CN102593953B CN201210042461.6A CN201210042461A CN102593953B CN 102593953 B CN102593953 B CN 102593953B CN 201210042461 A CN201210042461 A CN 201210042461A CN 102593953 B CN102593953 B CN 102593953B
Authority
CN
China
Prior art keywords
road
control
information
load
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210042461.6A
Other languages
Chinese (zh)
Other versions
CN102593953A (en
Inventor
徐希
冯树海
高宗和
戴则梅
陆进军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201210042461.6A priority Critical patent/CN102593953B/en
Publication of CN102593953A publication Critical patent/CN102593953A/en
Application granted granted Critical
Publication of CN102593953B publication Critical patent/CN102593953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an automatic line pulling control method based on provincial and regional integration, which comprises the steps of: sending a power cutting-off and limiting target command to a regional dispatcher by a provincial dispatcher; automatically receiving a task and sending an alarm by the regional dispatcher, and starting a task processing client; looking up task information by the regional dispatcher through the client and sending a confirming message to the provincial dispatcher; through a power cutting-off and limiting assistant decision client, selecting a power cutting-off and limiting sequence table and a line pulling strategy, combining real time remote signaling and telemetering information of an EMS (Enhanced Message Service) system to automatically generate the line pulling strategy of the target task; and sending a remote control command to a remote RTU (Remote Terminal Unit) terminal through a batch remote control technology. The method provided by the invention realizes integrated close loop operation for cutting off and limiting the power, can cut off the target line in real time efficiently, and powerfully guarantees safe and stable operation of the power grid.

Description

A kind of based on economizing the ground integrated road control method of automatically drawing
A kind of based on economizing the ground integrated road control method of automatically drawing.
Technical field
The invention belongs to dispatching automation of electric power systems field, relate to a kind of based on economizing the ground integrated road control method of automatically drawing.
background technology
Power cuts to limit consumption refer to electrical network have an accident or the uneven situation of power supply and demand under, provincial scheduling is assigned and is drawn the instruction of appearance of a street amount to regional dispatch, regional dispatch is based on drawing road tagmeme table or ration the power supply and draw road tagmeme table according to the accident having made, draw road combination according to real time data artificial nucleus to listing side by side, and pull open supply line's circuit breaker by power transformation monitor staff, the measure of stopping power supply by force.
The main liaison mode that relies on of traditional power cuts to limit consumption operation, notify regional dispatch center by the provincial dispatcher of control centre, assign limited load task object, regional dispatch personnel are again according to current operation of power networks situation, in conjunction with drawing the tagmeme table of rationing the power supply, arrange out and need the circuit of power cuts to limit consumption sequence, and the corresponding monitoring of notice or the operations staff of electric substation execution.This pattern exists following obvious deficiency:
1. automaticity is low, lacks workflow management.Take manual operation as main, the information interaction difficulty between province ground, in addition the record of circuit La road and recovery time, draw road load situation, lose electric quantitative statistics and all need to, by dispatcher's artificial treatment, greatly increase dispatcher's workload.
2. intermediate link is many.As arrange circuit need artificial nucleus to and calculate, the instruction of issue needs corresponding different monitoring one by one or the operations staff of electric substation to carry out, whole execution flow time is longer, can not realize quick control overhead.
3. artificial winding displacement complexity, lacks aid decision means.Ground key degree is receiving after task, rely on manual analysis completely, draw dataway operation select on need contrast draw ration the power supply tagmeme table in conjunction with current network load real time execution situation determine, lack effective aid decision means, cause decision-making poor efficiency, and have the possibility of mistuning degree, misoperation.
4.La road efficiency is low.Carrying out multichannel while drawing road, lack effective closed-loop control means and measure, draw road efficiency on the low side, even there is drawing in time the phenomenon on road, cannot respond in time the demand of provincial scheduling, affect power network safety operation, dispatch at present all less than providing effective management and technological means for drawing to ration the power supply each department.
Summary of the invention
The object of the invention is for drawing the operation of rationing the power supply, proposed a kind ofly based on economizing the ground integrated road control method of automatically drawing, realized the intelligent linkage processing of rationing the power supply of drawing between provincial scheduling and regional dispatch.
The present invention proposes a kind ofly is characterized in that based on economizing the ground integrated road control method of automatically drawing, and comprises the following steps:
1) in EMS system, adjust harmonically side build-in services end respectively by economizing ground integrated workflow management module in province, realize the information interaction of drawing the operation of rationing the power supply between provincial scheduling and regional dispatch, economize tune and can obtain quickly the implementation status of loading, the ground integrated workflow management module of described province is used for realizing the information interaction between province ground;
2) economize and adjust service end to be responsible for the mutual of procedure information in the mode of Resident Process, readjust the distribution and send mission bit stream to ground, receive ground simultaneously and adjust the task process information of uploading, economize and adjust client to be responsible for the typing transmit operation of task object;
3) adjust service end to be responsible for the mutual of procedure information in the mode of Resident Process, receive province and adjust the mission bit stream issuing, startup ground is adjusted and is drawn the operate services of rationing the power supply, and task operating result can be returned to province's tune;
4) adjust client to drawing the tagmeme table automatic modeling of rationing the power supply, to utilize the remote signalling telemetry intelligence (TELINT) of EMS system acquisition simultaneously, automatically generate Pull Road Strategy;
5) control strategy is handed down to the end RTU of transformer station by the batch remote control module that system is applied by SCADA to be carried out, and has realized the fast closed-loop processing of drawing the operation of rationing the power supply, and described batch remote control module is for operate multiple switches simultaneously.
Aforesaid based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: in described step 4), draw and ration the power supply in tagmeme table automatic modeling process, comprise various control type, every kind of control type defines and draws road on-load switch, according to network topology automatic search to a certain equipment that draws road on-load switch to control, refresh in real time the folding condition of Ben Lalu on-load switch simultaneously, and the current meritorious measuring value of Ben Lalu on-load switch institute control appliance, provide and control sequence number and control two kinds of modes of priority controlled La road on-load switch is carried out to order priority description.
Aforesaid based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: described in draw the tagmeme table of rationing the power supply to define respectively by area, plant stand or bus, comprise the dataway operation that draws of the situation of rationing the power supply, accident conditions and scheduled overhaul situation.
Aforesaid based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: monitor in real time definition La road on-load switch is capable, comprise the folding condition of object, current meritorious and associate device title; Whether monitoring interface Offered target drops into, controls sequence number, controls the contents such as priority; Simultaneously, from EMS, obtain facility information, topological connection relation information such as drawing road outlet, draw real-time telemetry/remote signalling information of road load and draw the operation information of road load, draw the operation information of road load to comprise associated switch folding condition, current meritorious and connection device.
Aforesaid based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: after modeling, in the time that needs draw road to control, system is calculated according to the Pull Road Strategy on policy selection hurdle automatically according to the target value of input, list and meet tactful control switch by list box, also comprise the information of current measuring value and institute's control appliance simultaneously.
Aforesaid based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: Pull Road Strategy comprises: press the excision of control sequence number and load, remove load, excise load (from big to small), excise by current load value size order load (from small to large) by current load value size order by control priority slicing, according to the different Pull Road Strategy of selecting, automatically select to need the on-load switch of excision.
Feature of the present invention:
Based on economizing the ground integrated road control method of automatically drawing, towards the operation of rationing the power supply of drawing of traditional provincial power network scheduling and region dispatching of power netwoks, develop a set of workflow management software, realize the information mutual communication between province ground, adjust side can realize the automatic modeling that draws road tagmeme table on ground simultaneously, and remote signalling remote measurement real time information based on EMS system, automatically generate Pull Road Strategy, improve the straighforward operation of SCADA application, adopt telecontrol engineering in batches, realize the rapidly and efficiently closed-loop process of line loop operation, can respond in time province's tune demand, the electrical network equilibrium of supply and demand and safe and stable operation are effectively ensured.
The beneficial effect that the present invention reaches:
1) for the operation of rationing the power supply of drawing between province ground provides computer auxiliaring means, standard handling process, in accident treatment process, economize between ground and can form effective information interaction, ground is adjusted and can be transferred to business feedback in time to economizing, economize that adjust can more efficiently assurance accident treatment situation, be conducive to accident treatment record and historical query simultaneously.
2) provide the instrument that draws the flexible modeling of tagmeme table of rationing the power supply, and can, according to the real-time telemetry remote signalling information of EMS, automatically provide the Pull Road Strategy under desired value.
3) realized and drawn the integrated closed loop operation of rationing the power supply, on the straighforward operation basis of SCADA application, adopted telecontrol engineering in batches, rapid excision target line that can real-time high-efficiency, has avoided too much manual intervention.
Accompanying drawing explanation
Fig. 1 realizes the system architecture schematic diagram that automatically draws road control method of the present invention;
Fig. 2 adjusts layback road aid decision flow chart of the present inventionly.
Embodiment
What the present invention proposed is described in detail as follows based on economizing ground integrated automatically drawing road control method by reference to the accompanying drawings and implement:
As shown in Figure 1, whole functional sequence point following steps of drawing the operation of rationing the power supply:
First respectively economize adjust harmonically EMS system in build-in services end, this service end can adopt message or file mode to process the interactive information between the ground of provinceing, starts accordingly and operates simultaneously;
2. adjust dispatcher to initiate task by economizing in case there is a need, start to economize and adjust side client in EMS system, input area, people, the desired value etc. of issuing an order information, after manual confirmation is errorless, send information to target area;
3. province adjusts side service end automatically target information to be sent to the EMS system of adjusting;
4. adjust side service end automatic reception task, prompt alarm, and eject and draw the aid decision client operation interface of rationing the power supply;
5. adjust dispatcher to receive after task, first in client, check up-to-date event information, and receive to economizing key degree confirmation;
6. key degree, by drawing the aid decision client process of rationing the power supply to draw dataway operation, is first selected to draw the tagmeme table of rationing the power supply, and then inputs desired value, selection strategy, and system reads the real-time telemetry remote signalling information in EMS, automatically generates and draws dataway operation sequence;
7. adjust dispatcher to confirm generating La road sequence, and carry out remote control in batches, target line is initiated to circuit breaker and cut off task;
8. task action result is sent to province's key degree by key degree, economizes after key degree is confirmed and finish this flow process.
The treatment step of Tiao Ceduila road, ground task is as follows:
1. first need drawing the tagmeme table modeling of rationing the power supply.System provides various control type, every kind of control type defines and draws road on-load switch, switchgear and EMS system have realized integrated modeling, the equipment (Transformer Winding/interchange line segment/load) that system is controlled to this switch according to network topology automatic search, can refresh in real time the folding condition of this control switch simultaneously, and the current meritorious measuring value of this switch institute control appliance, provide and control sequence number and control two kinds of modes of priority controlled switch is carried out to order priority description.
2. draw the tagmeme table modeling of rationing the power supply can check the reasonability of definition content, and can define respectively by area, plant stand or bus, for drawing road tagmeme table, the ration the power supply dataway operation that draws of situation, accident conditions and scheduled overhaul situation of system support.
3.La road real-time monitoring and control is monitored in real time to definition La road on-load switch, comprises the folding condition of object, current meritorious and associate device title.Whether monitoring interface can drop into, control sequence number, control the contents such as priority by Offered target.Meanwhile, can from EMS, obtain facility informations such as drawing road outlet, topological connection relation information, real-time telemetry/remote signalling information of drawing road load, the operation information that draws road to load, comprises associated switch folding condition, current meritorious and connection device.
4. after modeling, in the time that needs draw road to control, click excision load button, system can operate in ejection interface, in target value, input data, input complete system later and automatically calculate according to the strategy on policy selection hurdle, list box is listed and is met tactful control switch, also has the information of current measuring value and institute's control appliance simultaneously.In Information, current target value will be described how many, excision switch is how many, and the load value of excision is how many, and the topological relation check results of switch and equipment is with for reference.
In the sequence generative process of 5.La road, system provides Pull Road Strategy analysis means, realize the flexible selection of various Pull Road Strategy, having comprised: pressed the excision of control sequence number and load, remove load, excise load (from big to small), excise by current load value size order load (from small to large) by current load value size order by control priority slicing.According to the different Pull Road Strategy of selecting, automatically select to need the on-load switch of excision.
6. after Pull Road Strategy generates, click and carry out guidance command, can in man-machine interface, carry out straighforward operation, by batch distant control function, distant place switch is sent to tripping instruction, the multiple means such as whole remote control process has purview certification, remote control verification guarantee the correct and fail safe of straighforward operation.

Claims (6)

1. based on economizing the ground integrated road control method of automatically drawing, it is characterized in that, comprise the following steps:
1) in EMS system, adjust harmonically side build-in services end respectively by economizing ground integrated workflow management module in province, realize the information interaction of drawing the operation of rationing the power supply between provincial scheduling and regional dispatch, economize tune and obtain in time the implementation status of loading, the ground integrated workflow management module of described province is used for realizing the information interaction between province ground;
2) economize and adjust service end to be responsible for the mutual of procedure information in the mode of Resident Process, readjust the distribution and send mission bit stream to ground, receive ground simultaneously and adjust the task process information of uploading, economize and adjust client to be responsible for the typing transmit operation of task object;
3) adjust service end to be responsible for the mutual of procedure information in the mode of Resident Process, receive province and adjust the mission bit stream issuing, startup ground is adjusted and is drawn the operate services of rationing the power supply, and task operating result is returned to province's tune;
4) adjust client to drawing the tagmeme table automatic modeling of rationing the power supply, utilize the remote signalling telemetry intelligence (TELINT) of EMS system acquisition simultaneously, automatically generate Pull Road Strategy;
5) in EMS system, the control strategy of the batch remote control module of SCADA application is handed down to the end RTU of transformer station, and is carried out by the end RTU of transformer station, realize the fast closed-loop processing of drawing the operation of rationing the power supply, described batch remote control module is for operate multiple switches simultaneously.
2. according to claim 1 based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: in described step 4), draw and ration the power supply in tagmeme table automatic modeling process, comprise various control type, every kind of control type defines and draws road on-load switch, according to network topology automatic search to a certain equipment that draws road on-load switch to control, refresh in real time the folding condition of Ben Lalu on-load switch simultaneously, and the current meritorious measuring value of Ben Lalu on-load switch institute control appliance, provide and control sequence number and control two kinds of modes of priority controlled La road on-load switch is carried out to order priority description.
3. according to claim 2 based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: described in draw the tagmeme table of rationing the power supply to define respectively by area, plant stand or bus, comprise the dataway operation that draws of the situation of rationing the power supply, accident conditions and scheduled overhaul situation.
4. according to claim 2 based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: definition La road on-load switch is monitored in real time, comprised the folding condition of object, current meritorious and associate device title; Whether monitoring interface Offered target drops into, controls sequence number, controls priority content; Simultaneously, from EMS, obtain and draw road line-outgoing equipment information, topological connection relation information, draw real-time telemetry/remote signalling information of road load and draw the operation information of road load, draw the operation information of road load to comprise associated switch folding condition, current meritorious and connection device.
5. according to claim 2 based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: after modeling, in the time that needs draw road to control, system is calculated according to the Pull Road Strategy on policy selection hurdle automatically according to the target value of input, listed the control switch that meets Pull Road Strategy by list box, also comprise the information of current measuring value and institute's control appliance simultaneously.
6. according to claim 5 based on economizing the ground integrated road control method of automatically drawing, it is characterized in that: Pull Road Strategy comprises: excise load, press and control priority slicing except loading, loading by current load value size order excision by controlling sequence number, according to the different Pull Road Strategy of selecting, automatically select to need the on-load switch of excision.
CN201210042461.6A 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration Active CN102593953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210042461.6A CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210042461.6A CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Publications (2)

Publication Number Publication Date
CN102593953A CN102593953A (en) 2012-07-18
CN102593953B true CN102593953B (en) 2014-07-02

Family

ID=46482273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210042461.6A Active CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Country Status (1)

Country Link
CN (1) CN102593953B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789603B (en) * 2012-07-24 2016-01-20 中国电力科学研究院 A kind ofly take into account the provincial scheduling active power adjustment method that load draws road model
CN102842961B (en) * 2012-08-13 2016-04-20 中国电力科学研究院 A kind of area power grid draws aid decision-making system of rationing the power supply fast
CN102832710B (en) * 2012-08-13 2015-06-24 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN103823952B (en) * 2012-11-16 2016-12-28 国家电网公司 The dataflow design method of bulk power grid regulation and control integration whole process simulation training system
CN102983630A (en) * 2012-12-07 2013-03-20 沧州供电公司 Comprehensive operation method for power dispatching and monitoring
CN103036995A (en) * 2012-12-19 2013-04-10 云南电力调度控制中心 Power grid dispatching system
CN103560589B (en) * 2013-11-19 2016-01-20 国家电网公司 A kind of uniting and adjustment treatment system and method
CN105225584B (en) * 2015-08-03 2018-05-11 国家电网公司 A kind of team control function emulation system of area power grid breaker
CN106059075B (en) * 2016-06-21 2018-10-30 国网浙江省电力公司金华供电公司 Extra-high voltage direct-current is latched by the accurate lot control system of end load
CN106447221A (en) * 2016-10-18 2017-02-22 国网山东省电力公司烟台供电公司 Pulling road order compilation method
CN106786618B (en) * 2016-12-09 2019-05-31 国电南瑞科技股份有限公司 A kind of province ground integrated load batch cooperative control method and system
CN108494089B (en) * 2018-03-22 2022-05-24 国网天津市电力公司 Rapid, safe and reliable batch remote control method for limited-circuit pull circuits
CN110350595B (en) * 2019-06-19 2023-10-27 国网河南省电力公司 Load fast decision control method for maintaining stable section of subarea in accident state
CN110707721A (en) * 2019-10-18 2020-01-17 国网四川省电力公司南充供电公司 Reactive power feedback batch control system
CN112053041B (en) * 2020-08-20 2022-11-11 国电南瑞科技股份有限公司 Province-region integrated source network load storage real-time control system and control method
CN115425658B (en) * 2022-09-22 2024-05-28 国网山东省电力公司淄博供电公司 Data interaction method for power grid accurate load shedding system ground adjustment main distribution network
CN115622248A (en) * 2022-10-27 2023-01-17 国网山东省电力公司淄博供电公司 Load accurate control method based on distribution network automation system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431240A (en) * 2008-12-19 2009-05-13 四川省电力公司 Space-saving integrated AVC system control method considering step power station
CN101441454A (en) * 2008-12-26 2009-05-27 北京市电力公司调度通信中心 Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431240A (en) * 2008-12-19 2009-05-13 四川省电力公司 Space-saving integrated AVC system control method considering step power station
CN101441454A (en) * 2008-12-26 2009-05-27 北京市电力公司调度通信中心 Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李刚等.省地一体化电厂调度管理系统的设计与实现.《电力系统自动化》.2011,第35卷(第16期), *

Also Published As

Publication number Publication date
CN102593953A (en) 2012-07-18

Similar Documents

Publication Publication Date Title
CN102593953B (en) Automatic line pulling control method based on provincial and regional integration
CN102832710B (en) Assistant decision making method for quick power rationing of regional power grids
CN102694381B (en) Multistage electrical-network self-healing control method
CN102842961B (en) A kind of area power grid draws aid decision-making system of rationing the power supply fast
CN100403619C (en) Distribution-type real-time voltage power-less optimized controlling method
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN101216709A (en) Client distribution automation remote real time monitoring system
CN105515045A (en) Multi agent-based power transmission and distribution network and distributed type supply source coordinated control system and method
CN102025195B (en) Distribution network simulation dispatching and management system
CN110460154A (en) Energy storage station cooperation control system of power framework
CN1972059A (en) A micro power network system
CN106160229A (en) A kind of customer charge real-time control method and system
CN210780230U (en) Switch device for switching high power from off-grid to grid-connected
CN201163437Y (en) Automatization remote real-time monitoring system for client distribution network
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN105071376A (en) Method for implementing integrated framework of main distribution network
CN104242449B (en) A kind of serve scheduling application remote viewing information management realize method
CN115241977A (en) Power grid province and local distribution integrated load accurate control system
CN102043389A (en) Multi-protocol data supervisory control system
CN107359702A (en) Intelligent linkage Interlocking Methods based on IES700 systems
CN106530112A (en) Distribution management system
CN101924392B (en) Bipolar automatic power control method of high-voltage direct-current transmission
CN109004751B (en) Lightweight distributed energy gateway equipment
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation
CN201156680Y (en) Automatic throw-in equipment of adaptive standby power supply

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141203

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20