CN102900024A - 大型混凝土结构翻升模板以及使用方法 - Google Patents

大型混凝土结构翻升模板以及使用方法 Download PDF

Info

Publication number
CN102900024A
CN102900024A CN2012104400752A CN201210440075A CN102900024A CN 102900024 A CN102900024 A CN 102900024A CN 2012104400752 A CN2012104400752 A CN 2012104400752A CN 201210440075 A CN201210440075 A CN 201210440075A CN 102900024 A CN102900024 A CN 102900024A
Authority
CN
China
Prior art keywords
template
concrete structure
collar tie
die plate
tie beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104400752A
Other languages
English (en)
Other versions
CN102900024B (zh
Inventor
黄峰
雷运华
刘荣
梁新礼
吴克强
左少华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
6th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
6th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 6th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201210440075.2A priority Critical patent/CN102900024B/zh
Publication of CN102900024A publication Critical patent/CN102900024A/zh
Application granted granted Critical
Publication of CN102900024B publication Critical patent/CN102900024B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种大型混凝土结构翻升模板及使用方法,所述模板包括直接承受混凝土浇筑时的侧压力的钢面板,传递钢面板荷载和约束横向变形的竖带、上下圈梁及锚杆;所述竖带紧贴钢面板上,该竖带顶部和底部通过多段圈梁固定,顶部的上圈梁之间用连接杆固定,底部的下圈梁内穿设在混凝土的锚杆上。本发明的模板安装钢面板、竖带吊装、圈梁吊装、混凝土浇筑以及拆模,本发明大型混凝土结构无拉杆翻升模板结构形式受力层次清晰、模板组成简洁、安装拆卸方便,且经济性相对于外部桁架整体无拉杆式的模板节省近一半费用。

Description

大型混凝土结构翻升模板以及使用方法
技术领域
本发明涉及一种大型混凝土模板施工工程,具体是无拉杆翻升模板。 
背景技术
 目前在桥梁工程和其它建筑工程的混凝土结构模板工程,多采用外部支撑、内设对穿拉杆、外部桁架整体无拉杆式的加固,但对于混凝土结构断面尺寸非常大(断面尺寸达10m以上时)或高度较高时,采用对穿拉杆和外部支撑很难实现,采用外部桁架整体无拉杆式的模板费用也很高。在模板设计时需要综合考虑模板加固方式、安装方法、制作尺寸、受力特点、经济性及施工的可操作性。 
发明内容
有鉴于此,本发明要解决的技术问题在于提供一种大型混凝土结构翻升模板以及使用方法,模板组成简洁、安装拆卸方便。 
为解决上述技术问题,本发明的技术方案是这样实现的:一种大型混凝土结构翻升模板,所述模板包括直接承受混凝土浇筑时的侧压力的钢面板,传递钢面板荷载和约束横向变形的竖带、上下圈梁及锚杆;所述竖带紧贴钢面板上,该竖带顶部和底部通过多段圈梁固定,顶部的上圈梁之间用连接杆固定,底部的下圈梁内穿设在混凝土的锚杆上。 
进一步,所述上、下圈梁由双拼槽钢制成。 
进一步,包括面板、竖肋和横肋。 
一种大型混凝土结构翻升模板的使用方法,包括如下步骤: 
a、安装钢面板:模板经打磨、涂刷脱模剂处理后,利用吊机吊装模板至施工部位,连接模板,调整模板垂直度和平面位置并固定,安装操作平台支架;
b、竖带吊装:用吊机将竖带间距吊装,并挂在钢面板背部;
c、圈梁吊装:分别将上、下圈梁吊装放置在操作平台上,将上圈梁之间用固定连接,下圈梁用锚杆锚紧,安装连接杆和预埋锚杆,整个模板安装完成;
d、混凝土浇筑:控制混凝土分层厚度,确保模板整体受力均匀;
e、拆模:混凝土达到拆模强度后,先松除连接杆,再拆卸上下圈梁,吊离竖带,拆除模板,拆卸钢面板;
f、重复a~e步骤循环。
在所述步骤d中,分层厚度不超过30cm。 
本发明达到的技术效果如下:本发明大型混凝土结构无拉杆翻升模板适用于混凝土结构断面尺寸非常大时(断面尺寸达10m以上时)和高度较高时,采用现有对穿拉杆和外部支撑,外部桁架整体无拉杆式的模板费用很高。本发明大型混凝土结构无拉杆翻升模板结构形式受力层次清晰、模板组成简洁、安装拆卸方便,且经济性相对于外部桁架整体无拉杆式的模板节省近一半费用。 
附图说明
图1为本发明大型混凝土结构翻升模板的立体布置图; 
图2为图1中1-1横截面结构示意图;
图3为图1中2-2横截面结构示意图。
具体实施方式
如图1所示,根据大型混凝土结构翻升模板1的受力特点、受力层次,该模板包括钢面板11、竖带12、下圈梁16及锚杆14、上圈梁15及连接杆13。在图1中所示为一大型混凝土结构无拉杆翻升模板结构,钢面板11竖向由500mm、2000mm以及500mm高度分段组成,500mm的钢面板锚固在已浇混凝土上作为上部模板支撑和定位, 竖带12紧贴于钢面板外11侧并可拆卸,竖带12顶部和底部用圈梁套住,通过连接杆13和底部锚杆14将圈梁固定,达到模板加固的目的。 
图2和图3为模板顶部和底部的平面布置,上圈梁15分段制作,分段上圈梁15之间、连接杆13与上圈梁15之间均采用连接杆13通过轴销连接;下圈梁16也分段制作,通过预埋在已浇混凝土20中的锚杆14锚固圈梁,达到加固的目的。 
钢面板11:即为普通的钢模板由面板、竖肋和横肋组成,直接承受混凝土浇筑时的侧压力; 
竖带12:采用工字钢竖直悬挂在钢面板11上,传递钢面板的荷载,同时起到约束钢面板的横向变形;
下圈梁16及锚杆14:下圈梁16采用双拼槽钢制作而成,横向圈住竖带12底口,内穿锚杆14,锚杆14直接锚固于已浇混凝土中,将下圈梁16承受竖带12底口水平力后,通过锚杆14传递到已浇混凝土20中;
上圈梁15及连接杆:上圈梁15采用双拼槽钢制作而成,横向圈住竖带12顶口,上圈梁15之间用连接杆13和连接杆轴销连接,连接杆13将混凝土两侧上圈梁15连接成整体,承受竖带11顶口水平力。
本发明大型混凝土结构翻升模板的使用方法如下: 
a、钢面板11安装:模板经打磨、涂刷脱模剂等处理后,利用吊机吊装模板至施工部位,连接模板法兰螺栓,利用斜撑调整模板垂直度和平面位置再临时固定,安装好操作平台19支架;
b、竖带12吊装:用吊机将竖带按设计间距吊装,并挂在钢面板背部;
c、圈梁吊装:分别将上圈梁15、下圈梁16吊装放置在操作平台19上,将上圈梁15之间用连接杆轴销连接,下圈梁16用锚杆14锚紧,最后安装连接杆13和预埋锚杆18,整个模板安装完成;
d、混凝土浇筑:模板尺寸、垂直度等经检查合格后浇筑混凝土,浇筑时严格控制混凝土分层厚度(不超过30cm),确保模板整体受力均匀;
e、拆模:混凝土达到拆模强度后,先松除连接杆13,再拆卸上圈梁15、下圈梁16,吊离竖带12,拆除模板法兰螺栓,拆卸钢面板11;
f、重复a~e步骤循环施工。
以上所述,仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。 

Claims (5)

1.一种大型混凝土结构翻升模板,其特征在于,所述模板包括直接承受混凝土浇筑时的侧压力的钢面板,传递钢面板荷载和约束横向变形的竖带、上下圈梁及锚杆;所述竖带紧贴钢面板上,该竖带顶部和底部通过多段圈梁固定,顶部的上圈梁之间用连接杆固定,底部的下圈梁内穿设在混凝土的锚杆上。
2.如权利要求1所述的大型混凝土结构翻升模板,其特征在于,所述上、下圈梁由双拼槽钢制成。
3.如权利要求1所述的大型混凝土结构翻升模板,其特征在于,包括面板、竖肋和横肋。
4.一种如权利要求1所述的大型混凝土结构翻升模板的使用方法,其特征在于,包括如下步骤:
a、安装钢面板:模板经打磨、涂刷脱模剂处理后,利用吊机吊装模板至施工部位,连接模板,调整模板垂直度和平面位置并固定,安装操作平台支架;
b、竖带吊装:用吊机将竖带间距吊装,并挂在钢面板背部;
c、圈梁吊装:分别将上、下圈梁吊装放置在操作平台上,将上圈梁之间用固定连接,下圈梁用锚杆锚紧,安装连接杆和预埋锚杆,整个模板安装完成;
d、混凝土浇筑:控制混凝土分层厚度,确保模板整体受力均匀;
e、拆模:混凝土达到拆模强度后,先松除连接杆,再拆卸上下圈梁,吊离竖带,拆除模板,拆卸钢面板;
f、重复a~e步骤循环。
5.一种如权利要求1所述的大型混凝土结构翻升模板的使用方法,其特征在于,所述步骤d中,分层厚度不超过30cm。
CN201210440075.2A 2012-11-07 2012-11-07 大型混凝土结构翻升模板的使用方法 Active CN102900024B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210440075.2A CN102900024B (zh) 2012-11-07 2012-11-07 大型混凝土结构翻升模板的使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210440075.2A CN102900024B (zh) 2012-11-07 2012-11-07 大型混凝土结构翻升模板的使用方法

Publications (2)

Publication Number Publication Date
CN102900024A true CN102900024A (zh) 2013-01-30
CN102900024B CN102900024B (zh) 2015-07-08

Family

ID=47572491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210440075.2A Active CN102900024B (zh) 2012-11-07 2012-11-07 大型混凝土结构翻升模板的使用方法

Country Status (1)

Country Link
CN (1) CN102900024B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104343086A (zh) * 2014-10-27 2015-02-11 中铁港航局集团有限公司 斜拉桥上塔柱钢锚梁锚固区段小空间施工方法
CN106457606A (zh) * 2014-09-25 2017-02-22 东洋铝株式会社 混凝土成形用框架、利用其成形而成的混凝土成形体、使用了混凝土成形体的混凝土结构物、混凝土成形体的制造方法以及混凝土结构物的制造方法
CN110616735A (zh) * 2019-09-09 2019-12-27 湖南建工集团有限公司 一种用于挡土墙的模板体系及挡土墙的施工方法
CN110805270A (zh) * 2019-12-06 2020-02-18 荆门市佰思机械科技有限公司 一种导向翻模装置
CN110821155A (zh) * 2019-12-10 2020-02-21 荆门市佰思机械科技有限公司 一种起吊翻转的翻模模板
CN110821153A (zh) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 一种爬模装置的翻模模板
CN110821154A (zh) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 一种翻模装置
CN110905193A (zh) * 2019-12-05 2020-03-24 荆门市佰思机械科技有限公司 一种外翻内滑式爬模装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1054112A (zh) * 1990-02-19 1991-08-28 四川省桥梁工程公司 滑升翻模施工装置
CN2440889Y (zh) * 2000-08-16 2001-08-01 刘功诠 爬升平台翻模装置
CN201187051Y (zh) * 2008-05-06 2009-01-28 中交第二公路工程局有限公司 深水桥梁基础施工多功能钻孔平台顶板
CN201605538U (zh) * 2010-01-07 2010-10-13 中交第二公路工程局有限公司 高塔施工桁架式围檩、无拉杆翻模装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1054112A (zh) * 1990-02-19 1991-08-28 四川省桥梁工程公司 滑升翻模施工装置
CN2440889Y (zh) * 2000-08-16 2001-08-01 刘功诠 爬升平台翻模装置
CN201187051Y (zh) * 2008-05-06 2009-01-28 中交第二公路工程局有限公司 深水桥梁基础施工多功能钻孔平台顶板
CN201605538U (zh) * 2010-01-07 2010-10-13 中交第二公路工程局有限公司 高塔施工桁架式围檩、无拉杆翻模装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘飞: "自然通风冷却塔筒壁三角架翻模和电动爬模施工工艺比较", 《建筑安全》, no. 01, 5 January 2008 (2008-01-05), pages 20 - 22 *
李旺兴等: "翻模施工在肇兴大桥高墩施工中的应用", 《低温建筑技术》, no. 11, 1 December 2010 (2010-12-01), pages 62 - 64 *
杨树松等: "浅谈罗河大桥高墩的翻模施工", 《公路》, no. 09, 25 September 2007 (2007-09-25), pages 30 - 34 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106457606A (zh) * 2014-09-25 2017-02-22 东洋铝株式会社 混凝土成形用框架、利用其成形而成的混凝土成形体、使用了混凝土成形体的混凝土结构物、混凝土成形体的制造方法以及混凝土结构物的制造方法
CN104343086A (zh) * 2014-10-27 2015-02-11 中铁港航局集团有限公司 斜拉桥上塔柱钢锚梁锚固区段小空间施工方法
CN110616735A (zh) * 2019-09-09 2019-12-27 湖南建工集团有限公司 一种用于挡土墙的模板体系及挡土墙的施工方法
CN110905193A (zh) * 2019-12-05 2020-03-24 荆门市佰思机械科技有限公司 一种外翻内滑式爬模装置
CN110805270A (zh) * 2019-12-06 2020-02-18 荆门市佰思机械科技有限公司 一种导向翻模装置
CN110821153A (zh) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 一种爬模装置的翻模模板
CN110821154A (zh) * 2019-12-06 2020-02-21 荆门市佰思机械科技有限公司 一种翻模装置
CN110805270B (zh) * 2019-12-06 2021-03-23 荆门市佰思机械科技有限公司 一种导向翻模装置
CN110821155A (zh) * 2019-12-10 2020-02-21 荆门市佰思机械科技有限公司 一种起吊翻转的翻模模板

Also Published As

Publication number Publication date
CN102900024B (zh) 2015-07-08

Similar Documents

Publication Publication Date Title
CN102900024B (zh) 大型混凝土结构翻升模板的使用方法
CN101824800B (zh) 一种桥位现浇预应力混凝土连续梁的施工方法
CN103935911B (zh) 塔吊附墙支撑结构及其施工方法
CN102587286A (zh) 桥梁上部结构简支变连续施工方法
CN105464216A (zh) 基于整体提升式模板加固系统超高超大截面斜柱的施工方法
CN203113793U (zh) 一种倾斜结构大模板安装系统
CN206956979U (zh) 一种带顶柱的一字型剪力墙
CN201648978U (zh) 桥位现浇预应力混凝土连续梁的系杆拱支架
CN106884664B (zh) 隧道仰拱模板及隧道仰拱填充快速施工方法
CN102691267A (zh) 一种外置整体操作平台高墩施工方法
CN108797380B (zh) 悬灌连续梁托架悬吊施工装置及施工方法
CN201511439U (zh) 箱梁钢筋骨架整体绑扎、整体吊装系统
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN105951683A (zh) 闸墩牛腿钢筋施工方法
CN105971287B (zh) 反力墙竖向预应力施工方法
CN205296829U (zh) 超高超大截面斜柱整体提升式模板加固系统
CN101537660A (zh) 一种柔性玻璃钢圆柱模板安装与拆除工艺
CN202347846U (zh) 简易提升式定型化楼梯钢模板
CN104404923A (zh) 拱坝牛腿模板装置及基于该装置的施工方法
CN210685282U (zh) 一种预制轨顶风道装配结构
CN202611250U (zh) 立柱钢管混凝土灌注台架
CN113863354B (zh) 超高独立承台面筋整体安装结构及其施工方法
CN109537599A (zh) 深基坑支撑体系换撑结构的施工方法
CN110284433B (zh) 一种拱上π形刚架的安装方法
CN215885951U (zh) 施工电梯附着支撑装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161008

Address after: 430101 new agricultural industrial zone, iron industry village, Caidian District, Hubei, Wuhan

Patentee after: China Railway Major Bridge Bureau Sixth Engineering Co., LTD.

Address before: 430101 new agricultural industrial zone, iron industry village, Caidian District, Hubei, Wuhan

Patentee before: China Railway Major Bridge Bureau Sixth Engineering Co., LTD.

Patentee before: Group Co., Ltd., Zhongtie Daqiao Bureau