CN102439612A - 用于自顶向下项目计划的概括任务 - Google Patents
用于自顶向下项目计划的概括任务 Download PDFInfo
- Publication number
- CN102439612A CN102439612A CN2010800232136A CN201080023213A CN102439612A CN 102439612 A CN102439612 A CN 102439612A CN 2010800232136 A CN2010800232136 A CN 2010800232136A CN 201080023213 A CN201080023213 A CN 201080023213A CN 102439612 A CN102439612 A CN 102439612A
- Authority
- CN
- China
- Prior art keywords
- date
- task
- planned
- field
- subtask
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063116—Schedule adjustment for a person or group
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明的各实施方式涉及提供将项目管理软件用于利用允许用户在填充组成各高级目标的底层任务的细节之前描述各高级目标的自顶向下策略来创建项目计划的方法。作为单独在子任务数据上基本概括任务日期和持续时间的替代物,本发明允许用户将日期和持续时间值输入到概括任务中而不考虑相应的子任务何时发生。通过利用自顶向下项目管理方法,本发明的各实施方式促进将概括任务用作项目计划的开始点。在各子任务的更具体的细节未知时,用户能够输入项目的高级目标。因为概括任务数据不是从子任务数据汇总的,所以用户可以稍后指定诸如各子任务的日期和持续时间等的细节。
Description
背景技术
项目管理软件辅助项目经理开发计划、将资源分配给任务、跟踪进展、管理预算和分析工作负载。在项目的发起阶段,项目经理常常通过将他们的进度表分解成一组高级阶段来开始他们的计划。与这些阶段相关联的时间帧常常与已经从他们的组织向下传送给他们的关键日期或里程碑相关联或者与去往/来自外部各方的承诺相关联。这些日期通常很早就确定,常常是在建立了项目的大多数其他细节之前就已经确定。一旦项目经理具有对总体时间线的高级理解,然后,他们可以进行到标识在每一阶段下将帮助完成该阶段的目标的更具体工作项。这种方法被称为项目管理的自顶向下方法。替代地,自底向上方法涉及首先标识项目中的所有详细工作项,然后创建逻辑分组以便标识每一组任务何时执行和执行多久。
项目管理软件通过创建任务分层结构的能力帮助项目经理组织他们的进度表。项目阶段可以被建模为概括任务,在概括任务下可以存在相关的任务或子任务的列表。各子任务一起帮助完成各阶段的高级目标。
根据一些项目管理应用,概括任务是它们的子任务的汇总。由软件计算概括任务的日期和持续时间。概括任务的开始日期是其子任务的最早开始,完成日期是其子任务的最后完成日期,且其持续时间是其子任务的总跨度。通常,概括任务不可以在其最早的子任务之前开始,也不可以在其最后的子任务之后完成。因为总是基于概括任务的子任务的细节来计算概括任务,所以难以在已经完全地界定了其子任务的细节之前的具体日期调度项目阶段。
一些典型的管理应用的另一限制是无法维护项目经理可能不能控制的关键日期(例如,组织批准的项目中的特定阶段的时间帧预算;项目客户要求的截止期限)。在任务变成一组子任务的概括任务时,其日期可以由所计算的各子任务的汇总来盖写。如果改变了子任务的日期,则与概括任务相关联的日期跟着改变。
另外,往往给予项目经理用于完成一个阶段的具体时间预算,且该阶段内的工作项最初可以不完全占用所批准的时间帧。在滑移的情况中,如果时间允许,为了增加项目的范围,或者出于各种其他原因,项目经理可能想要将剩余的时间用作缓冲。如果概括任务自动地随着子任务延长和缩短,则会阻止项目经理在项目中建模这一缓冲时间。同样地,不存在示出子任务是否已经落后于概括阶段的原始计划日期的方便途径。如果子任务的完成日期延期,则所关联的概括任务持续时间相应地延长。
相对于这些考虑和其他考虑,完成本发明的各种实施方式。
概述
本发明的各实施方式提供以允许用户在填充组成高级目标的底层任务的细节之前描述高级目标的自顶向下策略来创建项目计划。用户可以操纵与底层任务相关联的数据而不会干扰高级目标的原始已计划进度表。可视指示符可以允许用户标识在各项目阶段的计划日期和持续时间相对于各子任务的实际计算的汇总日期之间的差异。通过查看项目计划,用户能够可视地标识高级目标的关键性能指示符,例如缓冲和滑移。
在下面的附图和描述中陈述一种或多种技术的细节。从下列详细描述的阅读和关联的附图的审阅将明显看出其他特征和优点。应理解,下列详细描述仅是解释性的,且不限制所要求保护的本发明。
提供本概述以便以简化形式介绍下面在详细描述中进一步描述的概念的选集。本概述不旨在标识所要求保护的本主题关键特征或必要特征,也不旨在辅助确定所要求保护的本主题的范围。
附图说明
图1是在高级目标的初始确定范围之后的示例项目计划的屏幕截图的图示。
图2是在已经输入高级目标的高级日期和持续时间之后的示例项目计划的屏幕截图的图示。
图3是在已经输入示例分析阶段的各工作项之后的示例项目计划的屏幕截图的图示。
图4是在将各工作项的列表移动到高级目标下之后显示汇总条形图的示例项目计划的屏幕截图的图示。
图5是在已经输入示例设计阶段的各工作项之后示例项目计划的屏幕截图的图示。
图6是在将各工作项的列表移动到高级目标下之后其中概括任务的日期是其子任务的汇总的示例项目计划的屏幕截图的图示。
图7是在已经输入示例开发阶段的各工作项之后示例项目计划的屏幕截图的图示。
图8是示出在将各工作项的列表移动到概括任务下面时如何保持概括任务的日期的示例项目计划的屏幕截图的图示。
图9是示出不带有所输入的数据的高级目标的示例项目计划的屏幕截图的图示。
图10是示出从示例测试阶段的子任务的日期所汇总的示例测试阶段的日期的示例项目计划的屏幕截图的图示。
图11是其中在进度表中发生滑移的示例项目计划的屏幕截图的图示。
图12是示出为本发明的各实施方式提供说明性的操作环境的电子计算设备的体系结构的框图。
详细描述
如以上简要地描述的,本发明的各实施方式涉及利用允许用户在填充组成各高级目标的底层任务的细节之前描述各高级目标的自顶向下策略来创建项目计划。作为对基本概括任务日期和子任务数据的持续时间的替代物,本发明提供更灵活的方法以使得用户可以将日期和持续时间值输入到概括任务中而不考虑相应的子任务何时可以发生。通过利用自顶向下项目管理方法,本发明的各实施方式增强作为项目计划的开始点的概括任务的创建。在各子任务的更具体细节未知时,用户能够输入项目的高级目标。因为概括任务数据不是从子任务日期汇总的,所以用户可以稍后指定诸如子任务的日期和持续时间等的细节。
下列详细描述引用了附图。在可能的任何场合下,在附图和下列描述中使用相同的参考数字来引用相同的或相似的元素。尽管可以描述本发明的各实施方式,但修改、改编和其他实现是可能的。例如,可以对各图中示出的各元素做出置换、添加或修改,且可以通过对所公开的方法置换、重排或添加各阶段来修改在此描述的各方法。因此,下列的详细描述不限制本发明,相反,本发明的确切范围由所附权利要求界定。
图1-图11是示出利用本发明的各实施方式的在不同计划阶段期间和在各种场景中项目计划看上去如何的示例屏幕截图。图1-图11旨在用作描述本发明的各实施方式的辅助和示例且不是对所要求保护的本发明的范围的限制。图1是在初始计划阶段项目计划看上去如何的示例。图1中所示出的示例屏幕截图在左侧示出用户可以用来输入数据且可以显示各种信息(这取决于用户可以选择的视图)的表110。用户可以选择他/她可以想要在表110中显示哪些字段(例如,任务模式、任务名称、持续时间、开始日期完成日期等等)。例如,表110看上去类似于电子表格应用工作表,且也类似于典型的电子表格应用那样工作。示例屏幕截图的右侧是图表视图120。在这一示例中,图120是甘特图。如果用户选择甘特图视图,则项目的各任务可以被显示在左侧,且它们的相互关系的图示和使用甘特条形图的进度表可以被显示在右侧。用于提供图1-图11中所示出的示例项目计划的合适的软件应用程序是华盛顿州雷蒙德市微软公司的PROJECT。在该示例中且正如图1中所示出的,用户已经输入了项目的四个高级目标(即,分析/软件要求115、设计阶段125、开发135和测试阶段145),这些高级目标被示出在字段“任务名称”105下。在项目计划中的这一阶段,用户可能仅知道项目的高级目标115、125、135、145。在用户在高级目标任务下输入附加的任务时,然后,高级目标任务115、125、135、145可以变成概括任务。
当用户可获得更多信息时,然后,他/她可以开始将附加的数据插入到表110。根据一种实施方式,允许指定高级目标任务或概括任务的开始日期、完成日期或持续时间中的任何一个或者不指定其中任何一个的灵活性。图2是示出在附加的分析之后项目计划看上去如何的示例屏幕截图。在这一示例中,用户知道第一任务即分析/软件要求115可以在其中发生的确切的时间帧,因此他/她可以在表110中的适当字段205、206、207下输入诸如相应的任务的持续时间216、开始日期217和完成日期218等的他/她知道的数据。因此,在用户将这一信息输入到表110时,可以以甘特图120中的甘特条形图219的形式示出所输入的数据的图形表示。
对于第二任务即设计阶段125,他/她仅知道所分配的总的预算时间,该总的预算时间在这一示例中是一周。用户可以在设计阶段125的持续时间字段205下输入一周的持续时间226。根据一种实施方式,可以将已知数据的图形表示显示在图120中。如果仅已知数据中的一些,则图形表示可以是不完整的图形,仅显示已知的数据。例如,仍然参见图2,任务设计阶段125的唯一已知数据是给它分配了一周的持续时间。结果,在甘特图120中,可以将持续时间229的图形表示示出为不带有确定的开始日期206或完成日期207的淡化的条形图。应明白,可以存在表示不完整数据的各种方式。随着定义和输入更多数据,相应地更新相应的条形图229。
