CN102418534B - Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame - Google Patents

Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame Download PDF

Info

Publication number
CN102418534B
CN102418534B CN 201110313765 CN201110313765A CN102418534B CN 102418534 B CN102418534 B CN 102418534B CN 201110313765 CN201110313765 CN 201110313765 CN 201110313765 A CN201110313765 A CN 201110313765A CN 102418534 B CN102418534 B CN 102418534B
Authority
CN
China
Prior art keywords
mould bases
board
mid
base
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110313765
Other languages
Chinese (zh)
Other versions
CN102418534A (en
Inventor
何辉斌
吴庆
曲鹏
潘国庆
孙庆波
苗云星
王元
王忠良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Road & Bridge Group Co Ltd
Original Assignee
Beijing Urban Construction Road & Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Road & Bridge Group Co Ltd filed Critical Beijing Urban Construction Road & Bridge Group Co Ltd
Priority to CN 201110313765 priority Critical patent/CN102418534B/en
Publication of CN102418534A publication Critical patent/CN102418534A/en
Application granted granted Critical
Publication of CN102418534B publication Critical patent/CN102418534B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a split movable mould frame device for a tunnel compartment wall, and a construction method for the split movable mould frame. The device is symmetrically arranged on two sides of the tunnel compartment wall, and consists of base mould frames, wall body mould frames, auxiliary sliding mechanisms, deflection separation mechanisms, and scaffold support structures. The wall body mould frames can turn and slide on tracks of the base mould frames. The concave surfaces of the wall body mould frames are connected with joist steel and channel steel, and the auxiliary sliding mechanisms, and the deflection separation mechanisms. The cross sections of the base mould frames and the wall body mould frames are curved. Each wall body mould frame consists of two split mould frames with different curvatures in five layers. The split movable mould frame device solves the problem that a concrete casting template of the tunnel compartment wall is dismantled and installed repeatedly, and can be used for large-scale concrete casting in one time. During casting, a scaffold is used as external support of the wall body mould frames; the auxiliary sliding mechanisms are used for supporting the wall body mould frames to slide in the horizontal direction; the deflection separation mechanisms are pulled to ensure that the wall body mould frames turn to be separated from the concrete surface, and the adhesion and friction of the concrete surface is eliminated; and the split movable mould frame device can move flexibly.

Description

Split type mobile formwork device and the job practices thereof of tunnel mid-board
Technical field
The present invention relates to frock and the job practices thereof of a kind of tunnel mid-board concrete pouring construction, particularly relate to a kind of split type mobile formwork device and job practices of building for duplex arch tunnel mid-board concrete.
Background technology
Small space carries out concrete pouring construction, and under the inaccessiable situation of power jacking equipment, it is that the little template of employing is assembled repeatedly, Zhi Li that traditional construction formwork mainly designs.The groundwork program is: structure reinforcing bars colligation-manually assemble branching standing template-structure concrete to build-artificial blocked breaking removing template.In a word, the characteristics of traditional construction formwork are that the assembling of fritter template piecemeal, blocked breaking remove, and then assembling, remove, so circulation again.Under traditional job practices situation, for improving construction speed, need to make a large amount of templates, to accelerate the construction formwork turnaround time, guarantee carrying out smoothly of construction target.Carry out the tunnel mid-board with conventional template and both built and waste time and energy, equipment and material are used in waste again.
Chinese patent " concrete construction water translation moving platen device " (patent No. 93211161.0), disclose that a kind of Gezhouba Project office provides: ' mould bases is provided with driving mechanism, mould bases can realize that by driving mechanism and sliding pair mould bases moves horizontally along vertical body of wall, to adapt to Concrete Construction ' technology.The feature of this patented technology is still to adopt little template cyclic utilization method, carries out the vertical body of wall of quadrangle and builds.The continuous mobile formwork of this Technology Need makes mould bases to being divided into one pours into a mould of pour mass of n section (every section is divided into the n piece again).It fails to solve, and the template that disposable large tracts of land is built and the tunnel mid-board uses need be assembled repeatedly, the dismounting problem; Though it has solved mould bases and has moved problem, but failing to solve because of concrete causes mould bases to move difficult problem (in fact to the bonding force of mould bases, by above-mentioned disclosed patented technology, mould bases is because of concrete conglutination power and frictional force reason, mobile very difficulty), it more can't provide the mobile problem be used to the shaped form mould bases of building the shaped form mid-board.In addition, this patented technology is for making the mould bases can be mobile smoothly along track, is provided with its that connected by built-in fitting and has the support of track and sliding pair around casting matrix, and this support causes its structure and installs all very complicated.
Summary of the invention
An object of the present invention is to provide does not a kind ofly just need to assemble repeatedly, remove and can disposable large tracts of land build use to the shaped form mid-board in whole engineering, simple in structure, can deflection leave bonding force and the frictional force that the face of building is eliminated concrete surface, the mobile split type mobile formwork device that is easy to the tunnel mid-board.
The split type mobile formwork device of tunnel of the present invention mid-board comprises track and sliding pair, the split type mobile formwork device of tunnel of the present invention mid-board is characterised in that: the split type mobile formwork device of described tunnel mid-board is symmetricly set on the both sides of tunnel mid-board, the split type mobile formwork device of the described tunnel mid-board of each side contains basic mould bases, wall mould base, auxiliary slipping mechanism, deflection releasing mechanism and scaffold braced structures, vertically fixedly there is described track on described basic mould bases top by the track fixed head, described wall mould base lower end is provided with the some steel wheels that become sliding pair with track, the concave surface of described wall mould base is by the vertical affixed reinforcement i iron of i iron junction plate, by the vertical affixed reinforcement channel-section steel of channel-section steel junction plate, the concave surface of described wall mould base is connected with described auxiliary slide mechanism and described deflection releasing mechanism.
The split type mobile formwork device of tunnel of the present invention mid-board, the curved type in wherein said basic mould bases cross section is vertically connected to form by bolt along the tunnel by n module unit template VI.
The split type mobile formwork device of tunnel of the present invention mid-board, the curved type in wherein said wall mould base cross section, vertically connected and composed by two split mould bases, described split mould bases is provided with five layers from top to bottom, wherein one deck mould bases is is vertically connected and composed by bolt by n module unit template I, two layers of mould bases are are vertically connected and composed by bolt by n module unit template II, three layers of mould bases are are vertically connected and composed by bolt by n module unit template III, four layers of mould bases are are vertically connected and composed by bolt by n module unit template IV, five layers of mould bases are are vertically connected and composed by bolt by n module unit template V, described one deck mould bases, two layers of mould bases, three layers of mould bases, four layers of mould bases, five layers of mould bases are vertically by i iron (9), i iron junction plate (8) and bolt are vertically by strengthening channel-section steel (7), channel-section steel junction plate (10) and bolt connect and compose a described split mould bases successively.
The split type mobile formwork device of tunnel of the present invention mid-board, wherein said unit board I, II, III, IV, V, the cross section of VI is curved type all, described unit board I, II, III, IV, V, the curvature of VI has nothing in common with each other, the curvature of the described unit board I of n piece of forming described one deck mould bases is identical, the curvature of the described unit board II of n piece of forming described two layers of mould bases is identical, the curvature of the described unit board III of n piece of forming described three layers of mould bases is identical, the curvature of the described unit board IV of n piece of forming described four layers of mould bases is identical, the curvature of the described unit board V of n piece of forming described five layers of mould bases is identical, and the curvature of the described unit board VI of n piece of forming described basic mould bases is identical.
The split type mobile formwork device of tunnel of the present invention mid-board, the length of wherein said basic mould bases have more two times of remainings of wall mould base length.
The split type mobile formwork device of tunnel of the present invention mid-board, wherein said auxiliary slipping mechanism is provided with the n cover, the described auxiliary slipping mechanism of every cover has a rubber wheel, described rubber wheel places on the turning rolls, described turning rolls is connected with two triatic stays and a hound, and described triatic stay is connected at Connection Block triangular in shape and on the wall mould base on the described wall mould base with described hound.
The split type mobile formwork device of tunnel of the present invention mid-board, wherein said deflection releasing mechanism has the n cover, contain a bottle gouard moved by hands in the described deflection releasing mechanism of every cover, one on the chain of leading on the described bottle gouard moved by hands is connected with the wall mould base weldment, and the built-in fitting with the vertical wall in tunnel is connected.
The split type mobile formwork device of tunnel of the present invention mid-board, wherein said wall mould base had both had a linear longitudinal movement track on the track of described basic mould bases, also have a horizontal flip-flop movement track.
The split type mobile formwork device of tunnel of the present invention mid-board is provided with stage clip in the wherein said triatic stay.
The split type mobile formwork device of tunnel of the present invention mid-board is provided with some base support between the vertical wall of wherein said track fixed head and tunnel, and described base support is provided with the adjusting jackscrew at the contact jaw with the vertical wall in tunnel.
Another object of the present invention provides the job practices of the split type mobile formwork device of a kind of tunnel mid-board.The job practices of the split type mobile formwork device of tunnel of the present invention mid-board is finished by following steps, and its steps characteristic is:
Step 1, basic mould bases is installed,
1.1, measure unwrapping wire, determine the position of basic mould bases, colligation mid-board reinforcement foundation, after finishing, symmetry is installed by the unit template VI that designs and produces and the basic mould bases that assembles in the mid-board both sides,
1.2, at basic mould bases lower end welding fixing steel plate, and fixing steel plate and mid-board embedded bar be connected and fixed;
1.3, in basic mould bases upper end vertically by track fixed head welded rails, the track fixed head outside arranges a base support in each template VI place, unit, and adjusts jackscrew and make its support firm,
The mid-board base concrete is built in step 2, completing steps 1 back between two basic mould bases,
Step 3, installation wall mould base,
3.1, the mid-board base concrete builds and finishes, and carries out the colligation of mid-board upper reinforcement on the mid-board base concrete,
3.2, afterwards the layer 5 mould bases of wall mould base is installed at first on two basic mould bases of symmetry, [install before the layer 5 mould bases, earlier steel wheel be installed in below the i iron of layer 5 mould bases, and steel wheel is placed on the track],
3.3, set up scaffold, assembly unit from the bottom to top and connect four layers, three layers, two layers of wall mould base and one deck mould bases [first during the spliced wall mould bases on scaffold, in the vertical junction of whole five layers of unit template (I, II, III, IV, V), by the affixed i iron of i iron junction plate, with the vertical belly of template place, one deck unit, by the affixed channel-section steel of channel-section steel junction plate]
3.4, afterwards, the termination of scaffold horizon bar is supported on the side of each layer channel-section steel respectively by base support and chock,
Step 4, after hours above-mentioned is carried out mid-board body concrete and is built between two wall mould bases,
After step 5, the typing of mid-board concrete, remove scaffold, and longitudinally connect one group of auxiliary slide mechanism at every split mould bases concave surface place by desired location respectively,
Step 6, connect two groups of deflection releasing mechanisms at every split mould bases concave surface place by desired location,
6.1, check auxiliary slide mechanism and deflection releasing mechanism installation qualification,
6.2, afterwards, the lead chain of pulling on the bottle gouard moved by hands overturns about 15 ° with wall mould base, and the rubber wheel (19) of auxiliary slide mechanism is contacted with the vertical wall in tunnel, the formation sliding support,
After step 7, auxiliary slide mechanism form sliding support, wall mould base is resolved into two split mould bases, respectively with the length remaining place propelling 1200cm of two split mould bases to basic mould bases; Remove the used basic mould bases in front and base support, go to next circulation construction place in the place ahead and reinstall basic mould bases and base support,
Step 8, two split mould bases after will moving connect into wall mould base again, afterwards 2~step 7 mid-board concrete the pouring construction that carries out next circulation repeatedly set by step.
The split type mobile formwork device of tunnel of the present invention mid-board and job practices difference from prior art thereof are that the split type mobile formwork device of tunnel of the present invention mid-board and job practices thereof have solved tunnel mid-board concrete and built the mode of operation that adopts little template assembling, Zhi Li to circulate repeatedly.Can disposablely carry out large tracts of land carries out concrete and builds.Taken full advantage of the horizon bar of scaffold as the outer support of wall mould base; Auxiliary slipping mechanism can be used for supporting the wall mould base horizontal slip; Wall mould base can make the wall mould base upset be separated from the concrete surface of building by the pulling of deflection releasing mechanism, makes wall mould base not have to build afterwards bonding force and the frictional force of concrete surface, movement that can be light.The split type mobile formwork device of tunnel of the present invention mid-board is a kind of frock of building of desirable tunnel mid-board.
Be described further below in conjunction with split type mobile formwork device and the job practices thereof of accompanying drawing to tunnel of the present invention mid-board.
Description of drawings
Fig. 1 looks schematic diagram for the structure master of the split type mobile formwork device of tunnel of the present invention mid-board.
Fig. 2 looks schematic diagram for the structure left side of the split type mobile formwork device of tunnel of the present invention mid-board.
Fig. 3 is the structure schematic top plan view of the split type mobile formwork device of tunnel of the present invention mid-board.
Fig. 4 is the split type mobile formwork device of tunnel of the present invention mid-board and the structural relation schematic diagram of scaffold.
Fig. 5 be among Fig. 1 the I detail drawing (slideway the installation on the basic mould bases and and steel wheel between structure).
Fig. 6 looks schematic diagram for unit template master.
Fig. 7 looks schematic diagram for a template left side, unit.
Working state schematic representation when Fig. 8 does not overturn for the split type mobile formwork device of tunnel mid-board.
Fig. 9 is the working state schematic representation after the split type mobile formwork device of tunnel mid-board overturns.
The specific embodiment
As Fig. 1, Fig. 3, shown in Figure 5, the split type mobile formwork device of tunnel of the present invention mid-board has utilized the prior art of track and sliding pair.The split type mobile formwork device of tunnel of the present invention mid-board is symmetricly set on the both sides of tunnel mid-board 25, and the split type mobile formwork device of the tunnel mid-board of each side contains basic mould bases 6, wall mould base, auxiliary slipping mechanism and deflection releasing mechanism.Vertically fixedly there is described track 15 on mould bases 6 tops, basis by fixed head 13.The wall mould base lower end is provided with some steel wheels 16, and steel wheel 16 is slidingly connected with track 15.The concave surface of wall mould base is by i iron junction plate 8 vertical affixed reinforcement i iron 9, by channel-section steel junction plate 10 vertical affixed reinforcement channel-section steels 7.The concave surface of wall mould base is connected with described auxiliary slide mechanism and described deflection releasing mechanism.
As Fig. 1, Fig. 2, Fig. 6, shown in Figure 7, the curved type in basic mould bases 6 cross sections is vertically connected to form by bolt along the tunnel by five module unit template VI.The curved type in wall mould base cross section is is vertically connected and composed by two split mould bases, and the split mould bases is provided with five layers from top to bottom, and wherein one deck mould bases 1 is is vertically connected and composed by bolt by five module unit template I; Two layers of mould bases 2 are are vertically connected and composed by bolt by five module unit template II; Three layers of mould bases 3 are are vertically connected and composed by bolt by five module unit template III; Four layers of mould bases 4 are are vertically connected and composed by bolt by five module unit template IV; Five layers of mould bases 5 are are vertically connected and composed by bolt by five module unit template V.One deck mould bases 1, two layers of mould bases 2, three layers of mould bases 3, four layers of mould bases 4, five layers of mould bases 5 vertical i iron (9), i iron junction plate (8) and bolt of passing through vertically connect and compose a described split mould bases successively by strengthening channel-section steel (7), channel-section steel junction plate (10) and bolt.
The cross section of unit board I, II, III, IV, V, VI is curved type all.The curvature of unit board I, II, III, IV, V, VI has nothing in common with each other.The curvature of five module unit plate I of composition one deck mould bases 1 is identical; The curvature of five module unit plate II of two layers of mould bases 2 of composition is identical; The curvature of five module unit plate III of three layers of mould bases 3 of composition is identical; The curvature of five module unit plate IV of four layers of mould bases 4 of composition is identical; The curvature of five module unit plate V of five layers of mould bases 5 of composition is identical; The curvature of five module unit plate VI of forming basic mould bases 6 is identical.
The split type mobile formwork device of tunnel of the present invention mid-board, the length of basic mould bases 6 have the length remaining that has more two times of wall mould base length always in whole construction course.
The split type mobile formwork device of tunnel of the present invention mid-board, wall mould base has a linear longitudinal movement track at the track 15 of basic mould bases 6, can carry out line sliding, also has a horizontal flip-flop movement track, can overturn in orbit 15 °.
Be provided with the n cover as the auxiliary slipping mechanism of Fig. 1, Fig. 2, Fig. 3, the described auxiliary slipping mechanism of every cover has a rubber wheel 19, and rubber wheel 19 places on the turning rolls 20, its rubber wheel 19 end faces after the wall mould base upset can with the vertical wall sliding-contact in tunnel.Turning rolls 20 is connected with two triatic stays 21 and a hound 22.Triatic stay 21 is connected at Connection Block 14 triangular in shape and on the wall mould base on the wall mould base with hound 22.
The deflection releasing mechanism has the n cover, has a bottle gouard moved by hands 18 in every cover deflection releasing mechanism.17 1 terminations of chain of leading on the bottle gouard moved by hands 18 are connected with wall mould base weldment 23, and a termination is connected with the built-in fitting 24 of the vertical wall in tunnel.Pulling bottle gouard moved by hands (18) can overturn to wall mould base, makes wall mould base leave concrete and builds face, in order to eliminate bonding force and frictional force, eliminates the resistance of motion of this respect.Auxiliary slipping mechanism can make wall mould base be supported when deflection, in order to slide smoothly.
Referring to Fig. 1, the split type mobile formwork device of tunnel of the present invention mid-board is provided with some base support 12 between the vertical wall in track fixed head 13 and tunnel.Base support 12 is used for fixing basic mould bases 6, also is used for strengthening simultaneously the support of track fixed head 13.Basis mould bases 6 be provided with fixing steel plate bottom.Base support 12 is provided with at the contact jaw with the vertical wall in tunnel and regulates jackscrew 26, is used for regulating support force.As shown in Figure 3, be provided with stage clip 27 in the triatic stay 21, stage clip 27 overcomes operation component, makes the firmly wall mould base of safe support inclination of triatic stay 27, can make the wall mould base even running again.
As shown in Figure 4, the split type mobile formwork device of tunnel of the present invention mid-board need be set up scaffold 11 when carrying out the concrete pouring construction.The scaffold braced structures is a part of the present invention.Scaffold 11 is used for the artificial height of going up on the one hand and does industry, and more important role is that the split type mobile formwork device at the tunnel mid-board carries out concrete when building, and wall mould base is supported and fixes.
The job practices of the split type mobile formwork device of tunnel of the present invention mid-board is finished by following steps:
Step 1, the basic mould bases 6 of installation,
1.1, measure unwrapping wire, determine the position of basic mould bases 6, colligation mid-board reinforcement foundation, after finishing, symmetry is installed by the unit template VI that designs and produces and the basic mould bases 6 that assembles in mid-board 25 both sides,
1.2, at basic mould bases 6 lower ends welding fixing steel plate, and fixing steel plate and mid-board embedded bar be connected and fixed;
1.3, in basic mould bases 6 upper ends vertically by track fixed head 13 welded rails 15, track fixed head 13 outsides arrange a base support 12 in each template VI place, unit, and adjust jackscrew 26 and make its support firm,
The mid-board base concrete is built in step 2, completing steps 1 back between two basic mould bases,
Step 3, installation wall mould base,
3.1, the mid-board base concrete builds and finishes, and carries out the colligation of mid-board upper reinforcement on the mid-board base concrete,
3.2, afterwards the layer 5 mould bases 5 of wall mould base is installed at first on two basic mould bases 6 of symmetry, [install before the layer 5 mould bases 5, earlier steel wheel 16 be installed in below the i iron 9 of layer 5 mould bases 5, and steel wheel 16 is placed on the track 15],
3.3, set up scaffold 11, assembly unit from the bottom to top and connect four layers 4, three layers 3, two layers 2 of wall mould base and one deck mould bases 1[first during the spliced wall mould bases on scaffold 11, in whole five layers of unit template I, II, III, IV, the vertical junction of V, by i iron junction plate 8 affixed i iron 9, with the vertical belly of template place, one deck unit, by channel-section steel junction plate 10 affixed channel-section steels 7]
3.4, afterwards, the termination of scaffold 11 horizon bars is supported on the side of each layer channel-section steel 7 respectively by base support 12 and chock,
Step 4, after hours above-mentioned is carried out mid-board body concrete and is built between two wall mould bases,
After step 5, the typing of mid-board concrete, remove scaffold 11, and vertically connect one group of auxiliary slide mechanism at every split mould bases concave surface place by desired location respectively,
Step 6, connect two groups of deflection releasing mechanisms at every split mould bases concave surface place by desired location,
6.1, check auxiliary slide mechanism and deflection releasing mechanism installation qualification,
6.2, afterwards, the lead chain 17 of pulling on the bottle gouard moved by hands 18 overturns about 15 ° with wall mould base, and the rubber wheel 19 of auxiliary slide mechanism is contacted with the vertical wall in tunnel, the formation sliding support,
After step 7, auxiliary slide mechanism form sliding support, wall mould base is resolved into two split mould bases, respectively with the length remaining place propelling 1200cm of two split mould bases to basic mould bases; Remove the used basic mould bases 6 in front and base support 12, go to next circulation construction place in the place ahead and reinstall basic mould bases 6 and base support 12,
Step 8, two split mould bases after will moving connect into wall mould base again, afterwards 2~step 7 mid-board concrete the pouring construction that carries out next circulation repeatedly set by step.
The split type mobile formwork device of tunnel of the present invention mid-board, the unit template of design is wide to be 79cm, long is 120cm.Split mould bases length 600cm after unit template (I, II, III, IV, the V) combination.Wall mould base length is 1200cm.Using wall mould base to carry out gradation circulation concrete in the engineering builds.Mid-board concreting is adopted and is carried out for twice, basic mould bases 6 namely is installed is earlier built the mid-board foundation, wall mould base is installed is again watered walling body part.The length that foundation is built is built length than wall body all the time and is had more 2 times (2400cm), and this length remaining is used for wall mould base and moves to next station.After the foundation concrete reaches certain intensity, do not remove basic mould bases earlier, begin a wall body mould bases, after wall body mould bases props up and stood, water walling body concrete.Because channel-section steel 7 and i iron 9 globalities are better, the supporting role of scaffold in addition, wall mould base can guarantee to reach the requirement of concrete pouring technique.After wall body concrete reaches form removal intensity, before the slip, earlier with scaffold 11 supporting removals, by bottle gouard moved by hands 18, wall mould base integral body is drawn remove concrete surface with leading chain 17, make it to laterally rotate about 15 ° (referring to Fig. 8, Fig. 9), on basic mould bases 6 tracks of not removing when wall mould base relies on lower end steel wheel 15 to be bearing in concreting for the first time, rely on rubber wheel 19 to be bearing on the tunnel wall, lead the chain haulage reach by artificial promotion cooperation, after wall mould base moves out 1200cm, remove the used basic mould bases 6 in front and base support 12, go to next circulation construction place in the place ahead the mid-board concrete pouring construction that carries out next circulation afterwards as stated above again is installed.
Above-described embodiment is described preferred embodiment of the present invention; be not that scope of the present invention is limited; design under the prerequisite of spirit not breaking away from the present invention; various distortion and improvement that those of ordinary skills make technical scheme of the present invention all should fall in the definite protection domain of claims of the present invention.

Claims (7)

1. the split type mobile formwork device of a tunnel mid-board, comprise track and sliding pair, be characterised in that: the split type mobile formwork device of described tunnel mid-board is symmetricly set on the both sides of tunnel mid-board (25), the split type mobile formwork device of the described tunnel mid-board of each side contains basic mould bases (6), wall mould base, auxiliary slipping mechanism, deflection releasing mechanism and scaffold braced structures, described track (15) is vertically fixed by track fixed head (13) in described basic mould bases (6) top, described wall mould base lower end is provided with the some steel wheels (16) that become sliding pair with track (15), the concave surface of described wall mould base is by the vertical affixed reinforcement i iron of i iron junction plate (8) (9), by the vertical affixed reinforcement channel-section steel of channel-section steel junction plate (10) (7), the concave surface of described wall mould base connects described auxiliary slipping mechanism and described deflection releasing mechanism;
Described wall mould base had both had a linear longitudinal movement track on the track (15) of described basic mould bases (6), also have a horizontal flip-flop movement track;
Described auxiliary slipping mechanism is provided with the n cover, the described auxiliary slipping mechanism of every cover has a rubber wheel (19), described rubber wheel (19) places on the turning rolls (20), described turning rolls (20) is connected with two triatic stays (21) and a hound (22), and described triatic stay (21) is connected at Connection Block (14) triangular in shape and on the wall mould base on the described wall mould base with described hound (22);
Described deflection releasing mechanism has the n cover, contain a bottle gouard moved by hands (18) in the described deflection releasing mechanism of every cover, (17) one on the chain of leading on the described bottle gouard moved by hands (18) is connected with wall mould base weldment (23), and one is connected with the built-in fitting (24) of the vertical wall in tunnel.
2. the split type mobile formwork device of tunnel according to claim 1 mid-board, it is characterized in that: the curved type in described basic mould bases (6) cross section, vertically connected to form by bolt along the tunnel by n module unit template VI, the curved type in described wall mould base cross section, vertically connected and composed by two split mould bases, described split mould bases is provided with five layers from top to bottom, wherein one deck mould bases (1) is is vertically connected and composed by bolt by n module unit template I, two layers of mould bases (2) are are vertically connected and composed by bolt by n module unit template II, three layers of mould bases (3) are are vertically connected and composed by bolt by n module unit template III, four layers of mould bases (4) are are vertically connected and composed by bolt by n module unit template IV, five layers of mould bases (5) are are vertically connected and composed by bolt by n module unit template V, described one deck, two layers, three layers, four layers, five layers of mould bases (1,2,3,4,5) vertically by i iron (9), i iron junction plate (8) and bolt are vertically by strengthening channel-section steel (7), channel-section steel junction plate (10) and bolt connect and compose a described split mould bases successively.
3. the split type mobile formwork device of tunnel according to claim 2 mid-board, it is characterized in that: described unit template I, II, III, IV, V, the cross section of VI is curved type all, described unit template I, II, III, IV, V, the curvature of VI has nothing in common with each other, the curvature of the described unit of n piece template I of forming described one deck mould bases (1) is identical, the curvature of the described unit of n piece template II of forming described two layers of mould bases (2) is identical, the curvature of the described unit of n piece template III of forming described three layers of mould bases (3) is identical, the curvature of the described unit of n piece template IV of forming described four layers of mould bases (4) is identical, the curvature of the described unit of n piece template V of forming described five layers of mould bases (5) is identical, and the curvature of the described unit of n piece template VI of forming described basic mould bases (6) is identical.
4. the split type mobile formwork device of tunnel according to claim 3 mid-board, it is characterized in that: the length of described basic mould bases (6) has more two times of remainings of wall mould base length.
5. the split type mobile formwork device of tunnel according to claim 1 mid-board is characterized in that: be provided with stage clip (27) in the described triatic stay (21).
6. the split type mobile formwork device of tunnel according to claim 1 mid-board, it is characterized in that: be provided with some base support (12) between the vertical wall of track fixed head (13) and tunnel, described base support (12) is provided with at the contact jaw with the vertical wall in tunnel and regulates jackscrew (26).
7. job practices according to the split type mobile formwork device of any described tunnel mid-board of claim 1-6, its steps characteristic is:
Step 1, basic mould bases (6) is installed,
1.1, measure unwrapping wire, determine the position of basic mould bases (6), colligation mid-board reinforcement foundation after finishing, is installed by the unit template VI that designs and produces and is assembled basic mould bases (6) in mid-board (25) both sides symmetry,
1.2, at basic mould bases (6) lower end welding fixing steel plate, and fixing steel plate and mid-board embedded bar be connected and fixed;
1.3, in basic mould bases (6) upper end vertically by track fixed head (13) welded rails (15), track fixed head (13) outside arranges a base support (12) in each template VI place, unit, and adjusts jackscrew (26) and make its support firm,
The mid-board base concrete is built in step 2, completing steps 1 back between two basic mould bases,
Step 3, installation wall mould base,
3.1, after the mid-board base concrete builds and finish, on the mid-board base concrete, carry out the colligation of mid-board upper reinforcement,
3.2, afterwards the layer 5 mould bases (5) of wall mould base is installed at first on two basic mould bases (6) of symmetry, layer 5 mould bases (5) is installed before, earlier steel wheel (16) is installed in below the i iron (9) of layer 5 mould bases (5), and steel wheel (16) placed on the track (15)
3.3, set up scaffold (11), assembly unit from the bottom to top and connect four layers, three layers, two layers and one deck mould bases (4,3,2,1) of wall mould base on scaffold (11); First during the spliced wall mould bases, in the vertical junction of whole five layers of unit template (I, II, III, IV, V), by the affixed i iron of i iron junction plate (8) (9), with the vertical belly of template place, one deck unit, by the affixed channel-section steel of channel-section steel junction plate (10) (7)
3.4, afterwards, the termination of scaffold (11) horizon bar is supported on the side of each layer channel-section steel (7) respectively by base support (12) and chock,
Step 4, after hours above-mentioned is carried out mid-board body concrete and is built between two wall mould bases,
After step 5, the typing of mid-board concrete, remove scaffold (11), and longitudinally connect one group of auxiliary slipping mechanism at every split mould bases concave surface place by desired location respectively,
Step 6, connect two groups of deflection releasing mechanisms at every split mould bases concave surface place by desired location,
6.1, check auxiliary slipping mechanism and deflection releasing mechanism installation qualification,
6.2, afterwards, the chain (17) of leading in pulling bottle gouard moved by hands (18) overturns about 15 ° with wall mould base, and the rubber wheel (19) of auxiliary slipping mechanism is contacted with the vertical wall in tunnel, the formation sliding support,
After step 7, auxiliary slipping mechanism form sliding support, wall mould base is resolved into two split mould bases, respectively with the length remaining place propelling 1200cm of two split mould bases to basic mould bases; Remove the used basic mould bases in front (6) and base support (12), go to next circulation construction place in the place ahead and reinstall basic mould bases (6) and base support (12),
Step 8, two split mould bases after will moving connect into wall mould base again, afterwards 2~step 7 mid-board concrete the pouring construction that carries out next circulation repeatedly set by step.
CN 201110313765 2011-10-17 2011-10-17 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame Active CN102418534B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110313765 CN102418534B (en) 2011-10-17 2011-10-17 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110313765 CN102418534B (en) 2011-10-17 2011-10-17 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame

Publications (2)

Publication Number Publication Date
CN102418534A CN102418534A (en) 2012-04-18
CN102418534B true CN102418534B (en) 2013-08-14

Family

ID=45943154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110313765 Active CN102418534B (en) 2011-10-17 2011-10-17 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame

Country Status (1)

Country Link
CN (1) CN102418534B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835728B (en) * 2012-11-27 2017-02-15 五冶集团上海有限公司 Method for pouring concrete into mid-board arch crown of multi-arch tunnel
CN107191201A (en) * 2017-07-12 2017-09-22 中交公局海威工程建设有限公司 Constructing middle partition wall in tunnel template and its constructing device
CN107725072A (en) * 2017-10-19 2018-02-23 中铁三局集团有限公司 Subway tunnel mid-board and smoke baffle plate integration pour mould bases and its construction method
CN107813460B (en) * 2017-12-12 2023-12-19 湖南精正设备制造有限公司 PDCPD-RIM light rotary translational die carrier
CN113685207B (en) * 2021-07-27 2023-09-12 中交隧道工程局有限公司 Intermediate wall turnover machine suitable for tunnel
CN113669068B (en) * 2021-07-27 2023-08-01 中交隧道工程局有限公司 Intermediate wall mounting process suitable for tunnel
CN115045669B (en) * 2022-08-11 2023-04-21 湖南省交通规划勘察设计院有限公司 Construction method of double-arch tunnel with oversized section in weak stratum

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1298283A1 (en) * 2001-09-28 2003-04-02 Gta Maschinensysteme Gmbh Tunnel boring machine
EP1882812A1 (en) * 2006-07-25 2008-01-30 Porr Tunnelbau GmbH Device and method for applying a settable layer to cladding of building elements
CN201666157U (en) * 2010-03-08 2010-12-08 中铁隧道集团四处有限公司 Inverted arch integral type moving die carrier
CN201915972U (en) * 2010-12-31 2011-08-03 中铁二局股份有限公司 Movable mold bracket for gutter cable trough in tunnel
CN202228087U (en) * 2011-10-17 2012-05-23 北京城建道桥建设集团有限公司 Split-type movable formwork device for tunnel partition wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1298283A1 (en) * 2001-09-28 2003-04-02 Gta Maschinensysteme Gmbh Tunnel boring machine
EP1882812A1 (en) * 2006-07-25 2008-01-30 Porr Tunnelbau GmbH Device and method for applying a settable layer to cladding of building elements
CN201666157U (en) * 2010-03-08 2010-12-08 中铁隧道集团四处有限公司 Inverted arch integral type moving die carrier
CN201915972U (en) * 2010-12-31 2011-08-03 中铁二局股份有限公司 Movable mold bracket for gutter cable trough in tunnel
CN202228087U (en) * 2011-10-17 2012-05-23 北京城建道桥建设集团有限公司 Split-type movable formwork device for tunnel partition wall

Also Published As

Publication number Publication date
CN102418534A (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102418534B (en) Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame
CN103967050B (en) Construction system of subway station
CN201908664U (en) Movable trestle bridge invert form board trolley
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN109629441B (en) PLC multipoint synchronous three-dimensional hydraulic bridge pushing system and pushing method
CN109629440B (en) Steel box girder pushing construction method based on walking type three-dimensional hydraulic pushing equipment
CN107100074A (en) A kind of lower bearing arch bridge concrete bridge deck construction method
CN202544854U (en) Lining trolley for subway station
CN111022079A (en) Trestle type full-section inverted arch two-lining trolley equipment and construction method thereof
CN103938534A (en) Overhead rail transit station integrated bridge structure and application method thereof
CN109610509A (en) A kind of the adjustable die system and construction method of pipe gallery automatic control section
CN106593469A (en) Trolley for construction of inverted arch
CN202228087U (en) Split-type movable formwork device for tunnel partition wall
CN102268858B (en) Cradle for suspension pouring of arch-type bridge
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN101723058B (en) Gliding method of tandem shipbuilding process block
CN2921280Y (en) Tunnel invert form trolley with floating running chassis
CN205936645U (en) A full liquid die plate system for culvert is pour
CN102134832A (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN109139050B (en) Self-propelled integrated tunnel inverted arch device
CN203834337U (en) Elevated rail traffic station integrated bridge structure
CN211342938U (en) Trestle type full-section inverted arch two-lining trolley equipment
CN204552760U (en) Traveling type hydraulic formwork jumbo
CN208203298U (en) A kind of big punching block of rail type side wall
CN105648908A (en) Decorating trolley used for crossing existing lines or crossing bridges and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant