CN103354388B - Multi-service linked electric power operation instruction issuing method - Google Patents

Multi-service linked electric power operation instruction issuing method Download PDF

Info

Publication number
CN103354388B
CN103354388B CN201310242089.8A CN201310242089A CN103354388B CN 103354388 B CN103354388 B CN 103354388B CN 201310242089 A CN201310242089 A CN 201310242089A CN 103354388 B CN103354388 B CN 103354388B
Authority
CN
China
Prior art keywords
equipment
power
error analysis
operational order
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310242089.8A
Other languages
Chinese (zh)
Other versions
CN103354388A (en
Inventor
黄春红
陈进忠
林继滨
郑舜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Xiamen Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310242089.8A priority Critical patent/CN103354388B/en
Publication of CN103354388A publication Critical patent/CN103354388A/en
Application granted granted Critical
Publication of CN103354388B publication Critical patent/CN103354388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to electrical network analysis and anti-error processing of an electric power scheduling instruction and especially relates to a multi-service linked electric power operation instruction issuing method. Before executing remote control operation to the power grid, an anti-error analysis and load flow calculation model is used to substitute the analysis and calculation of a human brain and ratification of many parties are obtained through operation monitoring, video monitoring and other modes so that a behavior constraint of the operation is formed. The integration analysis and the anti-error processing can be effectively performed on the electric power scheduling instruction. A comprehensive and safe guarantee is provided for security and accuracy of power-grid remote control. Burden of operation personnel is mitigated. The remote control operation is safe and reliable so that harm to the power grid caused by misoperation is avoided.

Description

The electric power operation instruction issuing method of many service interlocks
Technical field
The present invention relates to a kind of electrical network analysis of power scheduling instruction, anti-error process, the electric power operation instruction issuing method of particularly a kind of many service interlocks.
Background technology
In existing electric power system SCADA system, all there is distant control function, can carry out to various power scheduling instructions that remote control is assigned, straighforward operation.But, effective electrical network analysis is not passed through in this kind of power scheduling instruction, the anti-error process of more leisure opinion, therefore this distant control function lacks the guarantee of fail safe and accuracy, dispatching and monitoring personnel are made to have psychological burden when carrying out straighforward operation, but along with the development of electrical network, automaticity is also more and more higher, the management and running of electrical network are also developing to intelligent direction, electrical network straighforward operation is very general and necessary, straighforward operation seems a simple behavior act, if but generation misoperation brings huge harm by electrical network, although cause SCADA system to have distant control function, still continuing to use the most traditional mode to during power grid control, operate to scene, and the distant control function of SCADA system cannot effectively be played, then further cause the problem of actual operation poor efficiency and stable operation, hinder electrical network intelligent development.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, and propose one and can effectively power scheduling instruction comprehensively be analyzed, anti-error process, the electric power operation instruction issuing method of many service interlocks that fail safe and accuracy for electrical network Long-distance Control provide safeguard.
The present invention is achieved through the following channels:
The electric power operation instruction issuing method of many service interlocks, its main points are, comprise the steps:
A kind of electric power scheduling automatization system is provided, it establishes the power grid topology model based on CIM61970; This dispatch automated system includes power equipment real-time acquisition system and power system operation protocol data system simultaneously;
There is provided the electrical network be connected with electric power scheduling automatization system anti-error analysis process system, it includes control operation man-machine interface, automatically triggers anti-error analysis module, tidal current analysis computing module and anti-error analysis correction verification module, the anti-error analysis module of automatic triggering is connected with tidal current analysis computing module, and the two is all connected with anti-error analysis correction verification module, anti-error analysis correction verification module is then connected with control operation man-machine interface by network communication;
Control operation man-machine interface is chosen the equipment that will operate in the power grid topology model of electric power scheduling automatization system, and transmission remote manipulation instruction and check command trigger anti-error analysis module and tidal current analysis computing module to automatic, wherein,
First the anti-error analysis module of automatic triggering operates front power network topology and flow state according to operational order and from the current real-time data computational analysis that power equipment real-time acquisition system obtains, according to operational order, the rear state of operation is adjusted in operating equipment simulation further, power network topology after computational analysis operation and flow state, then power network topology before and after operation and flow state are compared, extract because this operation is to the change of the electric parameters that electrical network brings and the delta data of topological electrical island, send anti-error analysis correction verification module to
The electric parameters such as each equipment of electrical network before tidal current analysis computing module calculates operation according to operational order and after simulated operation is meritorious, idle, voltage, electric current, utilize the comparison of the calculation of tidal current electric parameters before and after operation, acquisition operates the delta data brought electric network swim, and compare with the out-of-limit limit value in each device parameter, calculate the overload because this operation brings, the out-of-limit information of equipment, and send anti-error analysis correction verification module to;
The data that anti-error analysis correction verification module obtains according to the anti-error analysis module of automatic triggering and tidal current analysis computing module, compare with power system operation protocol data system, judge whether operation violates power system operation code, if violate power system operation code, then judge that this operational order is that misoperation instruction rower of going forward side by side shows, if do not violate power system operation code, then judge that this operational order is as allowing instruction, rower of going forward side by side shows;
Checking data and the operational order indicated are sent it back control operation man-machine interface by network communication, if operational order is misoperation, then by control operation man-machine interface terminating operation; If checking data and operational order for allowing instruction, are then sent on monitoring machine by operational order;
The operational order of checking data and sign is compared judgement by monitoring machine, if the two is not identical, then and terminating operation, and return the anti-error analysis process system of electrical network, if the two conforms to, then operational order is sent to video monitoring system,
Video monitoring system carries out position calculation according to the equipment of specifying in operational order, then the angle corresponding with the operating equipment preset with the camera that designated equipment is associated and focal length is selected, automatically by associated field camera alignment function equipment, and feed back ready information to electric power scheduling automatization system
Send straighforward operation order to the measure and control device of transformer station by electric power scheduling automatization system, complete actual operation by the measure and control device of transformer station;
After operation terminates, the real-time running data of each equipment of this equipment of power equipment real-time acquisition system Real-time Collection and corresponding line, and send to the anti-error analysis process system of electrical network, analyzed as follows by anti-error analysis correction verification module: the variable quantity that should reach according to straighforward operation equipment of real-time running data and former calculating is compared, whether automatic discrimination reaches operation object state, if so, then the command set that operating and remote controlling sends is that system judges to operate completion status.
Electric power scheduling automatization system of the present invention also referred to as power dispatching automation EMS system,
The present invention is to before the actual execution of electrical network straighforward operation, the analytical calculation of the brain of people is replaced by anti-error analysis and power flow algorithm, and by operation monitoring, obtain and in many ways approve, define and judge from preoperative analysis, observe until the object after operation judges the behavior restraint of a series of operation to monitoring during operation, real provide a comprehensive safety guarantee for electrical network remote control, alleviate the burden of operating personnel, make straighforward operation more safe and reliable, avoid the harm that misoperation brings electrical network.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the electric power operation instruction issuing method of many service interlocks of the present invention;
Below in conjunction with accompanying drawing, the present invention is described further.
Embodiment
Most preferred embodiment:
With reference to accompanying drawing 1, the electric power operation instruction issuing method of many service interlocks, comprises the steps:
Precondition:
(1) power grid topology model based on CIM61970 has been established in current power dispatching automation EMS system;
(2) the power equipment real-time acquisition system in current power dispatching automation EMS system has possessed each Real-time Collection amount of power equipment.
Concrete implementation step and flow process:
1, on EMS primary connection figure, the equipment that will operate is selected at interface,
2, remote control check command is sent;
3, after receiving remote control check command, network communication is utilized guidance command to be issued anti-error analysis module and Load flow calculation module.
The anti-error analysis module of automatic triggering and Load flow calculation module carry out anti-error analysis to this operation, its method is, first power network topology and flow state before computational analysis operation, rear state is operated inner automatically operating equipment simulation being adjusted to of program, power network topology and flow state after computational analysis operation, and topological sum flow state before and after operation is compared, extract because this operation is to the change of the electric parameters that electrical network brings and the change of topological electrical island, utilize changing content, draw anti-error analysis conclusion.
Utilize flow calculation program module, the electric parameters such as each equipment of electrical network before and after operation is meritorious, idle, voltage, electric current can be calculated, utilize the comparison of the calculation of tidal current electric parameters before and after operation, the impact operating and electric network swim is brought can be drawn, and compare with the out-of-limit limit value in each device parameter, calculate the overload because this operation brings, the out-of-limit information of equipment.Described Load flow calculation is algorithm classical in electric power system, under calculating certain electric network state, and each power equipment power, voltage, electric current.
Utilize anti-error analysis checking routine module, utilize the power system operation code of sequencing, judge whether operation violates power system operation code, the operation of abuse is then misoperation.
Such as: 1513 disconnecting links are pulled open in remote control, by calculating the electric load of the band by this disconnecting link, because power system operation code forbids on-load drawing disconnecting link, be therefore judged as quiescing.
Utilize the analysis of this step program, draw check results, and result utilized network communication automatically to beam back in the man-machine interface at operator place.
4, operate man-machine interface and receive check results information, check results will be shown in dialog box, and by voice broadcast, operating personnel can be seen, can hear again that operation brings affect information.
If 5 perform for forbidding, then terminating operation;
If 6 for reminding operation;
If operator presses " permission " button, then carry out the 8th step; If operator presses " forbidding " button, then terminating operation.
If 7 for allowing operation;
8, operational order is sent on monitoring machine;
9, guard machine personnel and can see check analysis information simultaneously, and guard:
If operator presses " permission " button, then carry out the tenth step;
If operator presses " refusal " button, then terminating operation.
10, operation information is dealt into video monitoring system by system automatically, and video monitoring system selects camera and angle corresponding to the operating equipment that presets and focal length, automatically by associated field camera alignment function equipment automatically according to the equipment sent.
11, send actual straighforward operation order, to the measure and control device of transformer station, complete actual operation by the measure and control device of transformer station.
12, field apparatus whether action to put in place differentiation:
After sending guidance command, whether equipment is real has carried out action according to guidance command, now still unknown, and whether really operating equipment operation puts in place, is the problem of electric power system relation, because whether this is misoperation by directly affecting subsequent operation.
1) can whether action puts in place by the collection capacity system automatic discrimination equipment of SCADA system;
Such as: pull open switch, switch position signal was " conjunction " originally, after switch motion, position signalling strain is " dividing ", simultaneously, switch power and the strain of current acquisition value are 0, when these signals and collection capacity change, pass through network communication mode, to automatically be sent to anti-error Analysis Service module, when anti-error analysis module receives signal and the collection capacity of change, the variable quantity that should reach according to straighforward operation equipment is compared, automatic discrimination, whether reach operation object state, namely action puts in place, now, the command set sent by operating and remote controlling is that system judges to operate completion status, and eject dialog box prompting operating personnel, people is for checking again, before artificial confirmation, householder method below can be utilized to confirm.
2) state that puts in place of operating equipment is manually checked by Video Remote;
For confirming that the whether real action of equipment puts in place further, because system in preceding step has driven camera to targeted by this equipment, can manually be reaffirmed by video.
Meet the 12 step condition, operating personnel can click ACK button in prompting confirmation operation puts dialog box in place, represent this straighforward operation device action and put in place, can carry out the straighforward operation of next equipment.
It is same as the prior art that the present invention does not state part.

Claims (1)

1. the electric power operation instruction issuing method of many service interlocks, is characterized in that, comprise the steps:
A kind of electric power scheduling automatization system is provided, it establishes the power grid topology model based on CIM61970; This dispatch automated system includes power equipment real-time acquisition system and power system operation protocol data system simultaneously;
There is provided the electrical network be connected with electric power scheduling automatization system anti-error analysis process system, it includes control operation man-machine interface, automatically triggers anti-error analysis module, tidal current analysis computing module and anti-error analysis correction verification module, the anti-error analysis module of automatic triggering is connected with tidal current analysis computing module, and the two is all connected with anti-error analysis correction verification module, anti-error analysis correction verification module is then connected with control operation man-machine interface by network communication;
Control operation man-machine interface is chosen the equipment that will operate in the power grid topology model of electric power scheduling automatization system, and transmission remote manipulation instruction and check command trigger anti-error analysis module and tidal current analysis computing module to automatic, wherein,
First the anti-error analysis module of automatic triggering operates front power network topology and flow state according to operational order and from the current real-time data computational analysis that power equipment real-time acquisition system obtains, according to operational order, the rear state of operation is adjusted in operating equipment simulation further, power network topology after computational analysis operation and flow state, then power network topology before and after operation and flow state are compared, extract because this operation is to the change of the electric parameters that electrical network brings and the delta data of topological electrical island, send anti-error analysis correction verification module to
The each equipment of electrical network before tidal current analysis computing module calculates operation according to operational order and after simulated operation is gained merit, the electric parameters of idle, voltage, electric current, utilize the comparison of the calculation of tidal current electric parameters before and after operation, acquisition operates the delta data brought electric network swim, and compare with the out-of-limit limit value in each device parameter, calculate the overload because this operation brings, the out-of-limit information of equipment, and send anti-error analysis correction verification module to;
The data that anti-error analysis correction verification module obtains according to the anti-error analysis module of automatic triggering and tidal current analysis computing module, compare with power system operation protocol data system, judge whether operation violates power system operation code, if violate power system operation code, then judge that this operational order is that misoperation instruction rower of going forward side by side shows, if do not violate power system operation code, then judge that this operational order is as allowing instruction, rower of going forward side by side shows;
Checking data and the operational order indicated are sent it back control operation man-machine interface by network communication, if operational order is misoperation, then by control operation man-machine interface terminating operation; If checking data and operational order for allowing instruction, are then sent on monitoring machine by operational order;
The operational order of checking data and sign is compared judgement by monitoring machine, if the two is not identical, then and terminating operation, and return the anti-error analysis process system of electrical network, if the two conforms to, then operational order is sent to video monitoring system,
Video monitoring system carries out position calculation according to the equipment of specifying in operational order, then the angle corresponding with the operating equipment preset with the camera that designated equipment is associated and focal length is selected, automatically by associated field camera alignment function equipment, and feed back ready information to electric power scheduling automatization system
Send straighforward operation order to the measure and control device of transformer station by electric power scheduling automatization system, complete actual operation by the measure and control device of transformer station;
After operation terminates, the real-time running data of each equipment of this equipment of power equipment real-time acquisition system Real-time Collection and corresponding line, and send to the anti-error analysis process system of electrical network, analyzed as follows by anti-error analysis correction verification module: the variable quantity that should reach according to straighforward operation equipment of real-time running data and former calculating is compared, whether automatic discrimination reaches operation object state, if so, then the command set that operating and remote controlling sends is that system judges to operate completion status.
CN201310242089.8A 2013-06-19 2013-06-19 Multi-service linked electric power operation instruction issuing method Active CN103354388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310242089.8A CN103354388B (en) 2013-06-19 2013-06-19 Multi-service linked electric power operation instruction issuing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310242089.8A CN103354388B (en) 2013-06-19 2013-06-19 Multi-service linked electric power operation instruction issuing method

Publications (2)

Publication Number Publication Date
CN103354388A CN103354388A (en) 2013-10-16
CN103354388B true CN103354388B (en) 2015-07-01

Family

ID=49310723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310242089.8A Active CN103354388B (en) 2013-06-19 2013-06-19 Multi-service linked electric power operation instruction issuing method

Country Status (1)

Country Link
CN (1) CN103354388B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106022608A (en) * 2016-05-19 2016-10-12 国电南瑞科技股份有限公司 Remote operation safety control method considering state of power grid equipment
CN106059074A (en) * 2016-06-09 2016-10-26 重庆三峡学院 Power dispatching management system
CN109193642A (en) * 2018-10-15 2019-01-11 深圳供电局有限公司 A kind of power scheduling network is issued an order method and system
CN110391912B (en) * 2019-07-26 2022-05-24 南方电网科学研究院有限责任公司 Distributed evaluation decision method and system based on secret sharing mechanism
CN113222429B (en) * 2021-05-20 2022-11-29 国网山东省电力公司潍坊供电公司 Power grid power consumption demand supervision method based on geographic information consistency verification
CN113708278B (en) * 2021-08-30 2024-05-24 长园共创电力安全技术股份有限公司 Anti-misoperation dynamic verification method and system for transformer substation
CN115394069B (en) * 2022-07-29 2024-04-09 上海合壹未来文化科技有限公司 Multi-equipment linkage remote control system, method, equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2001104A2 (en) * 2007-06-08 2008-12-10 Honeywell International Inc. Network-based aircraft secondary electric power distribution system
CN201898375U (en) * 2010-05-06 2011-07-13 珠海共创电力安全技术股份有限公司 Intelligent, integrated and comprehensive mal-operation preventing system of distribution network
CN102324788A (en) * 2011-09-19 2012-01-18 山西省电力公司大同供电分公司 Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN102447305A (en) * 2010-10-11 2012-05-09 国电南瑞科技股份有限公司 Topological anti-misoperation system for power grid
CN102638041A (en) * 2012-04-17 2012-08-15 国网电力科学研究院 Method forquickly checking safety and stability of scheduling operation of power system on line
CN102931725A (en) * 2012-10-19 2013-02-13 广东电网公司电力科学研究院 Automatic topological coloring method of power dispatching master station type integrated intelligent anti-error system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2001104A2 (en) * 2007-06-08 2008-12-10 Honeywell International Inc. Network-based aircraft secondary electric power distribution system
CN201898375U (en) * 2010-05-06 2011-07-13 珠海共创电力安全技术股份有限公司 Intelligent, integrated and comprehensive mal-operation preventing system of distribution network
CN102447305A (en) * 2010-10-11 2012-05-09 国电南瑞科技股份有限公司 Topological anti-misoperation system for power grid
CN102324788A (en) * 2011-09-19 2012-01-18 山西省电力公司大同供电分公司 Power dispatching integrated anti-misoperation simulation comprehensive management platform
CN102638041A (en) * 2012-04-17 2012-08-15 国网电力科学研究院 Method forquickly checking safety and stability of scheduling operation of power system on line
CN102931725A (en) * 2012-10-19 2013-02-13 广东电网公司电力科学研究院 Automatic topological coloring method of power dispatching master station type integrated intelligent anti-error system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
电网调度智能防误系统;林良健;《华南理工大学专业学位硕士学位论文》;20101231;第23-29页 *

Also Published As

Publication number Publication date
CN103354388A (en) 2013-10-16

Similar Documents

Publication Publication Date Title
CN103354388B (en) Multi-service linked electric power operation instruction issuing method
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN102593953B (en) Automatic line pulling control method based on provincial and regional integration
CN102931727B (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN103501045B (en) Network command issuing method of electric power system dispatching commands
CN109787356B (en) Transformer substation remote control anti-misoperation method and system based on IEC61850 protocol
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN104753063A (en) Transformer substation bus load transferring method and system
CN103414169B (en) Based on relaying protection anti-error system and the method for work of automation system for the power network dispatching
CN104052633A (en) Integrated testing method for intelligent station 61850 and telecontrol 104 protocol
CN105513449A (en) Comprehensive evaluation method for power grid regulating and controlling integral simulating training system
CN105527541A (en) Method for judging power distribution line fault tripping
CN110674282A (en) Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN103618297A (en) High-efficiency and high-reliability fault processing method aiming at complex power distribution network
CN104407577A (en) Intelligent check anti-maloperation method based on real-time trend
CN107896005A (en) A kind of comprehensive automation system of transformer substation
CN111864894A (en) Remote uninterrupted power transmission calibration method suitable for line protection device
CN113746205A (en) One-button programmed remote operation method based on network-side collaborative safety error-proof check
CN107181321B (en) Method for realizing rapid load pulling based on power grid topological structure
CN111327477A (en) Substation area control protection method and system based on edge calculation
CN107766649A (en) A kind of system protection real-time closed-loop emulation test system and its operation method
CN104135079A (en) Failure processing method for intelligent power distribution network comprising distributed power supply
CN113472074A (en) Intelligent fault handling method and system for intelligent power grid dispatching control system
CN110687892B (en) Automatic fault processing method and device based on dispatching automation system
CN106651113A (en) Dispatcher operation risk evaluation method based on advanced N-1 analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant