CN107191201A - Constructing middle partition wall in tunnel template and its constructing device - Google Patents

Constructing middle partition wall in tunnel template and its constructing device Download PDF

Info

Publication number
CN107191201A
CN107191201A CN201710565364.8A CN201710565364A CN107191201A CN 107191201 A CN107191201 A CN 107191201A CN 201710565364 A CN201710565364 A CN 201710565364A CN 107191201 A CN107191201 A CN 107191201A
Authority
CN
China
Prior art keywords
tunnel
wall
steel form
middle partition
partition wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710565364.8A
Other languages
Chinese (zh)
Inventor
陈勇
李荐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201710565364.8A priority Critical patent/CN107191201A/en
Publication of CN107191201A publication Critical patent/CN107191201A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Abstract

The present invention is a kind of constructing middle partition wall in tunnel template and its constructing device, constructing middle partition wall in tunnel template is included along two longitudinally disposed steel form bodies of tunnel, two steel form bodies are lateral symmetry to be set, two steel form bodies constitute mid-board casting space to be onstructed between the side wall away from tunnel inner wall, contact is provided with the singletree structure that at least one length can be adjusted between each steel form body and relative tunnel inner wall, and the bottom of each steel form body is provided with the moving structure that each steel form body can be driven to be vertically moved along tunnel.The template and its constructing device overcome hydraulic pressure in the prior art from the problems such as the dead load of walking template presence is big, costly, mounting and adjusting is difficult to exist with assembled formwork installation is cumbersome, efficiency long in time limit is low, operating expenses is high, outward appearance is poor, the device can effectively improve construction of central division wall efficiency, reduction infrastructure cost and construction cost.

Description

Constructing middle partition wall in tunnel template and its constructing device
Technical field
The present invention relates to technical field of tunnel construction, more particularly to a kind of constructing middle partition wall in tunnel template and its construction dress Put.
Background technology
In Highway Construction in Mountainous Area field, due to being influenceed by landform, landforms, while to ensure technical-economic index and friendship Logical safety, mainly by setting tunnel to solve the problems, such as route line style.Because constructing tunnel need to be according to arrangement and surrounding rock category Optimum reasonable construction technique is taken, to ensure duration progress and controlled investment.When length of tunnel reaches certain require, one As use separate tunnel.When length of tunnel is shorter, preferably using multi-arch type tunnel.
In double-arched tunnel construction of central division wall, template is more important, and its selection directly affects the construction period.Because in tunnel Pilot tunnel section is smaller, and formwork assembling and disassembling is difficult, influence construction.It is many in the prior art that two kinds of template and assembled formwork are walked using hydraulic pressure certainly Mode is constructed.
Hydraulic pressure, by walking motor movement certainly, typically there is two kinds of structures from template is walked, and the first is to be provided with two in mid-board side Bar walking track, template center of gravity vertical line falls within two interorbitals, to maintain homeostasis, template increase additional weight.In the structure Template is connected in main template body by hydraulic system operation, panel by support bar, and main body is by they sup-port in pilot tunnel side wall On, be used for construction with cage bar curve partition wall, the structure exist from great, steel using amount it is big, it is costly the shortcomings of;It is for second Respectively there is a walking track in mid-board both sides, template connects integral by end I-steel, forms homeostasis structure.Should Template is by hydraulic system operation in structure, and panel is connected in main template body by support bar, and main body is being led by they sup-port On the wall of hole side, the structure is reduced compared with the first dead load, but still heavier, costly, and the arrangement of reinforcement mid-board that can not construct. To sum up, hydraulic pressure exists from great, costly from template is walked, and template is difficult in narrow and small middle drift space mounting adjustment.
Assembled formwork generally there are two kinds of structures, and the first is spliced by small-sized punching block, by drawing steel inside template Muscle is connected, spacer bar fixed form position, outside to ensure template monolithic stability by support or diagonal brace.The template is using artificial peace It is dress, dismounting, mobile, have the shortcomings that artificial quantity is more, peace is torn cumbersome and time-consuming many and small template open and is easily deformed;Second It is to be spliced by small-sized punching block, time-division two-step pouring of constructing, wall bottom, which is poured, finishes backfill stone.There is people's number in the structure Amount is more, time-consuming, the uppity shortcoming of pouring quality.To sum up, to there is installation cumbersome, long in time limit for assembled formwork, in every Wall operating expenses is high and outward appearance is poor.
Thus, the present inventor relies on experience and the practice for being engaged in relevant industries for many years, proposes a kind of constructing middle partition wall in tunnel Template and its constructing device, to overcome the defect of prior art.
The content of the invention
It is an object of the invention to provide a kind of constructing middle partition wall in tunnel template and its constructing device, overcome in the prior art Hydraulic pressure is from the installation that dead load is big, costly, mounting and adjusting is difficult to exist with assembled formwork of walking template presence is cumbersome, the duration The problems such as long efficiency is low, operating expenses is high, outward appearance is poor, the template and its constructing device can effectively improve construction of central division wall effect Rate, reduction infrastructure cost and construction cost.
The object of the present invention is achieved like this, a kind of constructing middle partition wall in tunnel template, the constructing middle partition wall in tunnel mould Plate is included along two longitudinally disposed steel form bodies of tunnel, and two steel form bodies are lateral symmetry to be set, described in two Steel form body constitutes mid-board casting space to be onstructed, each steel form body and phase between the side wall away from tunnel inner wall To tunnel inner wall between contact be provided with the singletree structure that at least one length can be adjusted, the bottom of each steel form body Portion is provided with the moving structure that each steel form body can be driven to be vertically moved along the tunnel.
In the better embodiment of the present invention, each steel form body is distinguished close to the side of the tunnel inner wall Inclined support structure is provided with, contact sets the singletree structure, each institute between each inclined support structure and relative tunnel inner wall The bottom for stating inclined support structure sets the moving structure.
In the better embodiment of the present invention, each inclined support structure includes at least one horizontal brace, the horizontal stroke The sidewall bottom of the close tunnel inner wall of the steel form body is connected to one end contact of brace, the horizontal brace The other end is extended to relative tunnel inner wall, and the bottom of each horizontal brace is fixedly connected with one along tunnel longitudinal direction The longeron of setting, the down-set moving structure in bottom of each longeron;Each inclined support structure also includes at least one The oblique brace set obliquely, one end of the oblique brace is resisted against the other end of the horizontal brace, the oblique support The other end contact of arm is connected to top side wall of the steel form body close to the tunnel inner wall.
In the better embodiment of the present invention, contact is set between each oblique brace and relative tunnel inner wall The operating platform along the longitudinally disposed level in the tunnel is additionally provided with the singletree structure, the oblique brace.
In the better embodiment of the present invention, the oblique brace is with the steel form body in the tunnel At least one transverse reinforced bar is provided between the side wall of wall.
The present invention a better embodiment in, between each longeron and relative tunnel inner wall contact be provided with to The longeron cross struts that few length can be adjusted.
In the better embodiment of the present invention, the moving structure is at least fixedly installed on the longeron including two Roller is rotatably connected on the rolling wheel support of two ends bottom, the rolling wheel support.
In the better embodiment of the present invention, between each steel form body is included on steel facing, the steel facing Every being provided with multiple working window open-works, each steel facing is fixedly connected by the panel block of the curved setting in multiple sections and constituted, The steel facing is respectively arranged with a ring connecting plate close to the two ends of the side of the tunnel inner wall, and the steel facing is close to institute The side for stating tunnel inner wall is additionally provided with multiple longitudinally disposed longitudinal ribs, and contact is connected to respectively at the two ends of the longitudinal rib On the ring connecting plate at two ends.
In the better embodiment of the present invention, set between two relative ends of two steel form bodies There is at least one termination Tiebar structure.
In the better embodiment of the present invention, two top side walls of the steel form body away from tunnel inner wall are equal It is provided with along the longitudinally disposed plank sheathing in tunnel, two plank sheathings are lateral symmetry to be set.
The purpose of the present invention can also be achieved in that the constructing middle partition wall in tunnel device includes constructing middle partition wall in tunnel mould Plate, in addition to the power set that the constructing middle partition wall in tunnel template can be driven to be vertically moved along the tunnel.
In the better embodiment of the present invention, the power set are constructing tunnel excavator or loading machine.
From the above mentioned, constructing middle partition wall in tunnel template of the invention and its constructing device have the advantages that:
(1) constructing middle partition wall in tunnel template of the invention is the monoblock type plate device of both lateral sides independence, and bottom is set Moving structure facilitate the movement of device, the singletree structure that length can be adjusted makes apparatus structure more stablize and facilitates workman to grasp Make, greatly accelerate the efficiency of construction of mid-board;
(2) constructing middle partition wall in tunnel formwork structure of the invention is simple, and overall weight is low, and cost is relatively low, and steel form sheet Body gravity energy is undertaken by mid-board, and the singletree structure between steel form body and tunnel inner wall can make device support more firm, So that safety is more stablized in construction;
(3) power set in constructing middle partition wall in tunnel device of the invention can use the idle digging of constructing tunnel Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
Brief description of the drawings
The following drawings is only intended to, in doing schematic illustration and explanation to the present invention, not delimit the scope of the invention.Wherein:
Fig. 1:For the schematic diagram of the constructing middle partition wall in tunnel template of the present invention.
Fig. 2:For the side view of the constructing middle partition wall in tunnel template of the present invention.
Fig. 3:For the schematic diagram of the steel form body of the present invention.
Fig. 4:For enlarged drawing in Fig. 3 I.
Fig. 5:For the structural representation of the steel facing of the present invention.
Fig. 6:For the construction flow chart of the present invention.
In figure:
100th, constructing middle partition wall in tunnel template;
1st, steel form body;
11st, termination Tiebar structure;12nd, steel facing;121st, working window open-work;13rd, ring connecting plate;14th, longitudinal rib;15、 Plank sheathing;
2nd, singletree structure;
21st, base;22nd, support bar;23rd, adjustment pipe;
3rd, moving structure;
31st, rolling wheel support;32nd, roller;33rd, track;
4th, inclined support structure;
41st, horizontal brace;42nd, longeron;43rd, oblique brace;44th, operating platform;45th, transverse reinforced bar;46th, longeron is horizontal Strut;
9th, tunnel.
Embodiment
In order to which technical characteristic, purpose and effect to the present invention are more clearly understood from, now control illustrates this hair Bright embodiment.
As shown in Figures 1 to 5, the present invention provides a kind of constructing middle partition wall in tunnel template 100, including is set along the longitudinal direction of tunnel 9 The two steel form bodies 1 put, two steel form bodies 1 are lateral symmetry to be set, and two steel form bodies 1 are away from tunnel inner wall Mid-board casting space to be onstructed is constituted between the wall of side, in the present embodiment, two relative ends of two steel form bodies 1 At least one termination Tiebar structure 11 is provided between portion, in the present embodiment, termination Tiebar structure 11 is to wire drawing thick stick. In the specific embodiment of the present invention, the quantity of termination Tiebar structure 11 at two ends is 3, and 3 termination Tiebar structures 11 are between the upper and lower Every setting, the termination Tiebar structure 11 at two ends can realize the connection between two steel form bodies 1.Construction of central division wall is completed Afterwards, two steel form bodies 1 are resisted against on the two side of mid-board, and two steel form bodies 1 center of gravity be projected in every On wall, after the completion of construction of central division wall, two steel form bodies 1 can be moved wall along the septum, and the gravity energy of steel form body 1 is by mid-board Undertake, reduce mobile burden.The problem of due to often there is out-of-flatness at the top of During Initial Stage Construction supporting, asked to solve this Topic, realizes the closure in the space between steel form body 1 and preliminary bracing top concrete, two steel form bodies 1 are away from tunnel The top side wall of road inwall is respectively provided with along the longitudinally disposed plank sheathing 15 in tunnel, and two plank sheathings 15 are lateral symmetry to be set, at this In one specific embodiment of invention, the width of plank sheathing 15 is 10cm.Each steel form body 1 and relative tunnel inner wall (tunnel Before construction is finished, general on its inwall to set pilot tunnel temporary support structures, one end of each singletree structure 2 is resisted against pilot tunnel and faced When supporting construction on) between contact be provided with the singletree structure 2 that at least one length can be adjusted, it is in the present embodiment, horizontal Pole structure 2 is the adjustable supporting post-rod of length, and one end of supporting post-rod sets base 21, the other end to set support bar 22, the adjustment pipe 23 that internal thread is set is equipped with base 21, one end of support bar 22 is arranged in adjustment pipe 23, and it is located at Set on the side wall of one end in adjustment pipe 23 with adjusting the external screw thread that the internal thread of pipe is matched, base 21 is fixed on steel form sheet On body 1, the other end of support bar 22 is resisted against on tunnel inner wall;In the specific embodiment of the present invention, the singletree of both sides The quantity of structure 2 is respectively 2, and singletree structure 2 can be such that the overall structure of constructing middle partition wall in tunnel template 100 more stablizes. The bottom of each steel form body 1 is provided with the moving structure 3 that each steel form body 1 can be driven to be vertically moved along tunnel.The present invention Constructing middle partition wall in tunnel template 100 be both lateral sides independence monoblock type plate device, bottom set the convenience of moving structure 3 The movement of device, the singletree structure 2 that length can be adjusted makes apparatus structure more stablize and facilitate operative, greatly accelerates The efficiency of construction of mid-board;The constructing middle partition wall in tunnel template 100 of the present invention is simple in construction, and overall weight is low, and cost is relatively low, and The gravity energy of steel form body 1 is undertaken by mid-board, and the singletree structure 2 between steel form body 1 and tunnel inner wall can make device Support is more firm so that safety is more stablized in construction.
Further, as shown in figure 1, steel form body 1 is respectively arranged with inclined support structure 4 close to the side of tunnel inner wall, respectively Contact sets foregoing singletree structure 2 between inclined support structure 4 and relative tunnel inner wall, and the bottom of each inclined support structure 4 is set Foregoing moving structure 3.
Further, it is in the present embodiment, horizontal as shown in figure 1, each inclined support structure 4 includes at least one horizontal brace 41 It is made to brace 41 of I-steel, one end contact of horizontal brace 41 is connected to steel form body 1 close to the side of tunnel inner wall Wall bottom, the other end of horizontal brace 41 is extended to relative tunnel inner wall, and the bottom of each horizontal brace 41 is fixedly connected Have one along the longitudinally disposed longeron 42 in tunnel, in the present embodiment, longeron 42 is made of I-steel, the bottom of each longeron 42 Down-set foregoing moving structure 3;Each inclined support structure 4 also includes at least one oblique brace 43 set obliquely, at this In embodiment, oblique brace 43 is made of I-steel, and oblique brace 43 and the horizontal matching of brace 41 are set, the present invention's In one specific embodiment, the oblique brace 43 of both sides and horizontal brace 41 are respectively 5.One end of oblique brace 43 is resisted against horizontal stroke To the other end of brace 41, the other end contact of oblique brace 43 is connected to steel form body 1 close to the side wall top of tunnel inner wall Portion.In the present embodiment, contact sets foregoing singletree structure 2 between each oblique brace 43 and relative tunnel inner wall, The operating platform 44 along the longitudinally disposed level in tunnel is additionally provided with each oblique brace 43, workman can be trampled in operating platform Constructing operation is carried out on 44.In order that steel form body 1 is more stablized, oblique brace 43 is with steel form body 1 in tunnel At least one transverse reinforced bar 45 is provided between the side wall of wall, in the present embodiment, longeron 42 is made of I-steel, two The quantity of the transverse reinforced bar 45 of side is respectively 3.More stablize in order that being supported between steel form body 1 and tunnel inner wall, The longeron cross struts 46 that at least one length can be adjusted are provided between each longeron 42 and relative tunnel inner wall, longeron is horizontal Strut 46 can also be the adjustable supporting post-rod of length, the structure of longeron cross struts 46 is different from the length of singletree structure 2, Structure is similar, will not be repeated here.
Further, as shown in Figure 1 and Figure 2, moving structure 3 is at least fixedly installed on the two ends bottom of longeron 42 including two Roller 32 is rotatably connected on rolling wheel support 31, rolling wheel support 31.In the specific embodiment of the present invention, tunnel is set on bottom surface Track 33 is put, roller 32 is moved along the scrolling realization device of track 33, and track 33 can be lifted, with the tune for the height for realizing device It is whole.
Further, as shown in Fig. 3, Fig. 4, Fig. 5, each steel form body 1 includes being arranged at intervals on steel facing 12, steel facing 12 There are multiple working window open-works 121, in the specific embodiment of we, the quantity of working window open-work 121 is 4,4 working windows The interlaced arrangement of open-work 121, convenient construction vibrates operation.Each steel facing 12 is fixed by the panel block of the curved setting in multiple sections to be connected Composition is connect, the material that panel block is used is Q235, and steel facing 12 is respectively arranged with a ring close to the two ends of the side of tunnel inner wall To connecting plate 13, steel facing 12 is additionally provided with multiple longitudinally disposed longitudinal ribs 14, longitudinal rib close to the side of tunnel inner wall Contact is connected on the ring connecting plate 13 at two ends respectively at 14 two ends.Ring connecting plate 13 and longitudinal rib 14 can preferably expire The globality and rigidity requirement of sufficient steel form body 1.
In the specific embodiment of the present invention, each steel facing 12 cutting for 6mm by 4 block length 1500mm, high 5400mm, thickness Face is assembled (for convenient in carrying, typically carrying out at the construction field (site) assembled) in the panel block of irregular curve type, and ring connects Fishplate bar 13 is made of the thick steel plates of 10mm, and its width is 200mm, is highly 5400mm, ring connecting plate 13 is fixedly welded on The two ends of two steel facings 12, longitudinal rib 14 is made up of 4X4mm channel-section steel, and the two ends of each longitudinal rib 14 are resisted against two ends respectively Ring connecting plate 13 on, longitudinal rib 14 is welded on steel facing 12 in 20cm intervals.Horizontal brace 41 and oblique brace 43 by 20b I-steel is made, and 5 groups of horizontal braces 41 and the longitudinally spaced steel form body 1 that is welded in of oblique brace 43 are in tunnel On the side wall of wall, operating platform 44 is made up of 16 I-steel, and the length dimension of operating platform 44 is 550mm;Two steel form sheets The termination Tiebar structure 11 set between the two ends of body 1 is φ 108mm to wire drawing thick stick.In the embodiment, tunnel partition wall is applied The wide 2500mm of upper shed of work template 100, the lower wide 3850mm of mouth, is highly 5400mm, and device gross weight is 16.292 tons.
The present invention also provides a kind of constructing middle partition wall in tunnel device, and constructing middle partition wall in tunnel device is included in foregoing tunnel Partition wall construction formwork 100, in addition to constructing middle partition wall in tunnel template 100 can be driven to be filled along the power that the tunnel is vertically moved Put.Constructing middle partition wall in tunnel template 100 can be by the dilatory movement of power set, and in the present embodiment, power set are applied for tunnel Work excavator or loading machine, when carrying out device movement, are dragged paragraph by paragraph respectively by excavator or loading machine in the both sides of mid-board It is dynamic.Power set when the constructing middle partition wall in tunnel template 100 of the present invention is moved can use the idle digging of constructing tunnel Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
As shown in fig. 6, carrying out construction of central division wall using the constructing middle partition wall in tunnel template 100 and its constructing device of the present invention When technological process it is as follows:
Step a, according to mid-board require carry out stencil design making;
Step b, carry out preparation of construction;
Reinforcing bar is installed in step c, tunnel;
Step d, by the present invention constructing middle partition wall in tunnel template 100 be moved to construction requirement position, when short transverse need When adjusting, it can be adjusted by lifting the track 33 of the lower section of roller 32;
Closure, installation of embedded parts (prior art) at the top of step e, completion mid-board casting space to be onstructed, are finally completed Hold mould (prior art) closure;
Step f, the constructing middle partition wall in tunnel template 100 to the present invention are fixed, adjust and hold out against singletree structure 2, Longeron cross struts 46;
Step g, progress concrete construction, constitute mid-board;
Step h, rotation singletree structure 2, longeron cross struts 46 loosen it, by each steel form sheet on the outside of mid-board Body 1 is removed and affects reach by power set;
Step i, repeat step d are to step h, until completing the construction of whole mid-boards.
From the above mentioned, constructing middle partition wall in tunnel template of the invention and its constructing device have the advantages that:
(1) constructing middle partition wall in tunnel template of the invention is the monoblock type plate device of both lateral sides independence, and bottom is set Moving structure facilitate the movement of device, the singletree structure that length can be adjusted makes apparatus structure more stablize and facilitates workman to grasp Make, greatly accelerate the efficiency of construction of mid-board;
(2) constructing middle partition wall in tunnel formwork structure of the invention is simple, and overall weight is low, and cost is relatively low, and steel form sheet Body gravity energy is undertaken by mid-board, and the singletree structure between steel form body and tunnel inner wall can make device support more firm, So that safety is more stablized in construction;
(3) power set in constructing middle partition wall in tunnel device of the invention can use the idle digging of constructing tunnel Pick machine or loading machine, improve the mobile efficiency of device, improve the utilization rate of the idle plant equipment in tunnel, energy-conserving and environment-protective.
Schematical embodiment of the invention is the foregoing is only, the scope of the present invention is not limited to.It is any Those skilled in the art, made equivalent variations and modification on the premise of the design of the present invention and principle is not departed from, The scope of protection of the invention should be belonged to.

Claims (12)

1. a kind of constructing middle partition wall in tunnel template, it is characterised in that the constructing middle partition wall in tunnel template is included along tunnel longitudinal direction The two steel form bodies set, two steel form bodies are lateral symmetry to be set, and two steel form bodies are away from tunnel Mid-board casting space to be onstructed is constituted between the side wall of road inwall, between each the steel form body and relative tunnel inner wall Contact is provided with the singletree structure that at least one length can be adjusted, and the bottom of each steel form body, which is provided with, can drive respectively The moving structure that the steel form body is vertically moved along the tunnel.
2. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that each steel form body is close to described The side of tunnel inner wall is respectively arranged with inclined support structure, and contact sets institute between each inclined support structure and relative tunnel inner wall Singletree structure is stated, the bottom of each inclined support structure sets the moving structure.
3. constructing middle partition wall in tunnel template as claimed in claim 2, it is characterised in that each inclined support structure includes at least one Individual horizontal brace, one end contact of the horizontal brace is connected to the steel form body close to the side wall bottom of the tunnel inner wall Portion, the other end of the horizontal brace is extended to relative tunnel inner wall, and the bottom of each horizontal brace is fixedly connected Have one along the longitudinally disposed longeron in the tunnel, the down-set moving structure in bottom of each longeron;Each diagonal brace Structure also includes at least one oblique brace set obliquely, and one end of the oblique brace is resisted against the horizontal brace The other end, the other end contact of the oblique brace is connected to the steel form body close to the side wall top of the tunnel inner wall Portion.
4. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that each oblique brace and relative tunnel Contact sets and is additionally provided with the singletree structure, the oblique brace along the longitudinally disposed water in the tunnel between road inwall Flat operating platform.
5. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that the oblique brace and the steel form Body is provided with least one transverse reinforced bar between the side wall of the tunnel inner wall.
6. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that in each longeron and relative tunnel Contact is provided with the longeron cross struts that at least one length can be adjusted between wall.
7. constructing middle partition wall in tunnel template as claimed in claim 3, it is characterised in that the moving structure at least includes two It is fixedly installed on the rolling wheel support of longeron two ends bottom, the rolling wheel support and is rotatably connected to roller.
8. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that each steel form body includes steel face Multiple working window open-works are arranged at intervals with plate, the steel facing, each steel facing is by the face of the curved setting in multiple sections Plate is fixedly connected with composition, and the steel facing is respectively arranged with ring connection close to the two ends of the side of the tunnel inner wall Plate, the steel facing is additionally provided with multiple longitudinally disposed longitudinal ribs, the longitudinal rib close to the side of the tunnel inner wall Contact is connected on the ring connecting plate at two ends respectively at two ends.
9. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that two of two steel form bodies At least one termination Tiebar structure is provided between relative end.
10. constructing middle partition wall in tunnel template as claimed in claim 1, it is characterised in that two steel form bodies are remote The top side wall of tunnel inner wall is provided with along the longitudinally disposed plank sheathing in tunnel, and two plank sheathings are lateral symmetry to be set.
11. a kind of constructing middle partition wall in tunnel device, it is characterised in that the constructing middle partition wall in tunnel device includes such as claim Constructing middle partition wall in tunnel template any one of 1 to 10, in addition to the constructing middle partition wall in tunnel template can be driven along institute State the power set that tunnel is vertically moved.
12. constructing middle partition wall in tunnel device as claimed in claim 11, it is characterised in that the power set are constructing tunnel With excavator or loading machine.
CN201710565364.8A 2017-07-12 2017-07-12 Constructing middle partition wall in tunnel template and its constructing device Pending CN107191201A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710565364.8A CN107191201A (en) 2017-07-12 2017-07-12 Constructing middle partition wall in tunnel template and its constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710565364.8A CN107191201A (en) 2017-07-12 2017-07-12 Constructing middle partition wall in tunnel template and its constructing device

Publications (1)

Publication Number Publication Date
CN107191201A true CN107191201A (en) 2017-09-22

Family

ID=59883486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710565364.8A Pending CN107191201A (en) 2017-07-12 2017-07-12 Constructing middle partition wall in tunnel template and its constructing device

Country Status (1)

Country Link
CN (1) CN107191201A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075454A (en) * 2020-01-17 2020-04-28 中铁十九局集团第三工程有限公司 Double-arch tunnel five-hole excavation method
CN112627844A (en) * 2020-12-01 2021-04-09 中铁建工集团有限公司北京路桥分公司 Auxiliary device convenient to highway is under construction in tunnel

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050045951A (en) * 2005-02-11 2005-05-17 장인건설기업(주) The mold apparatus for center wall of two archi tunnel
CN202140099U (en) * 2011-04-18 2012-02-08 中铁十二局集团有限公司 Movable formwork device used for pouring concrete division walls of metro tunnel turn lines
CN102418534A (en) * 2011-10-17 2012-04-18 北京城建道桥建设集团有限公司 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame
CN202544859U (en) * 2012-02-07 2012-11-21 成都市新筑路桥机械股份有限公司 Formwork trolley for partition lining in tunnel
CN203383833U (en) * 2013-08-02 2014-01-08 四川公路桥梁建设集团有限公司 Self-propelled mid-partition wall formwork for multiple-arch tunnel
CN204552761U (en) * 2015-01-11 2015-08-12 中交一公局第三工程有限公司 Wall all-hydraulic self-walking formwork jumbo in combined type song
CN204899939U (en) * 2015-08-05 2015-12-23 中交路桥华南工程有限公司 Bent wall wherein partition wall formworking jumbo
CN206246128U (en) * 2016-08-21 2017-06-13 洛阳高飞桥隧机械有限公司 A kind of mid-board lining trolley of M types multiple-arch tunnel
CN207122313U (en) * 2017-07-12 2018-03-20 中交一公局海威工程建设有限公司 Constructing middle partition wall in tunnel template and its constructing device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050045951A (en) * 2005-02-11 2005-05-17 장인건설기업(주) The mold apparatus for center wall of two archi tunnel
CN202140099U (en) * 2011-04-18 2012-02-08 中铁十二局集团有限公司 Movable formwork device used for pouring concrete division walls of metro tunnel turn lines
CN102418534A (en) * 2011-10-17 2012-04-18 北京城建道桥建设集团有限公司 Split movable mould frame device for tunnel compartment wall, and construction method for split movable mould frame
CN202544859U (en) * 2012-02-07 2012-11-21 成都市新筑路桥机械股份有限公司 Formwork trolley for partition lining in tunnel
CN203383833U (en) * 2013-08-02 2014-01-08 四川公路桥梁建设集团有限公司 Self-propelled mid-partition wall formwork for multiple-arch tunnel
CN204552761U (en) * 2015-01-11 2015-08-12 中交一公局第三工程有限公司 Wall all-hydraulic self-walking formwork jumbo in combined type song
CN204899939U (en) * 2015-08-05 2015-12-23 中交路桥华南工程有限公司 Bent wall wherein partition wall formworking jumbo
CN206246128U (en) * 2016-08-21 2017-06-13 洛阳高飞桥隧机械有限公司 A kind of mid-board lining trolley of M types multiple-arch tunnel
CN207122313U (en) * 2017-07-12 2018-03-20 中交一公局海威工程建设有限公司 Constructing middle partition wall in tunnel template and its constructing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075454A (en) * 2020-01-17 2020-04-28 中铁十九局集团第三工程有限公司 Double-arch tunnel five-hole excavation method
CN111075454B (en) * 2020-01-17 2022-01-04 中铁十九局集团第三工程有限公司 Double-arch tunnel five-hole excavation method
CN112627844A (en) * 2020-12-01 2021-04-09 中铁建工集团有限公司北京路桥分公司 Auxiliary device convenient to highway is under construction in tunnel
CN112627844B (en) * 2020-12-01 2023-09-22 中铁建工集团有限公司北京路桥分公司 Auxiliary device convenient to highway is under construction in tunnel

Similar Documents

Publication Publication Date Title
CN106702910B (en) A kind of main girder construction technique of the double rope face low-pylon cable-stayed bridges of double tower
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN104631343B (en) From traveling rhombus keying cradle in truss type structure and suspended basket and construction method
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN107905124B (en) A kind of symmetrical expression rigid frame-continuous girder construction technology
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
KR20060112504A (en) Downward construction system and method for 1-way girder and slab of underground structure
CN105143570A (en) Building structure and construction method for same
CN105484403A (en) Assembly type concrete bidirectional ribbed floor and construction method therefor
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN107476341A (en) Using cast in place and precast construction subway station prefabricated board assembling method
CN107571392A (en) A kind of beam making bench for the construction of transverse tensioning method prestressing force prefabricated small box girder
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN106351445A (en) Bracing reinforcement system and installation construction method of steel reinforced concrete inclined shear wall form assembly
CN106976157A (en) A kind of post stretching precast beam pedestal for being applicable different length and cross sectional shape
CN206942245U (en) Prefabricated case beam tie with reinforcing bar construction frame
WO2022252829A1 (en) Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN107191201A (en) Constructing middle partition wall in tunnel template and its constructing device
WO2022184136A1 (en) Assembly-type subway station full-hoisting construction method in pile-anchor retaining structure system
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN213510645U (en) PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed
CN107476338A (en) Prefabricated longeron assembling method
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN206070809U (en) ALC steam-pressing aero-concretes batten inclines curtain wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication