CN204826423U - Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member - Google Patents

Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member Download PDF

Info

Publication number
CN204826423U
CN204826423U CN201520572544.5U CN201520572544U CN204826423U CN 204826423 U CN204826423 U CN 204826423U CN 201520572544 U CN201520572544 U CN 201520572544U CN 204826423 U CN204826423 U CN 204826423U
Authority
CN
China
Prior art keywords
grouting
sleeve
cylinder section
section
steel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520572544.5U
Other languages
Chinese (zh)
Inventor
吴涛
魏慧�
刘伯权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201520572544.5U priority Critical patent/CN204826423U/en
Application granted granted Critical
Publication of CN204826423U publication Critical patent/CN204826423U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本实用新型公开了一种预制装配式混凝土构件用钢筋套筒灌浆连接件,包括用于连接插入钢筋与预埋钢筋的金属套筒、布设在金属套筒上端的密封垫圈和由灌注于金属套筒与插入钢筋之间空腔内的灌浆料形成的灌浆结构,插入钢筋为带肋钢筋,预埋钢筋的连接端为螺纹连接端;金属套筒分为上部筒段、中部连接筒段和下部筒段,上部筒段和中部连接筒段组成灌浆筒,插入钢筋插入灌浆筒内且其通过灌浆结构与灌浆筒紧固连接为一体;上部筒段内部为圆锥形内腔且其内径由上至下逐渐增大,下部筒段为螺纹连接接头;上部筒段上设置有灌浆口和排气口。本实用新型结构简单、设计合理且加工制作及使用操作简便、使用效果好,能简便、快速完成钢筋连接过程且连接可靠。

The utility model discloses a steel bar sleeve grouting connector for prefabricated assembled concrete components, which comprises a metal sleeve for connecting inserted steel bars and pre-embedded steel bars, a sealing gasket arranged on the upper end of the metal sleeve, and a metal sleeve poured into the metal sleeve. The grouting structure formed by the grouting material in the cavity between the cylinder and the inserted steel bar, the inserted steel bar is a ribbed steel bar, and the connection end of the pre-embedded steel bar is a threaded connection end; the metal sleeve is divided into an upper tube section, a middle connecting tube section and a lower part The barrel section, the upper barrel section and the middle connecting barrel section form the grouting barrel, and the steel bar is inserted into the grouting barrel and it is tightly connected with the grouting barrel through the grouting structure; the inside of the upper barrel section is a conical inner cavity with an inner diameter from top to The bottom gradually increases, and the lower barrel section is a threaded joint; the upper barrel section is provided with a grouting port and an exhaust port. The utility model has the advantages of simple structure, reasonable design, convenient processing, production and use, good use effect, simple and fast completion of the steel bar connection process and reliable connection.

Description

一种预制装配式混凝土构件用钢筋套筒灌浆连接件A steel sleeve grouting connector for prefabricated concrete components

技术领域technical field

本实用新型属于预制装配式混凝土构件施工技术领域,尤其是涉及一种预制装配式混凝土构件用钢筋套筒灌浆连接件。The utility model belongs to the technical field of construction of prefabricated assembled concrete components, in particular to a steel sleeve grouting connector for prefabricated assembled concrete components.

背景技术Background technique

预制装配式混凝土构件也称预制装配式混凝土结构,预制装配式混凝土简称为PC(PrecastConcrete)。预制装配式混凝土构件是以混凝土预制构件为主要构件,经装配、连接以及部分现浇而成的混凝土结构。国外的混凝土预制构件与钢筋混凝土几乎同时起步,而现代意义上的工业化预制混凝土构件在半个世纪前才得到真正发展。Prefabricated concrete components are also called prefabricated concrete structures, and prefabricated concrete is referred to as PC (Precast Concrete). Prefabricated prefabricated concrete components are concrete structures that are assembled, connected and partially cast-in-place with concrete prefabricated components as the main component. Foreign concrete prefabricated components and reinforced concrete started almost at the same time, but industrialized prefabricated concrete components in the modern sense were not really developed until half a century ago.

发展建筑产业化是建筑生产方式从粗放型生产向集约型生产的根本转变,是产业现代化的必然途径和发展方向。采用预制装配式混凝土结构体系是实现建筑产业化的有效途径。预制装配式混凝土构件的连接节点是薄弱环节,并且预制装配式混凝土构件内钢筋连接的性能直接决定结构的整体性能以及钢筋传力的效果,钢筋连接的性能是钢筋传力的关键因素,钢筋连接方式的选择直接影响建筑的施工速度与造价。并且,预制装配式混凝土构件内纵向钢筋的连接是关键,其中,纵向钢筋为沿预制装配式混凝土构件纵向长度方向布设的钢筋且其受力钢筋。The development of construction industrialization is the fundamental transformation of the construction production mode from extensive production to intensive production, and it is the inevitable way and development direction of industrial modernization. The use of prefabricated concrete structure system is an effective way to realize the industrialization of construction. The connection nodes of prefabricated concrete components are weak links, and the performance of steel bar connections in prefabricated concrete components directly determines the overall performance of the structure and the effect of steel force transmission. The performance of steel bar connections is the key factor for steel force transmission. The choice of method directly affects the construction speed and cost of the building. Moreover, the connection of the longitudinal reinforcement in the prefabricated concrete member is the key, wherein the longitudinal reinforcement is the reinforcement arranged along the longitudinal length direction of the prefabricated concrete member and its stressed reinforcement.

现浇混凝土结构中,常用的纵向钢筋连接方式有绑扎搭接、焊接连接以及机械连接等连接方式,但由于预制装配式混凝土构件的钢筋连接部位空间较小,采用上述传统的钢筋连接方式不便于施工。钢筋套筒灌浆连接接头能很好地解决了预制装配式混凝土结构中的纵向钢筋连接问题,可有效实现装配等同现浇的设计要求。但目前通常采用的套筒大多内部结构复杂,制造工艺繁琐,成本较高,并且对需连接钢筋的对中精度要求高,存在钢筋连接过程复杂、人工劳动强度大、连接速度慢等缺陷。并且,目前采用钢筋套筒灌浆连接方式进行钢筋连接时,没有一个统一、规范且具体的施工方法可遵循,实际施工时不可避免地存在施工操作比较随意、不规范、操作繁琐、施工工较低、连接质量较差等问题。In cast-in-place concrete structures, the commonly used connection methods for longitudinal reinforcement include lap joints, welding connections, and mechanical connections. construction. The steel sleeve grouting connection joint can well solve the problem of longitudinal steel connection in the prefabricated concrete structure, and can effectively realize the design requirement that assembly is equivalent to cast-in-place. However, most of the commonly used sleeves currently have complex internal structures, cumbersome manufacturing processes, high cost, and high requirements for the centering accuracy of the steel bars to be connected. There are defects such as complicated steel bar connection process, high manual labor intensity, and slow connection speed. In addition, when using the steel sleeve grouting connection method to connect steel bars at present, there is no unified, standardized and specific construction method to follow. In actual construction, it is inevitable that the construction operation is relatively random, irregular, cumbersome, and the construction work is relatively low. , poor connection quality, etc.

实用新型内容Utility model content

本实用新型所要解决的技术问题在于针对上述现有技术中的不足,提供一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其结构简单、设计合理且加工制作及使用操作简便、使用效果好,能简便、快速完成钢筋连接过程且连接可靠。The technical problem to be solved by the utility model is to provide a steel sleeve grouting connector for prefabricated concrete components in view of the deficiencies in the above-mentioned prior art. Good, the steel bar connection process can be completed easily and quickly, and the connection is reliable.

为解决上述技术问题,本实用新型采用的技术方案是:一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征在于:包括用于连接插入钢筋与预埋钢筋的金属套筒、布设在金属套筒上端的密封垫圈和由灌注于金属套筒与插入钢筋之间空腔内的灌浆料形成的灌浆结构,所述插入钢筋为带肋钢筋,所述预埋钢筋的连接端为螺纹连接端;所述金属套筒由上至下分为上部筒段、中部连接筒段和下部筒段,所述上部筒段、中部连接筒段和下部筒段呈同轴布设且三者的内腔相互连通;所述上部筒段和中部连接筒段组成灌浆筒,所述插入钢筋由上至下插入所述灌浆筒内且其通过灌浆结构与所述灌浆筒紧固连接为一体;所述上部筒段的内部为圆锥形内腔且其内径由上至下逐渐增大,所述圆锥形内腔的上端口为钢筋插入口,所述密封垫圈套装在插入钢筋与所述上部筒段之间且其位于所述圆锥形内腔上部,所述上部筒段的内侧壁与其中心轴线之间的夹角为2°~3°;所述中部连接筒段的横截面为圆环形且其内径由上至下逐渐缩小,所述中部连接筒段的上端内径与所述圆锥形内腔的下端口直径相同;所述下部筒段为用于连接所述螺纹连接端的螺纹连接接头;所述上部筒段的侧壁上部设置有用于灌注灌浆料的灌浆口且其侧壁底部设置有排气口。In order to solve the above technical problems, the technical solution adopted by the utility model is: a steel sleeve grouting connector for prefabricated concrete components, which is characterized in that it includes a metal sleeve for connecting inserted steel bars and pre-embedded steel bars, a layout The sealing gasket at the upper end of the metal sleeve and the grouting structure formed by the grouting material poured into the cavity between the metal sleeve and the inserted steel bar, the inserted steel bar is a ribbed steel bar, and the connecting end of the embedded steel bar is a screw thread Connecting end; the metal sleeve is divided into an upper cylinder section, a middle connecting cylinder section and a lower cylinder section from top to bottom, and the upper cylinder section, the middle connecting cylinder section and the lower cylinder section are arranged coaxially and the interior of the three The cavities are connected to each other; the upper cylinder section and the middle connecting cylinder section form a grouting cylinder, and the inserted steel bars are inserted into the grouting cylinder from top to bottom and are fastened and connected with the grouting cylinder as a whole through the grouting structure; the The interior of the upper cylinder section is a conical inner cavity and its inner diameter gradually increases from top to bottom. The upper port of the conical inner cavity is the insertion port of the steel bar, and the sealing gasket is set between the inserted steel bar and the upper cylinder section. and it is located at the upper part of the conical inner cavity, the angle between the inner side wall of the upper cylinder section and its central axis is 2°-3°; the cross section of the middle connecting cylinder section is circular and its The inner diameter gradually decreases from top to bottom, and the inner diameter of the upper end of the middle connecting cylinder section is the same as the diameter of the lower port of the conical inner cavity; the lower cylinder section is a threaded connection joint for connecting the threaded connection end; the The upper part of the side wall of the upper cylinder section is provided with a grouting opening for pouring grouting material and the bottom of the side wall is provided with an exhaust port.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述金属套筒为球墨铸铁筒。The above-mentioned steel sleeve grouting connector for prefabricated concrete components is characterized in that: the metal sleeve is a ductile iron cylinder.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述密封垫圈为橡胶密封圈且上表面与金属套筒的上端面相平齐。The above-mentioned steel sleeve grouting connector for prefabricated concrete components is characterized in that: the sealing gasket is a rubber sealing ring and the upper surface is flush with the upper end surface of the metal sleeve.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述螺纹连接接头为圆柱形接头,所述螺纹连接接头的内径与所述螺纹连接端的直径相同。The above-mentioned prefabricated assembled concrete component steel sleeve grouting connector is characterized in that: the threaded joint is a cylindrical joint, and the inner diameter of the threaded joint is the same as the diameter of the threaded end.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述上部筒段为圆柱形且其外径为Φ40mm~Φ60mm,所述上部筒段的壁厚由上至下逐渐缩小,所述上部筒段上端的壁厚d1=10mm~14mm且其下端壁厚与所述中部连接筒段的壁厚相同。The above-mentioned prefabricated assembled concrete component steel sleeve grouting connector is characterized in that: the upper cylinder section is cylindrical and its outer diameter is Φ40mm-Φ60mm, and the wall thickness of the upper cylinder section gradually increases from top to bottom. shrinking, the wall thickness d1 of the upper end of the upper cylinder section is 10mm-14mm and the wall thickness of the lower end is the same as that of the middle connecting cylinder section.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述中部连接筒段和下部筒段的壁厚相同且二者的壁厚d2=6mm~8mm。The above-mentioned steel sleeve grouting connector for prefabricated concrete components is characterized in that: the wall thickness of the middle connecting tube section and the lower tube section are the same, and the wall thickness d2 of the two is 6 mm to 8 mm.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述插入钢筋的直径与所述螺纹连接端的直径相同,所述灌浆筒的长度L1=6.5d~7.5d,所述下部筒段的长度L2=1.5d~2.5d,其中d为插入钢筋的直径。The aforementioned steel bar sleeve grouting connector for prefabricated concrete components is characterized in that: the diameter of the inserted steel bar is the same as the diameter of the threaded connection end, and the length L1 of the grouting tube is 6.5d to 7.5d. The length L2 of the lower cylinder section is 1.5d to 2.5d, where d is the diameter of the inserted steel bar.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述圆锥形内腔的上端口直径d3=d+10mm,其中d为插入钢筋的直径。The above-mentioned prefabricated assembled concrete component steel sleeve grouting connector is characterized in that: the diameter of the upper port of the conical inner cavity is d3=d+10mm, where d is the diameter of the inserted steel bar.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述中部连接筒段的长度为15mm~20mm。The above-mentioned prefabricated assembled concrete component steel sleeve grouting connector is characterized in that: the length of the middle connecting tube section is 15 mm to 20 mm.

上述一种预制装配式混凝土构件用钢筋套筒灌浆连接件,其特征是:所述插入钢筋底端与所述螺纹连接端顶端之间的间距为2mm~5mm。The aforementioned steel bar sleeve grouting connector for prefabricated concrete components is characterized in that: the distance between the bottom end of the inserted steel bar and the top end of the threaded connection end is 2 mm to 5 mm.

本实用新型与现有技术相比具有以下优点:Compared with the prior art, the utility model has the following advantages:

1、结构简单、设计合理且投入成本低。1. Simple structure, reasonable design and low input cost.

2、加工制作简便、外形尺寸小,。2. Easy to process and manufacture, small size.

3、使用操作简便、施工方便且采用的钢筋连接方法步骤简单、设计合理、实现方便且连接效率高、连接效果好,上部筒段的内部为圆锥形内腔且其内侧壁为倾斜面,因而在抗拉强度方面起到了明显的作用。同时,当相互对接的端部带螺纹的预埋钢筋和带肋钢筋(即插入钢筋)受到相背的拉力时,微膨胀的灌浆料与金属套筒内壁之间产生相对的轴向力,对灌浆料产生径向的收缩压力,使微膨胀的灌浆料更紧地箍紧带肋钢筋,大大增加了二者的连接强度,进而增加了连接处的抗拉强度。3. It is easy to use and operate, convenient to construct, and the steel bar connection method adopted is simple in steps, reasonable in design, convenient in realization, high in connection efficiency, and good in connection effect. Played a significant role in the tensile strength. At the same time, when the threaded pre-embedded steel bars and ribbed steel bars (that is, inserted steel bars) that are connected to each other are subjected to opposite tensions, a relative axial force is generated between the micro-expanded grouting material and the inner wall of the metal sleeve. The grouting material produces radial shrinkage pressure, which makes the slightly expanded grouting material tighten the ribbed steel bar more tightly, greatly increasing the connection strength of the two, and then increasing the tensile strength of the joint.

4、使用效果好且实用价值高、经济实用,能简便、快速完成钢筋连接过程且连接可靠,能简便实现钢筋之间的快速连接,并且钢筋的对中精度要求低,操作方便且省工省时,施工效率高,连接强度可靠,具有良好的经济效益。同时,通过对金属套筒各部分的结构与尺寸进行限定,再加上对连接方法步骤进行合理设计,达到整体尺寸小、占用空间小、省材、施工工艺简便、连接质量可靠等效果,在钢筋连接性能与质量稳定性满足相关技术规程的情况下,本实用新型的经济技术指标大大超过已有的水泥砂浆钢筋接头。另外,金属套筒与预埋钢筋之间以螺纹方式进行连接,加工方便,并且能使钢筋连接处的位置更精确;而金属套筒的内侧壁为倾斜面,方便插入钢筋的装配,不仅提高安装效率,而且大幅度提高了金属套筒的经济效益,节省材料成本。4. Good use effect and high practical value, economical and practical, can easily and quickly complete the steel bar connection process and the connection is reliable, can easily realize the fast connection between steel bars, and the centering accuracy of the steel bars is low, easy to operate and labor-saving , the construction efficiency is high, the connection strength is reliable, and it has good economic benefits. At the same time, by limiting the structure and size of each part of the metal sleeve, coupled with the reasonable design of the connection method steps, the overall size is small, the space occupied is small, the material is saved, the construction process is simple, and the connection quality is reliable. When the performance and quality stability of the steel bar connection meet the relevant technical regulations, the economic and technical indicators of the utility model greatly exceed that of the existing cement mortar steel bar joint. In addition, the metal sleeve and the pre-embedded steel bar are connected by threads, which is convenient for processing and can make the position of the joint of the steel bar more accurate; while the inner wall of the metal sleeve is an inclined surface, which is convenient for the assembly of the inserted steel bar, which not only improves The installation efficiency not only greatly improves the economic benefits of the metal sleeve, but also saves material costs.

5、适用面广且推广应用前景广泛,能应用于梁、柱和墙等预制装配式混凝土构件中的钢筋连接。5. It has a wide range of applications and broad prospects for promotion and application, and can be applied to the connection of steel bars in prefabricated concrete components such as beams, columns and walls.

下面通过附图和实施例,对本实用新型的技术方案做进一步的详细描述。The technical solutions of the present utility model will be further described in detail through the drawings and embodiments below.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为图1的A-A剖视图。Fig. 2 is a sectional view along line A-A of Fig. 1 .

图3为图1的B-B剖视图。Fig. 3 is a B-B sectional view of Fig. 1 .

图4为图1的C-C剖视图。Fig. 4 is a C-C sectional view of Fig. 1 .

图5为采用本实用新型进行钢筋连接时的方法流程框图。Fig. 5 is a flow chart of the method when the utility model is used to connect steel bars.

附图标记说明:Explanation of reference signs:

1—金属套筒;2—插入钢筋;3—预埋钢筋;1—metal sleeve; 2—insert steel bar; 3—embedded steel bar;

4—密封垫圈;5—灌浆结构;6—灌浆口;4—sealing gasket; 5—grouting structure; 6—grouting port;

7—排气口。7—Exhaust port.

具体实施方式Detailed ways

如图1所示,本实用新型包括用于连接插入钢筋2与预埋钢筋3的金属套筒1、布设在金属套筒1上端的密封垫圈4和由灌注于金属套筒1与插入钢筋2之间空腔内的灌浆料形成的灌浆结构5,所述插入钢筋2为带肋钢筋,所述预埋钢筋3的连接端为螺纹连接端。所述金属套筒1由上至下分为上部筒段、中部连接筒段和下部筒段,所述上部筒段、中部连接筒段和下部筒段呈同轴布设且三者的内腔相互连通。所述上部筒段和中部连接筒段组成灌浆筒,所述插入钢筋2由上至下插入所述灌浆筒内且其通过灌浆结构5与所述灌浆筒紧固连接为一体。结合图3和图4,所述上部筒段的内部为圆锥形内腔且其内径由上至下逐渐增大,所述圆锥形内腔的上端口为钢筋插入口,所述密封垫圈4套装在插入钢筋2与所述上部筒段之间且其位于所述圆锥形内腔上部,所述上部筒段的内侧壁与其中心轴线之间的夹角为2°~3°。所述中部连接筒段的横截面为圆环形且其内径由上至下逐渐缩小,所述中部连接筒段的上端内径与所述圆锥形内腔的下端口直径相同。结合图2,所述下部筒段为用于连接所述螺纹连接端的螺纹连接接头。所述上部筒段的侧壁上部设置有用于灌注灌浆料的灌浆口6且其侧壁底部设置有排气口7。As shown in Figure 1, the utility model includes a metal sleeve 1 for connecting the inserted steel bar 2 and the pre-embedded steel bar 3, a sealing gasket 4 arranged on the upper end of the metal sleeve 1, and a metal sleeve 4 poured into the metal sleeve 1 and the inserted steel bar 2. The grouting structure 5 formed by the grouting material in the cavity between them, the inserted steel bar 2 is a ribbed steel bar, and the connection end of the pre-embedded steel bar 3 is a threaded connection end. The metal sleeve 1 is divided into an upper cylinder section, a middle connecting cylinder section and a lower cylinder section from top to bottom, the upper cylinder section, the middle connecting cylinder section and the lower cylinder section are arranged coaxially and the inner cavities of the three connected. The upper tube section and the middle connecting tube section form a grouting tube, and the inserted steel bar 2 is inserted into the grouting tube from top to bottom and is tightly connected with the grouting tube as a whole through the grouting structure 5 . Referring to Fig. 3 and Fig. 4, the interior of the upper cylinder section is a conical inner cavity and its inner diameter gradually increases from top to bottom, the upper port of the conical inner cavity is a steel bar insertion port, and the sealing gasket 4 is set Between the inserted steel bar 2 and the upper barrel section and it is located at the upper part of the conical inner cavity, the included angle between the inner side wall of the upper barrel section and its central axis is 2°-3°. The cross-section of the middle connecting cylinder section is circular and its inner diameter gradually decreases from top to bottom, and the inner diameter of the upper end of the middle connecting cylinder section is the same as the diameter of the lower port of the conical inner cavity. Referring to FIG. 2 , the lower barrel section is a threaded connection joint for connecting the threaded connection end. The upper portion of the side wall of the upper barrel section is provided with a grouting opening 6 for pouring grouting material and the bottom of the side wall is provided with an exhaust port 7 .

本实施例中,所述灌浆口6位于排气口7的正上方。In this embodiment, the grouting port 6 is located directly above the exhaust port 7 .

本实施例中,所述金属套筒1为球墨铸铁筒。In this embodiment, the metal sleeve 1 is a ductile iron sleeve.

实际加工时,所述金属套筒1中上部筒段、中部连接筒段和下部筒段加工制作为一体。During actual processing, the upper cylinder section, the middle connecting cylinder section and the lower cylinder section of the metal sleeve 1 are processed into one body.

本实施例中,所述螺纹连接接头为圆柱形接头,所述螺纹连接接头的内径与所述螺纹连接端的直径相同。In this embodiment, the threaded joint is a cylindrical joint, and the inner diameter of the threaded joint is the same as the diameter of the threaded end.

并且,所述密封垫圈4为橡胶密封圈且上表面与金属套筒1的上端面相平齐。Moreover, the sealing washer 4 is a rubber sealing ring and its upper surface is flush with the upper end surface of the metal sleeve 1 .

本实施例中,所述上部筒段为圆柱形且其外径为Φ40mm~Φ60mm,所述上部筒段的壁厚由上至下逐渐缩小,所述上部筒段上端的壁厚d1=10mm~14mm且其下端壁厚与所述中部连接筒段的壁厚相同;所述中部连接筒段和下部筒段的壁厚相同且二者的壁厚d2=6mm~8mm;所述圆锥形内腔的上端口直径d3=d+10mm,其中d为插入钢筋2的直径。In this embodiment, the upper cylinder section is cylindrical and has an outer diameter of Φ40 mm to Φ60 mm, the wall thickness of the upper cylinder section gradually decreases from top to bottom, and the wall thickness d1 of the upper end of the upper cylinder section is 10 mm to 10 mm. 14mm and the wall thickness of the lower end is the same as that of the middle connecting cylinder section; the wall thickness of the middle connecting cylinder section and the lower cylinder section are the same and the wall thickness d2=6mm-8mm; the conical inner cavity The upper port diameter d3=d+10mm, where d is the diameter of the inserted steel bar 2.

实际加工时,可根据具体需要,对所述上部筒段的外径以及d1、d2和d3的取值大小进行相应调整。During actual processing, the outer diameter of the upper cylinder section and the values of d1, d2 and d3 can be adjusted accordingly according to specific needs.

实际使用时,所述插入钢筋2的直径与所述螺纹连接端的直径相同,所述灌浆筒的长度L1=6.5d~7.5d,所述下部筒段的长度L2=1.5d~2.5d,其中d为插入钢筋2的直径。所述中部连接筒段的长度为15mm~20mm。In actual use, the diameter of the inserted steel bar 2 is the same as the diameter of the threaded connection end, the length L1 of the grouting cylinder = 6.5d-7.5d, and the length L2 of the lower cylinder section = 1.5d-2.5d, wherein d is the diameter of the inserted steel bar 2. The length of the middle connecting cylinder section is 15mm-20mm.

本实施例中,所述灌浆筒的长度L1=7d,所述下部筒段的长度L2=2d。In this embodiment, the length L1 of the grouting cylinder = 7d, and the length L2 of the lower cylinder section = 2d.

实际加工时,可根据具体需要,对L1和L2的取值大小进行相应调整。During actual processing, the values of L1 and L2 can be adjusted accordingly according to specific needs.

本实施例中,所述插入钢筋2底端与所述螺纹连接端顶端之间的间距为2mm~5mm。In this embodiment, the distance between the bottom end of the inserted steel bar 2 and the top end of the threaded connection end is 2mm-5mm.

这样,使得插入钢筋2紧固固定于灌浆结构5内,并使所述螺纹连接端的顶端与灌浆结构5紧固连接为一体;同时,插入钢筋2插入所述灌浆筒的深度也能满足紧固固定需求。In this way, the inserted steel bar 2 is fastened and fixed in the grouting structure 5, and the top of the threaded connection end is tightly connected with the grouting structure 5; at the same time, the insertion depth of the inserted steel bar 2 into the grouting tube can also meet the fastening requirements. Fixed demand.

本实施例中,所述灌浆结构5的28天的抗压强度不低于85MPa且其24h与3h的膨胀率之差为0.02%~0.5%。In this embodiment, the 28-day compressive strength of the grouting structure 5 is not less than 85 MPa and the difference between the 24-h and 3-h expansion rates is 0.02%-0.5%.

由上述内容可知,本实用新型连接的两根钢筋中,一根为端头带螺纹的钢筋(即预埋钢筋3),另一根为普通带肋钢筋(即插入钢筋2);所述金属套筒1的一端设置有缩颈的螺纹孔(即所述下部筒段),并与预埋钢筋3的螺纹连接端连接;所述插入钢筋2插入金属套筒1内,并与灌注于金属套筒1的灌浆料硬化后的灌浆结构5结合并连接为一体;所述金属套筒1的内侧壁为倾斜面。这样,预埋钢筋3与所述下部筒段之间通过机械咬合力(即以螺纹方式)连接在一起,插入钢筋2与所述灌浆筒内的灌浆结构5紧固连接为一体,在对接钢筋受到背向拉力时,金属套筒1的倾斜内壁起到剪力键的作用,使得金属套筒1、插入钢筋2和灌浆结构5形成一个整体。As can be seen from the foregoing, among the two steel bars connected by the utility model, one is a threaded steel bar at the end (i.e. the pre-embedded steel bar 3), and the other is an ordinary ribbed steel bar (i.e. inserted into the steel bar 2); One end of the sleeve 1 is provided with a necked threaded hole (that is, the lower tube section), and is connected to the threaded connection end of the pre-embedded steel bar 3; the inserted steel bar 2 is inserted into the metal sleeve 1, and is poured into the metal The grouting structure 5 of the sleeve 1 after the grouting material has hardened is combined and connected as a whole; the inner side wall of the metal sleeve 1 is an inclined surface. In this way, the pre-embedded steel bars 3 and the lower barrel section are connected together by mechanical occlusal force (that is, in a threaded manner), and the inserted steel bars 2 are tightly connected with the grouting structure 5 in the grouting barrel as a whole. When subjected to back tension, the inclined inner wall of the metal sleeve 1 acts as a shear key, so that the metal sleeve 1, the inserted steel bar 2 and the grouting structure 5 form a whole.

实际使用时,所述灌浆口6和排气口7的内部为光孔或螺纹孔。In actual use, the insides of the grouting port 6 and the exhaust port 7 are smooth holes or threaded holes.

如图5所示,采用本实用新型进行钢筋连接时,包括以下步骤:As shown in Figure 5, when adopting the utility model to carry out reinforcing bar connection, comprise the following steps:

步骤一、预埋钢筋连接:将金属套筒1的下部筒段与预埋钢筋3的螺纹连接端连接为一体;Step 1, pre-embedded steel bar connection: connect the lower section of the metal sleeve 1 with the threaded connection end of the pre-embedded steel bar 3;

步骤二、插入钢筋插装:在插入钢筋2的连接端上套装密封垫圈4上后,将插入钢筋2的连接端由上至下插入所述灌浆筒内,再将插入钢筋2上套装的密封垫圈4下移至金属套筒1的圆锥形内腔上部,并使密封垫圈4垫装于插入钢筋2与金属套筒1的上部筒段之间,完成插入钢筋2的插装过程;Step 2. Inserting the steel bar into the insert: After the sealing gasket 4 is installed on the connecting end of the inserted steel bar 2, insert the connecting end of the inserted steel bar 2 into the grouting cylinder from top to bottom, and then insert the sealing gasket 4 on the inserted steel bar 2. The gasket 4 is moved down to the upper part of the conical inner cavity of the metal sleeve 1, and the sealing gasket 4 is installed between the inserted steel bar 2 and the upper section of the metal sleeve 1, and the insertion process of the inserted steel bar 2 is completed;

步骤三、灌浆:通过灌浆口6连续向金属套筒1灌注灌浆料;当排气口7内有灌浆料排出时,对排气口7进行封堵;待灌浆料充满所述灌浆筒内部时,停止灌注灌浆料,并对灌浆口6进行封堵,获得灌浆结构5;Step 3, grouting: continuously pour grouting material into the metal sleeve 1 through the grouting port 6; when the grouting material is discharged from the exhaust port 7, block the venting port 7; when the grouting material fills the inside of the grouting cylinder , stop pouring the grouting material, and seal the grouting port 6 to obtain the grouting structure 5;

步骤四、养护:对步骤三中所述灌浆结构5进行养护,养护完成后,完成预埋钢筋3与插入钢筋2的连接过程。Step 4. Maintenance: Carry out maintenance on the grouting structure 5 described in step 3. After the maintenance is completed, the connection process of the pre-embedded steel bar 3 and the inserted steel bar 2 is completed.

本实施例中,步骤二中将插入钢筋2的连接端由上至下插入所述灌浆筒内时,使插入钢筋2底端与所述螺纹连接端顶端之间的间距为2mm~5mm;步骤四中对所述灌浆结构5进行养护时,养护龄期不少于28天,所述灌浆结构5的28天的抗压强度不低于85MPa且其24h与3h的膨胀率之差为0.02%~0.5%。In this embodiment, when inserting the connection end of the inserted steel bar 2 into the grouting cylinder from top to bottom in step 2, the distance between the bottom end of the inserted steel bar 2 and the top end of the threaded connection end is 2 mm to 5 mm; When performing maintenance on the grouting structure 5 in Step 4, the curing period is not less than 28 days, the 28-day compressive strength of the grouting structure 5 is not less than 85MPa and the difference between the expansion rate of the 24h and 3h is 0.02% ~0.5%.

本实施例中,步骤一中所述预埋钢筋3为预埋在已施工成型第一预制混凝土构件内的钢筋,步骤二中所述插入钢筋2为布设在待施工第二预制混凝土构件内的钢筋;In this embodiment, the pre-embedded steel bar 3 described in step 1 is the steel bar pre-embedded in the first precast concrete member that has been constructed, and the inserted steel bar 2 described in step 2 is laid in the second precast concrete member to be constructed. Rebar;

对所述第二预制混凝土构件进行混凝土浇筑施工之前,先按照步骤一至步骤四中所述的方法,完成预埋钢筋3与插入钢筋2的连接过程;步骤四中进行养护时,待步骤三中所灌注灌浆料终凝后,开始对所述灌浆结构5进行养护。Before carrying out concrete pouring construction to the second prefabricated concrete member, first follow the method described in step 1 to step 4 to complete the connection process of pre-embedded steel bar 3 and inserted steel bar 2; when performing maintenance in step 4, wait for step 3 After the poured grouting material has finally set, the grouting structure 5 starts to be maintained.

并且,所述第一预制混凝土构件和所述预制装配式混凝土构件组成预制装配式混凝土构件。Moreover, the first prefabricated concrete element and the prefabricated assembled concrete element form a prefabricated assembled concrete element.

本实施例中,所灌注灌浆料终凝(即硬化)后,在标准养护条件下,灌浆结构5的28天的抗压强度不低于85MPa。由于抗压强度与膨胀率成反比,故二者需要兼顾,在保证抗压强度的前提下,膨胀率越大越好。In this embodiment, after the poured grouting material has finally set (ie hardened), under standard curing conditions, the 28-day compressive strength of the grouting structure 5 is not less than 85 MPa. Since the compressive strength is inversely proportional to the expansion rate, the two need to be considered. Under the premise of ensuring the compressive strength, the larger the expansion rate, the better.

综上,采用本实用新型进行钢筋连接时,先将预埋钢筋3于金属套筒1连接,再将插入钢筋2插入金属套筒1内;之后,将金属套筒1的上端口(具体是圆锥形内腔的上端口)装入橡胶密封圈,在橡胶密封圈(环球密封圈)的控制作用下,使插入钢筋2位于金属套筒1的中心轴线上;然后,用灌浆机且通过灌浆口6向金属套筒1注入灌浆料,当灌浆料从排气口7中流出时,用临时封堵件对排气口7进行封堵,待灌浆料充满金属套筒1内部时,用临时封堵件对灌浆口6进行封堵;灌浆完成后,养护至规定时间,即完成钢筋连接。此处,所采用的临时封堵件为橡胶密封圈。To sum up, when using the utility model to connect steel bars, the embedded steel bar 3 is first connected to the metal sleeve 1, and then the inserted steel bar 2 is inserted into the metal sleeve 1; after that, the upper port of the metal sleeve 1 (specifically The upper port of the conical inner cavity) is loaded into the rubber sealing ring, and under the control of the rubber sealing ring (global sealing ring), the inserted steel bar 2 is positioned on the central axis of the metal sleeve 1; then, the grouting machine is used to pass the grouting Port 6 injects grouting material into the metal sleeve 1. When the grouting material flows out from the exhaust port 7, use a temporary plug to block the exhaust port 7. When the grouting material fills the inside of the metal sleeve 1, use a temporary plug. The plugging piece seals the grouting port 6; after the grouting is completed, the curing is performed for a specified time, and the steel bar connection is completed. Here, the temporary blocking member used is a rubber sealing ring.

以上所述,仅是本实用新型的较佳实施例,并非对本实用新型作任何限制,凡是根据本实用新型技术实质对以上实施例所作的任何简单修改、变更以及等效结构变化,均仍属于本实用新型技术方案的保护范围内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical essence of the present utility model still belong to Within the scope of protection of the technical solution of the utility model.

Claims (10)

1. a prefabricated assembled concrete component reinforced bar sleeve is in the milk connector, it is characterized in that: comprise for the grouting structure (5) connecting the metal sleeve (1) inserting reinforcing bar (2) and embedded bar (3), the seal washer (4) being laid in metal sleeve (1) upper end and formed by the grouting material be poured between metal sleeve (1) and insertion reinforcing bar (2) in cavity, described insertion reinforcing bar (2) is Ribbed Bar, and the link of described embedded bar (3) is threaded ends; Described metal sleeve (1) is divided into top cylinder section, middle part connecting cylinder section and lower sleeve section from top to bottom, and described top cylinder section, middle part connecting cylinder section and lower sleeve section are coaxial laying and the inner chamber of three is interconnected; Described top cylinder section and middle part connecting cylinder section composition grouting cylinder, described insertion reinforcing bar (2) is from top to bottom inserted in described grouting cylinder and it is fastenedly connected by grouting structure (5) and described grouting cylinder and is integrated; The inside of described top cylinder section is conical cavity and its internal diameter from top to bottom increases gradually, the upper port of described conical cavity is reinforcing bar insert port, described seal washer (4) be sleeved on insert reinforcing bar (2) and described top cylinder section between and it is positioned at described conical cavity top, the angle between the inside wall of described top cylinder section and its central axis is 2 ° ~ 3 °; The cross section of described middle part connecting cylinder section is annular and its internal diameter from top to bottom reduces gradually, and the upper-end inner diameter of described middle part connecting cylinder section is identical with the lower port diameter of described conical cavity; Described lower sleeve section is the thread connecting joint for connecting described threaded ends; The side wall upper part of described top cylinder section is provided with the grouting mouth (6) for pouring into grouting material and its sidewall bottom is provided with exhaust opening (7).
2. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve according to claim 1, to it is characterized in that: described metal sleeve (1) is ductile iron cylinder.
3. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, to it is characterized in that: described seal washer (4) is for rubber seal and upper surface is mutually concordant with the upper surface of metal sleeve (1).
4. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, it is characterized in that: described thread connecting joint is cylinder-shaped joint, the internal diameter of described thread connecting joint is identical with the diameter of described threaded ends.
5. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, it is characterized in that: described top cylinder section is cylindrical and its external diameter is Φ 40mm ~ Φ 60mm, the wall thickness of described top cylinder section from top to bottom reduces gradually, the wall thickness d1=10mm ~ 14mm of Tong Duan upper end, described top and its lower end wall thickness is identical with the wall thickness of described middle part connecting cylinder section.
6. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, to it is characterized in that: described middle part connecting cylinder section and the two wall thickness d2=6mm ~ 8mm identical with the wall thickness of lower sleeve section.
7. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, it is characterized in that: the diameter of described insertion reinforcing bar (2) is identical with the diameter of described threaded ends, length L1=6.5d ~ the 7.5d of described grouting cylinder, length L2=1.5d ~ the 2.5d of described lower sleeve section, wherein d is the diameter inserting reinforcing bar (2).
8. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, to it is characterized in that: the upper port diameter d 3=d+10mm of described conical cavity, wherein d is the diameter inserting reinforcing bar (2).
9. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, to it is characterized in that: the length of described middle part connecting cylinder section is 15mm ~ 20mm.
10. to be in the milk connector according to a kind of prefabricated assembled concrete component reinforced bar sleeve described in claim 1 or 2, to it is characterized in that: the spacing between described insertion reinforcing bar (2) bottom and described threaded ends top is 2mm ~ 5mm.
CN201520572544.5U 2015-08-02 2015-08-02 Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member Expired - Fee Related CN204826423U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520572544.5U CN204826423U (en) 2015-08-02 2015-08-02 Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520572544.5U CN204826423U (en) 2015-08-02 2015-08-02 Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member

Publications (1)

Publication Number Publication Date
CN204826423U true CN204826423U (en) 2015-12-02

Family

ID=54684038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520572544.5U Expired - Fee Related CN204826423U (en) 2015-08-02 2015-08-02 Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member

Country Status (1)

Country Link
CN (1) CN204826423U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064619A (en) * 2015-08-02 2015-11-18 长安大学 Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN105735569A (en) * 2016-04-26 2016-07-06 中民筑友科技投资有限公司 Grouting sleeve and prefabricated member
CN106088483A (en) * 2016-07-29 2016-11-09 上海建工二建集团有限公司 A kind of grout sleeve and using method
CN108487551A (en) * 2018-04-10 2018-09-04 武汉理工大学 A kind of novel grout sleeve for precast concrete bar connecting
CN114293714A (en) * 2020-10-08 2022-04-08 衡水双信建筑机械有限公司 Semi-grouting sleeve for steel bar connection

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064619A (en) * 2015-08-02 2015-11-18 长安大学 Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN105735569A (en) * 2016-04-26 2016-07-06 中民筑友科技投资有限公司 Grouting sleeve and prefabricated member
CN106088483A (en) * 2016-07-29 2016-11-09 上海建工二建集团有限公司 A kind of grout sleeve and using method
CN108487551A (en) * 2018-04-10 2018-09-04 武汉理工大学 A kind of novel grout sleeve for precast concrete bar connecting
CN108487551B (en) * 2018-04-10 2019-11-22 武汉理工大学 A New Type of Grouting Sleeve for Reinforcement Connection of Precast Concrete Members
CN114293714A (en) * 2020-10-08 2022-04-08 衡水双信建筑机械有限公司 Semi-grouting sleeve for steel bar connection

Similar Documents

Publication Publication Date Title
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN204826426U (en) Grouting sleeve for steel bar connection
CN201660972U (en) Novel cement grouting reinforcement connecting joint
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN204112604U (en) The slip casting rebar connector of band cone tail
CN105064625A (en) Grout sleeve for reinforcement connection and reinforcement connecting method
CN103899043B (en) Embedded pyramidal half grout sleeve
CN102116075B (en) Novel joint prepared from cement grout and steel bars
CN103758291B (en) A kind of shearing enhancement mode half grout sleeve
CN202391019U (en) End part thickened grouting connector of steel bar
CN103899044B (en) Embedded pyramidal full grout sleeve
CN204370701U (en) For the steel concrete supporting device in assembly concrete building structure
CN103216044A (en) Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN204826419U (en) Bury ground tackle deeply
CN104533021A (en) Full grouting sleeve for connecting steel bars
CN107905455A (en) A kind of grouting sleeve for prefabricated concrete component reinforcement connection and preparation method thereof
CN108678287A (en) A kind of bar connecting full grout sleeve of slurry pin bank conjunction
CN105019606A (en) Precast concrete unit steel bar grouting connecting piece and connecting method
CN104314240A (en) Grouting anchor type rebar connection sleeve and manufacturing method thereof
CN104563396A (en) A pier head extruded semi-grouting steel bar sleeve, connection structure and construction method thereof
CN205935417U (en) Take half grout sleeve of threaded connection spare
CN204475676U (en) An extruded semi-grouting steel bar sleeve, its connecting structure, a concrete member using the sleeve and the connecting structure of the concrete member
CN212001932U (en) A full grouting sleeve and a prefabricated beam connecting structure with the sleeve
CN107700756A (en) A kind of assembly of shear wall structure exterior wall reinforcing bar is partly in the milk attachment means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20160802