CN102383601B - Method and device for leading pre-embedded pipes in concrete out of side wall joints - Google Patents

Method and device for leading pre-embedded pipes in concrete out of side wall joints Download PDF

Info

Publication number
CN102383601B
CN102383601B CN2011102473379A CN201110247337A CN102383601B CN 102383601 B CN102383601 B CN 102383601B CN 2011102473379 A CN2011102473379 A CN 2011102473379A CN 201110247337 A CN201110247337 A CN 201110247337A CN 102383601 B CN102383601 B CN 102383601B
Authority
CN
China
Prior art keywords
pipe
side wall
concrete
template
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011102473379A
Other languages
Chinese (zh)
Other versions
CN102383601A (en
Inventor
戴志清
任崇峰
盛信平
商永红
覃志斌
黄家权
乐运红
齐界夷
关小猛
闫晓萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2011102473379A priority Critical patent/CN102383601B/en
Publication of CN102383601A publication Critical patent/CN102383601A/en
Application granted granted Critical
Publication of CN102383601B publication Critical patent/CN102383601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for leading pre-embedded pipes in concrete out of side wall joints, comprising the following steps: A, positioning a pipe pre-embedded in concrete; B, binding reinforcing steel bars of side walls according to the design requirements, and erecting a template of a side wall; C, connecting one end of a casing with the pre-embedded pipe, sealing the other end of the casing for protection, and clinging the other end of the casing to the template of the side wall; D, pouring concrete; and E, detaching the template of the side wall after the strength of the concrete reaches the mould stripping requirement, cleaning up the opening of the casing, connecting the casing with a pipe of same diameter, and leading out the casing. Due to the steps, the construction of leading the pre-embedded pipe in the concrete out of side wall joints is realized. Because the pre-embedded pipe in the concrete is connected with the casing through screw threads, the external sealing and internal unblocking of the pre-embedded pipe are ensured. After finishing pouring the concrete and stripping the mould, the pre-embedded casing is connected with the pipe of same diameter, and the pre-embedded casing is led out of the side wall joints without disposing holes on the template of the side wall, thus the template is kept complete, the cost is reduced, and the construction efficiency is improved.

Description

Concrete internal embedded pipe is drawn job practices and the device at side wall parting place
Technical field
The present invention relates to job practices and device that job practices, particularly a kind of connection that a kind of inside concrete built-in pipe mouth of pipe draws are poured into the inside concrete built-in pipe.
Background technology
In the water power concrete construction, the concrete domestic demand is buried the pipelines such as cooling water pipe and grout pipe underground, and for dam concrete temperature control and joint grouting etc., this kind of built-in pipe is mostly iron pipe, and the mouth of pipe need be drawn from concrete side wall parting (or gallery side-walls).When built-in pipe is crossed side wall parting place in the past, need be on side wall template face pore-creating or part be adjusted into the wooden form construction, this all can be by damaged template, and has increased the form removable difficulty, affects construction period and construction quality.
Summary of the invention
Technical problem to be solved by this invention is to provide job practices and the device that a kind of concrete internal embedded pipe is drawn side wall parting place, can solve the technical barrier of inside concrete pipe laying construction needs destruction template in prior art.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: a kind of concrete internal embedded pipe is drawn the job practices at side wall parting place, comprises the following steps:
A, location concrete internal embedded pipe, cause built-in pipe the assigned address at side wall parting place, and, in mouth of pipe machining screw, built-in pipe be fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, vertical side wall template;
One end of C, sleeve pipe is connected with built-in pipe, by sleeve pipe other end shutoff protection, and is close to the side wall template;
D, concreting, strengthen the protection to the sleeve pipe mouth of pipe in casting process, and calibration template sideline at any time;
E, when concrete strength reaches the form removal requirement, by the side wall form removable, the mouth of pipe of cleaning sleeve pipe, and connect and to draw with indentical tube;
Realize the inside concrete built-in pipe is drawn the construction at side wall parting place by above-mentioned steps.
Described shutoff protection is with Polypropylence Sheet and butter shutoff.
In described step C, the position of being close to according to sleeve pipe, make mark at the another side of side wall template.
A kind of inside concrete pipe burying device, sleeve pipe one end is connected with built-in pipe, is close to the side wall template after other end shutoff.
Be provided with the countersunk head plug in described sleeve pipe.
A kind of concrete internal embedded pipe provided by the invention is drawn job practices and the device at side wall parting place, by the method that adopts sleeve pipe to connect, has changed traditional built-in pipe and has directly passed the job practices of side wall template.Owing at the service sleeve two ends, screw thread being set, by screw thread, concrete internal embedded pipe is connected with sleeve pipe, guarantee the outside seal of built-in pipe, inner unimpeded, after concreting completes form removal, adopt indentical tube to be connected with service sleeve in earlier stage, it is drawn to side wall parting place, need pore-creating on the side wall template, kept the integrality of side wall template, reduce cost, also improved efficiency of construction; Pipe laying is installed at twice, avoids the crossed construction with the side wall template, has reduced difficulty of construction, has guaranteed construction quality and progress.
The accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is overall structure schematic diagram of the present invention.
The schematic diagram that Fig. 2 is countersunk head plug in the present invention.
The specific embodiment
In Fig. 1, a kind of concrete internal embedded pipe is drawn the job practices at side wall parting place, comprises the following steps:
A, according to design drawing and Construction Specifications, the clear pipe of sign number and group number etc., location concrete internal embedded pipe 1, cause built-in pipe 1 assigned address at side wall parting place, and, in mouth of pipe machining screw, built-in pipe 1 be fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, vertical side wall template; And be fixed with steel pipe waling and tie rod etc.
One end and the built-in pipe 1 of C, sleeve pipe 2 are threaded connection, and by sleeve pipe 2 other end shutoff protections, and are close to side wall template 4; Specifically; the built-in pipe 1 of needs being drawn to the parting place causes side wall, and built-in pipe 1 nose end is installed the caliber sleeve pipe 2 slightly larger than built-in pipe, and the length of sleeve pipe 2 can be determined according to construction is actual; the other end of sleeve pipe 2 need be close to the installation of side wall template, and the mouth of pipe is protected.The position of being close to according to sleeve pipe 2, make mark at the another side of side wall template 4.
The mouth of pipe of sleeve pipe 2 can be with the mouth of pipe of Polypropylence Sheet and butter shutoff sleeve pipe 2, the mode of optimizing is, adopt 5 shutoff of countersunk head plug, the plug that described countersunk head plug 5 is the entire body screw thread, with sleeve pipe 2 be threaded engagement, can be fully upper in sleeve pipe 2, do not affect the space of sleeve pipe 2 mouths of pipe, sleeve pipe 2 mouths of pipe still can be close to side wall template 4, coordinate Polypropylence Sheet and butter plugging effect more excellent, end face at countersunk head plug 5 is provided with cross recess, is beneficial to dismounting.
D, after the constructions such as position in storehouse template, built-in fitting meet the requirements, start concreting, casting method is identical with conventional concrete construction, the protection of reinforcement to sleeve pipe 2 mouths of pipe in casting process, and calibration template sideline at any time, guarantee pouring quality.
E, when concrete strength reaches the form removal requirement, by the side wall form removable, during form removal, according to the mark on side wall template 4, determine the position of sleeve pipe 2 mouths of pipe.The purpose made marks is, while building, concrete grout smash shake and concrete self pressure under, likely enter into the position between sleeve pipe 2 mouths of pipe and side wall template, thereby sleeve pipe 2 mouths of pipe are hidden, can find fast the position of the mouth of pipe by mark, thereby increase work efficiency, this is especially effective for the occasion of having changed the constructor.
For the sleeve pipe 2 that is provided with countersunk head plug 5, cleaning countersunk head plug 5 cross recesses, can screw out countersunk head plug 5 easily.
Cleared up the mouth of pipe of sleeve pipe 2, can will be connected with sleeve pipe 2 with footpath access tube 3;
Realize the inside concrete built-in pipe is drawn the construction at side wall parting place by above-mentioned steps.
A kind of pipe burying device of the inside concrete for said method, sleeve pipe 2 one ends are connected with built-in pipe 1, are close to gallery side wall template 4 after other end shutoff.The scheme of optimizing is, as shown in Figure 1, Figure 2 in, be provided with countersunk head plug 5 in described sleeve pipe 2.

Claims (1)

1. a concrete internal embedded pipe is drawn the job practices at side wall parting place, it is characterized in that comprising the following steps:
A, location concrete internal embedded pipe (1), cause built-in pipe (1) assigned address at side wall parting place, and, in mouth of pipe machining screw, built-in pipe (1) be fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, vertical side wall template;
One end of C, sleeve pipe (2) is connected with built-in pipe (1), and sleeve pipe (2) other end, with Polypropylence Sheet and butter shutoff, and is close to side wall template (4); The position of being close to according to sleeve pipe (2), make mark at the another side of side wall template (4);
D, concreting, strengthen the protection to sleeve pipe (2) mouth of pipe in casting process, and calibration template sideline at any time;
E, when concrete strength reaches the form removal requirement, by the side wall form removable, the mouth of pipe of cleaning sleeve pipe (2), and connect and to draw with indentical tube;
Realize the inside concrete built-in pipe is drawn the construction at side wall parting place by above-mentioned steps.
CN2011102473379A 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints Active CN102383601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102473379A CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102473379A CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Publications (2)

Publication Number Publication Date
CN102383601A CN102383601A (en) 2012-03-21
CN102383601B true CN102383601B (en) 2013-12-04

Family

ID=45823401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102473379A Active CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Country Status (1)

Country Link
CN (1) CN102383601B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103944100B (en) * 2014-05-06 2017-02-15 中国葛洲坝集团第六工程有限公司 Cable seam crossing method for monitoring instrument
CN104631461A (en) * 2015-01-16 2015-05-20 长江勘测规划设计研究有限责任公司 Improved method for construction of reserved slot at downstream dam surface for cooling pipe installation
CN107313594A (en) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 After pour the pre-buried threaded sleeve connection method of member reinforcing steel bar
CN106567966B (en) * 2016-10-21 2020-09-15 上海市政工程设计研究总院(集团)有限公司 Underground comprehensive pipe gallery group pipe wall penetration seepage prevention method
CN107604937A (en) * 2017-09-13 2018-01-19 中国电建集团北京勘测设计研究院有限公司 The foundation structure of wind-driven generator and its construction method of basic annular type with pre-buried madjack pipe
CN112878674A (en) * 2021-01-19 2021-06-01 上海建工四建集团有限公司 Electric wire tube connecting device and mounting method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809396Y (en) * 2005-07-22 2006-08-23 武汉劲野机械有限责任公司 Screw thread type pipe joint
CN2830851Y (en) * 2005-11-02 2006-10-25 武汉劲野机械有限责任公司 Telescopic union joint
CN200996508Y (en) * 2006-12-30 2007-12-26 武汉劲野机械有限责任公司 Shielding-sleeve threaded connecter
CN201089979Y (en) * 2007-07-05 2008-07-23 袁祥生 Construction built-in fitting for external wall heat-preservation composite wall
CN201166195Y (en) * 2008-03-18 2008-12-17 林月红 Pre-buried pipe sleeve
CN201268945Y (en) * 2008-08-19 2009-07-08 中建三局第一建设工程有限责任公司 Casing tube reserved pre-burying system
CN101537662A (en) * 2009-04-17 2009-09-23 从卫民 Connection channel positioning method in prefabrication of spliced tower crane foundation prefabricated by concrete
CN201593305U (en) * 2009-12-22 2010-09-29 浙江大学 Embedded pipe positioning and fixing device in concrete
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809396Y (en) * 2005-07-22 2006-08-23 武汉劲野机械有限责任公司 Screw thread type pipe joint
CN2830851Y (en) * 2005-11-02 2006-10-25 武汉劲野机械有限责任公司 Telescopic union joint
CN200996508Y (en) * 2006-12-30 2007-12-26 武汉劲野机械有限责任公司 Shielding-sleeve threaded connecter
CN201089979Y (en) * 2007-07-05 2008-07-23 袁祥生 Construction built-in fitting for external wall heat-preservation composite wall
CN201166195Y (en) * 2008-03-18 2008-12-17 林月红 Pre-buried pipe sleeve
CN201268945Y (en) * 2008-08-19 2009-07-08 中建三局第一建设工程有限责任公司 Casing tube reserved pre-burying system
CN101537662A (en) * 2009-04-17 2009-09-23 从卫民 Connection channel positioning method in prefabrication of spliced tower crane foundation prefabricated by concrete
CN201593305U (en) * 2009-12-22 2010-09-29 浙江大学 Embedded pipe positioning and fixing device in concrete
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof

Also Published As

Publication number Publication date
CN102383601A (en) 2012-03-21

Similar Documents

Publication Publication Date Title
CN102383601B (en) Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN204112604U (en) The slip casting rebar connector of band cone tail
CN202391019U (en) End part thickened grouting connector of steel bar
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN104358360A (en) Full-grouting sleeve for connection of construction reinforcing steel bars
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN202214989U (en) Device for leading out concrete internal embedded pipe to side-wall joint
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN203684409U (en) Armored concrete grouting connection sleeve
CN204299044U (en) A kind of building iron connects uses full grout sleeve
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN106381883B (en) Bar Seepage method through walls
CN102505847A (en) Mud jacking pipe device
CN210369766U (en) Precast concrete fast-assembling exhaust pipe well structure
CN105971016A (en) Connection structure between joints of comprehensive pipe rack
CN207194452U (en) Underground chamber outer wall wall pipeline hole waterproof embedding pipe fittingses device
CN210105129U (en) A grout sleeve for steel bar connection for assembly type structure
CN208981356U (en) A kind of concrete prefabricated piping lane with antiseep preset structure
CN202788874U (en) Embedded grouting guide tube device in chamber lining concrete
CN208719592U (en) The proof mechanism of water of wall pipe in heating direct-burying pipeline well room
CN208009731U (en) A kind of prefabricated components bearing diagonal bottom embedded part and its pre-buried structure
CN104124650A (en) Processing-free cleaning-free fully-sealed dedicated concrete roof embedded wire box
CN206693653U (en) Concrete pouring structure exposed steel bar safeguard structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant