CN102447305A - Topological anti-misoperation system for power grid - Google Patents

Topological anti-misoperation system for power grid Download PDF

Info

Publication number
CN102447305A
CN102447305A CN2010105027017A CN201010502701A CN102447305A CN 102447305 A CN102447305 A CN 102447305A CN 2010105027017 A CN2010105027017 A CN 2010105027017A CN 201010502701 A CN201010502701 A CN 201010502701A CN 102447305 A CN102447305 A CN 102447305A
Authority
CN
China
Prior art keywords
misoperation
power grid
user
module
error
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105027017A
Other languages
Chinese (zh)
Other versions
CN102447305B (en
Inventor
许先锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN2010105027017A priority Critical patent/CN102447305B/en
Publication of CN102447305A publication Critical patent/CN102447305A/en
Application granted granted Critical
Publication of CN102447305B publication Critical patent/CN102447305B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a topological anti-misoperation system for a power grid, which is characterized by comprising the following functional modules: a data interface module for reading a power grid model and a power grid operation mode from a power grid automation system and a power grid centralized controlling system, acquiring a currently checking operation of a user and returning an anti-misoperation judgment result to the user; a data processing module for processing the power grid model and the processing the operation mode; a network topology analysis module for reading a current power grid model and a real-time operation mode and automatically carrying out substation island analysis and interval analysis; and an anti-misoperation locking control module for acquiring a current operation of the user, carrying out different anti-misoperation locking logic treatments according to the type of operation equipment and returning a result to the user. After the topological anti-misoperation system is adopted, the anti-misoperation locking control of a full-grid model can be realized and the scheduling misoperation can be furthest avoided.

Description

The power network topology anti-error system
Technical field
The present invention relates to a kind of power network topology anti-error system, be applicable to the anti-misoperation of automation system for the power network dispatching, also can be applied to the anti-misoperation of electrical network centralized monitoring system; Both can carry out the safety of real-time power network remote control and check, the safety that also can be applied to simulated environment is checked.
Background technology
[0002] in electric power system,, need carry out " five is anti-" locking inspection in order to prevent misoperation of electrical equipment to current operation.Common " five is anti-" is meant and prevents recurrent five kinds of misoperation faults in the electric power system grid switching operation, and promptly deciliter switch, on-load drawing isolating switch, band ground cutter close isolating switch, charged ground cutter (hanging earthing conductor) and the mistakenly entering charged chamber of closing by mistake.
" five the is anti-" system that uses in the electric power system at present is mainly used in the supervisory control system of transformer station, directly defines operation locking between electric equipment through the attendant and concerns and realize.With " five the is anti-" difference in the monitoring system of electric substation, in automation system for the power network dispatching and in the electrical network centralized monitoring system, not only number of devices is huge, and the equipment mobility is also frequent relatively." five anti-" in the monitoring system of electric substation can only realize the operation locking between this transformer station internal unit in addition, can't realize the operation locking with the distance station equipment room, and this are even more important when line maintenance.
Along with computer technology, development of Communication Technique, increasing transformer station has realized no worker monitor.Automation system for the power network dispatching and electrical network centralized monitoring system have realized compiling of this area model and real time operation mode, for the construction of realization based on the anti-error system of power network topology lays a solid foundation.
Summary of the invention
Technical problem that the present invention will solve provides a kind of power network topology anti-error system, can realize the operation locking between whole network equipment.
For solving the problems of the technologies described above, the present invention provides a kind of power network topology anti-error system, it is characterized in that, comprises following each functional module:
Data interface module: be used for from grid automation system and electrical network centralized control system read electric network model and power system operating mode, obtain the current verification of user operation, the anti-false judgment result is returned to the user;
Data processing module: be used for electric network model processing and operational mode and handle; Electric network model comprises power equipment information, sign board information etc., and operational mode comprises information such as remote measurement, remote signalling.Electric network model and operational mode information are data of the present invention bases.
Network topology analysis module: be used for carrying out automatically electric island and analyze and compartment analysis, adopt the BFS algorithm to generate electric island, judge electric island attitude in conjunction with information such as generator, equivalent generator, ground connection cutter, sign board in the island; With bus, circuit, transformer is the search border; Automatically carry out compartment analysis, analysis result can realize preventing charged splice grafting ground disconnecting link, prevent to be with ground connection to run the pass jointly, prevent to be with ground connection to close disconnecting link, prevent chargedly to close disconnecting link, prevent anti-error function such as mistake drawing switch.
Anti-misoperation locking control module: be used to obtain active user's operation, carry out different anti-misoperation locking logical process, and the result is returned to the user according to the operating equipment type.
Aforesaid power network topology anti-error system is characterized in that: the operating equipment type that said anti-misoperation locking control module is carried out the anti-misoperation locking logical process comprises: anti-error check, the anti-error check of ground connection switch operation of the anti-error check of breaker operator, isolation switch operation, our station is anti-error and the switching of anti-mistaking, the anti-error check of maintenance sign board.
Power network topology anti-error system system design principle of the present invention is: the power network topology anti-error system obtains the model and the real time operation mode information of current electrical network from automation system for the power network dispatching or electrical network centralized monitoring system through interface.Annexation according to electric equipment is carried out the network topology analysis, and electrical network is divided into charging zone, ground area and power supply interrupted district, realizes the compartment analysis of electrical network simultaneously.Anti mis-closedown function is realized at electric island attitude and operating equipment place according to the operating equipment end points at interval automatically.Owing to be to carry out the network topology analysis automatically, therefore after electric network model changes, need not the user carry out the maintenance of anti-error rule according to electric network model and real time operation mode.
Beneficial effect of the present invention: power network topology anti-error system of the present invention adapts to the needs of dispatching of power netwoks development; Carry out anti-misoperation locking control according to the whole network model; Can stop to dispatch the generation of misoperation to greatest extent; Especially with the generation of serious accidents such as ground connection operation disconnecting link, band ground connection console switch, charged splice grafting ground disconnecting link, extremely important meaning is arranged for the safe operation that ensures electrical network.The variation of the automatic adaptive model of power network topology anti-error system, need not user's service equipment between the operation locking relation, alleviated maintenance workload greatly, improved the intelligent level of operating efficiency and grid automation system.
Description of drawings
Fig. 1 is power network topology anti-error system software design figure of the present invention;
Fig. 2 is a power network topology anti-error system workflow diagram of the present invention.
Embodiment
Design of System Software
Design of System Software is as shown in Figure 1.Native system mainly is made up of data interface module, data processing module, network topology analysis module, anti-misoperation locking control module.
Data interface module be responsible for from grid automation system and electrical network centralized control system read electric network model and power system operating mode, obtain the current verification of user operation, the anti-false judgment result is returned to the user.
Data processing module comprises that electric network model is handled and operational mode is handled.
The network topology analysis module reads current electric network model and real time operation mode, carries out electric island automatically and analyzes and compartment analysis.
The anti-misoperation locking control module is obtained active user's operation, carries out different anti-misoperation locking logical process according to the operating equipment type, and the result is returned to the user.
System work process of the present invention is:
Mode of operation of the present invention is the C/S mode, and client is a man-machine interface, is responsible for carrying out alternately with the user.Service end is responsible for data processing, network topology analysis, anti-misoperation locking control and client and is carried out information interaction etc.The concrete course of work is:
1, service end initialization, data processing module reads electric network model and power system operating mode from grid automation system and electrical network centralized control system.
2, the network topology analysis module carries out analysis of electric island and compartment analysis according to electric network model and operational mode.
3, service end is waited for the checking prediction message that receives client.
If 4 do not have checking prediction message, then whether judgment models and operational mode change, if change, then read electric network model and operational mode again, and call the network topology analysis module again.If do not change, then continue to wait for the checking prediction message of client.
5, after receiving the client checking prediction message, the anti-misoperation locking control module is called circuit breaker verification, disconnecting link verification and ground connection disconnecting link verification interface respectively according to device type, and check results is returned to client.
6, after the verified, continue execution in step 3.
The anti mis-closedown function that the present invention realized comprises following several aspect that goes up:
1, the anti-error check of breaker operator: possess cyclization prompting, the prompting of unlinking, the prompting of load dead electricity, load charge prompting, be with ground connection to run pass prompting, each side switching manipulation prompting of transformer, the prompting of transformer neutral point ground cutter, 3/2 pull-switch operating sequence prompting etc. jointly.
2, the anti-error check of isolation switch operation: possess band ground connection and close disconnecting link prompting, charged deciliter disconnecting link prompting, deciliter disconnecting link prompting of non-equipotential, deciliter by-pass knife switch prompting, switch operation and point out in proper order etc.
3, the anti-error check of ground connection switch operation: possess the disconnecting link prompting of charged splice grafting ground, the ground disconnecting link prompting of band disconnecting link splice grafting, splice grafting with voltage ground, disconnecting link prompting.
4, the switching of the anti-error and anti-mistaking of our station.Because other factory's station equipment states are incorrect to cause treating that the anti-error check of operating equipment is obstructed out-of-date, the dispatcher can switch to the anti-error mode of our station, proceeds operation.
5, the anti-error check of maintenance sign board.When hanging the maintenance sign board on the power equipment, system will handle the maintenance sign board as the virtual ground disconnecting link.When removing the maintenance sign board on the power equipment, system will delete this virtual ground disconnecting link automatically.
Below disclose the present invention with preferred embodiment, so it is not in order to restriction the present invention, and all employings are equal to replacement or the technical scheme that obtained of equivalent transformation mode, all drop within protection scope of the present invention.

Claims (2)

1. a power network topology anti-error system is characterized in that, comprises following each functional module:
Data interface module: be used for from grid automation system and electrical network centralized control system read electric network model and power system operating mode, obtain the current verification of user operation, the anti-false judgment result is returned to the user;
Data processing module: be used for electric network model processing and operational mode and handle;
Network topology analysis module: be used to read current electric network model and real time operation mode; Automatically carrying out electric island analyzes and compartment analysis; Adopt the BFS algorithm to generate electric island, judge electric island attitude in conjunction with information such as generator, equivalent generator, ground connection cutter, sign board in the island; With bus, circuit, transformer is the search border, carries out compartment analysis automatically;
Anti-misoperation locking control module: be used to obtain active user's operation, carry out different anti-misoperation locking logical process, and the result is returned to the user according to the operating equipment type.
2. power network topology anti-error system according to claim 1 is characterized in that: the operating equipment type that said anti-misoperation locking control module is carried out the anti-misoperation locking logical process comprises: anti-error check, the anti-error check of ground connection switch operation of the anti-error check of breaker operator, isolation switch operation, our station is anti-error and the switching of anti-mistaking, the anti-error check of maintenance sign board.
CN2010105027017A 2010-10-11 2010-10-11 Topological anti-misoperation system for power grid Active CN102447305B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105027017A CN102447305B (en) 2010-10-11 2010-10-11 Topological anti-misoperation system for power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105027017A CN102447305B (en) 2010-10-11 2010-10-11 Topological anti-misoperation system for power grid

Publications (2)

Publication Number Publication Date
CN102447305A true CN102447305A (en) 2012-05-09
CN102447305B CN102447305B (en) 2013-11-20

Family

ID=46009516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105027017A Active CN102447305B (en) 2010-10-11 2010-10-11 Topological anti-misoperation system for power grid

Country Status (1)

Country Link
CN (1) CN102447305B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103354388A (en) * 2013-06-19 2013-10-16 国家电网公司 Multi-service linked electric power operation instruction issuing method
CN103414169A (en) * 2013-08-29 2013-11-27 国家电网公司 Relay protection and error prevention system based on power grid dispatching automation system and working method
CN103545919A (en) * 2013-09-05 2014-01-29 昆明理工大学 Island topology recognition method for active power distribution network
CN104467183A (en) * 2014-12-04 2015-03-25 国家电网公司 Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN104539045A (en) * 2014-12-17 2015-04-22 国家电网公司 Intelligent fault-analysis-prevention system and working method thereof
CN105024295A (en) * 2015-07-13 2015-11-04 南京国电南自电网自动化有限公司 Topology analysis-based intelligent transformer station tag hanging method
CN105021921A (en) * 2015-07-06 2015-11-04 国网天津市电力公司 Method for recognizing loop closing and opening of power grid based on topology analysis
CN108155717A (en) * 2017-03-16 2018-06-12 国网福建省电力有限公司厦门供电公司 The anti-error methods of calibration of distribution main website FA based on operation of power networks data
CN109919451A (en) * 2019-02-15 2019-06-21 合肥优晟电力科技有限公司 Based on true power network topology analysis and security knowledge base digital electric network system and method
CN111224342A (en) * 2020-03-20 2020-06-02 广西电网有限责任公司防城港供电局 Transformer anti-misoperation topology five-prevention design method based on dispatching automation system
CN113471865A (en) * 2021-07-02 2021-10-01 合肥优晟电力科技有限公司 Topological analysis-based power grid anti-misoperation electrical principle judgment method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3812072A1 (en) * 1988-04-12 1989-10-26 Licentia Gmbh METHOD FOR OPERATING THE SWITCHGEAR DEVICES OF A SWITCHGEAR
US5990570A (en) * 1996-06-13 1999-11-23 Hitachi, Ltd. Power supplying apparatus for a vehicle and an intensive wiring apparatus
CN1929241A (en) * 2006-09-18 2007-03-14 中国南方电网有限责任公司超高压输电公司 Zone control network topology five-preventing system for 500KV converting station
CN201234062Y (en) * 2008-06-20 2009-05-06 江苏省电力公司泗洪县供电公司 Five prevention one machine multiple station control apparatus for micro-computer
KR20090096101A (en) * 2008-03-07 2009-09-10 한국전력공사 System and method for preventing circuit breaker's wrong control using set theory

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3812072A1 (en) * 1988-04-12 1989-10-26 Licentia Gmbh METHOD FOR OPERATING THE SWITCHGEAR DEVICES OF A SWITCHGEAR
US5990570A (en) * 1996-06-13 1999-11-23 Hitachi, Ltd. Power supplying apparatus for a vehicle and an intensive wiring apparatus
CN1929241A (en) * 2006-09-18 2007-03-14 中国南方电网有限责任公司超高压输电公司 Zone control network topology five-preventing system for 500KV converting station
KR20090096101A (en) * 2008-03-07 2009-09-10 한국전력공사 System and method for preventing circuit breaker's wrong control using set theory
CN201234062Y (en) * 2008-06-20 2009-05-06 江苏省电力公司泗洪县供电公司 Five prevention one machine multiple station control apparatus for micro-computer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
穆国强等: "综合性电网调度/集控操作防误系统的设计与实现", 《电力系统自动化》, vol. 31, no. 23, 10 December 2007 (2007-12-10) *
许先锋等: "EMS中系统拓扑五防的设计和实现", 《电网技术》, vol. 30, 31 October 2006 (2006-10-31), pages 76 - 79 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103354388A (en) * 2013-06-19 2013-10-16 国家电网公司 Multi-service linked electric power operation instruction issuing method
CN103354388B (en) * 2013-06-19 2015-07-01 国家电网公司 Multi-service linked electric power operation instruction issuing method
CN103414169A (en) * 2013-08-29 2013-11-27 国家电网公司 Relay protection and error prevention system based on power grid dispatching automation system and working method
CN103414169B (en) * 2013-08-29 2015-08-19 江苏省电力公司扬州供电公司 Based on relaying protection anti-error system and the method for work of automation system for the power network dispatching
CN103545919A (en) * 2013-09-05 2014-01-29 昆明理工大学 Island topology recognition method for active power distribution network
CN103545919B (en) * 2013-09-05 2016-05-11 昆明理工大学 A kind of isolated island topology recognition methods of active distribution network
CN104467183A (en) * 2014-12-04 2015-03-25 国家电网公司 Dispatch anti-misoperation system for regional power grid in adjustment and control integrated mode
CN104539045A (en) * 2014-12-17 2015-04-22 国家电网公司 Intelligent fault-analysis-prevention system and working method thereof
CN105021921A (en) * 2015-07-06 2015-11-04 国网天津市电力公司 Method for recognizing loop closing and opening of power grid based on topology analysis
CN105021921B (en) * 2015-07-06 2018-03-30 国网天津市电力公司 A kind of power network based on topological analysis closes recognition methods of unlinking
CN105024295A (en) * 2015-07-13 2015-11-04 南京国电南自电网自动化有限公司 Topology analysis-based intelligent transformer station tag hanging method
CN105024295B (en) * 2015-07-13 2017-06-23 南京国电南自电网自动化有限公司 Intelligent substation based on topological analysis is listed method
CN108155717A (en) * 2017-03-16 2018-06-12 国网福建省电力有限公司厦门供电公司 The anti-error methods of calibration of distribution main website FA based on operation of power networks data
CN108155717B (en) * 2017-03-16 2020-08-25 国网福建省电力有限公司厦门供电公司 FA anti-error checking method of power distribution main station based on power grid operation data
CN109919451A (en) * 2019-02-15 2019-06-21 合肥优晟电力科技有限公司 Based on true power network topology analysis and security knowledge base digital electric network system and method
CN109919451B (en) * 2019-02-15 2023-09-26 合肥优晟电力科技有限公司 Digital power grid system and method based on real power grid topology analysis and safety knowledge base
CN111224342A (en) * 2020-03-20 2020-06-02 广西电网有限责任公司防城港供电局 Transformer anti-misoperation topology five-prevention design method based on dispatching automation system
CN113471865A (en) * 2021-07-02 2021-10-01 合肥优晟电力科技有限公司 Topological analysis-based power grid anti-misoperation electrical principle judgment method

Also Published As

Publication number Publication date
CN102447305B (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN102447305B (en) Topological anti-misoperation system for power grid
EP3301784B1 (en) Intelligent power server applied to protection and control system for intelligent substation
CN101692585B (en) Anti-operation locking system of transformation substation automatic system
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
US20110004355A1 (en) Hybrid Distribution Network Power Restoration Control
CN109634243A (en) A kind of scheduler program operating system based on intelligent robot
CN106527181A (en) Communication network-based distribution automation system simulation test method
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN101777793A (en) Intelligent measurement and control device and application method
CN103425847B (en) Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system
CN109633345B (en) Secondary equipment on-line monitoring and analyzing device
CN105094120A (en) Testing device capable of simulating action behaviors of primary equipment
CN105281429A (en) Method for preventing maloperation in scheduling remote control
CN101520647B (en) Automatic verification method of latching logic
CN109193947A (en) Power distribution room monitoring method, device, server and computer readable storage medium
CN111917179B (en) Real-time online misoperation prevention system of transformer substation based on multimode internet of things
CN103227460A (en) Intelligent power distribution monitoring system and intelligent power distribution monitoring method
CN103346617A (en) Error logical judgment prevention system and judgment method considering multiple constraint conditions
CN106655520B (en) Ensure the method that relay protection remote operation securely and reliably executes
CN101615012A (en) Remote operation intelligent and safe checking method
CN105680426A (en) Neural network based intelligent processing method for power-losing accident of 35kv line fault
CN102738892A (en) Realization method of intelligent anti-error system of transformer substation based on IEC61850
CN202798164U (en) Comprehensive anti-error blocking device based on 3G wireless communication network
CN102832717A (en) Closed-loop control method of power scheduling operation order and ground wire operation
CN104539045A (en) Intelligent fault-analysis-prevention system and working method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Xianfeng

Inventor after: Meng Yongliang

Inventor after: Liu Ji

Inventor after: Du Gang

Inventor before: Xu Xianfeng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU XIANFENG TO: XU XIANFENG MENG YONGLIANG LIU JI DU GANG

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141216

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141216

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee before: NARI Technology Development Co., Ltd.