CN104314105A - Connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and construction method of connecting vertical seaming structure - Google Patents

Connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and construction method of connecting vertical seaming structure Download PDF

Info

Publication number
CN104314105A
CN104314105A CN201410580283.1A CN201410580283A CN104314105A CN 104314105 A CN104314105 A CN 104314105A CN 201410580283 A CN201410580283 A CN 201410580283A CN 104314105 A CN104314105 A CN 104314105A
Authority
CN
China
Prior art keywords
cast
basement wall
layered
prefabricated double
buttress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410580283.1A
Other languages
Chinese (zh)
Other versions
CN104314105B (en
Inventor
吴敦军
李宁
汪杰
王流金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yangtze River Urban Architectural Design Co Ltd
Original Assignee
Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yangtze River Urban Architectural Design Co Ltd filed Critical Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority to CN201410580283.1A priority Critical patent/CN104314105B/en
Publication of CN104314105A publication Critical patent/CN104314105A/en
Application granted granted Critical
Publication of CN104314105B publication Critical patent/CN104314105B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and a construction method of the connecting vertical seaming structure. The connecting vertical seaming structure comprises the prefabricated bilayer superimposed basement external wall boards and the cast-in-situ buttress column, rebars of the cast-in-situ buttress column are bound at vertical seams of the prefabricated bilayer superimposed basement external wall boards, the prefabricated bilayer superimposed basement external wall boards are fixedly connected through column stirrups, connecting additional rebar sets are arranged at the vertical seams of the prefabricated bilayer superimposed basement external wall boards and used for connectedly fixing the prefabricated bilayer superimposed basement external wall boards and the cast-in-situ buttress column, the cast-in-situ buttress column is provided with an inner-side formwork, and formwork tying members are arranged between the inner-side formwork and the prefabricated bilayer superimposed basement external wall boards. The prefabricated external wall connecting vertical beams and the cast-in-situ buttress column are in combined construction, so that anti-seepage performance of a prefabricated external wall and reliability in connecting at joints can be improved, construction process is simplified, and construction efficiency is improved.

Description

The vertical piece structure of connection of the basement wall and cast-in-place buttress and construction method
Technical field
The present invention relates to structure design and prefabrication and assembly construction technical field, the vertical piece structure of connection of especially a kind of the basement wall and cast-in-place buttress and construction method.
Background technology
The key of fabricated assembly overall structure is effectively connected to form an overall structure after how being lifted at the scene by the component at produce in factory.Efficiency of construction and the quality of engineering directly can be affected in the installation complexity of connected node region component and concrete pouring quality.Therefore seek simple and easy to do as far as possible, the method for attachment of fabricated assembly overall structure safe and reliable is again that current engineering circles is constantly explored and the problem solved.
For the outer wall of basement of fabricated assembly overall, the antiseepage problem handling prefabricated double-layered the basement wall edge joint position well is very crucial.Existing technology is by pre embedded bolt and in-situ layer anchoring on precast plate, and to expect the problem reaching the anchoring of inner side template drawknot, but prior art is owing to adopting this kind of mode of operation, causes buttress inner side template cannot set up at precast plate edge joint position.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, the vertical piece structure of the connection of a kind of the basement wall and cast-in-place buttress and construction method are provided, precast facade is connected vertical piece to be combined with cast-in-place buttress and to construct, the barrier performance that well can either solve precast facade can strengthen again the connection reliability of Nodes, and construction technology simplifies, efficiency of construction improves.
In order to solve the problems of the technologies described above, technical scheme provided by the invention is:
The vertical piece structure of connection of the basement wall and cast-in-place buttress, comprises prefabricated double-layered the basement wall and cast-in-place buttress, carries out the reinforcing bar of the cast-in-place buttress of colligation at the vertical edge joint position of described prefabricated double-layered the basement wall; Described prefabricated double-layered the basement wall is fixedly connected with by column tie-bar; The vertical edge joint position of described prefabricated double-layered the basement wall also arranges and connects additional bar group, and described connection additional bar group is used for being connected and fixed prefabricated double-layered the basement wall and cast-in-place buttress; Described cast-in-place buttress is provided with inner side template, arranges template tension member between described inner side template and prefabricated double-layered the basement wall;
As present invention further optimization, described connection additional bar group comprises the first connection additional bar and is connected additional bar with second, described first connection additional bar and second is connected additional bar and be arranged in parallel, and arrange through cast-in-place buttress is vertical with cast-in-place buttress, described first connects additional bar is connected additional bar and column tie-bar colligation with second; simultaneously
As present invention further optimization, described column tie-bar is arranged between prefabricated double-layered the basement wall;
As present invention further optimization, described prefabricated double-layered the basement wall arranges metal connector, for connecting template tension member;
As present invention further optimization, described inner side template and cast-in-place buttress are bolted.
To the construction method that the vertical piece structure of connection of the basement wall and cast-in-place buttress operates, comprise following step:
(1) the vertical good prefabricated double-layered the basement wall of frame;
(2) at the cast-in-place buttress reinforcing bar of vertical edge joint position colligation of prefabricated double-layered the basement wall;
(3) prefabricated double-layered the basement wall is fixedly connected with by column tie-bar, arranges connect additional bar group at the vertical edge joint position of prefabricated double-layered the basement wall; Connect additional bar group and column tie-bar colligation, for being connected and fixed prefabricated double-layered the basement wall and cast-in-place buttress;
(4) in cast-in-place buttress erection inner side template;
(5) vacancy concreting in cast-in-place buttress and prefabricated double-layered the basement wall, thus make cast-in-place buttress and prefabricated double-layered the basement wall form entirety.
By above technical scheme, relative to prior art, the present invention has following beneficial effect:
1, the vertical piece of prefabricated double-layered the basement wall is arranged at cast-in-place buttress place, vertical piece is made to become a part for cast-in-place buttress, connecing the additional bar group prefabricated double-layered the basement wall of connection and cast-in-place buttress by setting up to connect, ensure that the continuity of exterior wall power transmission;
2, cast-in-place buttress only sets up template at inside circumference, easy construction, quick, saves the space needed for outboard template, and then decreases soil excavation, reduce operating expenses, accelerate the progress of construction;
3, template tension member is set on prefabricated double-layered the basement wall, solve the drawknot problem of template that outside cast-in-place buttress, prefabricated double-layered the basement wall is reserved and inner side template, strengthen the connection reliability of prefabricated double-layered the basement wall and cast-in-place buttress simultaneously, prevent because pre-erection and cast-in-place part are connected to form weak area and problem easy to crack;
4, prefabricated double-layered the basement wall edge joint position and cast-in-place buttress are combined as a whole and construct, make connection more reliable, antiseepage is more effective.
Accompanying drawing explanation
Figure 1 shows that structural representation of the present invention;
Wherein: 1 is cast-in-place buttress, 2 is prefabricated double-layered the basement wall, and 3 is template tension member, and 4 is the first connection additional bar, and 5 is the second connection additional bar.
Detailed description of the invention
Accompanying drawing discloses the structural representation of preferred embodiment involved in the present invention without limitation; Technical scheme of the present invention is explained below with reference to accompanying drawing.Accompanying drawing is only schematic diagram, only basic structure of the present invention is described in a schematic way, and therefore it only shows the relevant formation of the present invention, does not represent drawing and concrete details design.For those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Shown in Fig. 1, the vertical piece structure of connection of the basement wall and cast-in-place buttress, comprise prefabricated double-layered the basement wall 2 and cast-in-place buttress 1, the reinforcing bar of the cast-in-place buttress 1 of colligation is carried out at the vertical edge joint position of described prefabricated double-layered the basement wall 2, the vertical piece of prefabricated double-layered the basement wall 2 is arranged at cast-in-place buttress 1 place, vertical piece is made to become a part for cast-in-place buttress 1, the additional bar group prefabricated double-layered the basement wall 2 of connection and cast-in-place buttress 1 is connect by setting up to connect, ensure that the continuity of exterior wall power transmission, the vertical edge joint position of described prefabricated double-layered the basement wall 2 arranges and connects additional bar group, and described connection additional bar group is used for being connected and fixed prefabricated double-layered the basement wall 2 and cast-in-place buttress 1, described cast-in-place buttress 1 is provided with inner side template, and cast-in-place buttress 1 only sets up template at inside circumference, easy construction, quick, saves the space needed for outboard template, and then decreases soil excavation, reduce operating expenses, accelerate the progress of construction, between described inner side template and prefabricated double-layered the basement wall 2, template tension member 3 is set, solve the drawknot problem of template that outside cast-in-place buttress 1, prefabricated double-layered the basement wall 2 is reserved and inner side template, strengthen the connection reliability of prefabricated double-layered the basement wall 2 and cast-in-place buttress 1 simultaneously, prevent because pre-erection and cast-in-place part are connected to form weak area and problem easy to crack,
Described connection additional bar group comprises the first connection additional bar 4 and is connected additional bar 5 with second, and described first connection additional bar 4 is connected additional bar 5 with second and be arranged in parallel, and simultaneously through cast-in-place buttress 1; Described first connects additional bar 4 is connected additional bar 5 by column tie-bar colligation with second, be arranged between prefabricated double-layered the basement wall 2;
By arranging metal connector on described prefabricated double-layered the basement wall 2, for connecting template tension member 3;
Described inner side template and cast-in-place buttress 1 are bolted;
To the construction method that the vertical piece structure of connection of the basement wall and cast-in-place buttress 1 operates, comprise following step:
(1) the vertical good prefabricated double-layered the basement wall 2 of frame;
(2) at vertical edge joint position colligation cast-in-place buttress 1 reinforcing bar of prefabricated double-layered the basement wall 2;
(3) prefabricated double-layered the basement wall 2 is fixedly connected with by column tie-bar, arranges connect additional bar group at the vertical edge joint position of prefabricated double-layered the basement wall 2; Connect additional bar group and column tie-bar colligation, for being connected and fixed prefabricated double-layered the basement wall 2 and cast-in-place buttress 1; ;
(4) in cast-in-place buttress 1 inside circumference erection inner side template;
(5) at cast-in-place buttress 1 and vacancy concreting in prefabricated double-layered the basement wall 2, thus make cast-in-place buttress 1 form entirety with prefabricated double-layered the basement wall 2.
Prefabricated double-layered the basement wall 2 edge joint position and cast-in-place buttress 1 are combined as a whole and construct, make connection more reliable, antiseepage is more effective.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.

Claims (5)

1. the vertical piece structure of the connection of the basement wall and cast-in-place buttress, comprise prefabricated double-layered the basement wall and cast-in-place buttress, it is characterized in that: the reinforcing bar carrying out the cast-in-place buttress of colligation at the vertical edge joint position of described prefabricated double-layered the basement wall; Described prefabricated double-layered the basement wall is fixedly connected with by column tie-bar; The vertical edge joint position of described prefabricated double-layered the basement wall also arranges and connects additional bar group, and described connection additional bar group is used for being connected and fixed prefabricated double-layered the basement wall and cast-in-place buttress; Described cast-in-place buttress is provided with inner side template, arranges template tension member between described inner side template and prefabricated double-layered the basement wall.
2. the vertical piece structure of the connection of the basement wall according to claim 1 and cast-in-place buttress, it is characterized in that: described connection additional bar group comprises the first connection additional bar and is connected additional bar with second, described first connection additional bar and second is connected additional bar and be arranged in parallel, and arrange through cast-in-place buttress is vertical with cast-in-place buttress, described first connects additional bar is connected additional bar and column tie-bar colligation with second; simultaneously Described column tie-bar is arranged between prefabricated double-layered the basement wall.
3. the vertical piece structure of the connection of the basement wall according to claim 2 and cast-in-place buttress, is characterized in that: described prefabricated double-layered the basement wall arranges metal connector, for connecting template tension member.
4. the vertical piece structure of the connection of the basement wall according to claim 3 and cast-in-place buttress, is characterized in that: described inner side template and cast-in-place buttress are bolted.
5., to the construction method that the vertical piece structure of connection of the basement wall according to claim 1 and cast-in-place buttress operates, it is characterized in that, comprise following step:
(1) the vertical good prefabricated double-layered the basement wall of frame;
(2) at the cast-in-place buttress reinforcing bar of vertical edge joint position colligation of prefabricated double-layered the basement wall;
(3) prefabricated double-layered the basement wall is fixedly connected with by column tie-bar, arranges connect additional bar group at the vertical edge joint position of prefabricated double-layered the basement wall; Connect additional bar group and column tie-bar colligation, for being connected and fixed prefabricated double-layered the basement wall and cast-in-place buttress;
(4) in cast-in-place buttress erection inner side template;
(5) vacancy concreting in cast-in-place buttress and prefabricated double-layered the basement wall, thus make cast-in-place buttress and prefabricated double-layered the basement wall form entirety.
CN201410580283.1A 2014-10-27 2014-10-27 The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method Active CN104314105B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410580283.1A CN104314105B (en) 2014-10-27 2014-10-27 The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410580283.1A CN104314105B (en) 2014-10-27 2014-10-27 The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method

Publications (2)

Publication Number Publication Date
CN104314105A true CN104314105A (en) 2015-01-28
CN104314105B CN104314105B (en) 2016-08-17

Family

ID=52369407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410580283.1A Active CN104314105B (en) 2014-10-27 2014-10-27 The connection vertical piece structure of the basement wall and cast-in-place buttress and construction method

Country Status (1)

Country Link
CN (1) CN104314105B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735352A (en) * 2016-04-20 2016-07-06 山东大学 Fabricated structure based on foundation pit retaining pile for basement exterior walls, and construction method
CN108824676A (en) * 2018-09-11 2018-11-16 上海宝岳住宅工业有限公司 Two-sided overlapped shear wall bottom piece structure and its construction method of installation
CN109723187A (en) * 2019-01-07 2019-05-07 中国十七冶集团有限公司 A kind of large area lightweight aggregate buttress installation method
CN112681570A (en) * 2020-12-11 2021-04-20 三一筑工科技有限公司 Laminated column, laminated column and laminated wall connecting structure and construction method thereof
CN118601312A (en) * 2024-05-23 2024-09-06 中国建筑第八工程局有限公司 Construction method of rigid buttress column guide wall node

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030046782A (en) * 2001-12-06 2003-06-18 김해영 Elastic Joint of Retaining Wall
CN202347544U (en) * 2011-12-14 2012-07-25 江西建工第一建筑有限责任公司 Advance water stop construction structure for post-cast strip of basement outer wall
CN103821177A (en) * 2012-11-16 2014-05-28 中国二十冶集团有限公司 Underground diaphragm wall prefabricated reinforced concrete connector and connection method thereof
CN204151835U (en) * 2014-10-27 2015-02-11 南京长江都市建筑设计股份有限公司 The vertical piece structure of connection of the basement wall and cast-in-place buttress

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030046782A (en) * 2001-12-06 2003-06-18 김해영 Elastic Joint of Retaining Wall
CN202347544U (en) * 2011-12-14 2012-07-25 江西建工第一建筑有限责任公司 Advance water stop construction structure for post-cast strip of basement outer wall
CN103821177A (en) * 2012-11-16 2014-05-28 中国二十冶集团有限公司 Underground diaphragm wall prefabricated reinforced concrete connector and connection method thereof
CN204151835U (en) * 2014-10-27 2015-02-11 南京长江都市建筑设计股份有限公司 The vertical piece structure of connection of the basement wall and cast-in-place buttress

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735352A (en) * 2016-04-20 2016-07-06 山东大学 Fabricated structure based on foundation pit retaining pile for basement exterior walls, and construction method
CN108824676A (en) * 2018-09-11 2018-11-16 上海宝岳住宅工业有限公司 Two-sided overlapped shear wall bottom piece structure and its construction method of installation
CN108824676B (en) * 2018-09-11 2023-08-15 上海宝岳住宅工业有限公司 Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof
CN109723187A (en) * 2019-01-07 2019-05-07 中国十七冶集团有限公司 A kind of large area lightweight aggregate buttress installation method
CN112681570A (en) * 2020-12-11 2021-04-20 三一筑工科技有限公司 Laminated column, laminated column and laminated wall connecting structure and construction method thereof
CN112681570B (en) * 2020-12-11 2022-05-20 三一筑工科技股份有限公司 Laminated column, laminated column and laminated wall connecting structure and construction method thereof
CN118601312A (en) * 2024-05-23 2024-09-06 中国建筑第八工程局有限公司 Construction method of rigid buttress column guide wall node

Also Published As

Publication number Publication date
CN104314105B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104652654B (en) Assembled shear wall structure
AU2017415961B2 (en) Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN106013228B (en) A kind of overlapping monoblock type pipe gallery prefabricated assembly structural and its construction method
CN105781125B (en) A kind of installation method of assembled architecture
CN104563299B (en) Reinforced concrete prefabricated components and installation method
CN107313517B (en) Connection node between laminated wall and intermediate floor laminated floor
CN109339229B (en) Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor
CN105804241A (en) Single-layer prefabricated assembly type reinforced concrete beam-column joint
CN106968381B (en) Prefabricated precast shear wall and composite panel joints connected by combined grouting sleeves
CN106013237A (en) Precast concrete component assembly type subway station and installation method
CN107975160B (en) Shear wall structure with lateral connecting key groove, manufacturing and assembling method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN102877649B (en) Prefabricated concrete structure interlayer pouring construction method
CN104775553A (en) Novel L-shaped edge member for superimposed slab shear walls and connecting method for novel L-shaped edge member
CN109537851A (en) A kind of method for prefabricating of assembled pipe well
CN104314105A (en) Connecting vertical seaming structure for basement external wall boards and cast-in-situ buttress column and construction method of connecting vertical seaming structure
CN104947712A (en) Construction method of constructing beam-column joint using ring beam
CN111396079B (en) A superimposed assembled tunnel secondary lining structure and its construction method
CN104775555B (en) A kind of T-shaped composite plate shear wall edge member and attaching method thereof
CN105544798A (en) Assembled-type hollow-slab shear wall structure and construction method thereof
CN205348391U (en) Take prefabricated beam column rebar mechanical connection node of lag
KR101267565B1 (en) Construction method of under-ground core part structure in top-down construction procedure
CN106032705A (en) Integrated casting molding construction method of reinforced concrete floor system
CN205153536U (en) Structure is assembled to self -balancing integral template of reinforced concrete roof beam
CN204151835U (en) The vertical piece structure of connection of the basement wall and cast-in-place buttress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant