CN102593953A - Automatic line pulling control method based on provincial and regional integration - Google Patents

Automatic line pulling control method based on provincial and regional integration Download PDF

Info

Publication number
CN102593953A
CN102593953A CN2012100424616A CN201210042461A CN102593953A CN 102593953 A CN102593953 A CN 102593953A CN 2012100424616 A CN2012100424616 A CN 2012100424616A CN 201210042461 A CN201210042461 A CN 201210042461A CN 102593953 A CN102593953 A CN 102593953A
Authority
CN
China
Prior art keywords
road
load
control
draws
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100424616A
Other languages
Chinese (zh)
Other versions
CN102593953B (en
Inventor
徐希
冯树海
高宗和
戴则梅
陆进军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201210042461.6A priority Critical patent/CN102593953B/en
Publication of CN102593953A publication Critical patent/CN102593953A/en
Application granted granted Critical
Publication of CN102593953B publication Critical patent/CN102593953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an automatic line pulling control method based on provincial and regional integration, which comprises the steps of: sending a power cutting-off and limiting target command to a regional dispatcher by a provincial dispatcher; automatically receiving a task and sending an alarm by the regional dispatcher, and starting a task processing client; looking up task information by the regional dispatcher through the client and sending a confirming message to the provincial dispatcher; through a power cutting-off and limiting assistant decision client, selecting a power cutting-off and limiting sequence table and a line pulling strategy, combining real time remote signaling and telemetering information of an EMS (Enhanced Message Service) system to automatically generate the line pulling strategy of the target task; and sending a remote control command to a remote RTU (Remote Terminal Unit) terminal through a batch remote control technology. The method provided by the invention realizes integrated close loop operation for cutting off and limiting the power, can cut off the target line in real time efficiently, and powerfully guarantees safe and stable operation of the power grid.

Description

A kind of based on economizing the ground integrated road control method of drawing automatically
A kind of based on economizing the ground integrated road control method of drawing automatically.
Technical field
The invention belongs to the dispatching automation of electric power systems field, relate to a kind of based on economizing the ground integrated road control method of drawing automatically.
Background technology
Power cuts to limit consumption refer to electrical network have an accident or the uneven situation of power supply and demand under; Provincial scheduling is assigned to regional dispatch and is drawn the instruction of appearance of a street amount; Regional dispatch is based on drawing road tagmeme table according to the accident of having formulated or rationing the power supply and draw road tagmeme table; Draw the road combination according to the real time data artificial nucleus to listing side by side, and draw back supply line's circuit breaker, the measure of stopping power supply by force by the power transformation monitor staff.
The main liaison mode that relies on of traditional power cuts to limit consumption operation; Notify the regional dispatch center by the provincial dispatcher of control centre; Assign the limited load task object, the regional dispatch personnel are again according to current operation of power networks situation, in conjunction with drawing the tagmeme table of rationing the power supply; Arranging out needs the circuit of power cuts to limit consumption sequence, and corresponding monitoring of notice or the operations staff of electric substation execution.This pattern exists following obvious deficiency:
1. automaticity is low, lacks workflow management.With manual operation is main, the information interaction difficulty between the province ground, and the statistics of the record that draws road and recovery time of circuit, the situation of drawing the road load, loss electric weight all need increase dispatcher's workload by dispatcher's artificial treatment greatly in addition.
2. intermediate link is many.As arrange circuit need the artificial nucleus to and calculate, the instruction of issue needs corresponding one by one different monitoring or the operations staff of electric substation to carry out, the whole execution flow process time is longer, can not realize the quick control load.
3. artificial winding displacement is complicated, lacks the aid decision means.Ground key degree is after the task of receiving; Rely on manual analysis fully,, lack effective aid decision means drawing dataway operation need to select contrast to draw the tagmeme table of rationing the power supply to combine current network load real time execution situation to confirm; Cause the poor efficiency of making a strategic decision, and have the possibility of mistuning degree, misoperation.
4. draw road efficient low.Carrying out multichannel when drawing the road; Lack effective closed-loop control means and measure; Draw road efficient on the low side, even the phenomenon on road occurs in time to draw, can't in time respond provincial scheduling requirement; Influence power network safety operation, the each department scheduling is at present all less than to drawing to ration the power supply effective management and technological means being provided.
Summary of the invention
The objective of the invention is to drawing the operation of rationing the power supply, proposed a kind ofly, realized the intelligent linkage processing of rationing the power supply of drawing between provincial scheduling and regional dispatch based on economizing the ground integrated road control method of drawing automatically.
The present invention proposes a kind ofly is characterized in that based on economizing the ground integrated road control method of drawing automatically, may further comprise the steps:
1) in the EMS system; Transfer side build-in services end respectively through economizing ground integrated workflow management module harmonically in province; Realized drawing between provincial scheduling and the regional dispatch information interaction of rationing the power supply and operating; Economize accent and can obtain the implementation status of loading quickly, the ground integrated workflow management module of said province is used to realize economizing the information interaction between the ground;
2) economize the accent service end and be responsible for the mutual of procedure information, readjust the distribution to ground and send mission bit stream, receive the task process information that the ground accent is uploaded simultaneously, economize and transfer client to be responsible for the typing transmit operation of task object with the mode of resident process;
3) transfer service end to be responsible for the mutual of procedure information with the mode of resident process, reception province transfers the mission bit stream that issues, starts the ground accent and draws the operate services of rationing the power supply, and can the task operating result be returned to province's accent;
4) transfer client to utilize the remote signalling telemetry intelligence (TELINT) of EMS system acquisition simultaneously, generate automatically and draw the road strategy drawing the tagmeme table automatic modeling of rationing the power supply;
5) system is handed down to the end RTU of transformer station execution through the batch remote control module that SCADA uses with control strategy, has realized drawing the fast closed-loop processing of rationing the power supply and operating, and said batch remote control module is used for operating simultaneously a plurality of switches.
Aforesaid based on economizing the ground integrated road control method of drawing automatically; It is characterized in that: in said step 4); Draw in the tagmeme table automatic modeling process of rationing the power supply, comprise the various control type, every kind of control types defines again draws the road on-load switch; Automatically search a certain equipment that draws the road on-load switch to be controlled according to network topology; Refresh simultaneously the folding condition of Ben Lalu on-load switch in real time, and the current meritorious measuring value of Ben Lalu on-load switch institute control appliance, provide control sequence number and control priority dual mode that the road on-load switch of being controlled that draws is carried out the order priority description.
Aforesaid based on economizing the ground integrated road control method of drawing automatically, it is characterized in that: the said tagmeme table of rationing the power supply that draws defines respectively by area, factory station or bus, comprises the dataway operation that draws of the situation of rationing the power supply, accident conditions and scheduled overhaul situation.
Aforesaid based on economizing the ground integrated road control method of drawing automatically, it is characterized in that: to definition draw that the road on-load switch is capable to be monitored in real time, comprise the folding condition of object, current meritorious and associate device title; Whether the target that is provided with monitoring interface drops into, controls contents such as sequence number, control priority; Simultaneously; From EMS, obtain facility information, topological connection relation information such as drawing the road outlet, draw the real-time telemetry/remote signalling information of road load and the operation information that draws the road load, draw the operation information of road load to comprise related switch folding condition, current meritorious and connection device.
Aforesaid based on economizing the ground integrated road control method of drawing automatically; It is characterized in that: after modeling finishes; When needs draw road control; System is calculated according to the road strategy that draws on policy selection hurdle according to the target value of input automatically, lists the control switch that meets strategy by list box, also comprises the information of current measuring value and institute's control appliance simultaneously.
Aforesaid based on economizing the ground integrated road control method of drawing automatically; It is characterized in that: draw the road strategy to comprise: by control sequence number excision load, by the control priority slicing remove load, by current load value size order excision load (from big to small), by current load value size order excision load (from small to large); Draw the road strategy based on the difference of selecting, selection needs the on-load switch of excision automatically.
Characteristics of the present invention:
Based on economizing the ground integrated road control method of drawing automatically,, developed one and overlapped workflow management software towards the operation of rationing the power supply of drawing of traditional provincial power network scheduling and region dispatching of power netwoks; Realized the information mutual communication between province ground, transferred simultaneously side can realize drawing the automatic modeling of road tagmeme table on ground, and based on the remote signalling remote measurement real time information of EMS system; Automatically generate and draw the road strategy; Improve the straighforward operation that SCADA uses, adopt telecontrol engineering in batches, realized the closed-loop process rapidly and efficiently of line loop operation; Province's accent demand be can in time respond, the electrical network equilibrium of supply and demand and safe and stable operation effectively ensured.
The beneficial effect that the present invention reached:
1) rations the power supply to operate for drawing between the ground of provinceing computer auxiliaring means is provided; Standard handling process; In the accident treatment process, can form effective information interaction between province ground; Ground is transferred and can be transferred to the feedback in time of being engaged in to province, economizes that transfer can more efficiently assurance accident treatment situation, helps accident treatment record and historical query simultaneously.
2) instrument that draws the flexible modeling of tagmeme table of rationing the power supply is provided, and can be, has provided automatically and draw the road strategy under the desired value according to the real-time telemetry remote signalling information of EMS.
3) realize drawing the integrated close loop maneuver of rationing the power supply, on the straighforward operation basis that SCADA uses, adopt telecontrol engineering in batches, but the rapid excision target line of real-time high-efficiency has been avoided too much manual intervention.
Description of drawings
Fig. 1 is for realizing the system architecture sketch map that draws the road control method automatically of the present invention;
Fig. 2 is for transfer layback road aid decision flow chart of the present inventionly.
Embodiment
What the present invention proposed combines accompanying drawing and implements to specify as follows based on economizing the ground integrated road control method of drawing automatically:
As shown in Figure 1, whole functional sequence branch following steps of drawing the operation of rationing the power supply:
1. transfer build-in services end in the EMS system, this service end can adopt message or file mode to handle the interactive information between province ground harmonically in province at first respectively, start corresponding operation simultaneously;
2. transfer the dispatcher to initiate task by economizing having under the situation about needing, in the EMS system, start to economize and transfer the side client, information such as input area, the people that issues an order, desired value, manual work confirm errorless after, send information to the target area;
3. economize and transfer the side service end automatically target information to be transferred the EMS system with being sent to;
4. transfer side service end automatic reception task, prompt alarm, and eject and draw the aid decision client operation interface of rationing the power supply;
5. after transferring the dispatcher to receive task, at first in client, check up-to-date event information, and receive to economizing key degree confirmation;
6. the key degree draws dataway operation through drawing the aid decision client process of rationing the power supply, and at first selects to draw the tagmeme table of rationing the power supply, and imports desired value then, selection strategy, and system reads the real-time telemetry remote signalling information among the EMS, generates automatically and draws the dataway operation sequence;
7. key degree personnel confirm the road sequence of drawing that generates, and carry out remote control in batches, target line is initiated circuit breaker cut off task;
8. the key degree sends to province's key degree with task action result, economizes the key degree and confirms this flow process of back end.
Ground transfers side to drawing road task handling step following:
1. at first need be to drawing the tagmeme table modeling of rationing the power supply.System provides the various control type; Every kind of control types defines again draws the road on-load switch; Switchgear and EMS system have realized integrated modeling, and system searches the equipment (Transformer Winding/interchange line segment/load) that this switch is controlled automatically according to network topology, can refresh the folding condition of this control switch simultaneously in real time; And the current meritorious measuring value of this switch institute control appliance, provide the control sequence number switch of being controlled to be carried out order priority and describe with control priority dual mode.
2. draw the tagmeme table modeling of rationing the power supply can check the reasonability of definition content, and can define respectively by area, factory station or bus, to drawing road tagmeme table, the ration the power supply dataway operation that draws of situation, accident conditions and scheduled overhaul situation of system's support.
3. draw the road real-time monitoring and control that the road on-load switch that draws of definition is monitored in real time, comprise the folding condition of object, current meritorious and associate device title.Whether the target that can be provided with monitoring interface drops into, controls contents such as sequence number, control priority.Simultaneously, can from EMS, obtain facility informations such as drawing the road outlet, topological connection relation information, the real-time telemetry/remote signalling information of drawing the road load, the operation information that draws the road to load comprises related switch folding condition, current meritorious and connection device.
4. after modeling finishes; When needs draw road control, click excision load button, system can operate in ejecting the interface; In target value, import data; System was calculated according to the strategy on policy selection hurdle automatically after input finished, and list box is then listed the control switch that meets strategy, also had the information of current measuring value and institute's control appliance simultaneously.In Information, current target value will be described how much, the excision switch is how much, and the load value of excision is how much, and the topological relation check results of switch and equipment is with for reference.
5. in drawing road sequence generative process; System provides the road analysis of strategies means of drawing; Realized various flexible selections of drawing road strategy, having comprised: by control sequence number excision load, by the control priority slicing remove load, by current load value size order excision load (from big to small), by current load value size order excision load (from small to large).Draw the road strategy based on the difference of selecting, selection needs the on-load switch of excision automatically.
6. after drawing the road strategy to generate; Click and carry out guidance command, can in man-machine interface, carry out straighforward operation, promptly distant place switch is sent the tripping instruction through the batch distant control function; Whole remote control process has purview certification, and multiple means such as remote control verification guarantee the correct and fail safe of straighforward operation.

Claims (6)

1. one kind based on economizing the ground integrated road control method of drawing automatically, it is characterized in that, may further comprise the steps:
1) in the EMS system; Transfer side build-in services end respectively through economizing ground integrated workflow management module harmonically in province; Realize drawing between provincial scheduling and the regional dispatch information interaction of rationing the power supply and operating; Economize accent and in time obtain the implementation status of loading, the ground integrated workflow management module of said province is used to realize economizing the information interaction between the ground;
2) economize the accent service end and be responsible for the mutual of procedure information, readjust the distribution to ground and send mission bit stream, receive the task process information that the ground accent is uploaded simultaneously, economize and transfer client to be responsible for the typing transmit operation of task object with the mode of resident process;
3) transfer service end to be responsible for the mutual of procedure information with the mode of resident process, reception province transfers the mission bit stream that issues, starts the ground accent and draws the operate services of rationing the power supply, and the task operating result is returned to province's accent;
4) transfer client to drawing the tagmeme table automatic modeling of rationing the power supply, utilize the remote signalling telemetry intelligence (TELINT) of EMS system acquisition simultaneously, generate automatically and draw the road strategy;
5) system is handed down to the end RTU of transformer station execution through the batch remote control module control strategy of SCADA application, realizes drawing the fast closed-loop processing of rationing the power supply and operating, and said batch remote control module is used for operating simultaneously a plurality of switches.
2. according to claim 1 based on economizing the ground integrated road control method of drawing automatically; It is characterized in that: in said step 4); Draw in the tagmeme table automatic modeling process of rationing the power supply, comprise the various control type, every kind of control types defines again draws the road on-load switch; Automatically search a certain equipment that draws the road on-load switch to be controlled according to network topology; Refresh simultaneously the folding condition of Ben Lalu on-load switch in real time, and the current meritorious measuring value of Ben Lalu on-load switch institute control appliance, provide control sequence number and control priority dual mode that the road on-load switch of being controlled that draws is carried out the order priority description.
3. according to claim 2 based on economizing the ground integrated road control method of drawing automatically, it is characterized in that: the said tagmeme table of rationing the power supply that draws defines respectively by area, factory station or bus, comprises the dataway operation that draws of the situation of rationing the power supply, accident conditions and scheduled overhaul situation.
4. according to claim 2 based on economizing the ground integrated road control method of drawing automatically, it is characterized in that: the road on-load switch that draws to definition is monitored in real time, comprises the folding condition of object, current meritorious and associate device title; Whether the target that is provided with monitoring interface drops into, controls sequence number, control priority content; Simultaneously; From EMS, obtain and draw road outlet facility information, topological connection relation information, draw the real-time telemetry/remote signalling information of road load and the operation information that draws the road load, draw the operation information of road load to comprise related switch folding condition, current meritorious and connection device.
5. according to claim 2 based on economizing the ground integrated road control method of drawing automatically; It is characterized in that: after modeling finishes; When needs draw road control; System is calculated according to the road strategy that draws on policy selection hurdle according to the target value of input automatically, is listed by list box to meet the control switch that draws the road strategy, also comprises the information of current measuring value and institute's control appliance simultaneously.
6. described based on economizing the ground integrated road control method of drawing automatically based on claim 5; It is characterized in that: draw the road strategy to comprise: load, remove load, press current load value size order excision load, load by current load value size order excision by the control priority slicing by the excision of control sequence number; Draw the road strategy based on the difference of selecting, selection needs the on-load switch of excision automatically.
CN201210042461.6A 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration Active CN102593953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210042461.6A CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210042461.6A CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Publications (2)

Publication Number Publication Date
CN102593953A true CN102593953A (en) 2012-07-18
CN102593953B CN102593953B (en) 2014-07-02

Family

ID=46482273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210042461.6A Active CN102593953B (en) 2012-02-23 2012-02-23 Automatic line pulling control method based on provincial and regional integration

Country Status (1)

Country Link
CN (1) CN102593953B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789603A (en) * 2012-07-24 2012-11-21 中国电力科学研究院 Provincial dispatch active regulation method for considering load switch-off model
CN102832710A (en) * 2012-08-13 2012-12-19 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN102842961A (en) * 2012-08-13 2012-12-26 中国电力科学研究院 Quick cutting-off and rationing power assistant decision-making system of regional power grid
CN102983630A (en) * 2012-12-07 2013-03-20 沧州供电公司 Comprehensive operation method for power dispatching and monitoring
CN103036995A (en) * 2012-12-19 2013-04-10 云南电力调度控制中心 Power grid dispatching system
CN103560589A (en) * 2013-11-19 2014-02-05 国家电网公司 Joint debugging processing system and method
CN103823952A (en) * 2012-11-16 2014-05-28 国家电网公司 Data flow design method for large grid control integrated full-process simulation training system
CN105225584A (en) * 2015-08-03 2016-01-06 国家电网公司 A kind of team control function emulation system of area power grid isolating switch
CN106059075A (en) * 2016-06-21 2016-10-26 国网浙江省电力公司金华供电公司 Extra-high voltage direct-current locking receiving end load accurate batch control system
CN106447221A (en) * 2016-10-18 2017-02-22 国网山东省电力公司烟台供电公司 Pulling road order compilation method
CN106786618A (en) * 2016-12-09 2017-05-31 国电南瑞科技股份有限公司 A kind of ground integrated load batch cooperative control method of province and system
CN108494089A (en) * 2018-03-22 2018-09-04 国网天津市电力公司 A kind of fast and safely reliably ration the power supply draws road mass-produced remote control method
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN110707721A (en) * 2019-10-18 2020-01-17 国网四川省电力公司南充供电公司 Reactive power feedback batch control system
WO2022036793A1 (en) * 2020-08-20 2022-02-24 国电南瑞科技股份有限公司 Provincial and prefectural integrated source network load storage real-time control system and control method
CN115425658A (en) * 2022-09-22 2022-12-02 国网山东省电力公司淄博供电公司 Data interaction method between main and distribution networks of accurate load shedding system local dispatching of power grid
CN115622248A (en) * 2022-10-27 2023-01-17 国网山东省电力公司淄博供电公司 Load accurate control method based on distribution network automation system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431240A (en) * 2008-12-19 2009-05-13 四川省电力公司 Space-saving integrated AVC system control method considering step power station
CN101441454A (en) * 2008-12-26 2009-05-27 北京市电力公司调度通信中心 Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431240A (en) * 2008-12-19 2009-05-13 四川省电力公司 Space-saving integrated AVC system control method considering step power station
CN101441454A (en) * 2008-12-26 2009-05-27 北京市电力公司调度通信中心 Low-frequency unloading and fault circuit tagmeme on-line monitoring implementing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李刚等: "省地一体化电厂调度管理系统的设计与实现", 《电力系统自动化》 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102789603A (en) * 2012-07-24 2012-11-21 中国电力科学研究院 Provincial dispatch active regulation method for considering load switch-off model
CN102789603B (en) * 2012-07-24 2016-01-20 中国电力科学研究院 A kind ofly take into account the provincial scheduling active power adjustment method that load draws road model
CN102832710A (en) * 2012-08-13 2012-12-19 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN102842961A (en) * 2012-08-13 2012-12-26 中国电力科学研究院 Quick cutting-off and rationing power assistant decision-making system of regional power grid
CN102832710B (en) * 2012-08-13 2015-06-24 中国电力科学研究院 Assistant decision making method for quick power rationing of regional power grids
CN102842961B (en) * 2012-08-13 2016-04-20 中国电力科学研究院 A kind of area power grid draws aid decision-making system of rationing the power supply fast
CN103823952B (en) * 2012-11-16 2016-12-28 国家电网公司 The dataflow design method of bulk power grid regulation and control integration whole process simulation training system
CN103823952A (en) * 2012-11-16 2014-05-28 国家电网公司 Data flow design method for large grid control integrated full-process simulation training system
CN102983630A (en) * 2012-12-07 2013-03-20 沧州供电公司 Comprehensive operation method for power dispatching and monitoring
CN103036995A (en) * 2012-12-19 2013-04-10 云南电力调度控制中心 Power grid dispatching system
CN103560589A (en) * 2013-11-19 2014-02-05 国家电网公司 Joint debugging processing system and method
CN103560589B (en) * 2013-11-19 2016-01-20 国家电网公司 A kind of uniting and adjustment treatment system and method
CN105225584A (en) * 2015-08-03 2016-01-06 国家电网公司 A kind of team control function emulation system of area power grid isolating switch
CN105225584B (en) * 2015-08-03 2018-05-11 国家电网公司 A kind of team control function emulation system of area power grid breaker
CN106059075A (en) * 2016-06-21 2016-10-26 国网浙江省电力公司金华供电公司 Extra-high voltage direct-current locking receiving end load accurate batch control system
CN106059075B (en) * 2016-06-21 2018-10-30 国网浙江省电力公司金华供电公司 Extra-high voltage direct-current is latched by the accurate lot control system of end load
CN106447221A (en) * 2016-10-18 2017-02-22 国网山东省电力公司烟台供电公司 Pulling road order compilation method
CN106786618A (en) * 2016-12-09 2017-05-31 国电南瑞科技股份有限公司 A kind of ground integrated load batch cooperative control method of province and system
CN106786618B (en) * 2016-12-09 2019-05-31 国电南瑞科技股份有限公司 A kind of province ground integrated load batch cooperative control method and system
CN108494089A (en) * 2018-03-22 2018-09-04 国网天津市电力公司 A kind of fast and safely reliably ration the power supply draws road mass-produced remote control method
CN108494089B (en) * 2018-03-22 2022-05-24 国网天津市电力公司 Rapid, safe and reliable batch remote control method for limited-circuit pull circuits
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN110350595B (en) * 2019-06-19 2023-10-27 国网河南省电力公司 Load fast decision control method for maintaining stable section of subarea in accident state
CN110707721A (en) * 2019-10-18 2020-01-17 国网四川省电力公司南充供电公司 Reactive power feedback batch control system
WO2022036793A1 (en) * 2020-08-20 2022-02-24 国电南瑞科技股份有限公司 Provincial and prefectural integrated source network load storage real-time control system and control method
CN115425658A (en) * 2022-09-22 2022-12-02 国网山东省电力公司淄博供电公司 Data interaction method between main and distribution networks of accurate load shedding system local dispatching of power grid
CN115425658B (en) * 2022-09-22 2024-05-28 国网山东省电力公司淄博供电公司 Data interaction method for power grid accurate load shedding system ground adjustment main distribution network
CN115622248A (en) * 2022-10-27 2023-01-17 国网山东省电力公司淄博供电公司 Load accurate control method based on distribution network automation system

Also Published As

Publication number Publication date
CN102593953B (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN102593953B (en) Automatic line pulling control method based on provincial and regional integration
CN102694381B (en) Multistage electrical-network self-healing control method
CN102832710B (en) Assistant decision making method for quick power rationing of regional power grids
CN102842961B (en) A kind of area power grid draws aid decision-making system of rationing the power supply fast
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN100403619C (en) Distribution-type real-time voltage power-less optimized controlling method
CN101216709A (en) Client distribution automation remote real time monitoring system
CN108173267B (en) Offshore wind power plant and island microgrid combined monitoring system
CN102255389A (en) Method for implementing intensive intelligent substation based on intelligent power grid system
CN106160229A (en) A kind of customer charge real-time control method and system
CN102306955B (en) Residential distribution automation system
CN210780230U (en) Switch device for switching high power from off-grid to grid-connected
CN105071376A (en) Method for implementing integrated framework of main distribution network
CN102290863A (en) Distributed-feeder-automation-system-based remote monitoring terminal and implementation method
CN104242449B (en) A kind of serve scheduling application remote viewing information management realize method
CN102623994A (en) Substation area control method and system of microgrid operation mode
CN115241977A (en) Power grid province and local distribution integrated load accurate control system
CN106530112A (en) Distribution management system
CN105959214B (en) A kind of area transformer substation end I data communication gateway machine
CN102185372A (en) Method and device for generating backup automatic switchover control model based on EMS (energy management system)
CN101924392B (en) Bipolar automatic power control method of high-voltage direct-current transmission
CN201156680Y (en) Automatic throw-in equipment of adaptive standby power supply
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation
CN112563083B (en) Internet of things intelligent circuit breaker implementation device, method and system based on open protocol
CN106787131B (en) A kind of two rank region spare power automatic switching system and prepared auto restart control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NARI NANJING CONTROL SYSTEM LTD.

Effective date: 20141203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141203

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee after: NARI Technology Development Co., Ltd.

Patentee after: SGCC NARI Nanjing Control System Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Patentee before: NARI Technology Development Co., Ltd.