CN205100092U - Prefabricated assembled concrete bridge mound - Google Patents

Prefabricated assembled concrete bridge mound Download PDF

Info

Publication number
CN205100092U
CN205100092U CN201520869489.6U CN201520869489U CN205100092U CN 205100092 U CN205100092 U CN 205100092U CN 201520869489 U CN201520869489 U CN 201520869489U CN 205100092 U CN205100092 U CN 205100092U
Authority
CN
China
Prior art keywords
rod iron
screw
screw thread
sleeve
thread rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520869489.6U
Other languages
Chinese (zh)
Inventor
张建东
顾建成
刘朵
吴智深
张文明
卓为顶
汪昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Tech University
JSTI Group Co Ltd
Original Assignee
Nanjing Tech University
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Tech University, JSTI Group Co Ltd filed Critical Nanjing Tech University
Priority to CN201520869489.6U priority Critical patent/CN205100092U/en
Application granted granted Critical
Publication of CN205100092U publication Critical patent/CN205100092U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a prefabricated assembled concrete bridge mound, the screw rod iron is pre -buried in pier shaft festival section lower part down, it is pre -buried in pier shaft festival section upper portion to go up the screw rod iron, screw sleeve's lower part is the screw thread section, the upper portion of screw thread section is connected with the linkage segment, the upper portion of linkage segment is connected with the sleeve body, screw rod iron is down connected to screw sleeve's screw section, it inserts in the screw sleeve from the top to go up the screw rod iron, cylindrical notch is cup jointed to the outside, to descend the screw rod iron through cement mortar, go up the screw rod iron, screw sleeve and cylindrical notch fixed connection. Through separating grout sleeve become two parts from top to bottom, the scene only needs wrong income the latter half to dismantle and takes screw sleeve, can directly hoist the pier shaft and save the section, and work load is few, the diameter of the cylindrical notch twice for dismantling sleeve top diameter can be dismantled sleeve top diameter and for three times of pre -buried screw rod iron diameter, permit construction error big, and the efficiency of construction is high, the degree of difficulty is little, the operation of being convenient for.

Description

A kind of prefabricated assembled concrete bridge pier
Technical field
The utility model relates to a kind of sectional type bridge pier precast construction, particularly relates to a kind of prefabricated assembled concrete bridge pier.
Background technology
In the last few years, bridge construction presented the feature that bridge pier quantity is many, the duration is short.This has promoted the development of Precast Concrete Segmental Bridges bridge pier technology, owing to not needing tensioned prestressing bar, site work amount is little, so the technology connecting upper-lower segment with grout sleeve obtains extensive utilization in low earthquake intensity region, but existing grout sleeve link technique, and construction allowable error is little, construction precision requires high, particularly when upper and lower two sections need to rely on multiple grout sleeve to connect many reinforcing bars simultaneously, high to lifting required precision, difficulty of construction is very large.Therefore, from reduction difficulty of construction, improve efficiency of construction, the object of reduction of erection time is set out, and develops one and can increase construction allowable error, simple structure, safely and effectively novel grouting branch sleeve and have great importance.
Because connect the defect of existence between above-mentioned existing bridge pier, the utility model people is based on being engaged in the practical experience and professional knowledge that this type of product design manufacture enriches for many years, and coordinate the utilization of scientific principle, actively in addition research and innovation, to founding a kind of novel prefabricated assembled concrete bridge pier, it is made to have more practicality.Through constantly research, design, and through repeatedly studying sample and after improving, finally creating the utility model had practical value.
Utility model content
Main purpose of the present utility model is, overcomes the defect that between existing pier shaft, Joining Technology exists, and provides a kind of novel prefabricated assembled concrete bridge pier, reduce difficulty of construction, improve efficiency of construction, thus be more suitable for practicality, and there is the value in industry.
The purpose of this utility model and solve its technical problem and realize by the following technical solutions.According to a kind of prefabricated assembled concrete bridge pier that the utility model proposes, include lower screw thread rod iron, upper screw thread rod iron, screw shell and cylindrical notch,
Described lower screw thread rod iron is embedded in pier shaft sections bottom, and described upper screw thread rod iron is embedded in pier shaft sections top,
The bottom of described screw shell is thread segment, and the top of thread segment is connected with linkage section, and the top of linkage section is connected with sleeve body,
The thread segment of described screw shell connects lower screw thread rod iron, and upper screw thread rod iron inserts in screw shell from top, and the described cylindrical notch of outside socket, is fixedly connected with lower screw thread rod iron, upper screw thread rod iron, screw shell with cylindrical notch by cement mortar.
Further, aforesaid prefabricated assembled concrete bridge pier, is provided with grout hole at a side lower part of described cylindrical notch excircle, and a upper lateral part of described cylindrical notch excircle is provided with slurry outlet.
Further, aforesaid prefabricated assembled concrete bridge pier, all alternately arranges groove and fin at the surfaces externally and internally of described screw shell and cylindrical notch.
Further, aforesaid prefabricated assembled concrete bridge pier, is provided with hole at the top of described sleeve body and circumferential surface, and described upper screw thread rod iron is arranged in the hole at sleeve body top.
Prefabricated assembled concrete bridge pier Joining Technology, comprises following operating procedure,
Step one, prefabricated pier shaft sections, described lower screw thread rod iron and upper screw thread rod iron are embedded in different pier shaft sections respectively;
Step 2, is connected lower screw thread rod iron with upper screw thread rod iron with cylindrical notch by screw shell,
Step 3, joints cement mortar in cylindrical notch, and then pier shaft sections is fixed.
By technique scheme, prefabricated assembled concrete bridge pier of the present utility model at least has following advantages:
(1) by grout sleeve is separated into upper and lower two parts, factory's pre-buried the first half steel circular cylindrical notch, on-the-spot need be screwed into the latter half removable strip screw shell, can directly lift pier shaft sections, workload is few, and the diameter of (2) cylindrical notch is the twice of removable sleeve top diameter, removable sleeve top diameter is three times of pre-buried screw thread rod iron diameter, permission construction error is large, and efficiency of construction is high, difficulty is little, convenient operation.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be implemented according to the content of manual, be described in detail as follows below with preferred embodiment of the present utility model.
Accompanying drawing explanation
Fig. 1 is the sectional view of the utility model prefabricated assembled concrete bridge pier;
Fig. 2 is screw shell structural representation;
Fig. 3 is the top view of cylindrical notch;
Fig. 4 is pier shaft sections upper axis mapping;
Fig. 5 is pier shaft sections bottom axonometric drawing;
Mark implication in figure: 1. descend screw thread rod iron, 2. go up screw thread rod iron, 3. screw shell, 4. cylindrical notch, 5. grout hole, 6. slurry outlet, 7. bonding surface, 8. groove, 9. fin, 10. hole, 3-1. thread segment, 3-2. linkage section, 3-3. sleeve body.
Detailed description of the invention
For further setting forth the utility model for the technological means reaching predetermined utility model object and take and effect, to according to its detailed description of the invention of prefabricated assembled concrete bridge pier, feature and the effect thereof that the utility model proposes, be described in detail as follows.
Embodiment 1
Prefabricated assembled concrete bridge pier structure schematic diagram of the present utility model as shown in Fig. 1 ~ 5, includes lower screw thread rod iron 1, upper screw thread rod iron 2, screw shell 3, thread segment 3-1, linkage section 3-2, sleeve body 3-3, cylindrical notch 4, grout hole 5, slurry outlet 6, bonding surface 7, groove 8, fin 9 and hole 10.
Lower screw thread rod iron 1 is embedded in pier shaft sections bottom, and upper screw thread rod iron 2 is embedded in pier shaft sections top, smears epoxy gluing agent and form bonding surface 7 between the pier shaft sections be connected to each other.The bottom of screw shell 3 is thread segment 3-1, the top of thread segment 3-1 is connected with linkage section 3-2, the top of linkage section 3-2 is connected with sleeve body 3-3, the thread segment 3-1 of screw shell 3 connects lower screw thread rod iron 1, upper screw thread rod iron 2 inserts in screw shell 3 from top, be provided with hole 10 at the top of sleeve body 3-3 and circumferential surface, upper screw thread rod iron 2 is arranged in the hole 10 at sleeve body 3-3 top.Outside socket cylindrical groove mouth 4, is fixedly connected with lower screw thread rod iron 1, upper screw thread rod iron 2, screw shell 3 with cylindrical notch 4 by cement mortar.A side lower part of cylindrical notch 4 excircle is provided with grout hole 5, and a upper lateral part of cylindrical notch 4 excircle is provided with slurry outlet 6, and what replace at screw shell 3 external surface and cylindrical notch 4 inner surface is furnished with groove 8 and fin 9.
The Joining Technology of prefabricated assembled concrete bridge pier comprises following operating procedure:
Step one, prefabricated pier shaft sections, wherein descends screw thread rod iron 1 and upper screw thread rod iron 2 for follow more, is embedded in different pier shaft sections respectively;
Step 2, lower screw thread rod iron 1 is connected with upper screw thread rod iron 2 with cylindrical notch 4 by screw shell 3, screw shell 3 to be tightened with pre-buried lower screw thread rod iron 1 by thread segment 3-1 and is connected, after whole socket completes, first form bonding surface 7 in the agent of pier shaft sections upper surface uniform application one deck epoxy gluing, start again to lift new prefabricated pier shaft sections, during lifting, upper screw thread rod iron 2 is inserted the top of screw shell 3 sleeve body 3-3, screw shell 3 inserts in cylindrical notch 4, all align after inserting, slowly transferring in pier shaft sections process, adjust pier shaft sections position gradually, upper and lower pier shaft sections bonding surface 7 is precisely fitted, after determining that bonding surface 7 is precisely fitted, process the outer seam crossing of upper and lower pier shaft sections because of the excessive epoxy gluing agent of pressure,
Step 3, after epoxy gluing agent is solidified and is reached requirement of strength, the high-strength expansive cement mortar of ungauged regions is built in cylindrical notch 4, mortar is built by the grout hole 5 being arranged on cylindrical notch 4 excircle one side lower part, enter in space that cylindrical notch 4 and screw shell 3 formed, and it is inner to enter screw shell 3 by the hole 10 that screw shell 3 circumferential surface is arranged, and then pier shaft sections is fixed, the high-strength expansive cement mortar of grout hole 5 note pressure ungauged regions, slurry outlet 6 and grout hole 5 is closed when slurry outlet 6 pulp, the installation of a pier shaft sections can be completed.After mortar strength reaches designing requirement, then carry out next sections installation.
Wherein in cylindrical notch 4 with screw shell 3, alternately arrange groove 8 and fin 9, the snap-in force be used between increase and concrete, mortar, the sidewall of screw shell 3 has hole 10, the mortar inside and outside screw shell 3 is better bondd.
Cylindrical notch 4 height 30d≤X≤35d, screw shell 3 and the lower screw thread rod iron 1 be embedded in prefabricated pier shaft sections tighten connecting length X1 >=5d, screw shell 3 inserts the length X2 >=25d of cylindrical notch 4, the upper screw thread rod iron 2 be embedded in prefabricated pier shaft sections inserts the length X3 >=X2 of screw shell 3, screw shell 3 upper diameter D1 ≈ 3d, cylindrical notch 4 bore D2 ≈ 6d.
The above, it is only preferred embodiment of the present utility model, not any pro forma restriction is done to the utility model, although the utility model discloses as above with preferred embodiment, but and be not used to limit the utility model, any those skilled in the art, do not departing within the scope of technical solutions of the utility model, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solutions of the utility model, according to any simple modification that technical spirit of the present utility model is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (4)

1. a prefabricated assembled concrete bridge pier, is characterized in that: include lower screw thread rod iron (1), upper screw thread rod iron (2), screw shell (3) and cylindrical notch (4),
Described lower screw thread rod iron (1) is embedded in pier shaft sections bottom, and described upper screw thread rod iron (2) is embedded in pier shaft sections top,
The bottom of described screw shell (3) is thread segment (3-1), the top of thread segment (3-1) is connected with linkage section (3-2), the top of linkage section (3-2) is connected with sleeve body (3-3)
The thread segment (3-1) of described screw shell (3) connects lower screw thread rod iron (1), upper screw thread rod iron (2) is inserted in screw shell (3) from top, the described cylindrical notch (4) of outside socket, is fixedly connected with lower screw thread rod iron (1), upper screw thread rod iron (2), screw shell (3) with cylindrical notch (4) by cement mortar.
2. prefabricated assembled concrete bridge pier according to claim 1, it is characterized in that: a side lower part of described cylindrical notch (4) excircle is provided with grout hole (5), a upper lateral part of described cylindrical notch (4) excircle is provided with slurry outlet (6).
3. prefabricated assembled concrete bridge pier according to claim 1, is characterized in that: what replace at described screw shell (3) external surface and cylindrical notch (4) surfaces externally and internally is furnished with groove (8) and fin (9).
4. prefabricated assembled concrete bridge pier according to claim 1, it is characterized in that: be provided with hole (10) at the top of described sleeve body (3-3) and circumferential surface, described upper screw thread rod iron (2) is arranged in the hole (10) at sleeve body (3-3) top.
CN201520869489.6U 2015-11-03 2015-11-03 Prefabricated assembled concrete bridge mound Expired - Fee Related CN205100092U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520869489.6U CN205100092U (en) 2015-11-03 2015-11-03 Prefabricated assembled concrete bridge mound

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520869489.6U CN205100092U (en) 2015-11-03 2015-11-03 Prefabricated assembled concrete bridge mound

Publications (1)

Publication Number Publication Date
CN205100092U true CN205100092U (en) 2016-03-23

Family

ID=55515882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520869489.6U Expired - Fee Related CN205100092U (en) 2015-11-03 2015-11-03 Prefabricated assembled concrete bridge mound

Country Status (1)

Country Link
CN (1) CN205100092U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421221A (en) * 2015-11-03 2016-03-23 苏交科集团股份有限公司 Prefabricated segmental assembling concrete bridge pier and connection technique thereof
CN107988895A (en) * 2017-11-29 2018-05-04 浙江跃龙园林建设有限公司 A kind of bridge and its construction method
CN112030753A (en) * 2020-08-18 2020-12-04 中交路桥建设有限公司 Pier column installation method for ensuring thickness of slurry of foundation of assembled pier column

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421221A (en) * 2015-11-03 2016-03-23 苏交科集团股份有限公司 Prefabricated segmental assembling concrete bridge pier and connection technique thereof
CN107988895A (en) * 2017-11-29 2018-05-04 浙江跃龙园林建设有限公司 A kind of bridge and its construction method
CN107988895B (en) * 2017-11-29 2019-12-06 浙江跃龙园林建设有限公司 Bridge and construction method thereof
CN112030753A (en) * 2020-08-18 2020-12-04 中交路桥建设有限公司 Pier column installation method for ensuring thickness of slurry of foundation of assembled pier column

Similar Documents

Publication Publication Date Title
CN105421221A (en) Prefabricated segmental assembling concrete bridge pier and connection technique thereof
CN103452246B (en) The grouting deformed steel pipe box cylinder that the slurry anchor docking of a kind of reinforcing bar connects
CN104453014B (en) The method of attachment of 3D printing filled wall and constructional column and attachment structure
CN204753844U (en) Circular steel tube concrete column sleeve connected node
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN205857448U (en) A kind of assembly concrete shear wall structure
CN107100290A (en) A kind of prefabricated shear wall and overlapping plate node
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN205100092U (en) Prefabricated assembled concrete bridge mound
CN206337641U (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN108360712A (en) A kind of assembled steel reinforced concrete shear force wall and its construction method
CN108560544A (en) A kind of sleeve connection assembled pile foundation and its construction method
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN106677433A (en) Self-tightening half grouting sleeve connecting piece
CN106894587A (en) Precast stair connection method
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN105317168A (en) Split-type steel bar sleeve full-grouting joint
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN214531172U (en) Large-span assembled composite beam connecting structure
CN106088483A (en) A kind of grout sleeve and using method
CN213418238U (en) Assembled reinforcing bar connecting device for building
CN104153461A (en) Precast concrete structural member and method for building construction longitudinal connection between structural members
CN205917992U (en) Grout sleeve
CN212866625U (en) Pier head reinforcing bar combination grout sleeve and assembled component connection structure
CN203247697U (en) Pre-cast concrete structural member capable of being longitudinally connected

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

CF01 Termination of patent right due to non-payment of annual fee