CN107100074A - A kind of lower bearing arch bridge concrete bridge deck construction method - Google Patents

A kind of lower bearing arch bridge concrete bridge deck construction method Download PDF

Info

Publication number
CN107100074A
CN107100074A CN201710302555.5A CN201710302555A CN107100074A CN 107100074 A CN107100074 A CN 107100074A CN 201710302555 A CN201710302555 A CN 201710302555A CN 107100074 A CN107100074 A CN 107100074A
Authority
CN
China
Prior art keywords
longeron
hanging basket
arch bridge
concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710302555.5A
Other languages
Chinese (zh)
Inventor
王小飞
潘寿东
楼敏
王勤荣
周伟民
肖旺军
李永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201710302555.5A priority Critical patent/CN107100074A/en
Publication of CN107100074A publication Critical patent/CN107100074A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Abstract

A kind of lower bearing arch bridge concrete bridge deck construction method, belongs to concrete bridge girder Major Construction Techniques of Cantilevered Concreting field.Arch bridge main girder construction Hanging Basket of the present invention includes step 1, and the concrete arch bridge girder for saving standard knot is originated using construction with brackets;Step 2, arch bridge main girder construction Hanging Basket and its subsystem are installed, the front end of Hanging Basket is connected with hoist cable;Step 3, adjustment temporary pre-stressed concentration Suo Li;Step 4, colligation vertical concrete beam steel, completes longeron concreting;Step 5, form removal, removes Hanging Basket and is connected with hoist cable, arch bridge main girder construction Hanging Basket is run into next working position is constructed;Step 6, crossbeam casting system, colligation crossbeam concrete reinforcement and prestressing tendon are installed, crossbeam concreting is completed;Step 7, repeat step 36 continues to complete remaining bridge deck concrete structure construction.Simple and quick construction of the present invention, cost is low, and reasonable arrangement longeron is poured, crossbeam is poured and floorings laying opportunity, and construction arranges compact, and operating efficiency is high.

Description

A kind of lower bearing arch bridge concrete bridge deck construction method
Technical field
Applied the invention belongs to concrete bridge girder Major Construction Techniques of Cantilevered Concreting, more particularly to a kind of lower bearing arch bridge concrete bridge deck Work method.
Background technology
Lower bearing arch bridge has succinct handsome in appearance, construction, quick construction, bridge floor building height small and to unfavorable geology bar The advantages of adaptability of part, in China river, the large-scale popularization application of Zhejiang Plain soft clay area.Lower bearing arch bridge is main by encircleing Rib, girder and substructure composition, girder is typically using box-girder or the beam in length and breadth being made up of longeron, crossbeam and floorings System girder, for the base-supporting concrete girder using fitting the arch first then fitting the girder working procedure, conventional construction method typically has support Construction and segment lifting construction.
Stand construction method engineering method is simple, and difficulty of construction is small, but need to carry out corresponding basement process, and to being passed through or logical under bridge Boat has certain influence;Segment lifting construction needs place to meet relatively large hanging device to march into the arena and operate requirement.
The present invention proposes Hanging basket on front support construction to the base-supporting concrete girder for using fitting the arch first then fitting the girder working procedure, Front fulcrum of the engineering method by the use of arch bridge hoist cable as Hanging Basket, so as to effectively reduce the stress of Hanging Basket, realize girder without branch Frame is constructed.
The content of the invention
In order to solve the above-mentioned technical problem, it is an object of the invention to provide a kind of simple and quick construction, held under cost is low Formula arch bridge concrete bridge deck construction method.
The present invention provides a kind of lower bearing arch bridge concrete bridge deck construction method, including:
Step 1, the concrete arch bridge girder for saving standard knot is originated using construction with brackets;
Step 2, arch bridge main girder construction Hanging Basket and its subsystem are installed, the front end of Hanging Basket is connected with hoist cable;
Step 3, adjustment temporary pre-stressed concentration Suo Li;
Step 4, colligation vertical concrete beam steel, completes longeron concreting;
Step 5, form removal, removes Hanging Basket and is connected with hoist cable, arch bridge main girder construction Hanging Basket is run into next working position enters Row construction;
Step 6, crossbeam casting system, colligation crossbeam concrete reinforcement and prestressing tendon are installed, crossbeam concreting is completed;
Step 7, repeat step 3-6 continues to complete remaining bridge deck concrete structure construction.
Preferably, the step of arch bridge main girder construction Hanging Basket is installed in the step 2 specifically includes:
Step 2.1:Longeron running gear is laid to have poured on standard knot longeron in the previous section of standard knot longeron to be poured;
Step 2.2:Bearing platform is laid below longeron;Crane system before longeron is laid to hold to connect in bearing platform front portion Galassing platform and longeron;Lifting body is laid in bearing platform afterbody, and located between bearing platform and longeron;Lay anchor system To connect the bearing platform and the longeron between crane system before the lifting body and the longeron;
Step 2.3:Coordinated by the lifting body and anchor system and complete Hanging Basket lifting to design attitude, the longeron is installed Template system, carries out standard knot longeron and pours.
Preferably, the longeron running gear includes
Walking track and propelling cylinder above the longeron,
Extension leg located at the longeron both sides, wherein the bearing platform can be placed in the walking track by the extension leg On,
Walking rolling wheel structure between the bearing platform and the longeron.
Preferably, crane system includes preceding suspension rod and the helicitic texture being connected with preceding suspension rod before the longeron.
Preferably, the step 5 is specifically included:
Step 5.1:Crane system before longeron template system, longeron is removed, Hanging Basket is removed and is connected with hoist cable;
Step 5.2:Coordinated by the lifting body and anchor system and complete Hanging Basket decentralization;
Step 5.3:Hanging Basket is moved to next working position by the running gear.
Preferably, the step 5.2:Hanging Basket transfers to the position for hanging leg bottom piston shoes contact walking rail top face.
Preferably, the step 2.2 also includes laying rear suspension bar between the anchor system and the lifting body, For connecting the longeron and the bearing platform.
Preferably, the step 6 includes:
Step 6.1:The running gear of crossbeam casting system is laid to position of constructing;
Step 6.2:The spandrel girder of placement crossbeam casting system, beam template system, suspension system;
Step 6.3:Crossbeam is carried out to pour.
Preferably, a kind of lower bearing arch bridge concrete bridge deck construction method also include laying poured it is pre- between crossbeam The step of floorings processed, the step is carried out after step 6 between step 7, or is carried out after step 7.
The invention has the advantages that:
A kind of lower bearing arch bridge concrete bridge deck construction method of the present invention, effectively prevent shadow of the pouring construction to traffic under bridge Ring, realize that fitting the arch first then fitting the girder is constructed, pour section and form local freely-supported, beaer is fastened;Longeron is poured reasonable arrangement, crossbeam is poured Build and floorings laying opportunity, construction arranges compact, and operating efficiency is high.
Brief description of the drawings
Fig. 1 is a kind of longeron construction elevation of lower bearing arch bridge concrete bridge deck construction method of the invention;
Fig. 2 is the elevation of the longeron casting system of Fig. 1 hogging bridge girder construction hanging baskets;
Fig. 3 is a kind of longeron construction left view of lower bearing arch bridge concrete bridge deck construction method of the invention;
Fig. 4 is a kind of construction of beam elevation of lower bearing arch bridge concrete bridge deck construction method of the invention;
Fig. 5 is a kind of construction of beam left view of lower bearing arch bridge concrete bridge deck construction method of the invention.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Such as Fig. 1, a kind of lower bearing arch bridge concrete bridge deck construction method of the invention includes:
Step 1, the concrete arch bridge girder for saving standard knot 032 is originated using construction with brackets.The lower bearing arch bridge girder bag Include longeron 007, crossbeam and prefabricated bridge 031.
Step 2, arch bridge main girder construction Hanging Basket and its subsystem 030 are installed, the front end of Hanging Basket is connected with hoist cable 010, shape Into Hanging Basket freely-supported stress.
The Hanging Basket is the special construction hanging basket of arch bridge.It can be following Hanging Basket:
Such as Fig. 2-5, the Hanging Basket includes suspension centre system, lifting body 001, anchor before bearing platform 005, longeron template system, longeron Gu system 004, running gear, crossbeam casting system.During construction, Hanging Basket is operated the movement of position by running gear, utilizes It is equal that crane system before longeron, lifting body 001 and anchor system 004 build a stress between bearing platform 005 and longeron 007 Weighing apparatus, firm construction operation system.And longeron pour completion at least one save standard knot longeron pour after utilize independent crossbeam Casting system carries out pouring operation.
Wherein, the bottom of bearing platform 005 is according to bridge floor longitudinal and cross beam location arrangements, as workbench, in dress If when located at the lower section of longeron 007.
The longeron template system includes low template, side template and longeron hollow cavity inner template, pours and builds up for longeron Type.
Suspension centre system includes preceding suspension rod 017 and helicitic texture 006, the helicitic texture 006 and preceding suspension rod before the longeron 017 in the vertical direction is connected, and the helicitic texture 006 is generally feed screw nut, and Hanging Basket head is adjusted by suspension rod before arch bridge Level.Crane system is connected with hoist cable on bridge 010 before the longeron, as shown in Figure 1.Longeron is realized by adjusting helicitic texture 006 The dismounting of preceding suspension centre system.
The lifting body 001 can be hydraulic jack, be arranged at the afterbody of bearing platform 005, and located at load-bearing Between platform 005 and longeron 007, coordinate the anchor system to adjust Hanging Basket position and tail of the platform in casting process is provided Portion's fulcrum.
The form realization of the anchor slab with fining twisted steel of anchor system 004, in the middle part of the bearing platform, i.e., Before the lifting body 001 and longeron between crane system, and connect the bearing platform 005 and the longeron 007.
The running gear includes walking track 016, propelling cylinder 008, rolling wheel structure 002 of walking, hangs leg 051.It is described Walking track 016.The propelling cylinder 008 is above longeron.The extension leg 051 is located at the both sides of bearing platform 005, institute State bearing platform 005 to be placed on the walking track 016 by the extension leg 051, the extension leg 051 is used in walking process Carry out fulcrum conversion.The walking rolling wheel structure 002, when Hanging Basket needs walking, tilts out the walking rolling wheel structure 002, Overturn and draw in when need not walk.
Above-mentioned Hanging Basket plays fixation by anchor system in platform casting process, is also adjusted by crane system before longeron Whole Hanging Basket head level, Hanging Basket tail car is adjusted by lifting body 001, then three's collective effect realizes the firm peace of Hanging Basket Put.Further improve Hanging Basket balance, between the anchor system and lifting body 001 set rear suspension bar 003, it is described after hang Bar 003 is independently arranged, and it is assembled by the helicitic texture similar to preceding suspension rod 017.
The crossbeam casting system includes spandrel girder 012, suspension system, beam template system and crossbeam running gear.Institute State spandrel girder 012 and be located at the inner side that longeron is poured.The suspension system is realized using suspension rod.The beam template system includes side Template, end template, crossbeam hollow cavity inner template composition, shaping is poured for crossbeam.The crossbeam running gear can be class It is similar to a set of running gear of longeron running gear.The crossbeam casting system is rear cross beam casting system, and it is poured in longeron After the completion of, it can be poured as autonomous system.
The step of arch bridge main girder construction Hanging Basket is installed in the step 2 specifically includes:
Step 2.1:Longeron running gear is laid to have poured on standard knot longeron in the previous section of standard knot longeron to be poured.
Step 2.2:Bearing platform 005 is laid below longeron;Crane system is in before the bearing platform 005 before placement longeron Portion is to connect bearing platform 005 and longeron;Lifting body 001 is laid in the afterbody of bearing platform 005, and located at bearing platform 005 Between longeron;Anchor system 004 is laid between crane system before the lifting body 001 and the longeron to hold described in connection Galassing platform 005 and the longeron 007.The step 2.2 also includes laying rear suspension bar in the anchor system 004 and the jacking Between mechanism 001, for connecting the longeron and the bearing platform.
Step 2.3:Coordinated by the lifting body 001 and anchor system 004 and complete Hanging Basket lifting to design attitude, peace The longeron template system is filled, standard knot longeron is carried out and pours.
Step 3, adjustment temporary pre-stressed concentration Suo Li:The Suo Li of temporary pre-stressed concentration 033 is adjusted according to monitoring data.
Step 4, the concrete reinforcement of colligation longeron 007 to be poured, completes longeron concreting.
Step 5, form removal, removes Hanging Basket and is connected with hoist cable, arch bridge main girder construction Hanging Basket is run into next work Constructed position.
Step 5.1:Crane system before longeron template system, longeron is removed, Hanging Basket is removed and is connected with hoist cable.
Step 5.2:Coordinated by the lifting body and anchor system and complete Hanging Basket decentralization, Hanging Basket transfers to extension leg bottom The position of piston shoes contact walking rail top face.
Step 5.3:Hanging Basket is moved to next working position by the running gear.
Step 6, crossbeam casting system, colligation crossbeam concrete reinforcement and prestressing tendon are installed, crossbeam concrete is completed and pours Build.
Step 6.1:The running gear of crossbeam casting system is laid to position of constructing.
Step 6.2:The spandrel girder of placement crossbeam casting system, beam template system, suspension system.
Step 6.3:Crossbeam is carried out to pour.
Step 7, repeat step 3-6 continues to complete remaining bridge deck concrete structure construction.
Step 8, laying has poured the prefabricated bridge 031 between crossbeam.The step can also be after step 6 and step Carried out between 7.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the design of the present invention It is defined with scope.On the premise of design concept of the present invention is not departed from, technical side of this area ordinary person to the present invention The all variations and modifications that case is made, all should drop into protection scope of the present invention, claimed technology contents of the invention, Through all recording in detail in the claims.

Claims (9)

1. a kind of lower bearing arch bridge concrete bridge deck construction method, it is characterised in that including:
Step 1, the concrete arch bridge girder for saving standard knot is originated using construction with brackets;
Step 2, arch bridge main girder construction Hanging Basket and its subsystem are installed, the front end of Hanging Basket is connected with hoist cable;
Step 3, adjustment temporary pre-stressed concentration Suo Li;
Step 4, colligation vertical concrete beam steel, completes longeron concreting;
Step 5, form removal, removes Hanging Basket and is connected with hoist cable, arch bridge main girder construction Hanging Basket is run into next working position enters Row construction;
Step 6, crossbeam casting system, colligation crossbeam concrete reinforcement and prestressing tendon are installed, crossbeam concreting is completed;
Step 7, repeat step 3-6 continues to complete remaining bridge deck concrete structure construction.
2. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 1, it is characterised in that the step The step of arch bridge main girder construction Hanging Basket is installed in 2 specifically includes:
Step 2.1:Longeron running gear is laid to have poured on standard knot longeron in the previous section of standard knot longeron to be poured;
Step 2.2:Bearing platform is laid below longeron;Crane system before longeron is laid to hold to connect in bearing platform front portion Galassing platform and longeron;Lifting body is laid in bearing platform afterbody, and located between bearing platform and longeron;Lay anchor system To connect the bearing platform and the longeron between crane system before the lifting body and the longeron;
Step 2.3:Coordinated by the lifting body and anchor system and complete Hanging Basket lifting to design attitude, the longeron is installed Template system, carries out standard knot longeron and pours.
3. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 2, it is characterised in that the longeron Running gear includes
Walking track and propelling cylinder above the longeron,
Extension leg located at the bearing platform both sides, wherein the bearing platform can be placed in the walking rail by the extension leg On road,
Walking rolling wheel structure between the bearing platform and the longeron.
4. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 2, it is characterised in that the longeron Preceding crane system includes preceding suspension rod and the helicitic texture being connected with preceding suspension rod.
5. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 2, it is characterised in that the step 5 specifically include:
Step 5.1:Crane system before longeron template system, longeron is removed, Hanging Basket is removed and is connected with hoist cable;
Step 5.2:Coordinated by the lifting body and anchor system and complete Hanging Basket decentralization;
Step 5.3:Hanging Basket is moved to next working position by the running gear.
6. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 5, it is characterised in that the step 5.2:Hanging Basket transfers to the position for hanging leg bottom piston shoes contact walking rail top face.
7. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 2, it is characterised in that the step 2.2 also include laying rear suspension bar between the anchor system and the lifting body, for connecting the longeron and described holding Galassing platform.
8. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 1, it is characterised in that the step 6 include:
Step 6.1:The running gear of crossbeam casting system is laid to position of constructing;
Step 6.2:The spandrel girder of placement crossbeam casting system, beam template system, suspension system;
Step 6.3:Crossbeam is carried out to pour.
9. a kind of lower bearing arch bridge concrete bridge deck construction method according to claim 1, it is characterised in that also including paving If the step of prefabricated bridge between having poured crossbeam, the step is carried out after step 6 between step 7, Huo Zhe Carried out after step 7.
CN201710302555.5A 2017-05-03 2017-05-03 A kind of lower bearing arch bridge concrete bridge deck construction method Pending CN107100074A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710302555.5A CN107100074A (en) 2017-05-03 2017-05-03 A kind of lower bearing arch bridge concrete bridge deck construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710302555.5A CN107100074A (en) 2017-05-03 2017-05-03 A kind of lower bearing arch bridge concrete bridge deck construction method

Publications (1)

Publication Number Publication Date
CN107100074A true CN107100074A (en) 2017-08-29

Family

ID=59656496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710302555.5A Pending CN107100074A (en) 2017-05-03 2017-05-03 A kind of lower bearing arch bridge concrete bridge deck construction method

Country Status (1)

Country Link
CN (1) CN107100074A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505252A (en) * 2018-12-17 2019-03-22 彭国洪 A kind of simple method of construction of Very Large Bridge
CN110485311A (en) * 2019-08-09 2019-11-22 中铁广州工程局集团有限公司 A kind of double C shape hook movable hanging basket and construction method
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN111691298A (en) * 2020-04-21 2020-09-22 中铁广州工程局集团有限公司 Construction method for wide section of half-through arch bridge
WO2021212921A1 (en) * 2020-04-21 2021-10-28 中铁广州工程局集团有限公司 Construction system for widened section of half-through arch bridge
CN113722801A (en) * 2021-09-07 2021-11-30 中国铁路设计集团有限公司 Method for intelligently generating construction stage of concrete beam bridge by suspension casting method
WO2022041449A1 (en) * 2020-08-28 2022-03-03 中铁大桥局集团有限公司 Construction method for long platform guy-wire hanging basket and main girder section
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018232A (en) * 1996-07-03 1998-01-20 Taisei Corp Construction of traveling working vehicle
CN201250385Y (en) * 2008-09-10 2009-06-03 中铁八局集团第一工程有限公司 Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting
CN102797227A (en) * 2012-09-03 2012-11-28 贵州路桥集团有限公司 Construction method adopting inverted triangular obliquely-crawling hanging basket
CN103074854A (en) * 2013-01-23 2013-05-01 中交四航局第一工程有限公司 Rear supporting point triangular bracket hanging basket and bridge construction method using same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018232A (en) * 1996-07-03 1998-01-20 Taisei Corp Construction of traveling working vehicle
CN201250385Y (en) * 2008-09-10 2009-06-03 中铁八局集团第一工程有限公司 Rear support long cantilevered traveling carriage system for cable-stayed bridge cantilever casting
CN102797227A (en) * 2012-09-03 2012-11-28 贵州路桥集团有限公司 Construction method adopting inverted triangular obliquely-crawling hanging basket
CN103074854A (en) * 2013-01-23 2013-05-01 中交四航局第一工程有限公司 Rear supporting point triangular bracket hanging basket and bridge construction method using same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李超等: "贝雷片拼装挂篮在拱桥施工中的应用", 《民营科技》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505252A (en) * 2018-12-17 2019-03-22 彭国洪 A kind of simple method of construction of Very Large Bridge
CN110485311A (en) * 2019-08-09 2019-11-22 中铁广州工程局集团有限公司 A kind of double C shape hook movable hanging basket and construction method
CN110485311B (en) * 2019-08-09 2024-03-19 中铁广州工程局集团有限公司 double-C-shaped hook movable hanging basket and construction method
CN110792038A (en) * 2019-11-11 2020-02-14 山东交通学院 Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN111691298A (en) * 2020-04-21 2020-09-22 中铁广州工程局集团有限公司 Construction method for wide section of half-through arch bridge
WO2021212921A1 (en) * 2020-04-21 2021-10-28 中铁广州工程局集团有限公司 Construction system for widened section of half-through arch bridge
GB2599295A (en) * 2020-04-21 2022-03-30 China Railway Guangzhou Eng Group Co Ltd Construction system for widened section of half-through arch bridge
WO2022041449A1 (en) * 2020-08-28 2022-03-03 中铁大桥局集团有限公司 Construction method for long platform guy-wire hanging basket and main girder section
GB2608555A (en) * 2020-08-28 2023-01-04 China Railway Major Bridge Engineering Group Co Ltd Long platform guy-wire hanging basket and construction method for main girder section
CN113722801A (en) * 2021-09-07 2021-11-30 中国铁路设计集团有限公司 Method for intelligently generating construction stage of concrete beam bridge by suspension casting method
CN117604921A (en) * 2024-01-23 2024-02-27 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge
CN117604921B (en) * 2024-01-23 2024-03-29 贵州省公路工程集团有限公司 Cast-in-situ longitudinal moving bracket for middle box bottom plate of steel truss web rod-concrete combined arch bridge

Similar Documents

Publication Publication Date Title
CN107100074A (en) A kind of lower bearing arch bridge concrete bridge deck construction method
CN101586330B (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN103074854B (en) Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106702910A (en) Main girder construction process for extradosed cable-stayed bridge with double towers and double cable planes
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN102094392B (en) Lower supported hanging basket in bridge construction and application thereof
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN102704407B (en) Construction method of lower guide beam type bridge-erecting crane passing through tunnel
CN101787678B (en) Large-span section assembling bridge manufacturing machine and assembling construction process thereof
CN208815424U (en) A kind of bridge descending hanging basket
CN104790295A (en) Construction method of tire type gantry crane frame beam
CN207608836U (en) A kind of Successive interference cancellation cantilever pouring construction Diamond-Shape Form Traveler
CN102140779A (en) Movable cast-in-situ support and movable construction method of box girder cast-in-situ support
CN110528402A (en) A kind of construction method of the more purlin piece combination Hanging Baskets of ultra-wide box beam
CN105239510A (en) Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN107268455B (en) Concrete girder gooseneck composite structure beam cradle construction method
CN102418534B (en) Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame
CN110258352A (en) The steel reinforced concrete combined bridge construction method that two bridgings are done
CN210561749U (en) Multi-frame juxtaposed double-cantilever bridge girder erection machine
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN201972099U (en) Through type hanging basket in bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170829