CN106088483A - A kind of grout sleeve and using method - Google Patents
A kind of grout sleeve and using method Download PDFInfo
- Publication number
- CN106088483A CN106088483A CN201610613150.9A CN201610613150A CN106088483A CN 106088483 A CN106088483 A CN 106088483A CN 201610613150 A CN201610613150 A CN 201610613150A CN 106088483 A CN106088483 A CN 106088483A
- Authority
- CN
- China
- Prior art keywords
- grout sleeve
- prefabricated components
- bar
- node
- grouting material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Abstract
A kind of grout sleeve of the present invention and using method, relate to technical field of building construction, is in the milk insufficient for traditional grout sleeve and produces space, makes steel bar connecting joints not reach the problem that design strength requires.This grout sleeve includes a hollow cylindrical cylinder, the barrel tunneling boring of grout sleeve offers hole, the reinforcing bar of prefabricated components one and the reinforcing bar of prefabricated components two are connecting overlap joint formation bar splicing node at node, grout sleeve is sheathed on formation steel bar connecting joints outside it, and grouting material pouring steel bar connecting joints makes prefabricated components one and prefabricated components two be connected to become an entirety.This using method, first forms bar splicing node, and sheathed grout sleeve outside it by the reinforcing bar of prefabricated components one and the bar splicing of prefabricated components two;Secondly installation form, reserved dustpan mouth;Then cast grouting material completes the cladding to steel bar connecting joints so that prefabricated components one and prefabricated components two are integrally formed structure;Form removal after last intensity to be achieved.
Description
Technical field
The present invention relates to technical field of building construction, particularly to a kind of grout sleeve and using method.
Background technology
Prefabricated assembled concrete structural system refer to the component using prefabrication at assemble in site, and bound fraction is existing
The structural system watered.It is high that prefabricated assembled concrete building has factory operation degree, and site operation is convenient, the duration
Short, project progress is fast, on-the-spot pollutes the advantages such as few.In recent years, ultra-high performance concrete (be called for short UHPC) receive significant attention and
Widely popularize.UHPC is the special engineered material of a kind of superhigh intensity, high-durability, high tenacity, utilizes the feature that its intensity is high,
Can realize reducing structural elements size, reduce the purpose of concrete usage amount.But traditional grout sleeve holds when grouting
Easily it is in the milk insufficient and produces space, make steel bar connecting joints not reach design desired strength, affect construction quality.Fig. 1 is for passing
The structural representation of system grout sleeve.Wherein, 1-the first reinforcing bar, 2-the second reinforcing bar, 3-stock inlet, 4-grout outlet, 5-foundry goods fills
Slurry sleeve.Traditional foundry goods grout sleeve 5 needs market purchasing, and cost is high.
Therefore, in prefabricated assembled concrete structural system, it is in the milk as grouting material when using ultra-high performance concrete
When carrying out bar connecting, how a kind of low cost, intensity are high, be prone to construction grout sleeve and using method are provided, are ability
Field technique personnel need badly and solve the technical problem that.
Summary of the invention
Easily it is in the milk insufficient for traditional grout sleeve when grouting and produces space, make steel bar connecting joints reach not
To design desired strength, affect construction quality, and the problem that foundry goods grout sleeve cost is high, it is an object of the invention to provide one
Plant low cost, intensity is high, be prone to the grout sleeve for steel bar connecting joints grouting and the using method of construction.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of grout sleeve, for adjacent prefabricated components one and the connection of prefabricated components two, described grout sleeve includes
One hollow cylindrical cylinder, the barrel tunneling boring of described grout sleeve offers hole, the reinforcing bar of prefabricated components one and prefabricated components
The reinforcing bar of two connects and forms bar splicing node connecting overlap joint at node, and described grout sleeve is sheathed to be overlapped in described reinforcing bar and take
The outside connecing node forms steel bar connecting joints, and grouting material pouring steel bar connecting joints makes described prefabricated components one and prefabricated structure
Part two is connected to become an entirety.
Further, the length of described grout sleeve is more than or equal to the length of described bar splicing node.
Further, the internal diameter of described grout sleeve is than big 5mm~10mm of external diameter of described bar splicing node.
Further, described grout sleeve is rolled by expanded metal lath and forms.
Further, described grout sleeve is cylindrical or bicylinder shape or half cone-shaped.
The invention also discloses the using method of grout sleeve, comprise the steps:
One, the reinforcing bar of prefabricated components one and the bar splicing of prefabricated components two are formed bar splicing node, described reinforcing bar
Overlapped joints is positioned at the reserved groove of prefabricated components one, and the outside that grout sleeve is sheathed on bar splicing node simultaneously is formed
Steel bar connecting joints;
Two, around described steel bar connecting joints installation form, and reserved dustpan mouth;
Three, using grouting material to be poured described steel bar connecting joints by described dustpan mouth, grouting material passes through simultaneously
The hole of described grout sleeve enters inwall and completes the cladding to bar splicing node;
Four, form removal after design strength requires is reached until grouting material.
Further, described grouting material is ultra-high performance concrete.
What the present invention was useful has the technical effect that the grout sleeve of the present invention, and grout sleeve includes a hollow cylindrical cylinder,
The barrel tunneling boring of grout sleeve offers hole.This grout sleeve is by the reinforcing bar of prefabricated components one and the reinforcing bar of prefabricated components two
Form bar splicing node after having overlapped, then set up template, more whole bar splicing node is watered by overall pouring grouting material
Steel bar connecting joints is formed so that prefabricated components one and prefabricated components two form an entirety after filling.The embodiment of the present invention fills
Slurry sleeve is the design of tunneling boring perforating, it is possible to make the hole pair that grouting material is directed through on grout sleeve without pulp inlet
Bar splicing node grouting within grout sleeve pours, it is ensured that the density of concreting and adequacy.Certainly, wait to be in the milk
Material reaches form removal after design requires, so that the rod member of prefabricated components one and the reinforcing bar of prefabricated components two and grouting overlap
Cylinder forms a super high strength concrete node under the effect of grouting material, thus completes prefabricated components one and the company of prefabricated components two
Connect.Owing to grout sleeve can be drawn materials conveniently by holing on steel plate or using ready-made expanded metal lath to make, low cost,
It is greatly saved engineering cost.The using method of this grout sleeve is easy, has preferably promotional value.
Accompanying drawing explanation
Fig. 1 is the structural representation of conventional grout sleeve;
Fig. 2 is the scheme of installation of grout sleeve in one embodiment of the invention;
Fig. 3 is the structural representation of cylindrical grout sleeve in one embodiment of the invention;
Fig. 4 is the structural representation of bicylinder shape grout sleeve in one embodiment of the invention;
Fig. 5 is the structural representation of half cone-shaped grout sleeve in one embodiment of the invention;
Fig. 6 is the schematic diagram that in one embodiment of the invention, grout sleeve is connected node with ultra-high performance concrete.
In figure:
1-the first reinforcing bar;2-the second reinforcing bar;3-stock inlet;4-grout outlet, 5-foundry goods grout sleeve;10-prefabricated components one,
The reinforcing bar of 11-prefabricated components one, 12-groove;20-prefabricated components two, the reinforcing bar of 21-prefabricated components two;30-grout sleeve;40-
Template;50-dustpan mouth.
Detailed description of the invention
A kind of grout sleeve proposed the present invention below in conjunction with the drawings and specific embodiments and using method are made further
Describe in detail.According to description below, advantages and features of the invention will be apparent from.Hereinafter will be combined by cited embodiment
Accompanying drawing, describes technology contents and the feature of the present invention in detail.Need to additionally illustrate, accompanying drawing all use the form simplified very much and
All use non-ratio accurately, only in order to facilitate, to aid in illustrating lucidly the purpose of the embodiment of the present invention.For sake of convenience, under
Described in literary composition " on ", the upper and lower direction of D score and accompanying drawing consistent, but this can not become the restriction of technical solution of the present invention.
Embodiment one
The structure composition of the grout sleeve of the present invention is described in detail referring to figs. 2 to Fig. 6.
A kind of grout sleeve, for adjacent prefabricated components 1 and the connection of prefabricated components 2 20, grout sleeve 30 wraps
Including a hollow cylindrical cylinder, the barrel tunneling boring of grout sleeve 30 offers hole, the reinforcing bar 11 of prefabricated components one and prefabricated structure
The reinforcing bar 21 of part two is connecting overlap joint connection formation bar splicing node at node, and grout sleeve 30 is sheathed is overlapped in bar splicing
The outside of node forms steel bar connecting joints, and grouting material pouring steel bar connecting joints makes prefabricated components 1 and prefabricated components two
20 are connected to become an entirety.
Specifically, in prefabrication is constructed, prefabricated components are taken by the most reserved reinforcing bar each other
Connect in succession and pour into a mould grouting material concrete and form stable connection, thus form overall structure.In embodiments of the present invention, fill
Slurry is ultra-high performance concrete.Using the grout sleeve 30 reinforcing bar 11 by prefabricated components one and the reinforcing bar 21 of prefabricated components two
Form bar splicing node after having overlapped, then set up template 40, more overall pouring grouting material is to whole bar splicing node
Steel bar connecting joints is formed so that prefabricated components 1 and prefabricated components 2 20 form an entirety after pouring.The present invention implements
In example, grout sleeve 30 designs for tunneling boring perforating, and the lateral wall of the most whole grout sleeve 30 all offers continuously or do not connects
Continuous hole, so enables to hole that grouting material is directed through on grout sleeve 30 without pulp inlet to grout sleeve 30
Internal bar splicing node grouting pours, it is ensured that the density of concreting and adequacy.Certainly, treat that grouting material reaches to set
Meter require after form removal 40 so that the rod member 11 of prefabricated components one and the reinforcing bar 21 of prefabricated components two and grout sleeve
30 form a super high strength concrete node under the effect of grouting material, thus complete prefabricated components 1 and prefabricated components 2 20
Connection.Owing to grout sleeve 30 can be drawn materials conveniently by holing on steel plate or using ready-made expanded metal lath to make, become
This is low, is greatly saved engineering cost.
It is preferred that for the adequacy ensureing grouting so that grout sleeve 30 fully wrapped around bar splicing node, grouting set
The length of cylinder 30 is more than or equal to the length of bar splicing node.
Especially, internal diameter 5mm~10mm bigger than the external diameter of bar splicing node of grout sleeve 30, such that it is able to fully fill
Slurry, it is ensured that the connectivity robustness after the grouting of whole steel bar connecting joints so that prefabricated components 1 and prefabricated components 2 20 are formed
One complete entirety.
Certainly, in order to draw materials conveniently, grout sleeve 30 is rolled by expanded metal lath and forms.Grout sleeve 30 can be according to prefabricated structure
The position when reinforcing bar 11 of part one and the reinforcing bar 21 of prefabricated components two overlap thus the shape of bar splicing node that formed determine,
Such as can be for the cylinder shown in Fig. 3 to Fig. 5 or bicylinder shape or half cone-shaped.Wherein, the grouting set of half cone-shaped
Cylinder design, it is possible to when the reinforcing bar 11 of prefabricated components one and the reinforcing bar 21 of prefabricated components two overlap the most point-blank, it is allowed to
Certain range of error, it is achieved the quick lap joint of two reinforcing bars, thus save overlap joint installation work-hour.
Embodiment two
Please continue to refer to Fig. 2 to Fig. 6, describe the using method of the grout sleeve of the present invention in detail.
The using method of a kind of grout sleeve comprises the steps:
One, the reinforcing bar 11 of prefabricated components one and the reinforcing bar 21 of prefabricated components two are overlapped formation bar splicing node, reinforcing bar
Overlapped joints is positioned at the reserved groove 12 of prefabricated components one, and grout sleeve 30 is sheathed on the outside of bar splicing node simultaneously
Form steel bar connecting joints.
Two, around steel bar connecting joints installation form 40, and reserved dustpan mouth 50.
Three, using grouting material to be poured steel bar connecting joints by dustpan mouth 50, grouting material is through grouting set simultaneously
The hole of cylinder 30 enters inwall and completes the cladding to bar splicing node.
Four, form removal 40 after design strength requires is reached until grouting material.
Further, in order to improve the intensity of steel bar connecting joints, and prefabricated components 1 and prefabricated components 2 20 are reduced
Connecting the size of node, reduce the usage amount being used for pouring into a mould the grouting material concrete of node, grouting material is ultra-high performance concrete
I.e. UHPC.
In sum, the grout sleeve of the present invention, the reinforcing bar 11 of prefabricated components one and the reinforcing bar 21 of prefabricated components two are taken
Form bar splicing node after having connect, then set up template 40, more whole bar splicing node is watered by overall pouring grouting material
Steel bar connecting joints is formed so that prefabricated components 1 and prefabricated components 2 20 form an entirety after filling.The embodiment of the present invention
Middle grout sleeve 30 designs for tunneling boring perforating, it is possible to grouting material is directed through without pulp inlet on grout sleeve 30
Hole within grout sleeve 30 bar splicing node be in the milk cast, it is ensured that concrete cast density and adequacy.
Certainly, reach form removal 40 after design requires until grouting material, so that the rod member 11 of prefabricated components one and prefabricated components two
Reinforcing bar 21 and grout sleeve 30 under the effect of grouting material, form a super high strength concrete node, thus complete prefabricated structure
Part 1 and the connection of prefabricated components 2 20.Owing to grout sleeve 30 can be by holing or using ready-made steel on steel plate
Expanded metals is made, and draws materials conveniently, and low cost is greatly saved engineering cost.The using method of this grout sleeve is easy, has preferably
Ground promotional value.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention, this
Any change that the those of ordinary skill in bright field does according to the disclosure above content, modification, belong to the protection of claims
Scope.
Claims (7)
1. a grout sleeve, for adjacent prefabricated components one and the connection of prefabricated components two, it is characterised in that described grouting
Sleeve includes a hollow cylindrical cylinder, and the barrel tunneling boring of described grout sleeve offers hole, the reinforcing bar of prefabricated components one and
The reinforcing bar of prefabricated components two is connecting overlap joint connection formation bar splicing node at node, and described grout sleeve is sheathed is overlapped in institute
The outside stating bar splicing node forms steel bar connecting joints, and grouting material pouring steel bar connecting joints makes described prefabricated components one
It is connected to become an entirety with prefabricated components two.
Grout sleeve the most according to claim 1, it is characterised in that the length of described grout sleeve is more than or equal to described
The length of bar splicing node.
Grout sleeve the most according to claim 1, it is characterised in that the internal diameter of described grout sleeve is than described bar splicing
Big 5mm~10mm of external diameter of node.
Grout sleeve the most according to claim 1, it is characterised in that described grout sleeve is rolled by expanded metal lath and forms.
Grout sleeve the most according to claim 1, it is characterised in that described grout sleeve is cylindrical or bicylinder shape
Or half cone-shaped.
6. according to the using method of the grout sleeve described in any one of claim 1 to 5, it is characterised in that comprise the steps:
One, the reinforcing bar of prefabricated components one and the bar splicing of prefabricated components two are formed bar splicing node, described bar splicing
Node is positioned at the reserved groove of prefabricated components one, and the outside that grout sleeve is sheathed on bar splicing node simultaneously forms reinforcing bar
Connect node;
Two, around described steel bar connecting joints installation form, and reserved dustpan mouth;
Three, using grouting material to be poured into a mould described steel bar connecting joints by described dustpan mouth, grouting material is through described simultaneously
The hole of grout sleeve enters inwall and completes the cladding to bar splicing node;
Four, form removal after design strength requires is reached until grouting material.
Using method the most according to claim 6, it is characterised in that described grouting material is ultra-high performance concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610613150.9A CN106088483A (en) | 2016-07-29 | 2016-07-29 | A kind of grout sleeve and using method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610613150.9A CN106088483A (en) | 2016-07-29 | 2016-07-29 | A kind of grout sleeve and using method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106088483A true CN106088483A (en) | 2016-11-09 |
Family
ID=57479453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610613150.9A Pending CN106088483A (en) | 2016-07-29 | 2016-07-29 | A kind of grout sleeve and using method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106088483A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107288268A (en) * | 2017-06-27 | 2017-10-24 | 浙江大学 | Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint |
CN108678287A (en) * | 2018-04-27 | 2018-10-19 | 东南大学 | A kind of bar connecting full grout sleeve of slurry pin bank conjunction |
CN109057170A (en) * | 2018-09-26 | 2018-12-21 | 湖南大学 | A kind of fibre reinforced composites linked system and implementation method based on cement base cementing medium |
CN110485646A (en) * | 2018-07-23 | 2019-11-22 | 李藏柱 | A kind of sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3541896A1 (en) * | 1985-11-27 | 1987-07-30 | Wolfhart Andrae | Process for the tension-resistant and compression-resistant joint connection of ribbed steel reinforcing bars with the aid of a pipe sleeve |
US20070095013A1 (en) * | 2004-10-27 | 2007-05-03 | Kerkay Colleen M | Reinforcing bar coupling |
CN201746981U (en) * | 2010-07-28 | 2011-02-16 | 中国京冶工程技术有限公司 | Reinforced bar connecting structure between prefabricated reinforced bar concrete components |
CN203795726U (en) * | 2014-03-18 | 2014-08-27 | 宁波市镇海路石建筑科技有限公司 | Grout sleeve for connecting deformed steel bars |
CN104929319A (en) * | 2015-06-23 | 2015-09-23 | 山东明达建筑科技有限公司 | Grouting sleeve for rebar connection |
CN204826423U (en) * | 2015-08-02 | 2015-12-02 | 长安大学 | Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member |
CN205917992U (en) * | 2016-07-29 | 2017-02-01 | 上海建工二建集团有限公司 | Grout sleeve |
-
2016
- 2016-07-29 CN CN201610613150.9A patent/CN106088483A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3541896A1 (en) * | 1985-11-27 | 1987-07-30 | Wolfhart Andrae | Process for the tension-resistant and compression-resistant joint connection of ribbed steel reinforcing bars with the aid of a pipe sleeve |
US20070095013A1 (en) * | 2004-10-27 | 2007-05-03 | Kerkay Colleen M | Reinforcing bar coupling |
CN201746981U (en) * | 2010-07-28 | 2011-02-16 | 中国京冶工程技术有限公司 | Reinforced bar connecting structure between prefabricated reinforced bar concrete components |
CN203795726U (en) * | 2014-03-18 | 2014-08-27 | 宁波市镇海路石建筑科技有限公司 | Grout sleeve for connecting deformed steel bars |
CN104929319A (en) * | 2015-06-23 | 2015-09-23 | 山东明达建筑科技有限公司 | Grouting sleeve for rebar connection |
CN204826423U (en) * | 2015-08-02 | 2015-12-02 | 长安大学 | Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member |
CN205917992U (en) * | 2016-07-29 | 2017-02-01 | 上海建工二建集团有限公司 | Grout sleeve |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107288268A (en) * | 2017-06-27 | 2017-10-24 | 浙江大学 | Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint |
CN108678287A (en) * | 2018-04-27 | 2018-10-19 | 东南大学 | A kind of bar connecting full grout sleeve of slurry pin bank conjunction |
CN110485646A (en) * | 2018-07-23 | 2019-11-22 | 李藏柱 | A kind of sleeve, prefabricated components connector, prefabricated components and prefabricated components assembly |
CN109057170A (en) * | 2018-09-26 | 2018-12-21 | 湖南大学 | A kind of fibre reinforced composites linked system and implementation method based on cement base cementing medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204753844U (en) | Circular steel tube concrete column sleeve connected node | |
CN106088483A (en) | A kind of grout sleeve and using method | |
CN103216044B (en) | The cement grouting steel bar connecting structure of precast unit | |
CN100999913B (en) | Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof | |
CN206233584U (en) | Narrow zone exterior wall formwork erecting structure | |
CN205475352U (en) | Two sleeve connection structure of straight thread of muscle are indulged to bottom plate shrink post -cast strip | |
CN107313557A (en) | Universal steel concrete supporting component | |
CN105421221A (en) | Prefabricated segmental assembling concrete bridge pier and connection technique thereof | |
CN210458914U (en) | Connecting structure of prefabricated bridge pier stud and capping beam | |
CN105317168A (en) | Split-type steel bar sleeve full-grouting joint | |
CN205917992U (en) | Grout sleeve | |
CN205654090U (en) | Entrance to a cave strutting arrangement is reserved to floor | |
CN103866866B (en) | Super High Core Walls Structure and housing water node after setting a roof beam in place | |
CN200999389Y (en) | Panel point for steel pipe concrete column and reinforced concrete beam | |
CN205804771U (en) | A kind of reinforcing bar grout sleeve | |
CN202577944U (en) | Extending bar for steel pipe | |
CN205100092U (en) | Prefabricated assembled concrete bridge mound | |
CN106088482A (en) | A kind of fixed grout sleeve and using method | |
CN104196023A (en) | Precast concrete tubular pile tip with mechanical connection device and using method of precast concrete tubular pile tip | |
CN205917991U (en) | Fixed grout sleeve | |
CN205712736U (en) | A kind of half Prefabricated concrete-filled steel tube post of built-in high-strength shaped steel | |
CN103437345A (en) | Method for construction of diameter-expanding pile on pile top | |
CN206554242U (en) | A kind of new concrete composite beam and concrete filled steel tube column connected node | |
CN204098020U (en) | High-strength concrete pile cover | |
CN207378395U (en) | A kind of two-part hoist engine basis pre embedded bolt |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161109 |