CN102400519A - Assembling prefabricated reinforced concrete pipe column structure and construction method thereof - Google Patents

Assembling prefabricated reinforced concrete pipe column structure and construction method thereof Download PDF

Info

Publication number
CN102400519A
CN102400519A CN2011103658160A CN201110365816A CN102400519A CN 102400519 A CN102400519 A CN 102400519A CN 2011103658160 A CN2011103658160 A CN 2011103658160A CN 201110365816 A CN201110365816 A CN 201110365816A CN 102400519 A CN102400519 A CN 102400519A
Authority
CN
China
Prior art keywords
reinforced concrete
prefabricated reinforced
concrete pipe
joint
column structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103658160A
Other languages
Chinese (zh)
Inventor
张浦阳
丁红岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN2011103658160A priority Critical patent/CN102400519A/en
Publication of CN102400519A publication Critical patent/CN102400519A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses an assembling prefabricated reinforced concrete pipe column structure comprising at least two joints of pre-fabricated reinforced concrete pipes which are mutually connected; in the top joint of pre-fabricated reinforced concrete pipe, a top is connected with a beam plate; in the bottom joint of the pre-fabricated reinforced concrete pipe, a bottom is connected with a foundation, and concrete is post-cast into the pre-fabricated reinforced concrete pipes. The invention also discloses a construction method of the assembling prefabricated reinforced concrete pipe column structure. The invention realizes the batch and industrialized concrete structure construction by splitting and pre-fabricating the pipe column structure and then assembling and casting tube core concrete on site, so that the cost and construction fees of the structure are significantly reduced. Wherein the at least two joints of pre-fabricated reinforced concrete pipe structures which are mutually connected can serve as assembling tubular templates or stress structures which meet special requirements.

Description

A kind of assembling prefabricated reinforced concrete tubular column structure and job practices thereof
Technical field
The present invention relates to a kind of concrete pipe rod structure and job practices thereof, particularly relate to a kind of assembling prefabricated reinforced concrete tubular column structure and job practices thereof.
Background technology
At present, in construction work, during concrete column structure is constructed at the scene often because template is built control problem and the quality defects of precision.For some concrete column surfaces that specific (special) requirements is arranged, like as-cast finish, the cost of setting up template is higher in addition, and quality also guarantees not too easily.During winter construction simultaneously, concrete insulation problem also needs the higher cost measure to solve.
Summary of the invention
The present invention provides a kind of assembling precast concrete tubular column structure and the job practices thereof that can save manufacturing and installation cost for solving the technical problem that exists in the known technology.
First technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: a kind of assembling prefabricated reinforced concrete tubular column structure; Comprise the interconnective prefabricated reinforced concrete pipe of at least two joints; The top of going up the said prefabricated reinforced concrete pipe of a joint most partly is connected with beam slab; Next bottom of saving said prefabricated reinforced concrete pipe is connected with foundation, the concrete that waters after in the said prefabricated reinforced concrete pipe being.
All said prefabricated reinforced concrete pipes connect through prestressed reinforcement, and between the adjacent said prefabricated reinforced concrete pipe of two joints, are provided with the filling binding material.
The adjacent said prefabricated reinforced concrete pipe of two joints is provided with the dentation joint in interconnective end.
Be provided with heating wire in the said prefabricated reinforced concrete pipe.
The top of going up the said prefabricated reinforced concrete pipe of a joint most is provided with joint bar I; Next bottom of saving said prefabricated reinforced concrete pipe is provided with joint bar II.
The arrangement pitch of said joint bar II is 50-500mm, and the length of stretching out said prefabricated reinforced concrete tube outer surface is 100-500mm.
The arrangement pitch of said joint bar I is 50-500mm, and the length of stretching out said prefabricated reinforced concrete tube outer surface is 100-500mm.
The adjacent said prefabricated reinforced concrete pipe of two joints is equipped with the butt joint pre-embedded steel slab that is welded to each other in interconnective end.
Second technical scheme that the present invention takes for the technical problem that exists in the solution known technology is: the job practices of above-mentioned assembling prefabricated reinforced concrete tubular column structure; May further comprise the steps: the first step, accomplish the making of all prefabricated reinforced concrete pipes; Second step was connected the bottom of next joint prefabricated reinforced concrete pipe with foundation, in the 3rd step, next saves the top of prefabricated reinforced concrete pipe and connects extremely with a last joint prefabricated reinforced concrete pipe lifting; In the 4th step, repeated for the 3rd step until design elevation to tubing string; Go on foot to the work progress in the 4th step second, concreting in the prefabricated reinforced concrete pipe, building of single highly should be less than 10m; In the 5th step, the top of going up a joint prefabricated reinforced concrete pipe most partly is connected with beam slab.
Advantage and good effect that the present invention has are: employing splits tubular column structure prefabricated; Site assembly is built a core concrete then; Thereby realize the mass and the industrialization of concrete column structure construction; Can obviously reduce the cost and the operating expenses of structure like this, wherein interconnective at least two joint prefabricated reinforced concrete tubular structures can serve as the assembled tubular form or the force structure of specific (special) requirements.
Description of drawings
The structural representation that Fig. 1 connects for the assembling precast concrete tubular column structure of the present invention prefabricated reinforced concrete pipe;
Fig. 2 is the structural representation of the assembling precast concrete tubular column structure of the present invention.
Among the figure: 1, prefabricated reinforced concrete pipe, 2, joint bar I, 3, prestressed reinforcement, 4, the dentation joint, 5, binding material, 6, joint bar II, 7, foundation, 8, concrete, 9, the beam slab part.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, the following examples of giving an example now, and conjunction with figs. specifies as follows:
See also Fig. 1~Fig. 2, a kind of assembling prefabricated reinforced concrete tubular column structure comprises the interconnective prefabricated reinforced concrete pipe 1 of at least two joints, the concrete eight that waters after in the prefabricated reinforced concrete pipe 1 being.In the present embodiment, prefabricated reinforced concrete pipe 1 has three joints.Every joint is long to be 2m-9m; External diameter is 0.2-12m, and wall thickness is 0.1m-3m, and material is a steel concrete; Cement grade is C25-C120; All concrete reinforced pipes are prefabricated in advance, on-the-spot unified assembling, and the connected mode of prefabricated reinforced concrete pipe 1 can connect with welding or prestressed reinforcement according to stressed pattern different mining.
When adopting prestressed reinforcement 3 to connect; Being evenly distributed with the reservation prestressed reinforcement along the annular cross section in every joint prefabricated reinforced concrete pipe 1 bores a hole; With before foundation 7 is connected, prestressed reinforcement 3 has been installed in next joint prefabricated reinforced concrete pipe 1 at next joint prefabricated reinforced concrete pipe 1, penetrates prestressed reinforcement 3 after the adjacent 2-section pipe butt joint and pursues and save stretch-draw; Or after treating that all prefabricated reinforced concrete pipes 1 are all accomplished connection, unified prestressed reinforcement of tensioning 3.Adjacent two joint prefabricated reinforced concrete pipes 1 are provided with dentation joint 4 in interconnective end, reserve the slit of 20mm-100mm between the joint, are used for filling binding material 5, form adhesive section.Binding material 5 can be sulphide mastic.
The external surface of prefabricated reinforced concrete pipe 1 can prefabricatedly be ordinary concrete surface, clear-water concrete is surperficial, waterproof concrete is surperficial, any one surface in fire prevention concrete surface and the anti-corrosion concrete surface; Inner surface is optical surface or rough surface.
The prefabricated reinforced concrete pipe can provide the heated die plate function after the energising at the set inside heating wire.
The bottom of next joint prefabricated reinforced concrete pipe be furnished with can with foundation 7 after water the joint bar II 6 that becomes one, the arrangement pitch of joint bar II 6 is 50-500mm, the length that joint bar II stretches out the prefabricated reinforced concrete tube outer surface is 100-500mm.
The top of going up a joint prefabricated reinforced concrete pipe most be furnished with can with beam and slab structure 9 after water the joint bar I 2 that becomes one, the arrangement pitch of joint bar I 2 is 50-500mm, the length that joint bar I stretches out the prefabricated reinforced concrete tube outer surface is 100-500mm.
When above-mentioned prefabricated reinforced concrete pipe employing was weldingly connected, two adjacent joint prefabricated reinforced concrete pipes were equipped with pre-embedded steel slab in interconnective end, after the pre-embedded steel slab butt joint with the two, weld together.
The job practices of above-mentioned assembling prefabricated reinforced concrete tubular column structure may further comprise the steps:
The first step, at member factory prefabricated reinforced concrete pipe 1, it is prefabricated to adopt centrifuge method or horizontal disposed tubes structure to carry out, and is transported to the job site then;
Second step, with machineries such as loop wheel machine will be next save prefabricated reinforced concrete pipe and be placed into assigned address, the bottom of prefabricated pipe and foundation 7 are built be integral then; When adopting prestressed reinforcement to connect, this joint prefabricated reinforced concrete pipe is before building, and prestressed reinforcement 3 has been installed in the pipe;
In the 3rd step, next saves the top of prefabricated reinforced concrete pipe and connects extremely with 1 lifting of a last joint prefabricated reinforced concrete pipe;
In the 4th step, repeated for the 3rd step until design elevation to tubing string;
Go on foot to the work progress in the 4th step second, concreting 8 in the prefabricated reinforced concrete pipe, and building of single highly should be less than 10m; When adopting prestressed reinforcement to connect, in the 3rd step and the 4th step work progress, after can pursuing joint prestressed reinforcement of tensioning 3 or treating that all prefabricated reinforced concrete pipes are all accomplished connection, unified prestressed reinforcement of tensioning 3.
In the 5th step, the top of going up a joint prefabricated reinforced concrete pipe most is connected with beam slab part 9.
Although combine accompanying drawing that the preferred embodiments of the present invention are described above; But the present invention is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, is not restrictive; Those of ordinary skill in the art is under enlightenment of the present invention; Not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within protection scope of the present invention.

Claims (9)

1. assembling prefabricated reinforced concrete tubular column structure; It is characterized in that; Comprise the interconnective prefabricated reinforced concrete pipe of at least two joints; The top of going up the said prefabricated reinforced concrete pipe of a joint most partly is connected with beam slab, and next bottom of saving said prefabricated reinforced concrete pipe is connected with foundation, the concrete that waters after in the said prefabricated reinforced concrete pipe being.
2. assembling prefabricated reinforced concrete tubular column structure according to claim 1; It is characterized in that; All said prefabricated reinforced concrete pipes connect through prestressed reinforcement, and between the adjacent said prefabricated reinforced concrete pipe of two joints, are provided with the filling binding material.
3. assembling prefabricated reinforced concrete tubular column structure according to claim 2 is characterized in that, the adjacent said prefabricated reinforced concrete pipe of two joints is provided with the dentation joint in interconnective end.
4. according to claim 1 or 3 described assembling prefabricated reinforced concrete tubular column structures, it is characterized in that, be provided with heating wire in the said prefabricated reinforced concrete pipe.
5. assembling prefabricated reinforced concrete tubular column structure according to claim 1 is characterized in that, the top of going up the said prefabricated reinforced concrete pipe of a joint most is provided with joint bar I; Next bottom of saving said prefabricated reinforced concrete pipe is provided with joint bar II.
6. assembling prefabricated reinforced concrete tubular column structure according to claim 5 is characterized in that the arrangement pitch of said joint bar II is 50-500mm, and the length of stretching out said prefabricated reinforced concrete tube outer surface is 100-500mm.
7. assembling prefabricated reinforced concrete tubular column structure according to claim 5 is characterized in that the arrangement pitch of said joint bar I is 50-500mm, and the length of stretching out said prefabricated reinforced concrete tube outer surface is 100-500mm.
8. assembling prefabricated reinforced concrete tubular column structure according to claim 1 is characterized in that, the adjacent said prefabricated reinforced concrete pipe of two joints is equipped with the butt joint pre-embedded steel slab that is welded to each other in interconnective end.
9. the job practices of assembling prefabricated reinforced concrete tubular column structure as claimed in claim 1 is characterized in that, may further comprise the steps:
The first step is accomplished the making of all prefabricated reinforced concrete pipes;
In second step, the bottom of next joint prefabricated reinforced concrete pipe is connected with foundation;
In the 3rd step, next saves the top of prefabricated reinforced concrete pipe and connects extremely with a last joint prefabricated reinforced concrete pipe lifting;
In the 4th step, repeated for the 3rd step until design elevation to tubing string;
Go on foot to the work progress in the 4th step second, concreting in the prefabricated reinforced concrete pipe, building of single highly should be less than 10m;
In the 5th step, the top of going up a joint prefabricated reinforced concrete pipe most partly is connected with beam slab.
CN2011103658160A 2011-11-17 2011-11-17 Assembling prefabricated reinforced concrete pipe column structure and construction method thereof Pending CN102400519A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103658160A CN102400519A (en) 2011-11-17 2011-11-17 Assembling prefabricated reinforced concrete pipe column structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103658160A CN102400519A (en) 2011-11-17 2011-11-17 Assembling prefabricated reinforced concrete pipe column structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN102400519A true CN102400519A (en) 2012-04-04

Family

ID=45883129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103658160A Pending CN102400519A (en) 2011-11-17 2011-11-17 Assembling prefabricated reinforced concrete pipe column structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN102400519A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114584A (en) * 2013-03-13 2013-05-22 中冶建工集团有限公司 Pile shell structure of rotary excavating pile
CN103741884A (en) * 2014-02-13 2014-04-23 天津大学前沿技术研究院有限公司 Prefabricated reinforced concrete pipe column filled with stones and constructing method thereof
CN103758122A (en) * 2014-02-13 2014-04-30 天津大学前沿技术研究院有限公司 Environment-friendly modular concrete tubular column and construction method thereof
CN105908899A (en) * 2016-04-21 2016-08-31 吉林省健林建筑科技有限公司 Core-grouted assembly-type concrete column and construction method of same
CN106049754A (en) * 2016-07-22 2016-10-26 广东省建筑设计研究院 Standard assembly section of assembly-type concrete composite column and composite column formed through assembly section
CN107965091A (en) * 2017-11-17 2018-04-27 浙江海洋大学 A kind of civil engineering work pillar
CN114837351A (en) * 2022-06-27 2022-08-02 中国二十二冶集团有限公司 Method for mounting prestressed fabricated concrete structure inclined column

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB959239A (en) * 1962-04-24 1964-05-27 John Gill Contractors Ltd Improvements in or relating to reinforced concrete piles
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
CN101435250A (en) * 2008-12-12 2009-05-20 北京工业大学 Prefabricated common concrete pipe restricted type regeneration concrete core composite column and manufacturing method thereof
KR20100131780A (en) * 2009-06-08 2010-12-16 박정진 Heating danpla sheet and cold weather concret curing method using the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB959239A (en) * 1962-04-24 1964-05-27 John Gill Contractors Ltd Improvements in or relating to reinforced concrete piles
CN101255694A (en) * 2008-04-14 2008-09-03 河南国基建设集团有限公司 High-strength prestressed concrete pipe pile construction method
CN101435250A (en) * 2008-12-12 2009-05-20 北京工业大学 Prefabricated common concrete pipe restricted type regeneration concrete core composite column and manufacturing method thereof
KR20100131780A (en) * 2009-06-08 2010-12-16 박정진 Heating danpla sheet and cold weather concret curing method using the same

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郭纯等: "一种新型预制管混凝土柱的轴压性能研究", 《工业建筑》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114584A (en) * 2013-03-13 2013-05-22 中冶建工集团有限公司 Pile shell structure of rotary excavating pile
CN103114584B (en) * 2013-03-13 2015-06-24 中冶建工集团有限公司 Pile shell structure of rotary excavating pile
CN103741884A (en) * 2014-02-13 2014-04-23 天津大学前沿技术研究院有限公司 Prefabricated reinforced concrete pipe column filled with stones and constructing method thereof
CN103758122A (en) * 2014-02-13 2014-04-30 天津大学前沿技术研究院有限公司 Environment-friendly modular concrete tubular column and construction method thereof
CN105908899A (en) * 2016-04-21 2016-08-31 吉林省健林建筑科技有限公司 Core-grouted assembly-type concrete column and construction method of same
CN106049754A (en) * 2016-07-22 2016-10-26 广东省建筑设计研究院 Standard assembly section of assembly-type concrete composite column and composite column formed through assembly section
CN107965091A (en) * 2017-11-17 2018-04-27 浙江海洋大学 A kind of civil engineering work pillar
CN107965091B (en) * 2017-11-17 2019-11-12 浙江海洋大学 A kind of civil engineering work pillar
CN114837351A (en) * 2022-06-27 2022-08-02 中国二十二冶集团有限公司 Method for mounting prestressed fabricated concrete structure inclined column

Similar Documents

Publication Publication Date Title
CN102400519A (en) Assembling prefabricated reinforced concrete pipe column structure and construction method thereof
CN107795010B (en) Precast beam column joint and construction method thereof
CN107060140B (en) Prefabricated double-steel-tube concrete shear wall and assembling method thereof
CN108005309B (en) Prefabricated assembled embedded steel sleeve connecting concrete column and assembling method thereof
CN101672108B (en) Steel plate-brickwork combination stressed building component and production method thereof
CN102373803A (en) Novel precast concrete pipe die and construction method thereof
CN105735469A (en) Partially-bonded precast prestressed concrete frame structure
CN113719029A (en) Assembly type beam-column connecting joint based on hidden corbels and construction method thereof
CN102373804A (en) Novel precast concrete pipe column structure and construction method thereof
CN106320537A (en) Prefabricated concrete-filled square steel tube column and steel girder connecting joint
CN105507470A (en) Periphery-overlapped integral fabricated floor and construction method thereof
JP2008031733A (en) Bridge erection method
CN110512727B (en) Fabricated building lotus root beam pre-embedded insulation board post-tensioning method anchoring node structure and construction method thereof
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN106592777A (en) Assembly type steel-concrete combined beam column joint structure and implementation method thereof
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN111894193A (en) Assembled concrete inclined roof
CN210562609U (en) Prefabricated reinforced concrete tubular column structure that can assemble
KR101044730B1 (en) Beam having steel bar structure for reinforcing shearing force and upper tensile force, and providing space for passing through of plumbing, electric wire or communication wire etc
CN110107019B (en) Composite prefabricated floor slab for prefabricated building
CN104314105A (en) Connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and construction method of connecting vertical seaming structure
CN109441016B (en) Assembled concrete structure column steel tube sleeve joint and manufacturing method thereof
CN109267489B (en) Construction method for cable-stayed bridge cable tower anchoring area
CN104047381B (en) Assembled integral rare-reinforcement concrete shear wall structure
CN110725475A (en) Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120404