CN102425115A CN2011104223999A CN201110422399A CN102425115A CN 102425115 A CN102425115 A CN 102425115A CN 2011104223999 A CN2011104223999 A CN 2011104223999A CN 201110422399 A CN201110422399 A CN 201110422399A CN 102425115 A CN102425115 A CN 102425115A
Authority
CN
China
Prior art keywords
concrete
cable saddle
falsework
saddle buttress
loose
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104223999A
Other languages
English (en)
Other versions
CN102425115B (zh
Inventor
陈开桥
王吉连
毛伟琦
李军堂
涂满明
余绍宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
7th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
7th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC, 7th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2011104223999A priority Critical patent/CN102425115B/zh
Publication of CN102425115A publication Critical patent/CN102425115A/zh
Application granted granted Critical
Publication of CN102425115B publication Critical patent/CN102425115B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种主动克服散索鞍支墩混凝土自重和线形控制的方法,包括步骤:在锚碇施工时埋设承载膺架预埋件;拼装膺架,将承载膺架柱脚与预埋件定位、焊接牢固;立模浇筑散索鞍支墩及后锚块节段混凝土;通过承载膺架及液压设备对已浇筑节段支墩混凝土进行主动起顶;继续逐层浇筑锚块及散索鞍支墩混凝土,通过设计计算分道对已浇筑散索鞍支墩主动起顶,直至散索鞍支墩浇筑完成;完善承载膺架,浇筑锚室及侧墙混凝土;再浇筑合拢段及锚室顶板混凝土,拆除承载膺架。本发明能够有效控制墩体结构的应力及线形,并使墩底应力产生一定的预压力,抵消部分上部结构产生的拉应力,提高施工质量和施工安全,还可节约施工成本,提高经济效益。

Description

主动克服散索鞍支墩混凝土自重和线形控制的方法
技术领域
本发明涉及散索鞍支墩施工领域,特别是涉及一种主动克服散索鞍支墩混凝土自重和线形控制的方法。
背景技术
散索鞍支墩一般为超高大坡度结构,采用常规支架现浇施工时,受大倾斜角度的影响,在分节段浇筑散索鞍支墩混凝土的过程中,支架会产生下挠变形,且在墩底外边缘会产生拉应力,易导致墩底混凝土在施工阶段产生开裂,影响施工质量和施工安全;同时,在大坡度散索鞍支墩往高处施工的过程中,墩顶会产生较大的水平位移,使散索鞍支墩偏离设计位置,导致线形难以满足设计要求。
发明内容
本发明的目的是为了克服上述背景技术的不足,提供一种主动克服散索鞍支墩混凝土自重和线形控制的方法,能够有效控制墩体结构的应力及线形,并使墩底应力产生一定的预压力,抵消部分上部结构产生的拉应力,提高施工质量和施工安全,还可节约施工成本,提高经济效益。
本发明提供的主动克服散索鞍支墩混凝土自重和线形控制的方法,包括以下步骤:A、在散索鞍支墩锚碇及后锚块的施工中埋设承载膺架的预埋件,将承载膺架的柱脚固定在预埋件上,再分节段拼装承载膺架,承载膺架在垂直于散索鞍支墩混凝土的方向上设有支撑梁;B、承载膺架拼装到设计高度后,根据预先设置的预抬量,分层立模浇筑散索鞍支墩混凝土及后锚块混凝土,然后拆除模板,在承载膺架与散索鞍支墩混凝土之间、所述支撑梁的延长线上安装起顶分配梁和液压设备,液压设备的一端固定在起顶分配梁上,另一端顶在散索鞍支墩混凝土上,再通过承载膺架及液压设备对已浇筑散索鞍支墩混凝土进行主动起顶,克服散索鞍支墩墩底产生的弯矩,并对散索鞍支墩的线形进行控制;C、重复步骤B,继续逐层浇筑散索鞍支墩混凝土及后锚块混凝土,对已浇筑散索鞍支墩混凝土主动起顶,直至散索鞍支墩混凝土浇筑完成;D、承载膺架拼装完成后,在承载膺架的支撑上分节段浇筑锚室底板及侧墙混凝土,再浇筑合拢段及锚室顶板混凝土,然后拆除承载膺架。
在上述技术方案中,步骤A中所述承载膺架的柱脚与预埋件点焊以定位,待承载膺架定位完成后,再将柱脚与预埋件焊接牢固。
在上述技术方案中,步骤B中所述散索鞍支墩混凝土的强度达到设计强度的85%后,再安装起顶分配梁及液压设备,进行主动起顶。
在上述技术方案中,所述散索鞍支墩的内部浇筑呈空心状。
在上述技术方案中,所述液压设备采用千斤顶。
与现有技术相比,本发明的优点如下:
对于超高大坡度结构散索鞍混凝土及承载膺架两种刚度差异较大的结构,本发明通过设置液压设备,采用主动起顶控制,受力明确,能准确掌握两者的应力和变形,使主体结构和临时结构在可控的状态下工作,超高大坡度结构散索鞍施工在分节段浇筑混凝土的过程中能够有效控制墩体结构的应力及线形,并使墩底应力产生一定的预压力,抵消部分上部结构产生的拉应力,使墩体结构比原设计更安全,能够很好的控制施工质量,也可节约施工成本的投入,提高经济效益。
附图说明
图1为本发明实施例的施工示意图;
图2为图1的侧面图;
图3为锚室底板及侧墙混凝土的浇筑示意图;
图4为合拢段及锚室顶板混凝土的浇筑示意图。
图中:1-散索鞍支墩基础,2-后锚块,3-承载膺架,4-预埋件,5-柱脚,6-散索鞍支墩混凝土,7-起顶分配梁,8-液压设备,9-合拢段及锚室顶板混凝土,10-锚室底板及侧墙混凝土,11-支撑梁。
具体实施方式
下面结合附图及实施例对本发明作进一步的详细描述。
本发明实施例提供的主动克服散索鞍支墩混凝土自重和线形控制的方法,包括以下步骤:
A.参见图1所示,完成散索鞍支墩基础1大体积混凝土的施工后,进行后锚块2混凝土的浇筑,在浇筑散索鞍支墩基础1及后锚块2混凝土的同时,在相应位置埋设承载膺架3的预埋件4。初始拼装承载膺架3时,承载膺架3的柱脚5先与预埋件4点焊作定位焊接,待承载膺架3定位完成后,按图纸要求将柱脚5与预埋件4焊接牢固。再分节段拼装承载膺架3,承载膺架3在垂直于散索鞍支墩混凝土6的方向上设有支撑梁11。
B、承载膺架3拼装到设计高度后,根据预先设置的预抬量,分层立模浇筑散索鞍支墩混凝土6及后锚块2混凝土,当浇筑散索鞍支墩混凝土6至第三层时,拆除散索鞍支墩的第三层混凝土模板,待混凝土强度达到设计强度的85%后,在承载膺架3与散索鞍支墩混凝土6第三层之间、图1中从下往上第一个支撑梁11的延长线上安装起顶分配梁7及液压设备8,进行主动起顶。液压设备8的一端固定在起顶分配梁7上,另一端顶在散索鞍支墩混凝土6上,参见图2所示。再通过承载膺架3及液压设备8对已浇筑散索鞍支墩混凝土6进行主动起顶,克服散索鞍支墩墩底产生的弯矩,并对散索鞍支墩的线形进行控制。
C、重复步骤B,继续逐层浇筑散索鞍支墩混凝土6及后锚块2混凝土,对已浇筑散索鞍支墩混凝土6主动起顶,直至散索鞍支墩混凝土浇筑完成。
具体来说,逐层浇筑后锚块2混凝土;安装前锚面承载膺架3及起顶分配梁7,浇筑前锚面处混凝土;立模分节段浇筑散索鞍支墩混凝土6至第五层,拆除散索鞍支墩第五层混凝土模板,待混凝土强度达到设计强度的85%后,在承载膺架3与散索鞍支墩混凝土6第五层之间、图1中从下往上第二个支撑梁11的延长线上安装起顶分配梁7及液压设备8,进行主动起顶。逐层浇筑后锚块2混凝土完毕;继续安装承载膺架3及支撑梁11,立模分节段浇筑散索鞍支墩混凝土6至第八层,拆除散索鞍支墩第八层混凝土模板,待混凝土强度达到设计强度的85%后,在承载膺架3与散索鞍支墩混凝土6第八层之间、图1中从下往上第三个支撑梁11的延长线上安装起顶分配梁7及液压设备8,进行主动起顶;再逐层浇筑散索鞍支墩混凝土6至第十层。
D、参见图3所示,承载膺架3拼装完成后,在承载膺架3的支撑上分节段浇筑锚室底板及侧墙混凝土10,再浇筑合拢段及锚室顶板混凝土9,然后拆除承载膺架3。实际施工中,拆除承载膺架3的部分现浇支架及分配梁,安装现浇锚室支架分配梁,浇筑合拢段及锚室顶板混凝土9和锚室底板及侧墙混凝土10,参见图4所示,强度达设计要求后,拆除现浇支架及分配梁,待主缆安装完毕,浇筑剩余部分合拢段及锚室顶板混凝土9。
本发明实施例中的主动起顶控制为通过承载膺架3及液压设备8产生的水平力,克服散索鞍支墩墩底产生的弯矩,并对散索鞍支墩的线形进行控制。承载膺架3为散索鞍支墩混凝土6的承载者,也是锚室底板及侧墙混凝土10的承载者。本发明实施例中,散索鞍支墩的内部浇筑呈空心状,液压设备8可采用千斤顶。
显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。
本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (5)

1.一种主动克服散索鞍支墩混凝土自重和线形控制的方法,其特征在于包括以下步骤:
A、在散索鞍支墩锚碇及后锚块的施工中埋设承载膺架的预埋件,将承载膺架的柱脚固定在预埋件上,再分节段拼装承载膺架,承载膺架在垂直于散索鞍支墩混凝土的方向上设有支撑梁;
B、承载膺架拼装到设计高度后,根据预先设置的预抬量,分层立模浇筑散索鞍支墩混凝土及后锚块混凝土,然后拆除模板,在承载膺架与散索鞍支墩混凝土之间、所述支撑梁的延长线上安装起顶分配梁和液压设备,液压设备的一端固定在起顶分配梁上,另一端顶在散索鞍支墩混凝土上,再通过承载膺架及液压设备对已浇筑散索鞍支墩混凝土进行主动起顶,克服散索鞍支墩墩底产生的弯矩,并对散索鞍支墩的线形进行控制;
C、重复步骤B,继续逐层浇筑散索鞍支墩混凝土及后锚块混凝土,对已浇筑散索鞍支墩混凝土主动起顶,直至散索鞍支墩混凝土浇筑完成;
D、承载膺架拼装完成后,在承载膺架的支撑上分节段浇筑锚室底板及侧墙混凝土,再浇筑合拢段及锚室顶板混凝土,然后拆除承载膺架。
2.如权利要求1所述的主动克服散索鞍支墩混凝土自重和线形控制的方法,其特征在于:步骤A中所述承载膺架的柱脚与预埋件点焊以定位,待承载膺架定位完成后,再将柱脚与预埋件焊接牢固。
3.如权利要求1所述的主动克服散索鞍支墩混凝土自重和线形控制的方法,其特征在于:步骤B中所述散索鞍支墩混凝土的强度达到设计强度的85%后,再安装起顶分配梁及液压设备,进行主动起顶。
4.如权利要求1至3中任一项所述的主动克服散索鞍支墩混凝土自重和线形控制的方法,其特征在于:所述散索鞍支墩的内部浇筑呈空心状。
5.如权利要求1至3中任一项所述的主动克服散索鞍支墩混凝土自重和线形控制的方法,其特征在于:所述液压设备采用千斤顶。
CN2011104223999A 2011-11-11 2011-12-16 主动克服散索鞍支墩混凝土自重和线形控制的方法 Active CN102425115B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104223999A CN102425115B (zh) 2011-11-11 2011-12-16 主动克服散索鞍支墩混凝土自重和线形控制的方法

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201110355509.4 2011-11-11
CN201110355509 2011-11-11
CN2011104223999A CN102425115B (zh) 2011-11-11 2011-12-16 主动克服散索鞍支墩混凝土自重和线形控制的方法

Publications (2)

Publication Number Publication Date
CN102425115A true CN102425115A (zh) 2012-04-25
CN102425115B CN102425115B (zh) 2013-08-21

Family

ID=45959141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104223999A Active CN102425115B (zh) 2011-11-11 2011-12-16 主动克服散索鞍支墩混凝土自重和线形控制的方法

Country Status (1)

Country Link
CN (1) CN102425115B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457190A (zh) * 2018-01-23 2018-08-28 中交路桥华南工程有限公司 锚碇前锚室顶板施工方法
CN109468954A (zh) * 2018-10-29 2019-03-15 中交二航局第四工程有限公司 一种锚碇锚固系统的施工方式
CN110184919A (zh) * 2019-04-26 2019-08-30 安徽省公路桥梁工程有限公司 矮斜塔索鞍定位体系的施工方法
CN110747738A (zh) * 2019-10-28 2020-02-04 浙江省交通规划设计研究院有限公司 悬索桥锚碇的前锚室及钢混组合式上盖板的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064225A (ja) * 1998-08-25 2000-02-29 Shinko Kosen Kogyo Kk 吊構造物のケーブル取り付け方法
CN101225638A (zh) * 2007-12-20 2008-07-23 中铁大桥局股份有限公司 地锚式悬索桥预应力混凝土加劲箱梁安装方法
CN101446067A (zh) * 2008-12-22 2009-06-03 中铁大桥局集团第五工程有限公司 大跨度钢箱提篮拱桥y构施工方法
CN101775780A (zh) * 2010-01-22 2010-07-14 清华大学 钢-混凝土组合锚固结构及其施工方法
CN101838969A (zh) * 2010-02-09 2010-09-22 长沙理工大学 边跨散索套无支撑的独塔双跨自锚式悬索桥吊索张拉方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064225A (ja) * 1998-08-25 2000-02-29 Shinko Kosen Kogyo Kk 吊構造物のケーブル取り付け方法
CN101225638A (zh) * 2007-12-20 2008-07-23 中铁大桥局股份有限公司 地锚式悬索桥预应力混凝土加劲箱梁安装方法
CN101446067A (zh) * 2008-12-22 2009-06-03 中铁大桥局集团第五工程有限公司 大跨度钢箱提篮拱桥y构施工方法
CN101775780A (zh) * 2010-01-22 2010-07-14 清华大学 钢-混凝土组合锚固结构及其施工方法
CN101838969A (zh) * 2010-02-09 2010-09-22 长沙理工大学 边跨散索套无支撑的独塔双跨自锚式悬索桥吊索张拉方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108457190A (zh) * 2018-01-23 2018-08-28 中交路桥华南工程有限公司 锚碇前锚室顶板施工方法
CN109468954A (zh) * 2018-10-29 2019-03-15 中交二航局第四工程有限公司 一种锚碇锚固系统的施工方式
CN109468954B (zh) * 2018-10-29 2021-01-05 中交二航局第四工程有限公司 一种锚碇锚固系统的施工方式
CN110184919A (zh) * 2019-04-26 2019-08-30 安徽省公路桥梁工程有限公司 矮斜塔索鞍定位体系的施工方法
CN110184919B (zh) * 2019-04-26 2020-09-15 安徽省公路桥梁工程有限公司 矮斜塔索鞍定位体系的施工方法
CN110747738A (zh) * 2019-10-28 2020-02-04 浙江省交通规划设计研究院有限公司 悬索桥锚碇的前锚室及钢混组合式上盖板的施工方法

Also Published As

Publication number Publication date
CN102425115B (zh) 2013-08-21

Similar Documents

Publication Publication Date Title
CN104141383B (zh) 一种贝雷梁悬吊模板支撑体系及其施工工法
CN106894639B (zh) 一种下挂式钢结构逆向安装施工方法
CN102587659A (zh) 一种以混凝土柱支顶后浇带两侧结构的施工方法
CN102767303A (zh) 一种预制混凝土塔架及其构建方法
CN101914897A (zh) 单主缆斜吊杆地锚式悬索桥的施工方法
CN206692235U (zh) 一种钢结构穹顶起吊安装装置
CN105586833B (zh) 劲性骨架钢筋笼整体成型大型现浇薄壁高墩施工方法
CN104695715A (zh) 一种屋面张弦梁结构施工方法
CN203947771U (zh) 一种贝雷梁悬吊模板支撑体系
CN203794498U (zh) 一种内置式自升塔吊装置
CN102505636A (zh) 一种双薄壁墩连续刚构桥0号块施工方法
CN102425115B (zh) 主动克服散索鞍支墩混凝土自重和线形控制的方法
CN103290784A (zh) 拱梁结合桥吊装施工方法
CN105464216A (zh) 基于整体提升式模板加固系统超高超大截面斜柱的施工方法
CN110552502A (zh) 一种c型料场中间挡墙悬挑平台的施工方法
CN105804400A (zh) 一种曲面网架提升施工方法
CN104652813A (zh) 用于超高层建筑钢结构的塔吊施工工艺
CN103866693A (zh) 一种钢筋混凝土系杆拱桥拱肋的安装方法及吊装辅桥
CN102900024A (zh) 大型混凝土结构翻升模板以及使用方法
CN102277836B (zh) 倾斜式混凝土塔座的施工方法
CN103696429A (zh) 一种异形基坑的砼支撑加鱼腹梁的组合支撑体系及施工方法
CN109457814B (zh) 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法
CN103061508A (zh) 一种三角形滑模装置及施工方法
CN105714678A (zh) 一种复合式重力锚碇
CN102486051A (zh) 大面积球形网架人工拆除方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150212

Owner name: MBEC 7TH ENGINEERING CO., LTD.

Free format text: FORMER OWNER: MBEC 7TH ENGINEERING CO., LTD. GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Effective date: 20150212

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150212

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Patentee after: The 7th Engineering Co., Ltd., MBEC

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

Patentee before: The 7th Engineering Co., Ltd., MBEC

Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160407

Address after: 430050 Hubei Wuhan economic and Technological Development Zone headquarters Zone Bridge Industry Park

Patentee after: The 7th Engineering Co., Ltd., MBEC

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau

Patentee before: The 7th Engineering Co., Ltd., MBEC