CN105021921A - Method for recognizing loop closing and opening of power grid based on topology analysis - Google Patents

Method for recognizing loop closing and opening of power grid based on topology analysis Download PDF

Info

Publication number
CN105021921A
CN105021921A CN201510391856.0A CN201510391856A CN105021921A CN 105021921 A CN105021921 A CN 105021921A CN 201510391856 A CN201510391856 A CN 201510391856A CN 105021921 A CN105021921 A CN 105021921A
Authority
CN
China
Prior art keywords
equipment
analysis
electrical
bus
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510391856.0A
Other languages
Chinese (zh)
Other versions
CN105021921B (en
Inventor
张黎元
宋兴旺
肖丹丹
张颖
刘长德
张�杰
李冰洁
王永杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510391856.0A priority Critical patent/CN105021921B/en
Publication of CN105021921A publication Critical patent/CN105021921A/en
Application granted granted Critical
Publication of CN105021921B publication Critical patent/CN105021921B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a method for recognizing close and open loops of a power grid based on topology analysis, and the method is based on a real-time power grid data model and section, takes a generator set / equivalent line and an equivalent power line as a starting point, carries out the depth-first search analysis of power grid equipment and equipment states through network topology analysis, enables equipment to be divided into an electrical island and a bus number according to the dynamic connection relation of equipment, carries out the analysis of the electrical island and the bus number, and achieves the recognition of the loop closing and opening operations of the power grid. The method can quickly and precisely calculate the loop closing and opening regulation, effectively recognizes the change of an important operation mode of the power grid, provides a basis for the operation analysis of the power grid (the available rate of the analysis results is not less than 99%), facilitates the reduction of a remote operation risk, and improves the safety of remote operation regulation. Moreover, compared with the prior art, the method remarkably improves the operation performance.

Description

A kind of electrical network based on topological analysis closes recognition methods of unlinking
Technical field
The invention belongs to electric system regulation automatization field, especially a kind of electrical network based on topological analysis closes recognition methods of unlinking.
Background technology
Along with the quickening of urban construction, urban power consumption is growing, to have a power failure or even the power failure of short time all more responsive.Under this powering mode, accident, interruption maintenance or load transfer plan time unlink operate by closing, the reliability of power distribution network to customer power supply can be guaranteed.But when electrical network closes Open Loop Operation, in the middle of electrical network, larger steady-state current and dash current may be there is.This can have influence on safely and steadily running of electrical network.Therefore, will predict relevant issues in advance before operation, effectively identify that the great method of operation of electrical network changes, this has very important significance to the safe and stable operation of electrical network.
The electrical network of the topology Network Based related in patent of the present invention closes recognition methods of unlinking, can fast, accurate calculation goes out conjunction/Open Loop Operation, effectively identify that the great method of operation of electrical network changes, for operation of power networks analysis provides foundation, be conducive to reducing remote operation risk, promote the security of regulation and control remote operation.
Summary of the invention
The object of the invention is to overcome prior art deficiency, provide a kind of a kind of electrical network based on topological analysis promoting the security of regulation and control remote operation to close recognition methods of unlinking.
The technical solution used in the present invention is:
A kind of electrical network based on topological analysis closes recognition methods of unlinking, the method is based on real-time grid data model and section, with genset/equivalent circuit and equivalent power circuit for starting point, adopt Network topology mode, depth-first search analysis is carried out to grid equipment and equipment state, according to equipment Dynamic link library relation, equipment is divided into different electrical island and bus number, by the analysis to electrical island and bus number, realizes the identification of electrical network being closed to Open Loop Operation.
And the described electrical network based on topological analysis closes recognition methods of unlinking and comprises successively:
(1) electric network model analysis, the electrical equipment of the required search of electricity grid network topological analysis comprises unit, transformer, circuit, bus, switch, disconnecting link, grounding switch etc., wherein, unit, bus, grounding switch, as a single-ended model, distribute one and connect period; Circuit, switch, disconnecting link, as a both-end model, distribute two and connect period; Transformer, according to winding number, two or three connection periods of dynamic assignment, connected equipment connection period is identical;
(2) Network Topology Discovery analysis, with genset/isoline pipeline equipment for starting point, / conjunction state is divided according to equipment connecting relation and equipment, carry out depth-first Network Topology Discovery, until search power failure equipments, load, the electrical equipment for traversal carries out electrical island set, if electrical equipment electrical island is set, then continue search, according to above flow process, until all generators are all searched for complete; Take bus as starting point, carry out Network Topology Discovery equally, search power failure equipments, load, main transformer, carry out bus set for traveled through equipment, according to above flow process, until all buses are all searched for complete;
(3) close and separate ring analysis, system by process simulation drawing/switch-dividing, is analyzed both sides electrical island number and bus number, is differentiated and whether close Open Loop Operation.
And, in the conjunction solution ring analysis that step is (3) described, when switch closing operation, before operation, if switch both sides electrical island is number identical, bus difference, after operation, switch both sides electrical island is number identical, and bus is number identical, then current operation is Loop Closing Operation; When switch divides operation, before operation, if switch both sides electrical island is number identical, bus is number identical, and after operation, electrical island is number identical, and bus difference, then current operation is Open Loop Operation.
Advantage of the present invention and good effect are:
The electrical network of topology Network Based provided by the invention closes recognition methods of unlinking, can fast, accurate calculation goes out conjunction/Open Loop Operation, effectively identify that the great method of operation of electrical network changes, for operation of power networks analysis provides foundation, available rate >=99% of analysis result, be conducive to reducing remote operation risk, promote the security of regulation and control remote operation, its runnability comparatively prior art and way has obvious lifting.
Accompanying drawing explanation
Fig. 1 is the electrical connection schematic diagram in the present invention;
Fig. 2 is the topology search process flow diagram in the present invention;
Fig. 3 is that conjunction in the present invention is unlinked analysis process figure.
Embodiment
Below by accompanying drawing, the invention will be further described in conjunction with specific embodiments, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of electrical network based on topological analysis closes recognition methods of unlinking, see Fig. 1, the method is based on real-time grid data model and section, with genset/equivalent circuit and equivalent power circuit for starting point (in Fig. 1, in three circles, alternating current symbol represents), adopt Network topology mode, depth-first search analysis is carried out to grid equipment and equipment state, according to equipment Dynamic link library relation, equipment is divided into different electrical island and bus number, by the analysis to electrical island and bus number, realize the identification of electrical network being closed to Open Loop Operation.In Fig. 1, A-F represents transformer station, and the concrete equipment in transformer station does not draw.The circuit being power supply with generator or equivalence carries out Network Topology Discovery and electrical island, bus computational analysis for starting point, each electrical equipment in final plant stand can generate an electrical island number and bus number, correctly can verify out conjunction Open Loop Operation situation by the numerical value analyzing electrical island before and after electrical equipment operation and bus number.
The electric grid operating of this topology Network Based closes recognition methods of unlinking, and comprises topology search analysis (see Fig. 2) and close separating ring analysis (see Fig. 3) two parts content, and its specific works step is as follows:
Step one: carry out electric network model loading, obtains connection period, the status information of equipment of grid equipment, model load time≤3s;
Step 2: genset/equivalent circuit is extracted, topology search is carried out from genset/equivalent circuit, if the equipment electrical island searched number is-1, then be set to current electrical island number, until each branch road all searches power failure equipments or load, 1 is added to the generator electrical island number that next electrical island number is-1, searches for equally, by that analogy;
Step 3: all buses are extracted, topology search is carried out from sending out bus, if if the equipment bus searched number is-1, then be set to current bus number, until each branch road all searches power failure equipments, load or main transformer, next bus is searched for equally, by that analogy, topological analysis time≤1s;
Step 4: when carrying out switching manipulation, analyzes current switch type, if point operation, obtains the electrical island number of two side apparatus after switching manipulation, bus number, if switch both sides electrical island is number identical, and bus difference, then this is operating as Loop Closing Operation; If closing operation, obtain the electrical island number of two side apparatus before switching manipulation, bus number, if switch both sides electrical island is number identical, bus difference, then this is operating as Open Loop Operation, closes/unlink checking time≤1s.
Through inspection, available rate >=99% of this method analysis result
Although disclose embodiments of the invention and accompanying drawing for the purpose of illustration, but it will be appreciated by those skilled in the art that: in the spirit and scope not departing from the present invention and claims, various replacement, change and amendment are all possible, therefore, scope of the present invention is not limited to the content disclosed in embodiment and accompanying drawing.

Claims (3)

1. the electrical network based on topological analysis closes recognition methods of unlinking, it is characterized in that: the method is based on real-time grid data model and section, with genset/equivalent circuit and equivalent power circuit for starting point, adopt Network topology mode, depth-first search analysis is carried out to grid equipment and equipment state, according to equipment Dynamic link library relation, equipment is divided into different electrical island and bus number, by the analysis to electrical island and bus number, realizes the identification of electrical network being closed to Open Loop Operation.
2. the electrical network based on topological analysis according to claim 1 closes recognition methods of unlinking, and it is characterized in that: the described electrical network based on topological analysis closes recognition methods of unlinking and comprises successively:
(1) electric network model analysis, the electrical equipment of the required search of electricity grid network topological analysis comprises unit, transformer, circuit, bus, switch, disconnecting link, grounding switch etc., wherein, unit, bus, grounding switch, as a single-ended model, distribute one and connect period; Circuit, switch, disconnecting link, as a both-end model, distribute two and connect period; Transformer, according to winding number, two or three connection periods of dynamic assignment, connected equipment connection period is identical;
(2) Network Topology Discovery analysis, with genset/isoline pipeline equipment for starting point, / conjunction state is divided according to equipment connecting relation and equipment, carry out depth-first Network Topology Discovery, until search power failure equipments, load, the electrical equipment for traversal carries out electrical island set, if electrical equipment electrical island is set, then continue search, according to above flow process, until all generators are all searched for complete; Take bus as starting point, carry out Network Topology Discovery equally, search power failure equipments, load, main transformer, carry out bus set for traveled through equipment, according to above flow process, until all buses are all searched for complete;
(3) close and separate ring analysis, system by process simulation drawing/switch-dividing, is analyzed both sides electrical island number and bus number, is differentiated and whether close Open Loop Operation.
3. the electrical network based on topological analysis according to claim 2 closes recognition methods of unlinking, it is characterized in that: in the conjunction solution ring analysis that step is (3) described, when switch closing operation, before operation, if switch both sides electrical island is number identical, bus difference, after operation, switch both sides electrical island is number identical, and bus is number identical, then current operation is Loop Closing Operation; When switch divides operation, before operation, if switch both sides electrical island is number identical, bus is number identical, and after operation, electrical island is number identical, and bus difference, then current operation is Open Loop Operation.
CN201510391856.0A 2015-07-06 2015-07-06 A kind of power network based on topological analysis closes recognition methods of unlinking Active CN105021921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510391856.0A CN105021921B (en) 2015-07-06 2015-07-06 A kind of power network based on topological analysis closes recognition methods of unlinking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510391856.0A CN105021921B (en) 2015-07-06 2015-07-06 A kind of power network based on topological analysis closes recognition methods of unlinking

Publications (2)

Publication Number Publication Date
CN105021921A true CN105021921A (en) 2015-11-04
CN105021921B CN105021921B (en) 2018-03-30

Family

ID=54412035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510391856.0A Active CN105021921B (en) 2015-07-06 2015-07-06 A kind of power network based on topological analysis closes recognition methods of unlinking

Country Status (1)

Country Link
CN (1) CN105021921B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658870A (en) * 2017-10-17 2018-02-02 中国南方电网有限责任公司超高压输电公司检修试验中心 People having the same aspiration and interest unit division Fast implementation based on divided power system topological structure
CN112199861A (en) * 2020-10-29 2021-01-08 云南电网有限责任公司电力科学研究院 Method for judging closed-loop power regulation feasibility of power distribution network
CN115144679A (en) * 2022-08-31 2022-10-04 武汉格蓝若智能技术有限公司 Method and system for identifying real-time topological relation of collected voltage on line

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431255A (en) * 2008-11-17 2009-05-13 国电南瑞科技股份有限公司 Closed loop operation risk analysis method for power system
CN102447305A (en) * 2010-10-11 2012-05-09 国电南瑞科技股份有限公司 Topological anti-misoperation system for power grid

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101431255A (en) * 2008-11-17 2009-05-13 国电南瑞科技股份有限公司 Closed loop operation risk analysis method for power system
CN102447305A (en) * 2010-10-11 2012-05-09 国电南瑞科技股份有限公司 Topological anti-misoperation system for power grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
梁军 等: "城网自动化系统及其提高可靠性措施", 《电力可靠性管理文集》 *
蒋科 等: "基于拓扑辨识的电力系统运行方式组合方法", 《电网技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658870A (en) * 2017-10-17 2018-02-02 中国南方电网有限责任公司超高压输电公司检修试验中心 People having the same aspiration and interest unit division Fast implementation based on divided power system topological structure
CN112199861A (en) * 2020-10-29 2021-01-08 云南电网有限责任公司电力科学研究院 Method for judging closed-loop power regulation feasibility of power distribution network
CN112199861B (en) * 2020-10-29 2023-04-07 云南电网有限责任公司电力科学研究院 Power distribution network closed-loop power regulation feasibility judgment method
CN115144679A (en) * 2022-08-31 2022-10-04 武汉格蓝若智能技术有限公司 Method and system for identifying real-time topological relation of collected voltage on line
CN115144679B (en) * 2022-08-31 2022-11-29 武汉格蓝若智能技术有限公司 Method and system for identifying real-time topological relation of collected voltage on line

Also Published As

Publication number Publication date
CN105021921B (en) 2018-03-30

Similar Documents

Publication Publication Date Title
CN104965437B (en) A kind of operation order is intelligent at ticket method
CN101789596B (en) Automatic detection method of power grid failure
CN103105550B (en) A kind of intelligent relay protection device detection method and system
CN106021596B (en) A kind of analysis method of electric network fault rush of current topological diagram
CN103149547B (en) Transformer substation measurement return circuit on-line monitoring system and state maintenance method
CN108020750A (en) A kind of power distribution network power failure range analysis method and analytical equipment
CN103915836B (en) A kind of use for laboratory smart micro-grid system based on multiple distributed power sources
CN111049266B (en) Intelligent second-level power restoration method and system for regulation and control service
CN102904333B (en) Spare power automatic switching simulation method of power grid
CN102638041A (en) Method forquickly checking safety and stability of scheduling operation of power system on line
CN112510654B (en) Bus fault diagnosis method, system, readable medium and equipment
CN103730894B (en) EMS image checking mehtod and device
CN102638027B (en) Switch refusing action fault simulation method for online safety and stability evaluation of electric power system
CN103887792B (en) A kind of low-voltage distribution network modeling method containing distributed power source
CN103837785A (en) Feeder automation detection and simulation system
CN103529708A (en) Pre-operation simulation system for power distribution network and simulation analysis method
CN104778632A (en) Intelligent decision making aiding method and system for transfer power supply
CN104537484A (en) Power grid load loss risk assessment method based on PSASP model and emergency power supply automatic throw-in strategy
CN109428327A (en) Power grid key branch and leading stable mode recognition methods and system based on response
CN105021921A (en) Method for recognizing loop closing and opening of power grid based on topology analysis
CN104123427A (en) Regional distributed photovoltaic power generation system modeling method based on IEC61850 standard
CN107644564B (en) A kind of secondary system of intelligent substation functional simulation method for emulation training
CN108448566A (en) A kind of electric system on-line mixing emulation mode and system
CN102496075B (en) A kind of online data integration method based on internal memory
CN105203864A (en) Substation automatic test method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant