 Ps Mitsubishi Construction Co Ltd 複合pc橋の押出し架設工法及び複合pc構造
JP2005264533A (ja) * 2004-03-18 2005-09-29 Taisei Corp Pc箱桁押出し架設工法
CN101250855A (zh) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 多点整体顶推钢箱梁施工工法
CN101761032A (zh) * 2009-12-31 2010-06-30 上海海珀联动力技术有限公司 一种桥梁顶推架设设备
CN101892634A (zh) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 宽桥面单一纵隔板钢箱梁顶推机构及顶推方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030039259A (ko) * 2001-11-12 2003-05-17 심찬구 세그먼트지지용 가설부재를 이용한 아이엘엠 교량가설공법및 교량가설구조
JP2004019126A (ja) * 2002-06-12 2004-01-22 Ps Mitsubishi Construction Co Ltd 複合pc橋の押出し架設工法及び複合pc構造
JP2005264533A (ja) * 2004-03-18 2005-09-29 Taisei Corp Pc箱桁押出し架設工法
CN101250855A (zh) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 多点整体顶推钢箱梁施工工法
CN101761032A (zh) * 2009-12-31 2010-06-30 上海海珀联动力技术有限公司 一种桥梁顶推架设设备
CN101892634A (zh) * 2010-07-30 2010-11-24 中铁四局集团第六工程有限公司 宽桥面单一纵隔板钢箱梁顶推机构及顶推方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周叶飞: "变曲率竖曲线钢箱梁顶推受力特性及施工控制技术研究", 《工程科技Ⅱ辑》, no. 12, 15 December 2009 (2009-12-15) *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704414A (zh) * 2012-06-25 2012-10-03 上海同罡建筑工程有限公司 一种拱桥顶升的施工方法
CN102704414B (zh) * 2012-06-25 2014-05-14 上海同罡建筑工程有限公司 一种拱桥顶升的施工方法
CN103205940A (zh) * 2013-04-22 2013-07-17 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN103205940B (zh) * 2013-04-22 2015-11-11 成都建筑工程集团总公司 连续梁桥变坡比例交替顶升施工方法
CN104179127A (zh) * 2014-09-03 2014-12-03 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN104179127B (zh) * 2014-09-03 2016-01-20 长沙理工大学 顶推变曲率竖曲线梁支点标高确定方法
CN107066724A (zh) * 2017-04-10 2017-08-18 中铁二院工程集团有限责任公司 一种用于多线斜拉铁路桥的轨道线形控制方法
CN108221710A (zh) * 2018-02-13 2018-06-29 上海工程技术大学 一种可自动调整梁底标高的桥梁顶推施工设备
CN110644377B (zh) * 2019-09-30 2021-01-12 中铁二院工程集团有限责任公司 滚轮式梁体顶推施工装置
CN110644377A (zh) * 2019-09-30 2020-01-03 中铁二院工程集团有限责任公司 滚轮式梁体顶推施工装置
CN111877183A (zh) * 2020-06-17 2020-11-03 中铁桥隧技术有限公司 双向纵坡竖曲线桥梁顶推梁体转动自适应控制方法
CN111877183B (zh) * 2020-06-17 2021-09-07 中铁桥隧技术有限公司 双向纵坡竖曲线桥梁顶推梁体转动自适应控制方法
CN112609586A (zh) * 2020-12-18 2021-04-06 中建三局集团有限公司 一种钢箱梁自锚悬索桥塔梁同步施工方法
CN113718662A (zh) * 2021-09-18 2021-11-30 中铁大桥局集团有限公司 一种适用于复杂竖曲线钢桁梁顶推滑移方法
CN113718662B (zh) * 2021-09-18 2023-03-14 中铁大桥局集团有限公司 一种适用于复杂竖曲线钢桁梁顶推滑移方法
CN114016438A (zh) * 2021-12-28 2022-02-08 中鹏联合重工集团有限公司 一种桥梁顶推施工方法
CN114837103A (zh) * 2022-04-27 2022-08-02 中交路桥建设有限公司 钢箱梁双顶托举顶推安装方法
CN114837103B (zh) * 2022-04-27 2023-09-05 中交路桥建设有限公司 钢箱梁双顶托举顶推安装方法
CN115652859A (zh) * 2022-11-10 2023-01-31 中交第二航务工程局有限公司 一种离岸式桩基海工建筑物上部结构整体式安装方法
CN115652859B (zh) * 2022-11-10 2023-06-23 中交第二航务工程局有限公司 一种离岸式桩基海工建筑物上部结构整体式安装方法

Also Published As

Publication number Publication date
CN102477717B (zh) 2016-03-09

Similar Documents

Publication Publication Date Title
CN102477717A (zh) 一种桥梁顶推施工方法
CN105350457B (zh) 一种桥梁步履式顶推施工中钢槽梁落梁的方法
CN101914897B (zh) 单主缆斜吊杆地锚式悬索桥的施工方法
CN103726450B (zh) 简支板桥顶高方法及其可调高组合垫石结构
CN101824800B (zh) 一种桥位现浇预应力混凝土连续梁的施工方法
CN101230563B (zh) 一种不中断交通更换桥梁支座的方法及其专用装置
CN105839536A (zh) 一种斜拉桥索塔的施工方法
CN202492807U (zh) 钢箱梁步履式多点顶推施工系统
CN102587291A (zh) 一种钢箱梁步履式多点顶推施工方法及施工系统
CN103938552B (zh) 大跨度钢桁拱桥自平衡悬拼施工方法及主墩限位支座
CN103485283A (zh) 一种边跨现浇段吊架支撑系统及其实施方法
CN103437300A (zh) 墩顶钢梁无墩旁托架架设双悬臂的施工方法
CN102953348A (zh) 桥梁墩柱纠偏复位方法
CN108505443B (zh) 一种不设预拱度的大节段吊装自锚式悬索桥施工方法
CN101158146A (zh) 斜拉桥主梁滑动模架系统及施工方法
CN111501574B (zh) 钢板梁s平面线型无导梁分联平行顶推施工方法
KR101527782B1 (ko) 합성형 교량의 변위관리 및 반전합성 경사지보공 설치방법
CN106894346A (zh) 一种连续梁桥施工方法
CN102733307B (zh) 一种现浇梁膺架施工方法
CN209194353U (zh) 一种适用于桥梁高墩0#块施工的骑跨一体式托架
CN207775734U (zh) 一种单悬臂拼装的平衡调节装置
CN201891086U (zh) 一种用于桥梁顶推施工的临时墩墩顶调节装置
CN111962402A (zh) 一种钢箱梁侧向滑移安装方法
CN203741729U (zh) 一种用于桥梁顶推施工的预应力支撑系统
CN108590171A (zh) 一种钢木组合预拼分离式自爬升架体模板施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant