CN2921280Y - Tunnel invert form trolley with floating running chassis - Google Patents

Tunnel invert form trolley with floating running chassis Download PDF

Info

Publication number
CN2921280Y
CN2921280Y CN 200620034166 CN200620034166U CN2921280Y CN 2921280 Y CN2921280 Y CN 2921280Y CN 200620034166 CN200620034166 CN 200620034166 CN 200620034166 U CN200620034166 U CN 200620034166U CN 2921280 Y CN2921280 Y CN 2921280Y
Authority
CN
China
Prior art keywords
travelling wheel
tunnel
bogie frame
traffic under
under carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 200620034166
Other languages
Chinese (zh)
Inventor
高菊茹
梅志荣
文志勇
涂文轩
徐辰丁
张晓林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Southwest Research Institute Co Ltd
Original Assignee
China Railway Southwest Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Southwest Research Institute Co Ltd filed Critical China Railway Southwest Research Institute Co Ltd
Priority to CN 200620034166 priority Critical patent/CN2921280Y/en
Application granted granted Critical
Publication of CN2921280Y publication Critical patent/CN2921280Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a modularized trolley used to construct inverted arch of tunnel and belongs to technical field of construction equipment for tunnel, which comprises an anti-floating platform, a front travelling wheel and a back traveling wheel, a lifting front and back supporting base, a main frame of trolley with empty lower part comprising a leg post and a underframe of travelling crane, as well as a module of inverted arch beneath the underframe of the travelling crane. The front and back supporting bases as well as the front travelling wheel and the back travelling wheel are arranged on both two ends of underframe of travelling crane. The anti-floating platform is arranged on the top of the main frame of trolley and the travelling wheel can be lifted. With a floating mechanism, the underframe of the travelling crane is arranged above the module of the inverted arch. Having advantages of simple structure and low manufacturing cost, the utility model enables packing construction, maintenance of inverted arch to be carried out simultaneously with other operations such as tunnelling, cleaning and transporting debris. Without influences on quality of packing when moves in tunnel, the utility model is particularly applicable for packing construction of inverted arch of large and long railway tunnel.

Description

A kind of tunnel overhead arch mould plate trolley with floating type traffic under carriage
Technical field
The utility model relates to a kind of constructing tunnel equipment.What be particularly related to is a kind of formwork jumbo of placing tunnel invert.
Background technology
After finishing, tunnel excavation must use concrete placing lining cutting and inverted arch.Common way is to adopt lining trolley to come the placing lining cutting, and inverted arch and inverted arch filled section are then by manually building.The shortcoming of manually building inverted arch is that efficient is low, and quality can not get guaranteeing that the excavation operation that also influences the tunnel can not parallelly with the pouring construction of inverted arch carry out, and to other operation operation also serious interference, can not adapt to the construction requirement in the tunnel of growing up.For overcoming this deficiency, Chinese patent ZL03232894.X has proposed a kind of " tunnel full-circular monolithic lining formwork jumbo ", main composition comprises truss open web type Vierendeel girder, be installed in vehicle frame on the Vierendeel girder by the guide wheel guide rail structure, the Vierendeel girder bottom is equipped with liftable front and back base, top is equipped with the anti-floating platform, is installed in various template oil cylinders and the corresponding different templates that is connected on each oil cylinder on the vehicle frame.The formwork erection and the demoulding are all finished by the template oil cylinder.The whole lining cutting operation of loopful that utilizes alternately migrating of vehicle frame and Vierendeel girder to finish tunnel cross-section.The working method of this chassis is the migration mode that replaces, and structure is comparatively complicated, and manufacturing cost is higher; During concrete curing, the vibrations when muck haulage vehicle and pedestrian etc. pass through in the open web type bogie frame can pass to invert form and influence the concrete placing quality of not solidifying fully.
The utility model content
The purpose of this utility model provides a kind of inverted arch pouring quality, simple in structure and inverted arch pouring quality of guaranteeing and was not subjected to the tunnel overhead arch mould plate trolley with floating type traffic under carriage of car vibration influence.
Realize the tunnel overhead arch mould plate trolley with floating type traffic under carriage of the utility model purpose, its formation comprises anti-floating platform, preceding travelling wheel, back travelling wheel, ascending/decending back and front supporting seat, contain the open web type bogie frame of column, traffic under carriage and be arranged on the invert form of traffic under carriage below, described back and front supporting seat and forward and backward travelling wheel are installed in the two ends of traffic under carriage, the anti-floating platform is installed in the top of bogie frame, described travelling wheel is the ascending/decending travelling wheel, and described traffic under carriage is installed in the top of invert form with a relocation mechanism.
Operating principle of the present utility model is as follows:
Trolley running puts down the ascending/decending back and front supporting behind inverted arch placing station, by back and front supporting bogie frame is lifted in the lump together with travelling wheel and invert form and put invert form and put in place, makes anti-floating support jacking then and puts in place fixingly, can carry out the inverted arch placing.During placing and concrete curing, muck haulage vehicle and pedestrian etc. can pass through from the open web type bogie frame.Owing between traffic under carriage and invert form, be provided with a relocation mechanism, traffic under carriage floats with respect to invert form, the vibrations that cause on traffic under carriage when vehicle and walk then only make traffic under carriage unsteady and can not pass to invert form with respect to invert form, thereby realize that inverted arch placing quality was not subjected to the purpose of car vibration influence.After the inverted arch concrete reaches form removal intensity, fall anti-floating earlier and support, again bogie frame is upwards lifted in the lump together with invert form by the ascending/decending back and front supporting then, realize the demoulding.After finishing the demoulding, put down forward and backward ascending/decending travelling wheel, pack up the back and front supporting seat again, whole chassis is changed by forward and backward travelling wheel support.With drive unit chassis is slowly moved forward then, walking arrives next inverted arch placing station.Drive unit can be continued to use prior art and be arranged on the chassis, also can establish in addition separately, for example establishes the migration that a hoist engine also can be finished vehicle frame in the tunnel in addition.
Described ascending/decending supporting seat can be selected the hydraulic elevation type supporting seat that has up-down adjustment oil cylinder and lateral adjustments oil cylinder for use.Regulate the position of bogie frame by the position of regulating the back and front supporting seat, thereby guarantee to be installed in accurately putting in place of invert form under the bogie frame.
Described ascending/decending back and front supporting seat also can be a jack type.When adopting the supporting seat of jack type, should notice that synchronization action is to keep the balance of bogie frame.
For guaranteeing the run trace of chassis, described preceding travelling wheel can adopt guide tracked running roller.Before mobile trolley used, install track earlier, then ride after running roller puts down and be stuck on the track, guarantee accurately moving into place of chassis by track.
Still can one extension be set in the underframe rear end of bogie frame, affixed filling template below this extension when carrying out next section inverted arch placing operation, is finished the mechanization of the filled section on the preceding paragraph inverted arch and is built operation.
Considering to need to lay this situation of reinforcing bar before the inverted arch placing, for guaranteeing the smooth reach of chassis, can one extension be set at the underframe front end of described bogie frame, and preceding travelling wheel is installed in the front end of this extension.Utilize this extension to cross over next inverted arch placing station of laying reinforcing bar, travelling wheel is walked on the bottom surface, tunnel before next station before making.
Compared with the aforementioned existing similar products, the utility model has the advantages that and reduced Vierendeel girder that structure is more simple, greatly reduces manufacturing cost; Change original alternately migration for the one way migration, account for working space less; Safe and reliable, operating maintenance is convenient, and applicability is strong; Have and carry out large cross-section tunnel inverted arch monolithic concrete mechanization mould and build up the technical advantage that shape and inverted arch, filling separate placing, can fully guarantee the placing quality of tunnel invert.The time do not influence slag tap the carrying out of transportation or other operation of driving carrying out inverted arch placing construction, and the placing quality is not subjected to the car vibration influence, improved the whole work efficiency of constructing tunnel greatly, helped the reduction of erection time, saved cost.The placing construction of inverted arch of railway tunnel is specially adapted to grow up.
Content of the present utility model further illustrates with the following Examples, but content of the present utility model is not limited only to content related in the present embodiment.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Fig. 2 is the A-A view of Fig. 1
Fig. 3 is the C-C view of Fig. 1
Fig. 4 is the structural representation of the relocation mechanism between invert form and traffic under carriage
The station schematic diagram of traffic under carriage when Fig. 5 was car
Fig. 6 is the structural representation of another kind of relocation mechanism
Fig. 7 is the structural representation of embodiment 2 of the present utility model
Fig. 8 is the B-B view of Fig. 7
The specific embodiment
Embodiment 1:
Referring to Fig. 1-3, the formation of this tunnel overhead arch mould plate trolley comprises anti-floating platform 2, preceding travelling wheel 8, back travelling wheel 10, supporting seat 7 before the ascending/decending, back supporting seat 9, contain column 4, the open web type bogie frame 1 of traffic under carriage 11 and the invert form 3 that is arranged on traffic under carriage 11 belows, supporting seat 7 before described, back supporting seat 9 and preceding travelling wheel 8, back travelling wheel 10 is installed in the underframe two ends of bogie frame 1, anti-floating platform 2 is installed in the top of bogie frame 1, travelling wheel 8 before described, back travelling wheel 10 is the ascending/decending travelling wheel, and described traffic under carriage 11 usefulness one relocation mechanism 12 is installed in the top of invert form 3.5 for entering the trestle of chassis among the figure for slag waggon, and 6 is track, all can continue to use the prior art setting.
Referring to Fig. 4, described relocation mechanism can be fixed on the invert form 3 by end one by one, mandrel 14 that the other end is fixed on bogie frame column 4 bottoms, be fixed in traffic under carriage 11 and be sleeved on the sleeve 15 on the mandrel 14 and the sleeve 15 up limited steps 16 that limit that are fixed on the column 4 are constituted.After putting in place, invert form make anti-floating support jacking fixing fixing after promptly finishing invert form and putting in place that put in place, be sleeved on traffic under carriage 11 on the mandrel 14 formed one can be with respect to bogie frame column and the upper and lower mobile floating type underframe of invert form, weight and the vibrations when current in the open web type bogie frame such as vehicle and pedestrian of mucking haulage are then born by traffic under carriage fully, the vibrations distortion of the traffic under carriage that causes when crossing car, then isolate, thereby avoided the vibrations of invert form and guaranteed concrete maintenance quality by the gap between mandrel and sleeve.The station schematic diagram of Fig. 5 provides when being car traffic under carriage.Limited step 16 plays position-limiting action when lifting the underframe demoulding on back and front supporting, underframe drive bogie frame column and whole bogie frame and invert form is upwards lifted in the lump finish the demoulding.Mandrel 14 also can pass traffic under carriage by bogie frame column 4 and constitute.Sleeve also can directly form on traffic under carriage, promptly offers the through hole that passes for mandrel at traffic under carriage and gets final product.
Fig. 6 has provided the structural representation of another kind of relocation mechanism.By the axle sleeve 17 that is fixed in invert form 3, be fixed in traffic under carriage 11 and stretch the mandrel that has pin-and-hole 19 in axle sleeve 17 and connect mandrel 19 and the latch 20 that is connected of axle sleeve 17 is constituted.After finishing inverted arch placing operation, extract connection latch 20 out and make invert form 3 break away from traffic under carriage 11.During concrete curing, the vibrations of the traffic under carriage that causes when crossing car distortion then can not passed on to having broken away from the invert form of traffic under carriage this moment, thereby has avoided the vibrations of invert form and guaranteed concrete maintenance quality.Load onto connecting pin post 20 during the demoulding, finish being connected of invert form 3 and 11 of traffic under carriage again, on lift traffic under carriage and invert form can be lifted in the lump and finished the demoulding.
The forward and backward travelling wheel of described ascending/decending can be selected hydraulic up-down for use.It also can be jack type.For guaranteeing the run trace of chassis, described preceding travelling wheel 8 can adopt guide tracked running roller.Ascending/decending supporting seat 7,9 can be selected the hydraulic up-down supporting seat that has up-down adjustment oil cylinder and lateral adjustments oil cylinder for use.Regulate position that oil cylinder regulates the back and front supporting seat regulating the position of bogie frame by each, thereby guarantee to be installed in accurately putting in place of invert form under the bogie frame.
Still an extension 21 can be set in the underframe rear end of bogie frame, affixed filling template 22 below this extension when carrying out next section inverted arch placing operation, is finished the mechanization of the filled section on the inverted arch section and is built operation.In this structure situation, supplemental support 24 can be set in the rear end.
Embodiment 2:
Referring to Fig. 7-8, considering to need to lay this situation of reinforcing bar before the inverted arch placing, for guaranteeing the smooth reach of chassis, an extension 25 can be set, 8 front ends that are installed in this extension of preceding travelling wheel at the underframe front end of described bogie frame.Utilize this extension to cross over next inverted arch placing station of laying reinforcing bar, travelling wheel 8 is walked on the bottom surface, tunnel before next inverted arch placing station before making.Supporting seat 7 is upwards packed up and was stepped the reinforcing bar of laying before during walking, can realize the smooth reach of chassis.6 is track among the figure.

Claims (7)

1, a kind of tunnel overhead arch mould plate trolley with floating type traffic under carriage, comprise anti-floating platform, preceding travelling wheel, back travelling wheel, ascending/decending back and front supporting seat, contain the open web type bogie frame of column, traffic under carriage and be arranged on the invert form of traffic under carriage below, it is characterized in that described back and front supporting seat and forward and backward travelling wheel are installed in the two ends of traffic under carriage, the anti-floating platform is installed in the top of bogie frame, described travelling wheel is the ascending/decending travelling wheel, and described traffic under carriage is installed in the top of invert form with a relocation mechanism.
2, tunnel overhead arch mould plate trolley as claimed in claim 1 is characterized in that described relocation mechanism is fixed on the invert form, mandrel that the other end is fixed on bogie frame column bottom, is fixed in traffic under carriage and is sleeved on the sleeve on the mandrel and the up limited step of sleeve that limits that is fixed on the bogie frame column is constituted by end one by one.
3, tunnel overhead arch mould plate trolley as claimed in claim 1, it is characterized in that described relocation mechanism by the axle sleeve that is fixed in invert form, be fixed in the chassis underframe and stretch the mandrel that has pin-and-hole in axle sleeve and connect mandrel and the latch that is connected of axle sleeve is constituted.
4, tunnel overhead arch mould plate trolley as claimed in claim 1 is characterized in that described ascending/decending supporting seat is the hydraulic up-down supporting seat that has up-down adjustment oil cylinder and lateral adjustments oil cylinder.
5, tunnel overhead arch mould plate trolley as claimed in claim 1 is characterized in that described preceding travelling wheel is guide tracked running roller.
6, tunnel overhead arch mould plate trolley as claimed in claim 1 is characterized in that being provided with an extension in the underframe rear end of described bogie frame, is connected with filling template below this extension.
7, tunnel overhead arch mould plate trolley as claimed in claim 1 is characterized in that being provided with an extension at the underframe front end of described bogie frame, and described preceding travelling wheel is installed in the front end of this extension.
CN 200620034166 2006-05-12 2006-05-12 Tunnel invert form trolley with floating running chassis Expired - Lifetime CN2921280Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620034166 CN2921280Y (en) 2006-05-12 2006-05-12 Tunnel invert form trolley with floating running chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620034166 CN2921280Y (en) 2006-05-12 2006-05-12 Tunnel invert form trolley with floating running chassis

Publications (1)

Publication Number Publication Date
CN2921280Y true CN2921280Y (en) 2007-07-11

Family

ID=38253759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620034166 Expired - Lifetime CN2921280Y (en) 2006-05-12 2006-05-12 Tunnel invert form trolley with floating running chassis

Country Status (1)

Country Link
CN (1) CN2921280Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104033163A (en) * 2014-05-06 2014-09-10 中铁十七局集团第二工程有限公司 One-time concrete-pouring forming method of bottom plate and side walls of hydraulic tunnel
CN104747211A (en) * 2015-04-08 2015-07-01 山东省路桥集团有限公司 Anti-floating device for tunnel construction, steel mould board lining rig and anti-floating construction method
CN105041338A (en) * 2015-07-24 2015-11-11 四川省创力隧道机械设备有限公司 Caterpillar invert trestle trolley
CN106869945A (en) * 2017-03-08 2017-06-20 长安大学 A kind of motor driven vcehicular tunnel inverted arch construction bridge car
CN108118891A (en) * 2017-12-19 2018-06-05 中国建筑第八工程局有限公司 Slide template platform and its construction method
CN108331338A (en) * 2018-04-04 2018-07-27 中交第三公路工程局有限公司 A kind of hydraulic climbing formwork device and construction method
CN111749709A (en) * 2020-07-08 2020-10-09 长沙理工大学 Stable inverted arch trolley

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104033163A (en) * 2014-05-06 2014-09-10 中铁十七局集团第二工程有限公司 One-time concrete-pouring forming method of bottom plate and side walls of hydraulic tunnel
CN104747211A (en) * 2015-04-08 2015-07-01 山东省路桥集团有限公司 Anti-floating device for tunnel construction, steel mould board lining rig and anti-floating construction method
CN104747211B (en) * 2015-04-08 2017-03-08 山东省路桥集团有限公司 Constructing tunnel anti-floating system and punching block lining trolley and anti-floating construction method
CN105041338A (en) * 2015-07-24 2015-11-11 四川省创力隧道机械设备有限公司 Caterpillar invert trestle trolley
CN106869945A (en) * 2017-03-08 2017-06-20 长安大学 A kind of motor driven vcehicular tunnel inverted arch construction bridge car
CN106869945B (en) * 2017-03-08 2019-06-18 长安大学 A kind of motor driven vcehicular tunnel inverted arch construction bridge vehicle
CN108118891A (en) * 2017-12-19 2018-06-05 中国建筑第八工程局有限公司 Slide template platform and its construction method
CN108331338A (en) * 2018-04-04 2018-07-27 中交第三公路工程局有限公司 A kind of hydraulic climbing formwork device and construction method
CN111749709A (en) * 2020-07-08 2020-10-09 长沙理工大学 Stable inverted arch trolley
CN111749709B (en) * 2020-07-08 2021-10-19 长沙理工大学 Stable inverted arch trolley

Similar Documents

Publication Publication Date Title
CN100547225C (en) A kind of tunnel overhead arch mould plate trolley with floating type traffic under carriage
CN2921280Y (en) Tunnel invert form trolley with floating running chassis
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN207498755U (en) A kind of traveling trolley adjusted with horizontal extension and vertical supporting
CN107363988B (en) Hydraulic internal mold toothed rail traveling system and traveling method for prefabricated box girder
CN100572673C (en) Span continuous beam bridge fabrication machine in a kind of
CN201801818U (en) Bridge erecting machine capable of erecting double-track twin beams at tunnel entrance by zero distance
CN109653105A (en) Box girder bridge cantilever construction main truss cradle system and its application method
CN111022079A (en) Trestle type full-section inverted arch two-lining trolley equipment and construction method thereof
CN111852521B (en) Mouth-shaped piece assembling trolley for construction of internal structure of large-section shield tunnel and synchronous construction method
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN201943004U (en) Double-girder transporting and erecting integrated bridge girder erecting machine capable of realizing girder erecting at zero distance from tunnel portal
CN210561749U (en) Multi-frame juxtaposed double-cantilever bridge girder erection machine
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN201627144U (en) Double-beam transportation and erection integrated bridge girder erection machine
CN204662270U (en) A kind of case girder transferring system
CN2937233Y (en) Midspan continuous beam bridge building machine
CN203821184U (en) Spreader used for separating and paving roadbed slabs
CN201317627Y (en) Double nose girder bridging machine
CN211342938U (en) Trestle type full-section inverted arch two-lining trolley equipment
CN109139050A (en) Voluntarily integral type tunnel inverted arch device
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Effective date of abandoning: 20091007

C25 Abandonment of patent right or utility model to avoid double patenting