CN102832717A - Closed-loop control method of power scheduling operation order and ground wire operation - Google Patents

Closed-loop control method of power scheduling operation order and ground wire operation Download PDF

Info

Publication number
CN102832717A
CN102832717A CN 201210360918 CN201210360918A CN102832717A CN 102832717 A CN102832717 A CN 102832717A CN 201210360918 CN201210360918 CN 201210360918 CN 201210360918 A CN201210360918 A CN 201210360918A CN 102832717 A CN102832717 A CN 102832717A
Authority
CN
China
Prior art keywords
ground wire
scheduling
control method
loop control
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210360918
Other languages
Chinese (zh)
Inventor
朱银磊
张磊
吴一敌
杨兴宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201210360918 priority Critical patent/CN102832717A/en
Publication of CN102832717A publication Critical patent/CN102832717A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a closed-loop control method of a power scheduling operation order and a ground wire operation. The closed-loop control method comprises the following steps of: (1) using an electric fence topological graphic module to perform modeling according to a primary wiring graph of an electric fence and display a modeling graph; (2) using a scheduling back brake operation process module to generate and execute a scheduling operation order according to the modeling graph; and (3) analyzing the states of the electric fence before and after the operation of the electric fence, prompting a ground wire hanging operation on the basis of a safety analysis result and recording the current state of a ground wire when a ground wire management module performs a simulated operation on the electric fence topological graphic module, and prompting a dismounting operation of the ground wire when the operation order is replied. According to the closed-loop control method disclosed by the invention, the synchronous linkage management of order placement and ground wire management is realized, scheduling staff can be helped to judge the state where the whole-network ground wire is located in an intelligent manner, the hanging and dismounting situations of the whole-network ground wire can be controlled as a whole, the occurrence of mis-hanging, mis-dismounting and other accidents of the ground wire can be prevented, and the difficult problem that the state of the ground wire is difficult to identify by the scheduling staff during the processes of order placement and order replay of the operation order is solved.

Description

The closed loop control method of a kind of power scheduling operation order and ground wire operation
Technical field
The invention belongs to the power scheduling technical field, the closed loop control method of especially a kind of power scheduling operation order and ground wire operation.
Background technology
In frequent operation of power networks stateful switchover process; When the power construction operating personnel carry out operation of equipment at the scene; Hanging earthing conductor is important technical measures for electric safety; Ground wire can be introduced the earth with electric current, is the safety precaution of being adopted after having a power failure, and can avoid the injury of sending a telegram here the employee who is operating is caused suddenly." big operation " system construction requirements of national grid makes up novel power grid regulation and control operation architecture, changes the business model that existing management and running separate with equipment operation, realizes management and running management mode " regulation and control one ".Because dispatching command and on-the-spot practical operation order degree of integration difference; The operational order that the dispatcher works out to operating equipment does not relate to the hanging earthing conductor operational order; Order in scheduling, return the operating procedure that makes the ground wire of not being correlated with in the process, the dispatcher can not clearly know the whole network ground wire and hang, tears situation open, and mistuning degree, misoperation take place easily; Gently then cause power grid accident, heavy then human casualty accident takes place.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art, the closed loop control method of a kind of power scheduling operation order with the ground wire operation is provided, solved the dispatcher and ordered at operation order, return and make a difficult problem that is difficult to the identification state of ground wire in the process.
The present invention solves its technical problem and takes following technical scheme to realize:
The closed loop control method of a kind of power scheduling operation order and ground wire operation may further comprise the steps:
⑴ power network topology figure module carries out modeling and shows the modeling figure according to electrical network primary connection figure;
⑵ scheduling grid switching operation process module is touched figure generation and operation dispatching operational order according to building;
⑶ ground wire administration module is when the power network topology figure module carries out simulated operation; Analyze the electric network state of electric grid operating front and back; On safety analysis result's basis, carry out the prompting of hanging earthing conductor operation; And the current state of record ground wire, return when making when operational order and again the dismantling operation of ground wire to be pointed out.
And the mode that said step ⑴ power network topology figure module adopts the data integrated and topological mode of picture library to combine is carried out modeling.
And, during said step ⑵ scheduling grid switching operation process module operation dispatching operational order to ground wire articulate, dismantling operation points out in the modeling figure.
And said step ⑶ ground wire administration module resolves to operation order item by item according to power network topology with operational order, and carries out the electrical network simulated operation when carrying out the hanging earthing conductor operation; In simulated operating procedure, through to operating preceding electric network state and operating back state comparative analysis and operate accordingly, after the EO processing safety is analyzed, in the modeling figure, carry out the hanging earthing conductor prompting at last.
And said step ⑶ ground wire administration module resolves to operation order item by item according to power network topology with operational order, and carries out the electrical network simulated operation when removing the ground wire operation; In simulated operating procedure, through to operating preceding electric network state and operating back state comparative analysis and operate accordingly, after the EO processing safety is analyzed, in the modeling figure, carry out the hanging earthing conductor prompting at last.
Advantage of the present invention and beneficial effect are:
The present invention coordinates control through power network topology figure module, scheduling grid switching operation process module and ground wire operational administrative module operation order is ordered, returned and make process carry out ground wire hanging, tear open prompting; Realization is ordered and the synchronous interaction of ground wire management is managed; Help dispatcher's intelligent decision the whole network ground wire state of living in; The whole network ground wire is hung the situation of tearing open carry out integral body, prevent the generation that mistake is hung, mistake is torn accidents such as ground wire open control.Having solved the dispatcher orders at operation order, returns and to make a difficult problem that is difficult to the identification state of ground wire in the process; Can effectively avoid because state of ground wire is not understood and the misoperation fault that causes; For the regulation and control operation provides professional running platform and aid decision support; Realize that electrical network regulation and control operation changes to the science intelligent decision from traditional empirical decision making, guarantees power network safety operations at different levels.
Figure of description
Fig. 1 is a kind of state diagram of modeling figure of the present invention;
Fig. 2 is that the present invention carries out the hanging earthing conductor process chart in when operation;
Fig. 3 is the another kind of state diagram of modeling figure of the present invention;
Fig. 4 is that the present invention removes the ground wire process chart in when operation.
Embodiment
Below in conjunction with accompanying drawing the present invention is done further detailed description.
The closed loop control method of a kind of power scheduling operation order and ground wire operation; It is utilization network topology technology; Through the dispatcher operation order is ordered, returned and to make process carry out ground wire hanging, tear open prompting, realize ordering and the synchronous interaction management of ground wire management, help dispatcher's intelligent decision the whole network ground wire state of living in; The whole network ground wire is hung the situation of tearing open carry out integral body, prevent the generation that mistake is hung, mistake is torn accidents such as ground wire open control.The closed loop control method of this power scheduling operation order and ground wire operation coordinates through power network topology figure module, scheduling grid switching operation process module and ground wire operational administrative module that control realizes.Wherein, the power network topology figure module is mainly used in electrical network graphical modeling and displaying, for the ground wire management provides the network topology analytic function; Scheduling grid switching operation process module is mainly used in and generates the scheduling grid switching operation bill, and the operation dispatching operational order orders, return and make function; Ground wire operational administrative module is used to analyze the priority operating sequence of ground wire operation and scheduling operating command, and orders in the operation order, carries out the ground wire operation before returning order and remind with state.
The closed loop control method of a kind of power scheduling operation order and ground wire operation may further comprise the steps:
1, the power network topology figure module carries out modeling and shows the modeling figure according to electrical network primary connection figure.
The electrical network figure module is an electrical network graphic plotting and a management type platform based on data integrated technology of picture library and topology model construction technique construction, supports once, secondary device graphic plotting and demonstration; Modeling can be simulated the actual physical attribute of each equipment, handles five anti-rules automatically.
The power network topology figure module carries out modeling according to the primary connection figure to different equipment simulating actual physical attributes, but the circuit breaker turn-off current, and isolating switch can be realized obvious interruption intervals; Bus can compile, distributes and transmit electric energy; Generate figure as shown in Figure 1 after the modeling; Circuit breaker and isolating switch black shade are represented closure state, and the blank expression of white off-state, the mode of connection are that double-bus adds other maternal formula; 252 circuit breakers and 251 circuit breakers and both sides isolating switch be at closure state, and pocket encloses I road and half pocket line at run mode.
2, scheduling grid switching operation process module is touched figure generation and operation dispatching operational order according to building.
When needs overhauled circuit, scheduling grid switching operation process module generating run was ordered, and for example dispatched the grid switching operation bill order and was " half pocket line, 252 circuit breakers are changeed maintenance ", and the operation dispatching operational order orders and time order operation then.Order in scheduling, return to make in the process ground wire is articulated, removes extension that prompting depends on topology and the five anti-rule judgment ground wires of scheduling grid switching operation order to equipment, electrical network primary connection figure, tears demand open, and in figure, remind.
3, the ground wire administration module is when the power network topology figure module carries out simulated operation; Analyze the electric network state of electric grid operating front and back; On safety analysis result's basis, carry out the prompting of hanging earthing conductor operation; And the current state of record ground wire, return when making when operational order and again the dismantling operation of ground wire to be pointed out.
As shown in Figure 2, when carrying out the hanging earthing conductor operation, ground wire operational administrative module is analyzed according to power network topology operational order (inspection operation order) is resolved to operation order item by item, and carries out the electrical network simulated operation; In the simulated operating procedure through to electric network state before operating and the state comparative analysis of operation back: when reaching the maintenance condition, at first need 252 circuit breakers be broken off, draw back 252 circuit breaker both sides isolating switches then.Processing safety is analyzed after the EO, intelligent decision goes out at 252 circuit breaker both sides hanging earthing conductors, ejects with the dialog box window form then, and the prompting dispatcher needs hanging earthing conductor, need with field verification ground wire current state, just can construct.When inspection operation orders to finish, hanging earthing conductor, reach the maintenance condition after, electric network state is as shown in Figure 3.
When site operation finishes; Scheduling operation order is returned when making the dispatcher for " with 252 circuit breakers transhipment row ", and through same analytical work, ground wire operational administrative module prompting dispatcher need remove ground wire at this moment; And and field verification, just can send the electricity operation.As shown in Figure 4, when removing the ground wire operation, ground wire operational administrative module is analyzed according to power network topology operational order (sending electric operational order) is resolved to operation order item by item, and carries out the electrical network simulated operation; In the simulated operating procedure through to electric network state before operating and the state comparative analysis of operation back: reach when removing the ground wire condition, at first need 252 closing of power circuit breaker be connected 252 circuit breaker both sides isolating switches then.After the EO processing safety is analyzed, intelligent decision goes out at 252 circuit breaker both sides hanging earthing conductors, ejects with the dialog box window form then, and the prompting dispatcher removes ground wire.
It is emphasized that; Embodiment of the present invention is illustrative; Rather than it is determinate; Therefore the present invention includes and be not limited to the embodiment described in the embodiment, every other execution modes that drawn by those skilled in the art's technical scheme according to the present invention belong to the scope that the present invention protects equally.

Claims (5)

1. a power scheduling operation makes the closed loop control method of operating with ground wire, it is characterized in that: may further comprise the steps:
⑴ power network topology figure module carries out modeling and shows the modeling figure according to electrical network primary connection figure;
⑵ scheduling grid switching operation process module is touched figure generation and operation dispatching operational order according to building;
⑶ ground wire administration module is when the power network topology figure module carries out simulated operation; Analyze the electric network state of electric grid operating front and back; On safety analysis result's basis, carry out the prompting of hanging earthing conductor operation; And the current state of record ground wire, return when making when operational order and again the dismantling operation of ground wire to be pointed out.
2. the closed loop control method of a kind of power scheduling operation order according to claim 1 and ground wire operation, it is characterized in that: the mode that said step ⑴ power network topology figure module adopts the data integrated and topological mode of picture library to combine is carried out modeling.
3. the closed loop control method of a kind of power scheduling operation order according to claim 1 and ground wire operation is characterized in that: during said step ⑵ scheduling grid switching operation process module operation dispatching operational order to ground wire articulate, dismantling operation points out in the modeling figure.
4. the closed loop control method of a kind of power scheduling operation order according to claim 1 and ground wire operation; It is characterized in that: said step ⑶ ground wire administration module is when carrying out the hanging earthing conductor operation; According to power network topology operational order is resolved to operation order item by item, and carry out the electrical network simulated operation; In simulated operating procedure, through to operating preceding electric network state and operating back state comparative analysis and operate accordingly, after the EO processing safety is analyzed, in the modeling figure, carry out the hanging earthing conductor prompting at last.
5. the closed loop control method of a kind of power scheduling operation order according to claim 1 and ground wire operation; It is characterized in that: said step ⑶ ground wire administration module is when removing the ground wire operation; According to power network topology operational order is resolved to operation order item by item, and carry out the electrical network simulated operation; In simulated operating procedure, through to operating preceding electric network state and operating back state comparative analysis and operate accordingly, after the EO processing safety is analyzed, in the modeling figure, carry out the hanging earthing conductor prompting at last.
CN 201210360918 2012-09-25 2012-09-25 Closed-loop control method of power scheduling operation order and ground wire operation Pending CN102832717A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210360918 CN102832717A (en) 2012-09-25 2012-09-25 Closed-loop control method of power scheduling operation order and ground wire operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210360918 CN102832717A (en) 2012-09-25 2012-09-25 Closed-loop control method of power scheduling operation order and ground wire operation

Publications (1)

Publication Number Publication Date
CN102832717A true CN102832717A (en) 2012-12-19

Family

ID=47335731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210360918 Pending CN102832717A (en) 2012-09-25 2012-09-25 Closed-loop control method of power scheduling operation order and ground wire operation

Country Status (1)

Country Link
CN (1) CN102832717A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103077479A (en) * 2013-01-04 2013-05-01 湖州电力局 Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system
CN103177330A (en) * 2012-12-24 2013-06-26 远光软件股份有限公司 Operation order management system aiming at production and maintenance of thermodynamic system equipment
CN104463714A (en) * 2014-12-25 2015-03-25 国家电网公司 Simulated overhauling device and method
CN106815681A (en) * 2016-12-30 2017-06-09 国网江苏省电力公司检修分公司 Substation secondary device closed loop management platform and its management system based on Quick Response Code

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103177330A (en) * 2012-12-24 2013-06-26 远光软件股份有限公司 Operation order management system aiming at production and maintenance of thermodynamic system equipment
CN103077479A (en) * 2013-01-04 2013-05-01 湖州电力局 Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system
CN103077479B (en) * 2013-01-04 2015-01-21 湖州电力局 Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system
CN104463714A (en) * 2014-12-25 2015-03-25 国家电网公司 Simulated overhauling device and method
CN106815681A (en) * 2016-12-30 2017-06-09 国网江苏省电力公司检修分公司 Substation secondary device closed loop management platform and its management system based on Quick Response Code
CN106815681B (en) * 2016-12-30 2020-10-02 国网江苏省电力有限公司检修分公司 Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof

Similar Documents

Publication Publication Date Title
CN104965437B (en) A kind of operation order is intelligent at ticket method
CN109066754B (en) Direct-current power distribution network real-time simulation system and method
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN102447305B (en) Topological anti-misoperation system for power grid
CN109634243A (en) A kind of scheduler program operating system based on intelligent robot
CN103730883B (en) For the guard method of radial pattern direct-flow distribution system DC line short trouble
CN102255330A (en) Device and method for detecting island of micro power grid system
CN103367059B (en) A kind of high-voltage intelligent circuit breaker
CN103904779A (en) Intelligent substation intelligent terminal analog device and using method thereof
CN110909444B (en) High-speed rail traction power supply scheduling simulation training system
CN110086251B (en) Monitoring method and system for improving operation safety of power grid
CN104218672A (en) Real-time running status evaluation based power distribution network running risk warning system
CN102931727A (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN102968096A (en) Safe error proof verifying method for master station type comprehensive intelligent error proof system
CN102832717A (en) Closed-loop control method of power scheduling operation order and ground wire operation
CN102945535B (en) Power scheduling main station type comprehensive intelligent anti-error system equipment state intelligent identification Method
CN104460607A (en) Production system graphic ticketing method based on simulated rehearsal
CN103543384A (en) Method for determining bus ground faults
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN202084950U (en) Device for detecting generation of island in micro power grid system
CN103840559A (en) Looped network outdoor station fault simulator and fault simulation method thereof
CN103616610A (en) Simulation method of monitoring signals in power grid fault line
CN103972986B (en) A kind of intelligent substation protective device drive method that do not have a power failure
CN101615012A (en) Remote operation intelligent and safe checking method
CN111224396A (en) Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121219