CN107191201A - Constructing middle partition wall in tunnel template and its constructing device - Google Patents
Constructing middle partition wall in tunnel template and its constructing device Download PDFInfo
- Publication number
- CN107191201A CN107191201A CN201710565364.8A CN201710565364A CN107191201A CN 107191201 A CN107191201 A CN 107191201A CN 201710565364 A CN201710565364 A CN 201710565364A CN 107191201 A CN107191201 A CN 107191201A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- wall
- steel form
- middle partition
- partition wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005192 partition Methods 0.000 title claims abstract description 54
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 97
- 239000010959 steel Substances 0.000 claims abstract description 97
- 238000005266 casting Methods 0.000 claims abstract description 5
- 238000005096 rolling process Methods 0.000 claims description 7
- 239000000203 mixture Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 33
- 238000009415 formwork Methods 0.000 abstract description 9
- 238000009434 installation Methods 0.000 abstract description 4
- 230000005484 gravity Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000013632 homeostatic process Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 238000005491 wire drawing Methods 0.000 description 2
- GNFTZDOKVXKIBK-UHFFFAOYSA-N 3-(2-methoxyethoxy)benzohydrazide Chemical compound COCCOC1=CC=CC(C(=O)NN)=C1 GNFTZDOKVXKIBK-UHFFFAOYSA-N 0.000 description 1
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010141 design making Methods 0.000 description 1
- 230000000916 dilatatory effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Abstract
The present invention is a kind of constructing middle partition wall in tunnel template and its constructing device, constructing middle partition wall in tunnel template is included along two longitudinally disposed steel form bodies of tunnel, two steel form bodies are lateral symmetry to be set, two steel form bodies constitute mid-board casting space to be onstructed between the side wall away from tunnel inner wall, contact is provided with the singletree structure that at least one length can be adjusted between each steel form body and relative tunnel inner wall, and the bottom of each steel form body is provided with the moving structure that each steel form body can be driven to be vertically moved along tunnel.The template and its constructing device overcome hydraulic pressure in the prior art from the problems such as the dead load of walking template presence is big, costly, mounting and adjusting is difficult to exist with assembled formwork installation is cumbersome, efficiency long in time limit is low, operating expenses is high, outward appearance is poor, the device can effectively improve construction of central division wall efficiency, reduction infrastructure cost and construction cost.
Description
Technical field
The present invention relates to technical field of tunnel construction, more particularly to a kind of constructing middle partition wall in tunnel template and its construction dress
Put.
Background technology
In Highway Construction in Mountainous Area field, due to being influenceed by landform, landforms, while to ensure technical-economic index and friendship
Logical safety, mainly by setting tunnel to solve the problems, such as route line style.Because constructing tunnel need to be according to arrangement and surrounding rock category
Optimum reasonable construction technique is taken, to ensure duration progress and controlled investment.When length of tunnel reaches certain require, one
As use separate tunnel.When length of tunnel is shorter, preferably using multi-arch type tunnel.
In double-arched tunnel construction of central division wall, template is more important, and its selection directly affects the construction period.Because in tunnel
Pilot tunnel section is smaller, and formwork assembling and disassembling is difficult, influence construction.It is many in the prior art that two kinds of template and assembled formwork are walked using hydraulic pressure certainly
Mode is constructed.
Hydraulic pressure, by walking motor movement certainly, typically there is two kinds of structures from template is walked, and the first is to be provided with two in mid-board side
Bar walking track, template center of gravity vertical line falls within two interorbitals, to maintain homeostasis, template increase additional weight.In the structure
Template is connected in main template body by hydraulic system operation, panel by support bar, and main body is by they sup-port in pilot tunnel side wall
On, be used for construction with cage bar curve partition wall, the structure exist from great, steel using amount it is big, it is costly the shortcomings of;It is for second
Respectively there is a walking track in mid-board both sides, template connects integral by end I-steel, forms homeostasis structure.Should
Template is by hydraulic system operation in structure, and panel is connected in main template body by support bar, and main body is being led by they sup-port
On the wall of hole side, the structure is reduced compared with the first dead load, but still heavier, costly, and the arrangement of reinforcement mid-board that can not construct.
To sum up, hydraulic pressure exists from great, costly from template is walked, and template is difficult in narrow and small middle drift space mounting adjustment.
Assembled formwork generally there are two kinds of structures, and the first is spliced by small-sized punching block, by drawing steel inside template
Muscle is connected, spacer bar fixed form position, outside to ensure template monolithic stability by support or diagonal brace.The template is using artificial peace
It is dress, dismounting, mobile, have the shortcomings that artificial quantity is more, peace is torn cumbersome and time-consuming many and small template open and is easily deformed;Second
It is to be spliced by small-sized punching block, time-division two-step pouring of constructing, wall bottom, which is poured, finishes backfill stone.There is people's number in the structure
Amount is more, time-consuming, the uppity shortcoming of pouring quality.To sum up, to there is installation cumbersome, long in time limit for assembled formwork, in every
Wall operating expenses is high and outward appearance is poor.
Thus, the present inventor relies on experience and the practice for being engaged in relevant industries for many years, proposes a kind of constructing middle partition wall in tunnel
Template and its constructing device, to overcome the defect of prior art.
The content of the invention
It is an object of the invention to provide a kind of constructing middle partition wall in tunnel template and its constructing device, overcome in the prior art
Hydraulic pressure is from the installation that dead load is big, costly, mounting and adjusting is difficult to exist with assembled formwork of walking template presence is cumbersome, the duration
The problems such as long efficiency is low, operating expenses is high, outward appearance is poor, the template and its constructing device can effectively improve construction of central division wall effect
Rate, reduction infrastructure cost and construction cost.
The object of the present invention is achieved like this, a kind of constructing middle partition wall in tunnel template, the constructing middle partition wall in tunnel mould
Plate is included along two longitudinally disposed steel form bodies of tunnel, and two steel form bodies are lateral symmetry to be set, described in two
Steel form body constitutes mid-board casting space to be onstructed, each steel form body and phase between the side wall away from tunnel inner wall
To tunnel inner wall between contact be provided with the singletree structure that at least one length can be adjusted, the bottom of each steel form body
Portion is provided with the moving structure that each steel form body can be driven to be vertically moved along the tunnel.
In the better embodiment of the present invention, each steel form body is distinguished close to the side of the tunnel inner wall
Inclined support structure is provided with, contact sets the singletree structure, each institute between each inclined support structure and relative tunnel inner wall
The bottom for stating inclined support structure sets the moving structure.
In the better embodiment of the present invention, each inclined support structure includes at least one horizontal brace, the horizontal stroke
The sidewall bottom of the close tunnel inner wall of the steel form body is connected to one end contact of brace, the horizontal brace
The other end is extended to relative tunnel inner wall, and the bottom of each horizontal brace is fixedly connected with one along tunnel longitudinal direction
The longeron of setting, the down-set moving structure in bottom of each longeron;Each inclined support structure also includes at least one
The oblique brace set obliquely, one end of the oblique brace is resisted against the other end of the horizontal brace, the oblique support
The other end contact of arm is connected to top side wall of the steel form body close to the tunnel inner wall.
In the better embodiment of the present invention, contact is set between each oblique brace and relative tunnel inner wall
The operating platform along the longitudinally disposed level in the tunnel is additionally provided with the singletree structure, the oblique brace.
In the better embodiment of the present invention, the oblique brace is with the steel form body in the tunnel
At least one transverse reinforced bar is provided between the side wall of wall.
The present invention a better embodiment in, between each longeron and relative tunnel inner wall contact be provided with to
The longeron cross struts that few length can be adjusted.
In the better embodiment of the present invention, the moving structure is at least fixedly installed on the longeron including two
Roller is rotatably connected on the rolling wheel support of two ends bottom, the rolling wheel support.
In the better embodiment of the present invention, between each steel form body is included on steel facing, the steel facing
Every being provided with multiple working window open-works, each steel facing is fixedly connected by the panel block of the curved setting in multiple sections and constituted,
The steel facing is respectively arranged with a ring connecting plate close to the two ends of the side of the tunnel inner wall, and the steel facing is close to institute
The side for stating tunnel inner wall is additionally provided with multiple longitudinally disposed longitudinal ribs, and contact is connected to respectively at the two ends of the longitudinal rib
On the ring connecting plate at two ends.
In the better embodiment of the present invention, set between two relative ends of two steel form bodies
There is at least one termination Tiebar structure.
In the better embodiment of the present invention, two top side walls of the steel form body away from tunnel inner wall are equal
It is provided with along the longitudinally disposed plank sheathing in tunnel, two plank sheathings are lateral symmetry to be set.
The purpose of the present invention can also be achieved in that the constructing middle partition wall in tunnel device includes constructing middle partition wall in tunnel mould
Plate, in addition to the power set that the constructing middle partition wall in tunnel template can be driven to be vertically moved along the tunnel.
In the better embodiment of the present invention, the power set are constructing tunnel excavator or loading machine.
From the above mentioned, constructing middle partition wall in tunnel template of the invention and its constructing device have the advantages that:
(1) constructing middle partition wall in tunnel template of the invention is the monoblock type plate device of both lateral sides independence, and bottom is set
Moving structure facilitate the movement of device, the singletree structure that length can be adjusted makes apparatus structure more stablize and facilitates workman to grasp
Make, greatly accelerate the efficiency of construction of mid-board;
(2) constructing middle partition wall in tunnel formwork structure of the invention is simple, and overall weight is low, and cost is relatively low, and steel form sheet
Body gravity energy is undertaken by mid-board, and the singletree structure between steel form body and tunnel inner wall can make device support more firm,
So that safety is more stablized in construction;
(3) power set in constructing middle partition wall in tunnel device of the invention can use the idle digging of constructing tunnel
Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
Brief description of the drawings
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1:For the schematic diagram of the constructing middle partition wall in tunnel template of the present invention.
Fig. 2:For the side view of the constructing middle partition wall in tunnel template of the present invention.
Fig. 3:For the schematic diagram of the steel form body of the present invention.
Fig. 4:For enlarged drawing in Fig. 3 I.
Fig. 5:For the structural representation of the steel facing of the present invention.
Fig. 6:For the construction flow chart of the present invention.
In figure:
100th, constructing middle partition wall in tunnel template;
1st, steel form body;
11st, termination Tiebar structure;12nd, steel facing;121st, working window open-work;13rd, ring connecting plate;14th, longitudinal rib;15、
Plank sheathing;
2nd, singletree structure;
21st, base;22nd, support bar;23rd, adjustment pipe;
3rd, moving structure;
31st, rolling wheel support;32nd, roller;33rd, track;
4th, inclined support structure;
41st, horizontal brace;42nd, longeron;43rd, oblique brace;44th, operating platform;45th, transverse reinforced bar;46th, longeron is horizontal
Strut;
9th, tunnel.
Embodiment
In order to which technical characteristic, purpose and effect to the present invention are more clearly understood from, now control illustrates this hair
Bright embodiment.
As shown in Figures 1 to 5, the present invention provides a kind of constructing middle partition wall in tunnel template 100, including is set along the longitudinal direction of tunnel 9
The two steel form bodies 1 put, two steel form bodies 1 are lateral symmetry to be set, and two steel form bodies 1 are away from tunnel inner wall
Mid-board casting space to be onstructed is constituted between the wall of side, in the present embodiment, two relative ends of two steel form bodies 1
At least one termination Tiebar structure 11 is provided between portion, in the present embodiment, termination Tiebar structure 11 is to wire drawing thick stick.
In the specific embodiment of the present invention, the quantity of termination Tiebar structure 11 at two ends is 3, and 3 termination Tiebar structures 11 are between the upper and lower
Every setting, the termination Tiebar structure 11 at two ends can realize the connection between two steel form bodies 1.Construction of central division wall is completed
Afterwards, two steel form bodies 1 are resisted against on the two side of mid-board, and two steel form bodies 1 center of gravity be projected in every
On wall, after the completion of construction of central division wall, two steel form bodies 1 can be moved wall along the septum, and the gravity energy of steel form body 1 is by mid-board
Undertake, reduce mobile burden.The problem of due to often there is out-of-flatness at the top of During Initial Stage Construction supporting, asked to solve this
Topic, realizes the closure in the space between steel form body 1 and preliminary bracing top concrete, two steel form bodies 1 are away from tunnel
The top side wall of road inwall is respectively provided with along the longitudinally disposed plank sheathing 15 in tunnel, and two plank sheathings 15 are lateral symmetry to be set, at this
In one specific embodiment of invention, the width of plank sheathing 15 is 10cm.Each steel form body 1 and relative tunnel inner wall (tunnel
Before construction is finished, general on its inwall to set pilot tunnel temporary support structures, one end of each singletree structure 2 is resisted against pilot tunnel and faced
When supporting construction on) between contact be provided with the singletree structure 2 that at least one length can be adjusted, it is in the present embodiment, horizontal
Pole structure 2 is the adjustable supporting post-rod of length, and one end of supporting post-rod sets base 21, the other end to set support bar
22, the adjustment pipe 23 that internal thread is set is equipped with base 21, one end of support bar 22 is arranged in adjustment pipe 23, and it is located at
Set on the side wall of one end in adjustment pipe 23 with adjusting the external screw thread that the internal thread of pipe is matched, base 21 is fixed on steel form sheet
On body 1, the other end of support bar 22 is resisted against on tunnel inner wall;In the specific embodiment of the present invention, the singletree of both sides
The quantity of structure 2 is respectively 2, and singletree structure 2 can be such that the overall structure of constructing middle partition wall in tunnel template 100 more stablizes.
The bottom of each steel form body 1 is provided with the moving structure 3 that each steel form body 1 can be driven to be vertically moved along tunnel.The present invention
Constructing middle partition wall in tunnel template 100 be both lateral sides independence monoblock type plate device, bottom set the convenience of moving structure 3
The movement of device, the singletree structure 2 that length can be adjusted makes apparatus structure more stablize and facilitate operative, greatly accelerates
The efficiency of construction of mid-board;The constructing middle partition wall in tunnel template 100 of the present invention is simple in construction, and overall weight is low, and cost is relatively low, and
The gravity energy of steel form body 1 is undertaken by mid-board, and the singletree structure 2 between steel form body 1 and tunnel inner wall can make device
Support is more firm so that safety is more stablized in construction.
Further, as shown in figure 1, steel form body 1 is respectively arranged with inclined support structure 4 close to the side of tunnel inner wall, respectively
Contact sets foregoing singletree structure 2 between inclined support structure 4 and relative tunnel inner wall, and the bottom of each inclined support structure 4 is set
Foregoing moving structure 3.
Further, it is in the present embodiment, horizontal as shown in figure 1, each inclined support structure 4 includes at least one horizontal brace 41
It is made to brace 41 of I-steel, one end contact of horizontal brace 41 is connected to steel form body 1 close to the side of tunnel inner wall
Wall bottom, the other end of horizontal brace 41 is extended to relative tunnel inner wall, and the bottom of each horizontal brace 41 is fixedly connected
Have one along the longitudinally disposed longeron 42 in tunnel, in the present embodiment, longeron 42 is made of I-steel, the bottom of each longeron 42
Down-set foregoing moving structure 3;Each inclined support structure 4 also includes at least one oblique brace 43 set obliquely, at this
In embodiment, oblique brace 43 is made of I-steel, and oblique brace 43 and the horizontal matching of brace 41 are set, the present invention's
In one specific embodiment, the oblique brace 43 of both sides and horizontal brace 41 are respectively 5.One end of oblique brace 43 is resisted against horizontal stroke
To the other end of brace 41, the other end contact of oblique brace 43 is connected to steel form body 1 close to the side wall top of tunnel inner wall
Portion.In the present embodiment, contact sets foregoing singletree structure 2 between each oblique brace 43 and relative tunnel inner wall,
The operating platform 44 along the longitudinally disposed level in tunnel is additionally provided with each oblique brace 43, workman can be trampled in operating platform
Constructing operation is carried out on 44.In order that steel form body 1 is more stablized, oblique brace 43 is with steel form body 1 in tunnel
At least one transverse reinforced bar 45 is provided between the side wall of wall, in the present embodiment, longeron 42 is made of I-steel, two
The quantity of the transverse reinforced bar 45 of side is respectively 3.More stablize in order that being supported between steel form body 1 and tunnel inner wall,
The longeron cross struts 46 that at least one length can be adjusted are provided between each longeron 42 and relative tunnel inner wall, longeron is horizontal
Strut 46 can also be the adjustable supporting post-rod of length, the structure of longeron cross struts 46 is different from the length of singletree structure 2,
Structure is similar, will not be repeated here.
Further, as shown in Figure 1 and Figure 2, moving structure 3 is at least fixedly installed on the two ends bottom of longeron 42 including two
Roller 32 is rotatably connected on rolling wheel support 31, rolling wheel support 31.In the specific embodiment of the present invention, tunnel is set on bottom surface
Track 33 is put, roller 32 is moved along the scrolling realization device of track 33, and track 33 can be lifted, with the tune for the height for realizing device
It is whole.
Further, as shown in Fig. 3, Fig. 4, Fig. 5, each steel form body 1 includes being arranged at intervals on steel facing 12, steel facing 12
There are multiple working window open-works 121, in the specific embodiment of we, the quantity of working window open-work 121 is 4,4 working windows
The interlaced arrangement of open-work 121, convenient construction vibrates operation.Each steel facing 12 is fixed by the panel block of the curved setting in multiple sections to be connected
Composition is connect, the material that panel block is used is Q235, and steel facing 12 is respectively arranged with a ring close to the two ends of the side of tunnel inner wall
To connecting plate 13, steel facing 12 is additionally provided with multiple longitudinally disposed longitudinal ribs 14, longitudinal rib close to the side of tunnel inner wall
Contact is connected on the ring connecting plate 13 at two ends respectively at 14 two ends.Ring connecting plate 13 and longitudinal rib 14 can preferably expire
The globality and rigidity requirement of sufficient steel form body 1.
In the specific embodiment of the present invention, each steel facing 12 cutting for 6mm by 4 block length 1500mm, high 5400mm, thickness
Face is assembled (for convenient in carrying, typically carrying out at the construction field (site) assembled) in the panel block of irregular curve type, and ring connects
Fishplate bar 13 is made of the thick steel plates of 10mm, and its width is 200mm, is highly 5400mm, ring connecting plate 13 is fixedly welded on
The two ends of two steel facings 12, longitudinal rib 14 is made up of 4X4mm channel-section steel, and the two ends of each longitudinal rib 14 are resisted against two ends respectively
Ring connecting plate 13 on, longitudinal rib 14 is welded on steel facing 12 in 20cm intervals.Horizontal brace 41 and oblique brace 43 by
20b I-steel is made, and 5 groups of horizontal braces 41 and the longitudinally spaced steel form body 1 that is welded in of oblique brace 43 are in tunnel
On the side wall of wall, operating platform 44 is made up of 16 I-steel, and the length dimension of operating platform 44 is 550mm;Two steel form sheets
The termination Tiebar structure 11 set between the two ends of body 1 is φ 108mm to wire drawing thick stick.In the embodiment, tunnel partition wall is applied
The wide 2500mm of upper shed of work template 100, the lower wide 3850mm of mouth, is highly 5400mm, and device gross weight is 16.292 tons.
The present invention also provides a kind of constructing middle partition wall in tunnel device, and constructing middle partition wall in tunnel device is included in foregoing tunnel
Partition wall construction formwork 100, in addition to constructing middle partition wall in tunnel template 100 can be driven to be filled along the power that the tunnel is vertically moved
Put.Constructing middle partition wall in tunnel template 100 can be by the dilatory movement of power set, and in the present embodiment, power set are applied for tunnel
Work excavator or loading machine, when carrying out device movement, are dragged paragraph by paragraph respectively by excavator or loading machine in the both sides of mid-board
It is dynamic.Power set when the constructing middle partition wall in tunnel template 100 of the present invention is moved can use the idle digging of constructing tunnel
Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
As shown in fig. 6, carrying out construction of central division wall using the constructing middle partition wall in tunnel template 100 and its constructing device of the present invention
When technological process it is as follows:
Step a, according to mid-board require carry out stencil design making;
Step b, carry out preparation of construction;
Reinforcing bar is installed in step c, tunnel;
Step d, by the present invention constructing middle partition wall in tunnel template 100 be moved to construction requirement position, when short transverse need
When adjusting, it can be adjusted by lifting the track 33 of the lower section of roller 32;
Closure, installation of embedded parts (prior art) at the top of step e, completion mid-board casting space to be onstructed, are finally completed
Hold mould (prior art) closure;
Step f, the constructing middle partition wall in tunnel template 100 to the present invention are fixed, adjust and hold out against singletree structure 2,
Longeron cross struts 46;
Step g, progress concrete construction, constitute mid-board;
Step h, rotation singletree structure 2, longeron cross struts 46 loosen it, by each steel form sheet on the outside of mid-board
Body 1 is removed and affects reach by power set;
Step i, repeat step d are to step h, until completing the construction of whole mid-boards.
From the above mentioned, constructing middle partition wall in tunnel template of the invention and its constructing device have the advantages that:
(1) constructing middle partition wall in tunnel template of the invention is the monoblock type plate device of both lateral sides independence, and bottom is set
Moving structure facilitate the movement of device, the singletree structure that length can be adjusted makes apparatus structure more stablize and facilitates workman to grasp
Make, greatly accelerate the efficiency of construction of mid-board;
(2) constructing middle partition wall in tunnel formwork structure of the invention is simple, and overall weight is low, and cost is relatively low, and steel form sheet
Body gravity energy is undertaken by mid-board, and the singletree structure between steel form body and tunnel inner wall can make device support more firm,
So that safety is more stablized in construction;
(3) power set in constructing middle partition wall in tunnel device of the invention can use the idle digging of constructing tunnel
Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
Schematical embodiment of the invention is the foregoing is only, the scope of the present invention is not limited to.It is any
Those skilled in the art, made equivalent variations and modification on the premise of the design of the present invention and principle is not departed from,
The scope of protection of the invention should be belonged to.
Claims (12)
1. a kind of constructing middle partition wall in tunnel template, it is characterised in that the constructing middle partition wall in tunnel template is included along tunnel longitudinal direction
The two steel form bodies set, two steel form bodies are lateral symmetry to be set, and two steel form bodies are away from tunnel
Mid-board casting space to be onstructed is constituted between the side wall of road inwall, between each the steel form body and relative tunnel inner wall
Contact is provided with the singletree structure that at least one length can be adjusted, and the bottom of each steel form body, which is provided with, can drive respectively
The moving structure that the steel form body is vertically moved along the tunnel.
2. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that each steel form body is close to described
The side of tunnel inner wall is respectively arranged with inclined support structure, and contact sets institute between each inclined support structure and relative tunnel inner wall
Singletree structure is stated, the bottom of each inclined support structure sets the moving structure.
3. constructing middle partition wall in tunnel template as claimed in claim 2, it is characterised in that each inclined support structure includes at least one
Individual horizontal brace, one end contact of the horizontal brace is connected to the steel form body close to the side wall bottom of the tunnel inner wall
Portion, the other end of the horizontal brace is extended to relative tunnel inner wall, and the bottom of each horizontal brace is fixedly connected
Have one along the longitudinally disposed longeron in the tunnel, the down-set moving structure in bottom of each longeron;Each diagonal brace
Structure also includes at least one oblique brace set obliquely, and one end of the oblique brace is resisted against the horizontal brace
The other end, the other end contact of the oblique brace is connected to the steel form body close to the side wall top of the tunnel inner wall
Portion.
4. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that each oblique brace and relative tunnel
Contact sets and is additionally provided with the singletree structure, the oblique brace along the longitudinally disposed water in the tunnel between road inwall
Flat operating platform.
5. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that the oblique brace and the steel form
Body is provided with least one transverse reinforced bar between the side wall of the tunnel inner wall.
6. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that in each longeron and relative tunnel
Contact is provided with the longeron cross struts that at least one length can be adjusted between wall.
7. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that the moving structure at least includes two
It is fixedly installed on the rolling wheel support of longeron two ends bottom, the rolling wheel support and is rotatably connected to roller.
8. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that each steel form body includes steel face
Multiple working window open-works are arranged at intervals with plate, the steel facing, each steel facing is by the face of the curved setting in multiple sections
Plate is fixedly connected with composition, and the steel facing is respectively arranged with ring connection close to the two ends of the side of the tunnel inner wall
Plate, the steel facing is additionally provided with multiple longitudinally disposed longitudinal ribs, the longitudinal rib close to the side of the tunnel inner wall
Contact is connected on the ring connecting plate at two ends respectively at two ends.
9. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that two of two steel form bodies
At least one termination Tiebar structure is provided between relative end.
10. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that two steel form bodies are remote
The top side wall of tunnel inner wall is provided with along the longitudinally disposed plank sheathing in tunnel, and two plank sheathings are lateral symmetry to be set.
11. a kind of constructing middle partition wall in tunnel device, it is characterised in that the constructing middle partition wall in tunnel device includes such as claim
Constructing middle partition wall in tunnel template any one of 1 to 10, in addition to the constructing middle partition wall in tunnel template can be driven along institute
State the power set that tunnel is vertically moved.
12. constructing middle partition wall in tunnel device as claimed in claim 11, it is characterised in that the power set are constructing tunnel
With excavator or loading machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710565364.8A CN107191201A (en) | 2017-07-12 | 2017-07-12 | Constructing middle partition wall in tunnel template and its constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710565364.8A CN107191201A (en) | 2017-07-12 | 2017-07-12 | Constructing middle partition wall in tunnel template and its constructing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107191201A true CN107191201A (en) | 2017-09-22 |
Family
ID=59883486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710565364.8A Pending CN107191201A (en) | 2017-07-12 | 2017-07-12 | Constructing middle partition wall in tunnel template and its constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107191201A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075454A (en) * | 2020-01-17 | 2020-04-28 | 中铁十九局集团第三工程有限公司 | Double-arch tunnel five-hole excavation method |
CN112627844A (en) * | 2020-12-01 | 2021-04-09 | 中铁建工集团有限公司北京路桥分公司 | Auxiliary device convenient to highway is under construction in tunnel |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050045951A (en) * | 2005-02-11 | 2005-05-17 | 장인건설기업(주) | The mold apparatus for center wall of two archi tunnel |
CN202140099U (en) * | 2011-04-18 | 2012-02-08 | 中铁十二局集团有限公司 | Movable formwork device used for pouring concrete division walls of metro tunnel turn lines |
CN102418534A (en) * | 2011-10-17 | 2012-04-18 | 北京城建道桥建设集团有限公司 | Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame |
CN202544859U (en) * | 2012-02-07 | 2012-11-21 | 成都市新筑路桥机械股份有限公司 | Formwork trolley for partition lining in tunnel |
CN203383833U (en) * | 2013-08-02 | 2014-01-08 | 四川公路桥梁建设集团有限公司 | Self-propelled mid-partition wall formwork for multiple-arch tunnel |
CN204552761U (en) * | 2015-01-11 | 2015-08-12 | 中交一公局第三工程有限公司 | Wall all-hydraulic self-walking formwork jumbo in combined type song |
CN204899939U (en) * | 2015-08-05 | 2015-12-23 | 中交路桥华南工程有限公司 | Bent wall wherein partition wall formworking jumbo |
CN206246128U (en) * | 2016-08-21 | 2017-06-13 | 洛阳高飞桥隧机械有限公司 | A kind of mid-board lining trolley of M types multiple-arch tunnel |
CN207122313U (en) * | 2017-07-12 | 2018-03-20 | 中交一公局海威工程建设有限公司 | Constructing middle partition wall in tunnel template and its constructing device |
-
2017
- 2017-07-12 CN CN201710565364.8A patent/CN107191201A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050045951A (en) * | 2005-02-11 | 2005-05-17 | 장인건설기업(주) | The mold apparatus for center wall of two archi tunnel |
CN202140099U (en) * | 2011-04-18 | 2012-02-08 | 中铁十二局集团有限公司 | Movable formwork device used for pouring concrete division walls of metro tunnel turn lines |
CN102418534A (en) * | 2011-10-17 | 2012-04-18 | 北京城建道桥建设集团有限公司 | Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame |
CN202544859U (en) * | 2012-02-07 | 2012-11-21 | 成都市新筑路桥机械股份有限公司 | Formwork trolley for partition lining in tunnel |
CN203383833U (en) * | 2013-08-02 | 2014-01-08 | 四川公路桥梁建设集团有限公司 | Self-propelled mid-partition wall formwork for multiple-arch tunnel |
CN204552761U (en) * | 2015-01-11 | 2015-08-12 | 中交一公局第三工程有限公司 | Wall all-hydraulic self-walking formwork jumbo in combined type song |
CN204899939U (en) * | 2015-08-05 | 2015-12-23 | 中交路桥华南工程有限公司 | Bent wall wherein partition wall formworking jumbo |
CN206246128U (en) * | 2016-08-21 | 2017-06-13 | 洛阳高飞桥隧机械有限公司 | A kind of mid-board lining trolley of M types multiple-arch tunnel |
CN207122313U (en) * | 2017-07-12 | 2018-03-20 | 中交一公局海威工程建设有限公司 | Constructing middle partition wall in tunnel template and its constructing device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075454A (en) * | 2020-01-17 | 2020-04-28 | 中铁十九局集团第三工程有限公司 | Double-arch tunnel five-hole excavation method |
CN111075454B (en) * | 2020-01-17 | 2022-01-04 | 中铁十九局集团第三工程有限公司 | Double-arch tunnel five-hole excavation method |
CN112627844A (en) * | 2020-12-01 | 2021-04-09 | 中铁建工集团有限公司北京路桥分公司 | Auxiliary device convenient to highway is under construction in tunnel |
CN112627844B (en) * | 2020-12-01 | 2023-09-22 | 中铁建工集团有限公司北京路桥分公司 | Auxiliary device convenient to highway is under construction in tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106702910B (en) | A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower | |
CN104695337B (en) | Self-lifting sliding and turnover construction system and construction method | |
CN104631343B (en) | From traveling rhombus keying cradle in truss type structure and suspended basket and construction method | |
CN107905114B (en) | A kind of construction method of large span Successive interference cancellation | |
CN107905124B (en) | A kind of symmetrical expression rigid frame-continuous girder construction technology | |
CN107905111B (en) | A kind of rigid frame-continuous girder end bay construction technology | |
KR20060112504A (en) | Downward construction system and method for 1-way girder and slab of underground structure | |
CN105143570A (en) | Building structure and construction method for same | |
CN105484403A (en) | Assembly type concrete bidirectional ribbed floor and construction method therefor | |
CN104594204B (en) | Urban light rail viaduct mountain type U beam Construction Supporting System and construction method | |
CN107476341A (en) | Using cast in place and precast construction subway station prefabricated board assembling method | |
CN107571392A (en) | A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder | |
CN114770706B (en) | Light T-beam prefabrication equipment and prefabrication installation construction method | |
CN106351445A (en) | Bracing reinforcement system and installation construction method of steel reinforced concrete inclined shear wall form assembly | |
CN106976157A (en) | A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape | |
CN206942245U (en) | Prefabricated case beam tie with reinforcing bar construction frame | |
WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
CN207122313U (en) | Constructing middle partition wall in tunnel template and its constructing device | |
CN107191201A (en) | Constructing middle partition wall in tunnel template and its constructing device | |
WO2022184136A1 (en) | Assembly-type subway station full-hoisting construction method in pile-anchor retaining structure system | |
CN204475184U (en) | Urban light rail viaduct mountain type U beam Construction Supporting System | |
CN213510645U (en) | PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed | |
CN107476338A (en) | Prefabricated longeron assembling method | |
CN217761022U (en) | Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station | |
CN206070809U (en) | ALC steam-pressing aero-concretes batten inclines curtain wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170922 |
|
RJ01 | Rejection of invention patent application after publication |