仍参见该示例,在计划进程中的这一阶段,用户可以不知道需要多久来完成第三任务“开发”135;然而,他/她可以知道他/她具有2009年3月20日的截止期限。为了在表110中表示这一已知的数据片段,用户可以开发任务135的在完成字段207下输入2009年3月20日周五的完成日期238。对于第四任务“测试阶段”145,用户可能还不知道任何信息;因此,他/她可以将字段205、206、207保留为空白或输入TBD(待定)以便表示将在进一步分析之后将确定更多数据。
根据一种实施方式,一旦已经计划了高级目标115、125、135、145,然后,用户就可以输入各个子任务的附加细节而不会影响高级目标的原始计划。继续上面的示例项目计划,图3示出在用户将附加的数据输入到表110时项目计划看上去如何。在这一示例屏幕截图中,用户在分析/软件要求任务115下输入工作项325、335、345、355的列表。由于用户将数据输入到持续时间205、开始日期206和完成日期207字段,甘特图120提供用示出项目的任务的跨越时间线310的持续时间205的甘特条形图219、329、339、349、359更新的任务列表的图形表示。
如果用户将工作项325、335、345、355的列表移动到移动任务115下,那么任务115变成概括任务。图4是示出被移动到分析/软件要求任务115下的工作项325、335、345、355的列表屏幕截图。分析/软件要求任务115现在是概括任务,且已经被移动到它下面的工作项325、335、345、355现在是子任务。根据一种实施方式,本发明允许概括任务具有比其子任务的完成日期迟的完成日期。这允许用户建模其中在概括任务115下的子任务324、335、345、355不用光给定的项目阶段的全部所计划的预算时间216的情况。根据另一实施方式,在用户通过将一组子任务移动到给定任务下来创建概括任务时,可以使用由概括任务的用户输入的信息以及子任务的所计算的汇总的组合来填充概括日期。这允许在将给定任务转换成概括任务时保留用户所输入的关于任务的开始时间、完成时间或持续时间信息。
图4的示例屏幕截图示出,尽管概括任务115的子任务325、335、345、355的总跨度不等于概括任务的持续时间,但已经维持概括任务115的原始日期。根据一种实施方式,因为概括任务日期不受其子任务的汇总日期的限制,用户可以建模其中项目阶段下的各工作项在概括任务的开始日期之后开始的情况。另外,用户可以建模其中各子任务领先它们的概括任务的所计划的开始日期的情况。
根据另一实施方式,用户可以标识在概括任务的所计划的日期和持续时间与各子任务的日期的实际计算的汇总相比较的差异。在甘特图视图120上,可以显示表示所计划的日期和所计算的日期的两个甘特条形图219、419。这允许用户可视地比较在所计划的日期219和所计算的日期419之间的差异并标识滑移和/或可用的缓冲时间。根据一种实施方式,所计算的日期甘特条形图419可以显示给出所计算的日期358是超过还是不达到所计划的日期218的指示的可视特性。例如,如果所计算的日期358少于所计划的日期218,则可以将所计算的日期甘特条形图419显示为蓝色。替代地,如果所计算的日期358超过了所计划的日期218,则可以将所计算的日期甘特条形图419显示为红色。用户可以瞥一眼项目的甘特图120并快速地看到项目115的阶段是否具有缓冲时间或者它是否落后于其所计划的完成日期218。
根据另一实施方式,如果用户将他/她的光标放置在概括任务的所计算的日期甘特条形图419上,则可以展开包含说明存在用于所关联的概括任务115的多少缓冲时间或过剩时间的文本的弹出框。根据另一实施方式,可以提供概括任务的所计算的日期计划和汇总日期两者以使得用户可以在这些日期之间执行精确比较。用户可以选择在他/她的任务表视图上显示两组日期,或通过由应用程序(即,微软PROJECT)提供的编程接口由程序标识该差异。在本发明之前,概括任务的日期受其子任务的汇总日期限制。如果用户具有不匹配其子任务的汇总日期的项目阶段的所计划的开始日期或结束日期,则用户将必须或是手动地用人工开始日期和完成日期追加到“假任务”或是在特定的项目阶段所计划的开始日期和完成日期处添加两个里程碑任务。
仍参见示例项目计划,图5中的屏幕截图示出设计阶段125。用户具有为这一阶段125计划的两个工作任务525、535,且已经将它们输入到表110中。在用户将两个工作任务525、535移动到设计阶段任务125下时,各工作任务变成子任务,且设计阶段任务变成概括任务。这在图6中的屏幕截图中示出。根据一种实施方式,如果用户还没有输入任务的开始时间206信息、完成时间207信息或持续时间205信息,则本发明将用从子任务汇总计算的值填充空白字段。如图6中所示出,应用程序已经利用第一子任务525的开始日期527,并确定设计阶段125将在与最早的子任务525相同的日期开始。在用户开始他/她的项目计划时,他/她在设计阶段125的这一时刻拥有的唯一信息是具有所计划的一周的持续时间226。他/她既不指定开始日期206也不指定完成日期207。因此,在用户输入子任务并指定该子任务的开始日期时,应用程序现在具有关于相应的概括任务应何时开始的一些信息。
图6示出在用户嵌入子任务时设计阶段125的开始日期627和完成日期628被自动填充。在这一场景中,从子任务数据汇总概括任务数据,这是因为概括任务日期字段627、628留空。根据一种实施方式,用户可以在所计算的概括和自顶向下概括之间切换,且在计划中也具有两种类型的概括任务的混合。如图6中所示出,自动地更新甘特图120以便反映所输入的数据。所计划的日期甘特条形图229在外观上已经从图5中所示出的模糊条形图改变成带有指示开始日期627和结束日期628的不同标记的已定义甘特条形图。下面所计划的日期甘特条形图229是所计算的甘特条形图629。如所计算的甘特条形图629的长度和颜色所指示的,用户可以看到设计阶段125包含缓冲时间。
继续示例且现在参见图7,图7的屏幕截图示出具有2009年3月20日周五的完成日期738的开发阶段135,其中用户已经指定阶段135必须不迟于该日期完成。用户已经输入包含一些日期信息746、747、748、757、767的若干工作项745、755、765。如图8中所示出,在用户将开发任务135转换成概括任务之后,维持开发阶段的完成日期738,且已经基于子任务745、755、765的所输入的数据746、747、748、757、767用所计算的日期增殖持续时间836单元和开始日期837单元。
根据一种实施方式,可以提供可视指示以便指示任务是否包含手动地输入的日期信息(被钉住的任务)或者它是否其子任务的纯汇总。如图8中所示出的,被钉住的任务的可视指示可以是图标,例如定位在表110中的任务模式字段805下的图钉810。如果任务具有缺失的信息,则可以显示替代的可视指示。如所示出的,带有缺失数据的被钉住的任务的可视指示可以是图标,例如图钉和问号815。图钉810(即,可视指示)表示用户已经输入了一些信息。该信息可以是持续时间205、开始日期206和/或完成日期207。根据一种实施方式,如果任务被钉住,则该任务的所输入的数据不依赖于在它下面的子任务的数据并保持恒定。下面参考图11描述这种情况的示例。如果还没有给任务指派任何日期信息,以及如果从其子任务数据计算其日期205、206、207,将显示表示这种情况的可视指示。可视表示可以是如下面参考图10示出和描述的箭头。
现在参见图9,屏幕截图示出测试阶段145,测试阶段145是示例项目的最终阶段。在用户最初开始项目计划时,他/她不知道持续时间205、开始日期206或完成日期207。进一步,在计划过程中,在图9中,用户将工作项955、965、975、985、995、905和那些项的细节添加到测试阶段任务145下面。在将测试阶段任务145转换成概括任务之后,对于该概括任务145,自动地从其子任务955、965、975、985、995、905计算日期1047、1048和持续时间1046,如图10中所示出。应明白,如果用户不指定给定任务的任何信息205、206、207,且如果修改了其子任务955、965、975、985、995、905的日期,则相应地调整所关联的汇总概括任务日期1046、1047、1048。
如先前所提到的,可以显示指示任务的日期是其子任务数据的纯汇总的可视表示。如图10中所示出的,在任务模式805字段下示出箭头1005。根据一种实施方式,用户可以手动地钉住任务以使得如果修改了其子任务日期则其日期不改变。根据另一实施方式,如果已经从其子任务的数据汇总概括任务的日期,则用户可以稍后指定该概括任务的数据,这将其从自动地汇总的任务转换成手动概括(被钉住的任务)。例如,用户可以输入他还没有输入任何数据的测试阶段概括任务,以及该测试阶段的若干子任务,这些子任务的日期汇总成该测试阶段的三十天的持续时间。稍后,用户可以发现他将额外的五天分配给该阶段。在用户进入并手动地将三十五天输入到测试阶段的持续时间字段时,然后,它从自动进度表的概括任务改变成手动概括任务或被钉住的任务。因此,如果修改了其子任务日期,则其日期将不改变。
如先前所提到的,如果所计算的日期超过其所计划的日期,则所计算的日期甘特条形图可以被显示为红色以便指示其子任务将不能不迟于其所计划的完成日期完成。图11示出这一场景。在图11中,示例用户已经用附加的数据1156、1158、1166、1168更新来自图8的项目计划。用户已经为开发阶段135指定2009年3月20日周五的完成日期738;然而,其最后的子任务即模块3 765的完成日期1168是在这一日期738之后。示出若干可视指示符以便警告用户进度表中的滑移。如上所述,在项目计划的甘特图120中示出所调度的日期甘特条形图1109和所计算的日期甘特条形图1119。所计算的日期甘特条形图1119被示出为延伸超过所调度的日期甘特条形图1109,且也可以是被显示为红色以便指示其进度表的过度延长。
如图11中也示出的,模块3的765的完成日期1168在下面划红线1101以便指示这一任务765正引起开发阶段135比其所计划的日期738更晚完成。根据一种实施方式,如果数据片段与项目内的其他数据矛盾,可以显示与该数据有关的可选择标识1101。如果用户通过已知的方法选择标识1101,则可以显示信息,这给予用户关于如何修改数据以便缓和它与进度表中的其他数据发生的任何矛盾的选项。
如先前也描述的,如果任务被钉住,则该任务的所输入的数据不依赖于在它之下的子任务的数据,且将保持恒定。根据一种实施方式,本发明允许概括任务在所有其子任务的完成日期之前完成,这允许用户建模其中子任务落后于所计划的项目阶段完成日期的情况其特征。图11示出这一场景。示例开发任务135是被钉住的任务,这是因为示例用户已经输入它的数据片段。在这一示例中,用户已经指定2009年3月20日周五的完成日期738。在用户稍后将数据1156、1158、1166、1168添加到该图时,开发阶段135的完成日期738保持不变,尽管它与其最后的子任务765的完成日期1168矛盾。
图12示出可以被用来实现在此描述的技术的一般计算机环境1200。计算机环境1200仅是计算环境的一个示例且不旨在暗示关于计算机和网络体系结构的使用范围或功能的任何限制。计算机环境1200也不应被解释为具有与示例计算机环境1200中示出的各组件中的任何一个或组合相关的任何依赖性或要求。
计算机环境1200包括以计算机1202的形式的通用计算设备。计算机1202的各组件可以包括但不限于一个或多个处理器或处理单元1204、系统存储器1206和将包括处理器1204的各种系统组件耦合到系统存储器1206的系统总线1208。
系统总线1208表示包括存储器总线或存储器控制器、外围总线、加速图形端口和使用各种总线体系结构中的任何的处理器总线或局部总线的若干类型的总线结构中的任何的一个或多个。作为示例,这样的体系结构可以包括也称为夹层(Mezzanine)总线的外围组件互连(PCI)总线、PCI Express总线(以及类似物)、通用串行总线(USB)、安全数字(SD)总线和/或IEEE 1394即火线(FireWire)总线。
计算机1202可以包括各种计算机可读介质。这样的介质可以是可由计算机1202访问的任何可用的介质且包括易失性介质和非易失性介质、可移动介质和不可移动介质两者。
系统存储器1206包括以诸如随机存取存储器(RAM)1210等的易失性存储器以及/或诸如只读存储器(ROM)1212或闪速RAM等的非易失性存储器的形式的计算机可读介质。包含例如在启动期间帮助在之间在计算机1202内的元件之间传递信息的基本例程的基本输入/输出系统(BIOS)1214被存储在ROM1212或闪速RAM中。RAM 1210通常包含立即可访问的和/或目前由处理单元1204操作的数据和/或程序模块。
计算机1202也可以包括其他可移动/不可移动、易失性/非易失性计算机存储介质。作为示例,图12示出用于从不可移动的非易失性磁介质(未示出)读取和向其写入的硬盘驱动器1216、用于从可移动的非易失性磁盘1220(例如,“软盘”)读取和向其写入的磁盘驱动器1218和用于从诸如CD-ROM、DVD-ROM或其他光学介质等的可移动非易失性光盘1224读取和/或向其写入光盘驱动器1222。硬盘驱动器1216、磁盘驱动器1218和光盘驱动器1222都由一个或多个数据介质接口1225连接到系统总线1208。替代地,硬盘驱动器1216、磁盘驱动器1218和光盘驱动器1222可以由一个或多个接口(未示出)连接到系统总线1208。
盘驱动器和它们所关联的计算机可读介质为计算机1202提供计算机可读指令、数据结构、程序模块和其他数据的非易失性存储。尽管示例示出硬盘1216、可移动磁盘1220和可移动光盘1224,但应明白,也可以使用可以存储可由计算机访问的数据的诸如磁带盒或其他磁存储设备、闪速存储器卡、CD-ROM、数字多用盘(DVD)或其他光存储、随机存取存储器(RAM)、只读存储器(ROM)、电可擦除可编程只读存储器(EEPROM)等等的其他类型的计算机可读介质来实现示例计算系统和环境。
可以将任何数量的程序模块存储在硬盘1216、磁盘1220、光盘1224、ROM1212和/或RAM 1210上,作为示例,这些程序模块包括操作系统1226、一个或多个应用程序程序1228、其他程序模块1230和程序数据1232。这样的操作系统1226、一个或多个应用程序程序1228、其他程序模块1230和程序数据1232(或其某种组合)中的每一个可以实现在此描述的项目管理实施方式的全部或部分。可以借助于其来实现本发明的各实施方式的示例软件应用程序包括微软公司的PROJECT。
用户可以经由诸如键盘1234和指点设备1236(例如,“鼠标”)等的输入设备将命令和信息输入到计算机1202。其他输入设备1238(未具体示出)可以包括话筒、操纵杆、游戏垫、圆盘式卫星天线、串行端口、扫描仪和/或类似物。这些和其他输入设备经由被耦合到系统总线1208的输入/输出接口1240连接到处理单元1204,但是可以由诸如并行端口、游戏端口或通用串行总线(USB)等的其他接口和总线结构连接。
监视器1242或其他类型的显示设备也可以经由诸如视频适配器1244等的接口连接到系统总线1208。除了监视器1242之外,其他输出外围设备可以包括诸如扬声器(未示出)和打印机1246等的可以经由I/O接口1240连接到计算机1202的组件。
计算机1202可以使用到诸如远程计算设备1248等的一个或多个远程计算机的逻辑连接来在联网环境中操作。作为示例,远程计算设备1248可以是PC、便携式计算机、服务器、路由器、网络计算机、对等设备或其他普通网络节点等等。远程计算设备1248被示出为可以包括在此相对于计算机1202描述的元素和特征中的许多或全部的便携式计算机。替代地,计算机1202也可以在非联网环境中操作。
在计算机1202和远程计算机1248之间的逻辑连接被叙述为局域网(LAN)1250和通用广域网(WAN)1252。这样的联网环境在办公室、企业范围的计算机网络、内联网和因特网中是常见的。
在LAN联网环境中实现时,计算机1202经由网络接口或适配器1254连接到局域网1250。在WAN联网环境中实现时,计算机1202通常包括调制解调器1256或用于在广域网1252上建立通信的其他装置。可以内置或外置于计算机1202的调制解调器1256可以经由I/O接口1240或其他适当的机制连接到系统总线1208。应明白,所示出的网络连接是示例,且可以采用在计算机1202和1248之间建立至少一个通信链路的其他装置。
在诸如以计算环境1200示出的联网环境等的联网环境中,可以将相对于计算机1202或其部分叙述的程序模块存储在远程存储器存储设备中。作为示例,远程应用程序程序1258驻留在远程计算机1248的存储器设备中。出于说明的目的,诸如操作系统等的应用程序或程序和其他可执行程序组件在此被示出为分立的块,尽管认识到这样的程序和组件在各种时刻驻留在计算设备1202的不同存储组件中且由计算机的至少一个数据处理器执行。
在此可以在诸如程序模块等的由一个或多个计算机或其他设备执行的计算机可执行指令的一般上下文中描述各种模块和技术。一般地,程序模块包括用于执行特定的任务或实现特定的抽象数据类型的例程、程序、对象、组件、数据结构等等。通常,在各种实施方式中,程序模块的功能可以按照期望组合或分布。
可以将这些模块和技术的一种实现存储在某种各形式的计算机可读介质上或跨越某种各形式的计算机可读介质而传送。计算机可读介质可以是可由计算机访问的任何可用的介质。作为示例而非限制,计算机可读介质可以包括“计算机存储介质”和“通信介质”。
“计算机存储介质”包括以用于存储诸如计算机可读指令、数据结构、程序模块或其他数据等的信息的任何方法或技术实现的易失性介质和非易失性介质、可移动介质和不可移动介质。计算机存储介质包括但不限于RAM、ROM、EEPROM、闪速存储器或其他存储器技术、CD-ROM、数字多用盘(DVD)或其他光存储、磁带盒、磁带、磁盘存储或其他磁存储设备、或可以被用来存储所期望的信息且可由计算机访问的任何其他介质。
“通信介质”通常以诸如载波或其他传输机制等的经调制的数据信号具体化计算机可读指令、数据结构、程序模块或其他数据。通信介质也包括任何信息传递介质。术语“经调制的数据信号”意味着以编码信号中的信息的方式来设定或改变其一个或多个特性的信号。仅作为非限制示例,通信介质包括诸如有线网络或直接有线连接等的有线介质和诸如声学、RF、红外和其他无线介质等的无线介质。上面中的任何的组合也被包括在计算机可读介质的范围内。
如在此所描述的,以自顶向下策略创建项目计划允许用户在填充组成各高级目标的底层任务的细节之前描述各高级目标。本领域中的技术人员将明显看出,可以在不偏离本发明的范围或精神的前提下做出各种修改或变更。本领域中的技术人员将从本说明书的考虑和在此公开的本发明的实践明显看出本发明的其他实施方式。
Claims (15)
1.一种用于创建自顶向下项目计划的计算机实现的方法,所述方法包括:
接收由用户输入的与概括任务(115)和包括所述概括任务的子任务(325、335、345、355)相关联的信息;
确定概括任务的开始日期(206)字段、完成日期(207)字段和/或持续时间(205)字段是否包含用户所输入的信息;
如果概括任务(125)的开始日期(206)字段、完成日期(207)字段或持续时间(205)字段中的至少一个但不多于两个包含用户所输入的信息,则
除了利用所述概括任务的子任务信息的所计算的汇总(汇总日期)之外,还利用由所述用户输入的概括任务信息(所计划的日期)(226、526、527、528、536、537、538)来确定所述概括任务(125)的进度表;
确定概括任务的所计算的汇总日期(627、628)是否与所计划的日期(527、538)矛盾;
如果任务的所计算的汇总日期与所计划的日期矛盾,则保留所述用户所输入的所计划的日期(226、526、527、528、536、537、538);以及
在所述项目计划(110)的相应字段中显示所确定的概括任务进度表(627、628)。
2.如权利要求1所述的计算机实现的方法,其特征在于,
如果概括任务(145)的开始日期(206)字段、完成日期(207)字段和持续时间(205)字段中不包含用户所输入的信息,则
利用所述概括任务的子任务信息的所计算的汇总(汇总日期)(1046、1047、1048)来确定所述概括任务(145)的进度表;以及
在所述项目计划(110)的相应字段中显示所确定的概括任务进度表(1046、1047、1048)。
3.如权利要求1所述的计算机实现的方法,其特征在于,
如果概括任务(135)的开始日期(837)字段、完成日期(738)字段或持续时间(836)字段中的全部三个都包含用户所输入的信息,则
保留所述用户所输入的所计划的日期(837、738、836);以及
如果在所计划的日期(837、738、836)和所述概括任务的子任务(736)的所述汇总日期(1168)之间存在差异(1101、1109、1119),则标识所述差异;以及
显示对任务是否包含所计划的日期和/或所述任务是否包含汇总日期的指示(810、815、1005)。
4.如权利要求1所述的计算机实现的方法,其特征在于,标识在所述概括任务的所计划的日期和所述汇总日期之间的差异包括提供被显示在项目计划甘特图(120)上的所计划的日期甘特条形图(1109)和所计算的汇总日期甘特条形图(1119)。
5.如权利要求1所述的计算机实现的方法,其特征在于,标识在所述概括任务的所计划的日期和所述汇总日期之间的差异包括在项目计划表(110)内提供所计划的日期字段(1156、1166)和汇总日期字段(205)。
6.如权利要求1所述的计算机实现的方法,其特征在于,确定概括任务(135)的所计算的汇总日期是否与所计划的日期矛盾包括确定概括任务开始日期(837)是否在包括所述概括任务的所述子任务(747、757、767)的所有所述开始日期之前发生。
7.如权利要求1所述的计算机实现的方法,其特征在于,确定概括任务(135)的所计算的汇总日期是否与所计划的日期矛盾包括确定概括任务开始日期(837)是否在包括所述概括任务的所述子任务(747、757、767)的所有所述完成日期之后发生。
8.如权利要求1所述的计算机实现的方法,其特征在于,确定概括任务(125)的所计算的汇总日期是否与所计划的日期矛盾包括确定概括任务完成日期(628)是否在包括所述概括任务的所述子任务(538)的所有所述完成日期之后发生。
9.如权利要求1所述的计算机实现的方法,其特征在于,确定概括任务(125)的所计算的汇总日期是否与所计划的日期矛盾包括确定概括任务完成日期(628)是否在包括所述概括任务的所述子任务(538)的所有所述完成日期之前发生。
10.如权利要求3所述的计算机实现的方法,其特征在于,显示对任务是否包含所计划的日期和/或所述任务是否包含汇总日期的指示包括如果所述任务仅包含所计划的日期则显示与所述任务的所显示的信息相关联的图钉图标(810)。
11.如权利要求3所述的计算机实现的方法,其特征在于,显示对任务是否包含所计划的日期和/或所述任务是否包含汇总日期的指示包括如果所述任务包含所计划的日期和汇总日期则显示与所述任务的所显示的信息相关联的图钉图标和问号(815)。
12.如权利要求3所述的计算机实现的方法,其特征在于,显示对任务是否包含所计划的日期和/或所述任务是否包含汇总日期的指示包括如果所述任务仅包含汇总日期则显示与所述任务的所显示的信息相关联的箭头图标(1005)。
13.一种包含计算机可执行指令的计算机可读介质,各计算机可执行指令在由计算机执行时执行一种用于创建自顶向下项目计划的方法,所述方法包括:
接收由用户输入的与概括任务(115)和包括所述概括任务的一个或多个子任务(325、335、345、355)相关联的信息;
确定概括任务的开始日期(206)字段、完成日期(207)字段和/或持续时间(205)字段是否包含用户所输入的信息;
如果概括任务的开始日期字段、完成日期字段或持续时间字段中的至少一个但不多于两个包含用户所输入的信息,则
除了利用所述概括任务的子任务信息的所计算的汇总(汇总日期)之外,还利用由所述用户输入的概括任务信息(所计划的日期)(226、526、527、528、536、537、538)来确定所述概括任务(125)的进度表;
确定概括任务的所计算的汇总日期(627、628)是否与所计划的日期(527、538)矛盾;以及
如果概括任务的所计算的汇总日期与所计划的日期矛盾,则
保留所述用户所输入的所计划的日期(226、526、527、528、536、537、538);以及
标识在所计划的日期和所述汇总日期之间的差异;
在所述项目计划(110)的相应字段中显示所确定的概括任务进度表(627、628);
否则,如果概括任务(145)的开始日期(206)字段、完成日期(207)字段和持续时间(205)字段中不包含用户所输入的信息,则
利用所述概括任务的子任务信息的所计算的汇总(汇总日期)(1046、1047、1048)来确定所述概括任务(145)的进度表;以及
在所述项目计划(110)的相应字段中显示所确定的概括任务进度表(1046、1047、1048);
否则,如果概括任务(135)的开始日期(837)字段、完成日期(738)字段或持续时间(836)字段中的全部三个包含用户所输入的信息,则
保留所述用户所输入的所计划的日期(837、738、836);以及
标识在所述概括任务的子任务(765)的所计划的日期(837、738、836)和所述汇总日期(1168)之间的任何差异(1101、1109、1119);以及
显示对任务是否包含所计划的日期和/或所述任务是否包含汇总日期的指示(810、815、1005)。
14.如权利要求13所述的计算机可读介质,其特征在于,
标识在所述概括任务的所计划的日期和所述汇总日期之间的差异包括提供被显示在项目计划甘特图(120)上的所计划的日期甘特条形图(1109)和所计算的汇总日期甘特条形图(1119);以及
标识在所述概括任务的所计划的日期和所述汇总日期之间的差异包括在项目计划表(110)内提供所计划的日期字段(1156、1166)和汇总日期字段(205)。
15.如权利要求13所述的计算机可读介质,其特征在于,确定概括任务(135)的所计算的汇总日期是否与所计划的日期矛盾包括:
确定概括任务开始日期(837)是否在包括所述概括任务的所述子任务(747、757、767)的所有所述开始日期之前发生;
确定概括任务开始日期(837)是否在包括所述概括任务的所述子任务(747、757、767)的所有所述完成日期之后发生;
确定概括任务完成日期(628)是否在包括所述概括任务的所述子任务(538)的所有所述完成日期之后发生;以及
确定概括任务完成日期(628)是否在包括所述概括任务的所述子任务(538)的所有所述完成日期之前发生。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US12/468,663 | 2009-05-19 | ||
US12/468,663 US8160911B2 (en) | 2009-05-19 | 2009-05-19 | Project management applications utilizing summary tasks for top-down project planning |
PCT/US2010/034618 WO2010135122A2 (en) | 2009-05-19 | 2010-05-12 | Summary tasks for top-down project planning |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102439612A true CN102439612A (zh) | 2012-05-02 |
Family
ID=43125184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010800232136A Pending CN102439612A (zh) | 2009-05-19 | 2010-05-12 | 用于自顶向下项目计划的概括任务 |
Country Status (6)
Country | Link |
---|---|
US (1) | US8160911B2 (zh) |
EP (1) | EP2433253A2 (zh) |
JP (1) | JP2012527693A (zh) |
KR (1) | KR20120015324A (zh) |
CN (1) | CN102439612A (zh) |
WO (1) | WO2010135122A2 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107730196A (zh) * | 2017-08-01 | 2018-02-23 | 上海壹账通金融科技有限公司 | 项目进度管理方法及终端设备 |
CN110941750A (zh) * | 2019-11-28 | 2020-03-31 | 金蝶软件(中国)有限公司 | 一种数据联动的方法以及相关装置 |
CN113379385A (zh) * | 2021-06-11 | 2021-09-10 | 上海妙一生物科技有限公司 | 一种临床研究项目计划数据处理方法和装置 |
Families Citing this family (57)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8082274B2 (en) * | 2007-06-28 | 2011-12-20 | Microsoft Corporation | Scheduling application allowing freeform data entry |
US8316371B2 (en) * | 2009-04-09 | 2012-11-20 | Mindjet Llc | Task hierarchy in an event-driven communication system |
US8160911B2 (en) | 2009-05-19 | 2012-04-17 | Microsoft Corporation | Project management applications utilizing summary tasks for top-down project planning |
CN102541880A (zh) * | 2010-12-17 | 2012-07-04 | 金蝶软件(中国)有限公司 | 一种甘特图的生成方法及系统 |
US8952966B2 (en) * | 2011-06-06 | 2015-02-10 | Oracle International Corporation | Multiple element selections in Gantt charts |
US9747008B2 (en) * | 2012-08-24 | 2017-08-29 | Northrop Grumman Systems Corporation | Method and user interface device for efficient collaboration in a maintenance environment |
CN102981842B (zh) * | 2012-11-08 | 2015-06-10 | 北京空间飞行器总体设计部 | 一种生成可交互横道图的方法 |
US20140229222A1 (en) * | 2013-02-08 | 2014-08-14 | Sadaf Shakil | Integrated project planning and management application |
US20140278715A1 (en) * | 2013-03-15 | 2014-09-18 | International Business Machines Corporation | Estimating required time for process granularization |
JP2015014939A (ja) * | 2013-07-05 | 2015-01-22 | 富士通株式会社 | 作業管理方法及び作業管理プログラム |
US20150046856A1 (en) * | 2013-08-06 | 2015-02-12 | SmartSheet.com, Inc. | Interactive Charts For Collaborative Project Management |
AU2013399649B2 (en) * | 2013-09-03 | 2017-03-23 | Landmark Graphics Corporation | Well activity bar charts |
CN103533029B (zh) * | 2013-09-26 | 2017-05-24 | 广州中国科学院软件应用技术研究所 | 甘特图数据加载方法及系统 |
US9710571B2 (en) | 2014-03-07 | 2017-07-18 | Oracle International Corporation | Graphical top-down planning system |
US9423943B2 (en) | 2014-03-07 | 2016-08-23 | Oracle International Corporation | Automatic variable zooming system for a project plan timeline |
CN103955793B (zh) * | 2014-04-25 | 2017-04-26 | 国家电网公司 | 基于Dijkstra算法的站控层测试任务管理系统及方法 |
US9418348B2 (en) | 2014-05-05 | 2016-08-16 | Oracle International Corporation | Automatic task assignment system |
US9575799B2 (en) * | 2014-07-11 | 2017-02-21 | International Business Machines Corporation | Task association analysis in application maintenance service delivery |
WO2016007199A1 (en) * | 2014-07-11 | 2016-01-14 | Textura Corporation | Construction project performance management |
US10810222B2 (en) | 2014-11-24 | 2020-10-20 | Asana, Inc. | Continuously scrollable calendar user interface |
US10643157B2 (en) | 2015-02-03 | 2020-05-05 | Oracle International Corporation | Task progress update history visualization system |
US10496943B2 (en) | 2015-03-30 | 2019-12-03 | Oracle International Corporation | Visual task assignment system |
US20160291821A1 (en) * | 2015-04-06 | 2016-10-06 | Microsoft Technology Licensing, Llc | Generating and displaying graphical representations of processes |
US10902339B2 (en) | 2015-05-26 | 2021-01-26 | Oracle International Corporation | System and method providing automatic completion of task structures in a project plan |
US10977434B2 (en) | 2017-07-11 | 2021-04-13 | Asana, Inc. | Database model which provides management of custom fields and methods and apparatus therfor |
US20190050811A1 (en) * | 2017-08-14 | 2019-02-14 | Brian Kang | Project scheduling system and method |
US10623359B1 (en) | 2018-02-28 | 2020-04-14 | Asana, Inc. | Systems and methods for generating tasks based on chat sessions between users of a collaboration environment |
US11138021B1 (en) | 2018-04-02 | 2021-10-05 | Asana, Inc. | Systems and methods to facilitate task-specific workspaces for a collaboration work management platform |
US10613735B1 (en) | 2018-04-04 | 2020-04-07 | Asana, Inc. | Systems and methods for preloading an amount of content based on user scrolling |
US11106331B1 (en) * | 2018-05-25 | 2021-08-31 | Palantir Technologies Inc. | Interactive display with workflow management system |
US10785046B1 (en) | 2018-06-08 | 2020-09-22 | Asana, Inc. | Systems and methods for providing a collaboration work management platform that facilitates differentiation between users in an overarching group and one or more subsets of individual users |
US10616151B1 (en) | 2018-10-17 | 2020-04-07 | Asana, Inc. | Systems and methods for generating and presenting graphical user interfaces |
US10956845B1 (en) | 2018-12-06 | 2021-03-23 | Asana, Inc. | Systems and methods for generating prioritization models and predicting workflow prioritizations |
US11568366B1 (en) | 2018-12-18 | 2023-01-31 | Asana, Inc. | Systems and methods for generating status requests for units of work |
US11113667B1 (en) | 2018-12-18 | 2021-09-07 | Asana, Inc. | Systems and methods for providing a dashboard for a collaboration work management platform |
US10684870B1 (en) | 2019-01-08 | 2020-06-16 | Asana, Inc. | Systems and methods for determining and presenting a graphical user interface including template metrics |
US11782737B2 (en) | 2019-01-08 | 2023-10-10 | Asana, Inc. | Systems and methods for determining and presenting a graphical user interface including template metrics |
US11204683B1 (en) | 2019-01-09 | 2021-12-21 | Asana, Inc. | Systems and methods for generating and tracking hardcoded communications in a collaboration management platform |
US11341445B1 (en) | 2019-11-14 | 2022-05-24 | Asana, Inc. | Systems and methods to measure and visualize threshold of user workload |
US11783253B1 (en) | 2020-02-11 | 2023-10-10 | Asana, Inc. | Systems and methods to effectuate sets of automated actions outside and/or within a collaboration environment based on trigger events occurring outside and/or within the collaboration environment |
US11599855B1 (en) | 2020-02-14 | 2023-03-07 | Asana, Inc. | Systems and methods to attribute automated actions within a collaboration environment |
US11455601B1 (en) | 2020-06-29 | 2022-09-27 | Asana, Inc. | Systems and methods to measure and visualize workload for completing individual units of work |
US11449836B1 (en) | 2020-07-21 | 2022-09-20 | Asana, Inc. | Systems and methods to facilitate user engagement with units of work assigned within a collaboration environment |
US11568339B2 (en) | 2020-08-18 | 2023-01-31 | Asana, Inc. | Systems and methods to characterize units of work based on business objectives |
US11769115B1 (en) | 2020-11-23 | 2023-09-26 | Asana, Inc. | Systems and methods to provide measures of user workload when generating units of work based on chat sessions between users of a collaboration environment |
US11405435B1 (en) | 2020-12-02 | 2022-08-02 | Asana, Inc. | Systems and methods to present views of records in chat sessions between users of a collaboration environment |
US11694162B1 (en) | 2021-04-01 | 2023-07-04 | Asana, Inc. | Systems and methods to recommend templates for project-level graphical user interfaces within a collaboration environment |
US11676107B1 (en) | 2021-04-14 | 2023-06-13 | Asana, Inc. | Systems and methods to facilitate interaction with a collaboration environment based on assignment of project-level roles |
US11553045B1 (en) | 2021-04-29 | 2023-01-10 | Asana, Inc. | Systems and methods to automatically update status of projects within a collaboration environment |
US11803814B1 (en) | 2021-05-07 | 2023-10-31 | Asana, Inc. | Systems and methods to facilitate nesting of portfolios within a collaboration environment |
US11792028B1 (en) | 2021-05-13 | 2023-10-17 | Asana, Inc. | Systems and methods to link meetings with units of work of a collaboration environment |
US11809222B1 (en) | 2021-05-24 | 2023-11-07 | Asana, Inc. | Systems and methods to generate units of work within a collaboration environment based on selection of text |
US11756000B2 (en) | 2021-09-08 | 2023-09-12 | Asana, Inc. | Systems and methods to effectuate sets of automated actions within a collaboration environment including embedded third-party content based on trigger events |
US11635884B1 (en) | 2021-10-11 | 2023-04-25 | Asana, Inc. | Systems and methods to provide personalized graphical user interfaces within a collaboration environment |
US11836681B1 (en) | 2022-02-17 | 2023-12-05 | Asana, Inc. | Systems and methods to generate records within a collaboration environment |
US11763223B1 (en) | 2022-05-18 | 2023-09-19 | Realization Technologies, Inc | System for generating and maintaining a resource deployment map over a communications network |
US11863601B1 (en) | 2022-11-18 | 2024-01-02 | Asana, Inc. | Systems and methods to execute branching automation schemes in a collaboration environment |
Family Cites Families (47)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6154753A (en) | 1995-09-15 | 2000-11-28 | Cable & Wireless, Inc. | Document management system and method for business quality modeling |
JP3204063B2 (ja) | 1996-01-10 | 2001-09-04 | 日本電気株式会社 | スケジュール管理システム |
US6138141A (en) | 1996-10-18 | 2000-10-24 | At&T Corp | Server to client cache protocol for improved web performance |
US7146381B1 (en) | 1997-02-10 | 2006-12-05 | Actioneer, Inc. | Information organization and collaboration tool for processing notes and action requests in computer systems |
JPH11191120A (ja) | 1997-12-26 | 1999-07-13 | Hitachi Ltd | スケジュール管理システムのスケジュール表示方法および予約スケジュール管理方法 |
US6424983B1 (en) | 1998-05-26 | 2002-07-23 | Global Information Research And Technologies, Llc | Spelling and grammar checking system |
JP2000090151A (ja) | 1998-09-10 | 2000-03-31 | Ibm Japan Ltd | スケジュール表示方法、スケジュール変更方法、スケジュール管理装置、スケジュール管理プログラムを格納した記憶媒体 |
US6442567B1 (en) | 1999-05-14 | 2002-08-27 | Appintec Corporation | Method and apparatus for improved contact and activity management and planning |
US7212986B1 (en) | 1999-06-16 | 2007-05-01 | Metier, Ltd. | Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability |
US6944622B1 (en) | 2000-01-20 | 2005-09-13 | International Business Machines Corporation | User interface for automated project management |
DE10051456A1 (de) | 2000-10-17 | 2002-04-25 | Siemens Ag | Verfahren zum Referenzieren von zeitbezogenen Einträgen in verschiedenen Dateien eines Planungsprogramms |
US7249042B1 (en) | 2000-11-01 | 2007-07-24 | Microsoft Corporation | Method and system for visually indicating project task durations are estimated using a character |
US6901407B2 (en) | 2001-01-12 | 2005-05-31 | Rick D. Curns | System and method for updating project management scheduling charts |
US7415393B1 (en) | 2001-06-14 | 2008-08-19 | Massachusetts Institute Of Technology | Reliability buffering technique applied to a project planning model |
JP2003076879A (ja) | 2001-08-31 | 2003-03-14 | Kts:Kk | 貿易取引支援装置および方法ならびに貿易取引支援のためのプログラム |
US7305392B1 (en) | 2001-11-02 | 2007-12-04 | Apex Innovations, Inc. | Multi-organizational project management system |
US20050197999A1 (en) | 2001-11-28 | 2005-09-08 | Appmail Llc | System and method for task management |
US20040054566A1 (en) | 2002-06-17 | 2004-03-18 | J'maev Jack Ivan | Method and apparatus for event driven project management |
US7194695B1 (en) | 2003-03-31 | 2007-03-20 | Unisys Corporation | Logistics management system presenting user interface for performing multiple freight management tasks |
US7505998B2 (en) | 2003-07-10 | 2009-03-17 | Computer Associates Think, Inc. | Apparatuses and methods for dynamic creation of phase Gantt charts |
US20050080713A1 (en) | 2003-09-30 | 2005-04-14 | Cmarket, Inc. | Method and apparatus for creating a catalog for an on-line charitable auction or fund raising event |
US7975239B2 (en) | 2003-12-17 | 2011-07-05 | Palo Alto Research Center Incorporated | System and method for providing metadata interaction and visualization with task-related objects |
US7876763B2 (en) | 2004-08-05 | 2011-01-25 | Cisco Technology, Inc. | Pipeline scheduler including a hierarchy of schedulers and multiple scheduling lanes |
JP4177280B2 (ja) | 2004-03-25 | 2008-11-05 | 東芝ソリューション株式会社 | 計画業務管理支援システム、及び計画業務管理支援プログラム |
US20050278208A1 (en) | 2004-06-15 | 2005-12-15 | Microsoft Corporation | Method and system for restarting a project management system scheduling engine based on user input of contractual start/finish data |
US20060004618A1 (en) | 2004-06-30 | 2006-01-05 | Microsoft Corporation | Explaining task scheduling for a project |
US8005710B2 (en) | 2004-09-28 | 2011-08-23 | Microsoft Corporation | Methods and systems for caching and synchronizing project data |
US7496886B2 (en) | 2004-09-30 | 2009-02-24 | Microsoft Corporation | Method and system for providing cross project commitments |
US7958003B2 (en) | 2004-12-20 | 2011-06-07 | Microsoft Corporation | Method and system for work scheduling on calendars to establish day state information |
US7460544B2 (en) | 2004-12-29 | 2008-12-02 | Intel Corporation | Flexible mesh structure for hierarchical scheduling |
US7921026B2 (en) | 2005-03-01 | 2011-04-05 | Microsoft Corporation | Method and system for generating a timeline associated with a project schedule |
US8032823B2 (en) | 2005-04-15 | 2011-10-04 | Carnegie Mellon University | Intent-based information processing and updates |
CN1885325A (zh) | 2005-06-23 | 2006-12-27 | 国际商业机器公司 | 工作任务细分结构设计管理器、设计工具及其方法 |
US20070055688A1 (en) | 2005-09-08 | 2007-03-08 | International Business Machines Corporation | Automatic report generation |
US20070192748A1 (en) * | 2006-01-06 | 2007-08-16 | Marware, Inc. | Project management system and method |
WO2007091979A1 (en) | 2006-02-08 | 2007-08-16 | National University Of Singapore | A method and system for constraint-based project scheduling |
US20070245300A1 (en) | 2006-03-22 | 2007-10-18 | Benjamin Chan | Apparatus, system, and method for presenting project scheduling information in combination with workflow information |
US8005705B2 (en) * | 2006-09-07 | 2011-08-23 | International Business Machines Corporation | Validating a baseline of a project |
US8578301B2 (en) | 2006-11-22 | 2013-11-05 | Skadool, Inc. | Hierarchical events |
US20080221946A1 (en) * | 2007-01-05 | 2008-09-11 | Robert Balon | Method and system for evaluating and summarizing weekly project progress |
US7668800B2 (en) | 2007-03-15 | 2010-02-23 | Ricoh Company, Ltd. | Database query generation for project task management system for managing project schedules over a network |
US8082274B2 (en) | 2007-06-28 | 2011-12-20 | Microsoft Corporation | Scheduling application allowing freeform data entry |
US20090048896A1 (en) | 2007-08-14 | 2009-02-19 | Vignesh Anandan | Work management using integrated project and workflow methodology |
US20090287523A1 (en) * | 2008-05-19 | 2009-11-19 | Microsoft Corporation | Showing and correcting irregularities in a schedule |
US20090327020A1 (en) * | 2008-06-27 | 2009-12-31 | Microsoft Corporation | Intelligent task Deactivation In Project Scheduling Application |
US20100070328A1 (en) * | 2008-09-16 | 2010-03-18 | Tetsuro Motoyama | Managing Project Schedule Data Using Project Task State Data |
US8160911B2 (en) | 2009-05-19 | 2012-04-17 | Microsoft Corporation | Project management applications utilizing summary tasks for top-down project planning |
-
2009
- 2009-05-19 US US12/468,663 patent/US8160911B2/en not_active Expired - Fee Related
-
2010
- 2010-05-12 JP JP2012511893A patent/JP2012527693A/ja not_active Withdrawn
- 2010-05-12 CN CN2010800232136A patent/CN102439612A/zh active Pending
- 2010-05-12 WO PCT/US2010/034618 patent/WO2010135122A2/en active Application Filing
- 2010-05-12 EP EP10778124A patent/EP2433253A2/en not_active Withdrawn
- 2010-05-12 KR KR1020117027428A patent/KR20120015324A/ko not_active Application Discontinuation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107730196A (zh) * | 2017-08-01 | 2018-02-23 | 上海壹账通金融科技有限公司 | 项目进度管理方法及终端设备 |
CN107730196B (zh) * | 2017-08-01 | 2021-04-02 | 深圳壹账通智能科技有限公司 | 项目进度管理方法及终端设备 |
CN110941750A (zh) * | 2019-11-28 | 2020-03-31 | 金蝶软件(中国)有限公司 | 一种数据联动的方法以及相关装置 |
CN110941750B (zh) * | 2019-11-28 | 2023-07-07 | 金蝶软件(中国)有限公司 | 一种数据联动的方法以及相关装置 |
CN113379385A (zh) * | 2021-06-11 | 2021-09-10 | 上海妙一生物科技有限公司 | 一种临床研究项目计划数据处理方法和装置 |
Also Published As
Publication number | Publication date |
---|---|
WO2010135122A2 (en) | 2010-11-25 |
KR20120015324A (ko) | 2012-02-21 |
US20100299171A1 (en) | 2010-11-25 |
WO2010135122A3 (en) | 2011-02-03 |
US8160911B2 (en) | 2012-04-17 |
JP2012527693A (ja) | 2012-11-08 |
EP2433253A2 (en) | 2012-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102439612A (zh) | 用于自顶向下项目计划的概括任务 | |
Senapathi et al. | Systems thinking approach to implementing kanban: A case study | |
US8306841B2 (en) | Enterprise project management system and method therefor | |
US20060004618A1 (en) | Explaining task scheduling for a project | |
US8275653B2 (en) | Industrial status viewer system and method | |
US20070260502A1 (en) | Project resource plans | |
AU2005206586A1 (en) | A project management method and system | |
CN101689258A (zh) | 允许自由形式的数据输入的调度应用程序 | |
US20140350985A1 (en) | Systems, methods, and computer programs for providing integrated critical path method schedule management & data analytics | |
KR20180097181A (ko) | 자동화된 분류별 공정표 표시 방법 및 시스템 | |
Deshmukh et al. | Study of scheduling in Microsoft Project software | |
Gusakova | Development of high-rise buildings: Digitalization of life cycle management | |
Larson | Agile methodologies for business intelligence | |
Bopalia | Iterative Integrated Planning and Scheduling Model in Project Management | |
US20210406808A1 (en) | Method and system of planning and scheduling that incorporates inheritance, feedback learning, path optimization, and simulation | |
US20230351530A1 (en) | Computer Systems and Methods for Dynamic Pull Planning | |
Samant | Computer Support for Successful Project Management: Using MS Project 2016 with Information Technology Projects | |
Hussain et al. | Integrated Logistics Cost Optimization Through Automated Forecasted Drilling Operations Report | |
Luo | Application of Agile Development and Innovative Technology in the Structural Engineering | |
Baldwin et al. | Improving design management in the building industry | |
Almajed et al. | An Iterative Hybrid Agile Methodology for Developing Archiving Systems | |
Gjolleshi | Examining construction productivity improvement by applying Takt Time Planning to generate an execution guideline | |
GB2624413A (en) | A scheduling system | |
Horton et al. | Drilling and Petroleum Engineering Program and Project Management at Santos Ltd. | |
AU2014200681A1 (en) | A project management method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |