Prior art keywords
load
control
batch
province
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611129781.XA
Other languages
Chinese (zh)
Other versions
CN106786618B (en
Inventor
孙世明
戴则梅
张雄风
江叶峰
廖大鹏
孟勇亮
盛振明
李雪松
刘传良
唐元合
丁学田
王鹴
胡浔惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611129781.XA priority Critical patent/CN106786618B/en
Publication of CN106786618A publication Critical patent/CN106786618A/en
Application granted granted Critical
Publication of CN106786618B publication Critical patent/CN106786618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

The present invention relates to a kind of ground integrated load batch cooperative control method of province and system, based on saving ground intelligent grid regulation and control isomorphism system, accident is in emergency circumstances, save to adjust and calculate the load that each department need to be supported, then adjusted to various regions and issue load excision desired value, reception control command is adjusted to transfer in row three-way handshake with province in ground, and load batch excision is carried out according to load excision desired value, realize province and adjust one-touch batch spatial load forecasting, occur under high-power deletion condition in provincial power network, realize each department quick control of load batch, effectively ensure the safe and stable operation of regional power grid.Present invention utilizes cross-system service bus realize saving ground load batch control information cooperation interaction, control command it is quick issue and control result Real-time Feedback, the security and rapidity of batch spatial load forecasting between province ground can be substantially improved, it is ensured that in emergency circumstances power network safety operation.

Description

A kind of ground integrated load batch cooperative control method of province and system
Technical field
The invention belongs to dispatching automation of electric power systems technical field, the load batch for being related to a kind of province ground integrated is cooperateed with Control method and system.
Background technology
In the case of regional power grid generation major accident causes high-power vacancy, save and adjust side needs largely negative from the whole province's excision Lotus is so as to ensure electric power netting safe running.Intelligent grid dispatch automated system is adjusted not to low-voltage-grade equipment modeling due to saving And the problems such as regulation and control authority, therefore cut carrying out that directly each regional load cannot be completed by saving adjusting system when load cuts off Except, it is necessary to quickly be cut off by districted dispatch system completion correspondence regional load.For in-depth saves ground integrated job requirement, it is necessary to one kind Save ground integrated scheduling load batch Collaborative Control means and quickly control realizing the load of the whole province.
Load batch is carried out between provincial control centre and regional dispatch center at present to coordinate mainly to pass through phone during control Etc. traditional means be controlled instruction issue with check and correction, again according to grid operating conditions, road sequence is drawn in selection to regional dispatch personnel Spatial load forecasting is performed after confirmation.The pattern has the following disadvantages:
1st, automaticity is low, lacks unified management.Province assigns each ground to adjust and issues control instruction, based on artificial operation, lacks Weary unified flow management.And for spatial load forecasting situation, control result statistics etc. also cannot in real time on send province to adjust, province tune cannot Next step decision-making is carried out according to control situation.
2nd, interaction is few between province ground, and security is low.Information interaction approach is single between province ground, mainly with the mode reality such as phone Now exchange, for control instruction and execute instruction, provincial control centre cannot realize the accurate school and regional dispatch center between Test, security is substantially reduced.
3rd, control efficiency is low.Traditional mode lacks effective closed loop measure, and artificial dependence is big, and control instruction is issued slowly, Spatial load forecasting efficiency is low, and provincial regulation and control center need to manually be linked up and confirm control instruction, region one by one with multiple regions regulation and control center Regulation and control center is likely to occur the demand that cannot timely respond to provincial control centre, influences power network safety operation.
The content of the invention
For not enough present on prior art, cooperateed with it is an object of the present invention to provide a kind of ground integrated load batch of province Control method and system, are substantially improved the security and rapidity of batch spatial load forecasting between province ground, it is ensured that in emergency circumstances power network Safe and stable operation.
To achieve these goals, the present invention is to realize by the following technical solutions:
The ground integrated load batch cooperative control method of a kind of province, it is characterised in that comprise the following steps:
1) side is adjusted to register load group control system control instruction interaction management service end, the service of foundation waits client request report Text, saves between the client for adjusting side registration load group control system control instruction interaction, system instruction interaction by service bus and each From remote agent realize data transfer;
2) save and adjust side to unify to set each department load excision desired value by saving ground integrated load Collaborative Control interface, and pass through Is communicated between the cross-system based on service bus and each department load excision desired value is transferred to various regions tune;
3) adjust side service end to receive to save and adjust the load excision desired value for issuing to instruct, automatically confirm that and on send anti-school load to cut off Desired value is adjusted to province;
4) save after adjusting side joint to receive the anti-school desired value sent on ground tune, checked with desired value is issued, execution is issued after true Recognize instruction;
5) after adjusting side joint receipts province to adjust execution to confirm to instruct, adjust with above sending to perform to confirm to instruct and give province's tune;Simultaneously by ground key degree Member performs spatial load forecasting after selecting sequence and confirmation according to control strategy, by control result Real-time Feedback to province in implementation procedure Adjust;
6) control instruction interaction after the completion of, save adjust, adjust can integrated load batch collaboration control system in inquiry operation record And mode of operation.
Further, in the step 1)In, the data flow for saving ground integrated Collaborative Control interaction push process is:Save Adjust and push function is manually triggered by overall-in-one control schema interface, save regulation and control instruction interaction client acquisition processed and issue control instruction letter Breath, is sent to local service agency by way of service bus, adjusts remote agent to take with forwarding a request to by service broker Adjust the interaction that anti-school is made requests on identical processing mode in business, ground.
Further, in the step 2)In, saving ground integrated Collaborative Control interface includes browsing state interface and control State interface, browses the related data that road system is drawn at state interface for operating personnel's monitoring various regions batch, is not available for control operation;Control State interface processed then can be set various regions excision payload and perform batch control operation.
Further, in the step 2)In, the operational control function of saving ground integrated load Collaborative Control interface includes Load excision desired value sets and issues, load excision desired value confirms, control cancellation issues operation.
Further, in the step 2)In, province is readjusted the distribution after sending load to cut off target failure, is repeated and is pushed, it is to avoid by Interrupted in short-time communication, cause command information to push the situation of failure.
Further, in the step 4)In, save and adjusted before execution unconfirmed after sending load excision desired value, check It is unsanctioned that the instruction for issuing and cancelling is adjusted to ground.
Further, in the step 5)In, control strategy is included by control priority slicing except load, current loads are from big Load is cut off from small to large to small excision load, current loads.
Further, the ground integrated load batch cooperative control method of the province and system, it is characterised in that:Described Step 6)In, realize that control instruction is interacted between province ground, operated comprising three-way handshake altogether, shake hands for the first time:Save tune and issue control Instruct to ground and adjust, multiple confirmation instruction is recalled on ground;Second handshake:Save tune and issue control command, recall to multiple confirmation with waiting Perform;Third time is shaken hands:Recall to it is multiple perform confirm instruction, save adjust receive confirm perform.
Another object of the present invention provides a kind of province ground integrated load batch cooperative control system, and it includes:
Save and adjust the quick control module of batch load, the client for registering the interaction of load group control system control instruction sets each Regional load cuts off desired value, issues load excision desired value instruction, and after adjust the anti-school desired value sent with receiving, and issues Desired value is checked, and execution is issued after and confirms instruction, finally reception, supervisory sequence control result;
The quick control module of batch load is adjusted on ground, and the quick control module of batch load is adjusted for uploading real-time controllable burden to province, Receive the load excision desired value instruction for saving and adjusting and issue, automatically confirm that and on send anti-school load excision desired value to adjust batch negative to saving The quick control module of lotus, and receive province and adjust the quick control module of batch load to perform after control targe value confirms instruction, above send ground Tune is performed and confirms that instruction adjusts the quick control module of batch load to province;Dispatcher is adjusted to select sequence according to control strategy by ground simultaneously And spatial load forecasting is performed after confirming, control result Real-time Feedback is adjusted into the quick control module of batch load to province in implementation procedure.
Further, it is repeatable to push away after the province adjusts the quick control module of batch load to send load excision target failure Send, and before execution unconfirmed after sending load excision desired value, check is unsanctioned to adjust batch load quickly to control to ground Module issues the instruction for cancelling.
Based on province and district intelligent grid Dispatching Control System platform, accident in emergency circumstances, saves tune and calculates the present invention The load that each department need to be supported, then adjusts to various regions and issues load excision desired value, and ground adjusts reception control command to transfer in row with province Three-way handshake, and load batch excision is carried out according to load excision desired value, realize province and adjust one-touch batch spatial load forecasting. Provincial power network occurs under high-power deletion condition, realizes each department quick control of load batch, effectively ensures regional power grid Safe and stable operation.
Brief description of the drawings
Describe the present invention in detail with reference to the accompanying drawings and detailed description;
Fig. 1 is a kind of system overview flow chart of the ground integrated load batch cooperative control method of the province for providing of the invention;
The data flowchart of the interactive push process that Fig. 2 is provided for the present invention;
Fig. 3 interacts schematic diagram for the control command that the present invention is provided.
Specific embodiment
For technological means, creation characteristic, reached purpose and effect for making present invention realization are easy to understand, with reference to Specific embodiment, is expanded on further the present invention.
The present invention proposes a kind of ground integrated load batch cooperative control method of province and system, to save ground intelligent grid Regulate and control based on isomorphism system, using cross-system service bus, load batch control information cooperation interaction, control are ordered with realizing province Order it is quick issue and control result Real-time Feedback, the invention can be substantially improved the security of batch spatial load forecasting between province ground And rapidity, it is ensured that in emergency circumstances power network safety operation.The ground integrated load batch cooperative control system of province is used In the ground integrated load batch cooperative control method of province for realizing that above-mentioned technical proposal is provided.
As shown in figure 1, entirely saving ground integrated load batch Collaborative Control flow is divided into following steps:
1st, ground integrated load batch cooperative control system is saved, various regions can be set by integrative coordinated control interface and be cut off load Size performs batch control operation.Save and adjust side dispatcher to start scheduling Collaborative Control interface, adjusted according to various regions in control interface Scheduling team control can cutting load amount, issue various regions tune scheduling team control control capability, if load excision desired value send failure, Can repeat to push, it is to avoid because short-time communication is interrupted, cause command information to push the situation of failure;
2nd, adjusting dispatcher to save this time adjusts the instruction that issues to confirm, and is readjusted the distribution to province and send confirmation control instruction, waits and saving Dispatcher is adjusted to confirm to perform after checking;
3rd, save and adjust the confirmation command adjusted with receiving to ask, after check passes through, adjusted to ground and issue confirmation execute instruction;
4th, tuning is saved to readjust the distribution and send execution to confirm instruction, completes the control instruction interaction between province ground.Adjust and adjust what is issued according to province in ground Load excision desired value adjusts batch spatial load forecasting software to select control strategy by ground, carries out load batch control operation, controls Strategy includes cutting off negative from small to large except load, current loads cut off load, current loads from big to small by control priority slicing Lotus;
5th, save and adjusted before execution unconfirmed is adjusted after sending load excision desired value, such as adjust anti-school control instruction to check and do not lead to Cross, then the instruction for issuing and cancelling is adjusted to ground;
6th, after the completion of saving the interaction of ground integrated batch load control order, save adjust, adjust can be in the batch collaboration control of integrated load Inquiry operation record and mode of operation in system.
As shown in Fig. 2 the data flow for saving ground integrated Collaborative Control interaction push process is:Adjust side registration load group in ground Control system control instruction interaction management service end, saves the client for adjusting side registration load group control system control instruction interaction, saves and adjusts Push function is manually triggered by overall-in-one control schema interface, province's regulation and control instruction interaction client processed is obtained and issues control instruction information, Local service agency is sent to by way of service bus, remote agent service is adjusted by service broker with forwarding a request to, Adjust the interaction that anti-school is made requests on identical processing mode in ground.
As shown in figure 3, realizing control command secure interactive between province ground, operated comprising three-way handshake altogether, shaken hands for the first time: Save tune issue control instruction to adjust, ground recall to it is multiple confirm instruct;Second handshake:Save tune and issue control command, wait Recall to it is multiple confirm perform;Third time is shaken hands:Recall to it is multiple perform confirm instruction, save adjust receive confirm perform.
Referring to Fig. 1, the present embodiment separately provides a kind of province ground integrated load batch cooperative control system, and it includes:
Save and adjust the quick control module of batch load, the client for registering the interaction of load group control system control instruction sets each Regional load cuts off desired value, issues load excision desired value instruction, and after adjust the anti-school desired value sent with receiving, and issues Desired value is checked, and execution is issued after and confirms instruction, finally reception, supervisory sequence control result;
The quick control module of batch load is adjusted on ground, and the quick control module of batch load is adjusted for uploading real-time controllable burden to province, Receive the load excision desired value instruction for saving and adjusting and issue, automatically confirm that and on send anti-school load excision desired value to adjust batch negative to saving The quick control module of lotus, and receive province and adjust the quick control module of batch load to perform after control targe value confirms instruction, above send ground Tune is performed and confirms that instruction adjusts the quick control module of batch load to province;Dispatcher is adjusted to select sequence according to control strategy by ground simultaneously And spatial load forecasting is performed after confirming, control result Real-time Feedback is adjusted into the quick control module of batch load to province in implementation procedure.
After the province adjusts the quick control module of batch load to send load excision target failure, repeat and push, and in hair Send load to cut off after desired value before execution unconfirmed, check and unsanctioned adjust the quick control module of batch load to issue to ground to take Disappear the instruction of execution.
Based on province and district intelligent grid Dispatching Control System platform, accident in emergency circumstances, saves tune and calculates the present invention The load that each department need to be supported, then adjusts to various regions and issues load excision desired value, and ground adjusts reception control command to transfer in row with province Three-way handshake, and load batch excision is carried out according to load excision desired value, realize province and adjust one-touch batch spatial load forecasting. Provincial power network occurs under high-power deletion condition, realizes each department quick control of load batch, effectively ensures regional power grid Safe and stable operation.
General principle of the invention and principal character and advantages of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent thereof.

Claims (10)

1. the ground integrated load batch cooperative control method of a kind of province, it is characterised in that comprise the following steps:
1) side is adjusted to register load group control system control instruction interaction management service end, the service of foundation waits client request report Text, saves between the client for adjusting side registration load group control system control instruction interaction, system instruction interaction by service bus and each From remote agent realize data transfer;
2) save and adjust side to unify to set each department load excision desired value by saving ground integrated Collaborative Control interface, and by being based on Is communicated between the cross-system of service bus and each department load excision desired value is transferred to various regions tune;
3) adjust side service end to receive to save and adjust the load excision desired value for issuing to instruct, automatically confirm that and on send anti-school load to cut off Desired value is adjusted to province;
4) save after adjusting side joint to receive the anti-school desired value sent on ground tune, checked with desired value is issued, execution is issued after true Recognize instruction;
5) after adjusting side joint receipts province to adjust execution to confirm to instruct, adjust with above sending to perform to confirm to instruct and give province's tune;Simultaneously by ground key degree Member performs spatial load forecasting after selecting sequence and confirmation according to control strategy, by control result Real-time Feedback to province in implementation procedure Adjust;
6) control instruction interaction after the completion of, save adjust, adjust can integrated load batch collaboration control system in inquiry operation record And mode of operation.
2. load batch cooperative control method according to claim 1, it is characterised in that in the step 1)In, save ground one Body Collaborative Control interaction push process data flow be:Save to adjust and push function manually triggered by overall-in-one control schema interface, Save regulation and control instruction interaction client acquisition processed and issue control instruction information, local service generation is sent to by way of service bus Reason, remote agent service is adjusted by service broker with forwarding a request to, and ground is adjusted and makes requests on anti-school with identical processing mode Interaction.
3. load batch cooperative control method according to claim 1, it is characterised in that in the step 2)In, save ground one Body Collaborative Control interface includes browsing state interface and control state interface, browses state interface and monitors various regions in batches for operating personnel The related data of road system is drawn, control operation is not available for;Control state interface then can be set various regions excision payload execution batch Amount control operation.
4. load batch cooperative control method according to claim 1, it is characterised in that in the step 2)In, save ground one The operational control function at body Collaborative Control interface includes load excision desired value setting and issues, load excision desired value is true Recognize, control cancellation to issue operation.
5. load batch cooperative control method according to claim 1, it is characterised in that in the step 2)In, province readjusts the distribution After sending load to cut off target failure, repeat and push.
6. load batch cooperative control method according to claim 1, it is characterised in that in the step 4)In, save and adjust After transmission load excision desired value before execution unconfirmed, the unsanctioned instruction adjusted to ground and issues and cancel is checked.
7. load batch cooperative control method according to claim 1, it is characterised in that in the step 5)In, control plan Slightly include cutting off load from small to large except load, current loads cut off load, current loads from big to small by control priority slicing.
8. load batch cooperative control method according to claim 1, it is characterised in that the ground integrated load of the province batch Amount cooperative control method and system, it is characterised in that:In the step 6)In, realize that control instruction is interacted between province ground, altogether bag Containing three-way handshake operation, shake hands for the first time:Save tune issue control instruction to adjust, ground recall to it is multiple confirm instruct;Second handshake: Save tune and issue control command, recall to multiple confirmation with waiting perform;Third time is shaken hands:Recall to it is multiple perform confirm instruction, save Adjust to receive and confirm to perform.
9. the ground integrated load batch cooperative control system of a kind of province, it is characterised in that it includes:
Save and adjust the quick control module of batch load, the client for registering the interaction of load group control system control instruction sets each Regional load cuts off desired value, issues load excision desired value instruction, and after adjust the anti-school desired value sent with receiving, and issues Desired value is checked, and execution is issued after and confirms instruction, finally reception, supervisory sequence control result;
The quick control module of batch load is adjusted on ground, and the quick control module of batch load is adjusted for uploading real-time controllable burden to province, Receive the load excision desired value instruction for saving and adjusting and issue, automatically confirm that and on send anti-school load excision desired value to adjust batch negative to saving The quick control module of lotus, and receive province and adjust the quick control module of batch load to perform after control targe value confirms instruction, above send ground Tune is performed and confirms that instruction adjusts the quick control module of batch load to province;Dispatcher is adjusted to select sequence according to control strategy by ground simultaneously And spatial load forecasting is performed after confirming, control result Real-time Feedback is adjusted into the quick control module of batch load to province in implementation procedure.
10. load batch cooperative control system according to claim 9, it is characterised in that the province adjusts batch load fast After fast control module sends load excision target failure, repeat and push, and unconfirmed after load excision desired value is sent hold Before row, the unsanctioned instruction for being issued to the ground tune quick control module of batch load and being cancelled is checked.
CN201611129781.XA 2016-12-09 2016-12-09 A kind of province ground integrated load batch cooperative control method and system Active CN106786618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611129781.XA CN106786618B (en) 2016-12-09 2016-12-09 A kind of province ground integrated load batch cooperative control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611129781.XA CN106786618B (en) 2016-12-09 2016-12-09 A kind of province ground integrated load batch cooperative control method and system

Publications (2)

Publication Number Publication Date
CN106786618A true CN106786618A (en) 2017-05-31
CN106786618B CN106786618B (en) 2019-05-31

Family

ID=58875719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611129781.XA Active CN106786618B (en) 2016-12-09 2016-12-09 A kind of province ground integrated load batch cooperative control method and system

Country Status (1)

Country Link
CN (1) CN106786618B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109447452A (en) * 2018-10-23 2019-03-08 国网天津市电力公司 A kind of on-line testing method of D5000 system loading batch control function
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN111864736A (en) * 2020-07-22 2020-10-30 中国电力科学研究院有限公司 Controllable load hierarchical control method and system coordinated by master station and slave station and storage medium
CN112330268A (en) * 2020-10-21 2021-02-05 中国南方电网有限责任公司 Regional power spot market data interactive verification method and system
CN114019839A (en) * 2021-09-23 2022-02-08 国网天津静海供电有限公司 Power grid load batch control system
WO2022036793A1 (en) * 2020-08-20 2022-02-24 国电南瑞科技股份有限公司 Provincial and prefectural integrated source network load storage real-time control system and control method
CN116074227A (en) * 2022-11-09 2023-05-05 国网重庆市电力公司电力科学研究院 Multi-power system testing method based on virtualization platform
CN116579549A (en) * 2023-04-27 2023-08-11 国网安徽省电力有限公司歙县供电公司 Optimized scheduling method and system for source network load storage
CN116074227B (en) * 2022-11-09 2024-05-14 国网重庆市电力公司电力科学研究院 Multi-power system testing method based on virtualization platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101969234A (en) * 2010-11-17 2011-02-09 国电南瑞科技股份有限公司 Optimization control method of transformer load of transformer substation automation system
CN102063563A (en) * 2010-12-14 2011-05-18 中国电力科学研究院 Network-province-local integrative bus load predicting method
CN102593953A (en) * 2012-02-23 2012-07-18 国电南瑞科技股份有限公司 Automatic line pulling control method based on provincial and regional integration
US20130054040A1 (en) * 2011-08-23 2013-02-28 Tohoku Electric Power Co., Inc. Load Leveling System of Power System
CN104504483A (en) * 2014-10-31 2015-04-08 国家电网公司 Method for realizing integration of anti-misoperation operation order provincial dispatching and local dispatching

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101969234A (en) * 2010-11-17 2011-02-09 国电南瑞科技股份有限公司 Optimization control method of transformer load of transformer substation automation system
CN102063563A (en) * 2010-12-14 2011-05-18 中国电力科学研究院 Network-province-local integrative bus load predicting method
US20130054040A1 (en) * 2011-08-23 2013-02-28 Tohoku Electric Power Co., Inc. Load Leveling System of Power System
CN102593953A (en) * 2012-02-23 2012-07-18 国电南瑞科技股份有限公司 Automatic line pulling control method based on provincial and regional integration
CN104504483A (en) * 2014-10-31 2015-04-08 国家电网公司 Method for realizing integration of anti-misoperation operation order provincial dispatching and local dispatching

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程鑫等: "省地协同安全约束发电调度优化策略", 《中国电机工程学会2015年年会论文集》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109447452A (en) * 2018-10-23 2019-03-08 国网天津市电力公司 A kind of on-line testing method of D5000 system loading batch control function
CN109447452B (en) * 2018-10-23 2022-02-11 国网天津市电力公司 Online testing method for batch control function of D5000 system load
CN110350595A (en) * 2019-06-19 2019-10-18 国网河南省电力公司 The load high-speed decision control method for maintaining subregion section stable under accident condition
CN110350595B (en) * 2019-06-19 2023-10-27 国网河南省电力公司 Load fast decision control method for maintaining stable section of subarea in accident state
CN111864736B (en) * 2020-07-22 2022-11-01 中国电力科学研究院有限公司 Controllable load hierarchical control method and system coordinated by master station and slave station and storage medium
CN111864736A (en) * 2020-07-22 2020-10-30 中国电力科学研究院有限公司 Controllable load hierarchical control method and system coordinated by master station and slave station and storage medium
WO2022036793A1 (en) * 2020-08-20 2022-02-24 国电南瑞科技股份有限公司 Provincial and prefectural integrated source network load storage real-time control system and control method
CN112330268A (en) * 2020-10-21 2021-02-05 中国南方电网有限责任公司 Regional power spot market data interactive verification method and system
CN112330268B (en) * 2020-10-21 2023-08-22 中国南方电网有限责任公司 Regional power spot market data interactive verification method and system
CN114019839A (en) * 2021-09-23 2022-02-08 国网天津静海供电有限公司 Power grid load batch control system
CN116074227A (en) * 2022-11-09 2023-05-05 国网重庆市电力公司电力科学研究院 Multi-power system testing method based on virtualization platform
CN116074227B (en) * 2022-11-09 2024-05-14 国网重庆市电力公司电力科学研究院 Multi-power system testing method based on virtualization platform
CN116579549A (en) * 2023-04-27 2023-08-11 国网安徽省电力有限公司歙县供电公司 Optimized scheduling method and system for source network load storage
CN116579549B (en) * 2023-04-27 2023-12-01 国网安徽省电力有限公司歙县供电公司 Optimized scheduling method and system for source network load storage

Also Published As

Publication number Publication date
CN106786618B (en) 2019-05-31

Similar Documents

Publication Publication Date Title
CN106786618A (en) A kind of ground integrated load batch cooperative control method of province and system
CN103066701A (en) Power grid dispatching real-time operation command method and system
CN102097014B (en) Flight ground support service commanding and dispatching system
CN106682826A (en) Emergency repair command platform for distribution network
CN104935675B (en) A kind of electric automobile charging pile intelligent networking apparatus and method
CN103065215B (en) Power grid dispatching method
CN102593953B (en) Automatic line pulling control method based on provincial and regional integration
CN201608541U (en) Solar-energy photovoltaic intelligent power station based on Ethernet
CN102637023A (en) Remote unmanned aerial vehicle cluster control method and system based on 3G (the 3rd Generation Telecommunication) and GPRS (General Packet Radio Service) cell phone communication
CN111130097A (en) Novel aggregated resource-oriented ubiquitous scheduling control architecture and method
CN104953707A (en) Intelligent error prevention method and system for monitoring operation order
CN104578422B (en) Remote maintenance method for transformer substation telecontrol forwarding table
CN104504483B (en) Method for realizing province and local integration of anti-misoperation tickets
CN110472794A (en) A kind of unmanned plane collaboration acceleration Logistic Scheduling optimization method
CN112202851A (en) Intelligent terminal plug and play method based on Internet of things technology
CN112132299A (en) Operation and maintenance work order management system and method
CN105071376A (en) Method for implementing integrated framework of main distribution network
CN105227639A (en) A kind of transformer station's remote pictures transfer approach and the alarm of a kind of transformer station direct transfer method
CN109510314B (en) Method for scheduling interaction between intelligent command DICP system and inspection robot system
Yang et al. Research on the integrated space-air-ground communication network based on network slicing and its key technologies
CN111242492B (en) WebService-based resource aggregator regulation and control information interaction system and method
CN205121640U (en) Distribution fault handling information interaction terminal based on remove operation technology
CN100364269C (en) CNS/ATM control workstation and control method thereof
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN115339656A (en) Operation control system for multi-satellite application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant