CN108678287A - A kind of bar connecting full grout sleeve of slurry pin bank conjunction - Google Patents
A kind of bar connecting full grout sleeve of slurry pin bank conjunction Download PDFInfo
- Publication number
- CN108678287A CN108678287A CN201810392426.4A CN201810392426A CN108678287A CN 108678287 A CN108678287 A CN 108678287A CN 201810392426 A CN201810392426 A CN 201810392426A CN 108678287 A CN108678287 A CN 108678287A
- Authority
- CN
- China
- Prior art keywords
- grout sleeve
- pin
- sleeve body
- hole
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
- E04C5/163—Connectors or means for connecting parts for reinforcements the reinforcements running in one single direction
- E04C5/165—Coaxial connection by means of sleeves
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The present invention provides a kind of bar connecting full grout sleeve of slurry pin bank conjunction, including grout sleeve body, pin hole, the pin for being inserted into the pin hole and being fixed on the grout sleeve body, the injected hole for extending through the grout sleeve body and spaced setting and plasma discharge hole, the UHPC grouting materials and two connected reinforcing bars that pour into the grout sleeve body;The injected hole and the plasma discharge hole are arranged side by side along the axis direction of the grout sleeve body, two connected reinforcing bars to insertion and block grout sleeve body both ends by grout sleeve body both ends, by pouring into the UHPC grouting materials by the grouting port until being flowed out by the thick liquid discharge mouth.Compared with the relevant technologies, bar connecting of the invention, which with slurry pin bank closes full grout sleeve and combined pin with UHPC grouting materials, considerably increases the reliability of sleeve connection, contributes to the connectivity problem for solving Large-size rebar in bridge structure.
Description
Technical field
The present invention relates to field of civil engineering more particularly to a kind of prefabricated assembled concrete member stress bar connecting to use
It starches the bar connecting that pin bank is closed and closes full grout sleeve with slurry pin bank.
Background technology
Development fabricated construction, main member is promoted to be prefabricated in the factory life currently, country advocates building industrialization energetically
Postpartum carries out the assembly of prefabricated components to scene, and component is connected as overall structure, and between prefabricated components steel bar stress can
It is the key factor for influencing structure general safety and stress performance by connecting then.National sector standard《Prefabricated concrete structure
Technical regulation》JGJ1 has carried out relevant regulation to the connection method of prefabricated components, according to the rules, the application of sleeve grouting connection
Range is wider, connects reliability higher, can be applied to the connection between vertical member in bridge structure.
Since the weight and volume of prefabricated components is typically much deeper than building structure, bar diameter used in bridge structure
Also larger, and the connection of Large-size rebar is conducive to construct, therefore, being proposed to the sleeve grouting connection of Large-size rebar needs
It asks.Had in connection using the reinforcing bar of major diameter in prefabricated components convenient construction, can quick-assembling, erection tolerance it is big
The advantages that, meanwhile, diameter, which increases after sleeve length wall thickness, all to be needed to increase, this makes existing sleeve processing more difficult, and even
The performance of increase grouting material when connecing due to bar diameter is also required to improve, to meet the performance requirement of connection.
Therefore, a kind of full grout sleeve of bar connecting slurry pin bank conjunction must be provided by, which having in fact, solves above-mentioned technical problem.
Invention content
The technical problem to be solved in the invention is to provide a kind of providing the reinforcing bar reliably connected for prefabricated components reinforcing bar
Connection closes full grout sleeve with slurry pin bank.
In order to solve the above technical problems, the present invention provides a kind of bar connecting slurry pin banks to close full grout sleeve, including
In the grout sleeve body of hollow columnar, through the grout sleeve body setting pin hole, be inserted into the pin hole and fixation
In the grout sleeve body pin, extend through the grout sleeve body and spaced setting injected hole and plasma discharge hole,
Pour into the UHPC grouting materials and two connected reinforcing bars of the grout sleeve body;Institute's injected hole and the plasma discharge hole are along the filling
The axis direction for starching sleeve body is arranged side by side, and two connected reinforcing bars are by grout sleeve body both ends to being inserted into and to institute
It states grout sleeve body both ends to be blocked, by pouring into the UHPC grouting materials by the grouting port until by the thick liquid discharge mouth stream
Go out.
Preferably, the pin hole includes at least four, and the pin hole is respectively set to the grout sleeve body
Both ends form symmetrical structure, and pin actual quantity and pin, which are inserted into after the pin hole, stretches into length in grouting material according to grouting
Adhesion strength is adjusted between material and grout sleeve body, and guarantee will not occur grouting material and extract destruction from grout sleeve body.
Preferably, the pin includes the head of a nail and the nail rod that is extended by the head of a nail, and the nail rod includes by the head of a nail
The first segment of extension and the second segment extended from the first segment to the direction far from the head of a nail;The outer surface of the first segment
Equipped with external screw thread, the inner wall of the pin hole is equipped with the internal thread coordinated with the external screw thread, and the pin passes through the outer spiral shell
Line is engaged in the internal thread and is fixed on the grout sleeve body, and the second segment extends in the grout sleeve body.
Preferably, the cross-sectional area of the first segment is more than the cross-sectional area of the second segment, for easy for installation,
And the first segment section bearing capacity is more than the second segment, will not be because of processing screw thread and as nail after screw thread for processing
Bar stress weakness section ensures that pin and the grout sleeve body form reliable entirety, the pin by the first segment with
The grout sleeve body stress fixes to form entirety.
Preferably, the injected hole and the plasma discharge hole are circle, pour into the grouting material in the injected hole as no steel
The UHPC grouting materials of fiber, prevent grouting material from directly bearing the pin extruding force and cleaving;The UHPC grouting
Material increases the adhesion strength of grouting material and the connected reinforcing bar, reduces the connected reinforcing bar in the grout sleeve body
Anchorage length, to reduce the grout sleeve body length.
Preferably, it further includes from the injected hole to far from institute that the bar connecting slurry pin bank, which closes full grout sleeve structure,
It states the injected hole wall extension of grout sleeve body direction extension and prolongs from the plasma discharge hole to far from grout sleeve body direction
The plasma discharge hole wall extension stretched.
Preferably, the injected hole and the plasma discharge hole are respectively positioned between two pin holes.
Compared to the prior art, the full grout sleeve of bar connecting of the invention slurry pin bank conjunction passes through institute by the pin
It states external screw thread to be engaged in the internal thread and be fixed on the grout sleeve body, the second segment extends to the grout sleeve body
Interior, the pin and the grout sleeve bodily form are integral, and the grout sleeve body is improved from structure and is filled with internal filling
Adhesion strength between slurry.Pin centralized arrangement is made at sleeve both ends in the mechanical snap for effectively improving sleeve and grouting material
With, while avoiding the occurrence of sleeve-grouting material sliding rupture, also avoid sleeve stress maximum position punching to sleeve carry
Weakening caused by power.From grout sleeve body both ends to two connected reinforcing bars of insertion, then to grout sleeve body both ends
It is blocked, then pours into mating ultra-high performance concrete (Ultra High Performance from the injected hole
Concrete, UHPC) grouting material, until the plasma discharge hole has the UHPC grouting materials to flow out, grouting works are completed, by supporting
Shield, the adhesion strength of reinforcing bar and grouting material can be improved, be avoided out using UHPC grouting materials by forming steel reinforcement abutting joints jointing
Existing reinforcing bar is destroyed from the extraction in grouting material, meanwhile, it also avoids due to grouting caused by the problem of stress concentration that pin is brought
Expect cleavage fracture.By the way that assembly concrete bridge structure prefabricated components are made above, the bar connecting is closed complete with slurry pin bank
Grout sleeve structure provides reliable connection method for bar connecting, contributes to the company for solving Large-size rebar in bridge structure
Problem is connect, and processing technology is simple, can be widely applied in prefabricated concrete structure, there is wide future in engineering applications.
Description of the drawings
Fig. 1 is the stereochemical structure decomposed schematic diagram that bar connecting of the present invention closes full grout sleeve with slurry pin bank;
Fig. 2 is that bar connecting of the present invention starches the full grout sleeve use state diagram of pin bank conjunction;
Fig. 3 is that bar connecting of the present invention starches the full grout sleeve of pin bank conjunction with embodiment schematic diagram.
Specific implementation mode
Below in conjunction with drawings and embodiments, the invention will be further described.
It please join shown in Fig. 1-2, the present invention provides a kind of bar connecting full grout sleeve of slurry pin bank conjunction, including grout sleeve
Body 1, pin hole 2, pin 3, injected hole 4, plasma discharge hole 5, UHPC grouting materials 6 are connected reinforcing bar 7.
In present embodiment, the grout sleeve body 1 is in hollow columnar.It is described to be cut using seamless steel pipe saw, technique letter
It is single.
In the present embodiment, the pin hole 2 includes at least four, and the pin hole is respectively set to the grouting
The both ends of sleeve body 1 and symmetrical structure is formed, pin actual quantity and pin stretch into after being inserted into the pin hole in grouting material
Length determines that grouting material will not occur for guarantee from grout sleeve body according to required adhesion strength between grouting material and grout sleeve body
Middle extraction destroys.
In the present embodiment, the pin 3 includes the head of a nail 31 and the nail rod 32 extended by the head of a nail, the nail rod packet
The second segment 322 for including the first segment 321 extended from the head of a nail and being extended from the first segment to the direction far from the head of a nail;
The outer surface of the first segment 321 is equipped with external screw thread, and the inner wall of the pin hole 2 is equipped with the interior spiral shell coordinated with the external screw thread
Line, the pin 3 are engaged in the internal thread by the external screw thread by are fixed on the grout sleeve body 1, and with foot
The fixed function for enough having the head of a nail 31 of area ensure that the pin 3 and the grout sleeve body 1 form entirety.
In the present embodiment, the second segment 322 extends to the depth in the grout sleeve body 1 and the pin
The quantity of nail 3 is determined according to required adhesion strength between the UHPC grouting materials 6 and the grout sleeve body 1, it is therefore prevented that described
UHPC grouting materials 6, which occur extracting from the grout sleeve body 1, to be destroyed.
More preferably, in the present embodiment, the cross-sectional area of the first segment 321 is more than the cross of the second segment 322
Area of section.It realizes that the second segment 322 can directly be pierced by the pin hole 2, is convenient for Fast Installation.And the first segment
321 section bearing capacities are more than the second segment 322, and the first segment 321 will not be because of processing screw thread and as the pin 3
Stress weakness section is conducive to engineering manufacture and using reliable.
In the present embodiment, the injected hole 4 and the plasma discharge hole 5 are circle, are filled with plastics in Engineering operation
Starch pipe matching.It further includes from the injected hole 4 to far from the filling that the bar connecting slurry pin bank, which closes full grout sleeve structure,
Starch the injected hole wall extension and extend from the plasma discharge hole 5 to far from 1 direction of grout sleeve body that 1 direction of sleeve body extends
Plasma discharge hole wall extension, the injected hole wall extension and plasma discharge hole wall extension be conducive in Engineering operation with the modeling
Material grout pipe is connected and fixed, in order to which engineering construction operates.
In the present embodiment, the injected hole 4 and the plasma discharge hole 5 extend through the grout sleeve body 1 and mutually
Interval setting;The injected hole 4 and the plasma discharge hole 5 are arranged side by side along the axis direction of the grout sleeve body 1, and are respectively positioned on
Between two pin holes 2.
Two connected reinforcing bars 7 are by 1 both ends of grout sleeve body to being inserted into and to 1 both ends of grout sleeve body
It is blocked, by pouring into the UHPC grouting materials 6 by the grouting port 4 until being flowed out by the thick liquid discharge mouth 5.
In engineering construction, the injection UHPC grouting materials 6 in the injected hole 4, when 6 note of UHPC grouting materials
After the full grout sleeve body 1, there is the UHPC to fill along the plasma discharge hole 5 of 1 axis spacing parallel arranging of the grout sleeve body
Slurry 6 is discharged, and is conducive to the direction that the UHPC grouting materials 6 are filled in the grout sleeve body 1, prevent unfilled feelings in this way
Condition occurs and the UHPC grouting materials 6 pour in down a chimney situation in the plasma discharge hole 5.
In the present embodiment, the UHPC grouting materials 6 poured into the grout sleeve body 1 are by modified more suitable
Together in the material of grouting.Compared to general strength cement-based grouting material, grouting material and reinforcing bar can be increased using the UHPC grouting materials 6
Adhesion strength, therefore anchorage length of the connected reinforcing bar 7 in the grout sleeve body 1 can be effectively reduced, described in guarantee
The reinforcing bar length for being connected component reserved joint when 7 diameter of reinforcing bar increases will not be long to which the grout sleeve body 1 is grown
Degree will not be long, and transport easy to process and construction while ensures the reliability of structure connection, using the UHPC grouting materials 6
It is also prevented from the cleavage fracture of grouting material.The connected reinforcing bar 7 is the reinforcing bar being relatively large in diameter used in science of bridge building, but
Common bar connecting is can also be used for, purposes of the present invention is more extensive.
Bar connecting of the present invention closes full grout sleeve with slurry pin bank and carries out the docking connection of precast concrete steel bar stress
Method be:
When concrete prefabricated element factory makes prefabricated components, by connected one 7 end of connected reinforcing bar
It is inserted into the grout sleeve body 1 of one end, 7 head of connected reinforcing bar reaches the specified of 1 middle part of the grout sleeve body
Position, the port of the other end of the grout sleeve body 1 and the template of prefabricated components are fixed.By the plastics grout pipe with it is described
Injected hole 4 is connected and fixed, and the plastics grout pipe and the plasma discharge hole 5 are connected and fixed.Then concrete members are poured and are supported
It protects to prescribed strength.After precast concrete is transported to construction site, hoisting prefabricated component is carried out, and component is stayed to the institute set
Grout sleeve body 1 is stated to be directed at another connected connected reinforcing bar 7 and be inserted into slowly, in place by prefabricated components splicing,
1 both ends of grout sleeve body are blocked, by the UHPC grouting materials 6 being stirred from the low of the grout sleeve body 1
4 pressure of the injected hole at position pours into, and the UHPC grouting materials 6 is made to be discharged from positioned at the plasma discharge hole 5 of high level, blocks
The plasma discharge hole 5, the maintenance of UHPC grouting materials 6 form to defined intensity and are connected the jointing that reinforcing bar 7 docks.
Bar connecting of the present invention closes the process that full grout sleeve is embodied in precast segment assembly bridge pier with slurry pin bank
It is as follows:
It please join shown in Fig. 3, step 1:It is first that concrete pier is segmented prefabricated in factory's progress, it is processed in prefabricated components
The bar connecting is closed full grout sleeve structure with slurry pin bank and is installed to connected 7 end of reinforcing bar described in member bottom section by factory,
And it is inserted into the bar connecting slurry pin bank and closes full grout sleeve structure to prescribed depth, the other end of the grout sleeve body 1
Mouth is fixed with prefabricated components mold, and casting concrete is simultaneously conserved to prescribed strength, and demoulding is stacked for use;
Step 2:When prefabricated components in-site installation, it will be embedded in described in prefabricated components bottom described in being connected on reinforcing bar 7
Bar connecting closes full grout sleeve structure alignment bottom segment same position with slurry pin bank and stretches out the exposed connected reinforcing bar 7
Head, and decline slowly by crane, until prefabricated components are installed in place, and after prefabricated components are corrected and are fixed temporarily, envelope
Stifled splicing seams, and the bar connecting from low level closes 4 pressure injection of the injected hole of full grout sleeve structure with slurry pin bank and stirs
The UHPC grouting materials 6 mixed, until the plasma discharge hole 5 of seam total cross-section and grouting 1 high level of grout sleeve body
There are the UHPC grouting materials 6 to be discharged, is conserved to defined intensity after blocking in time, complete the vertical applied force reinforcing bar of prefabricated components
The grouting of grout sleeve body 1 connection.
Compared to the prior art, the full grout sleeve of bar connecting of the invention slurry pin bank conjunction passes through institute by the pin
It states external screw thread to be engaged in the internal thread and be fixed on the grout sleeve body, the second segment extends to the grout sleeve body
Interior, the pin and the grout sleeve bodily form are integral, and the grout sleeve body is improved from structure and is filled with internal filling
Adhesion strength between slurry.Pin centralized arrangement is made at sleeve both ends in the mechanical snap for effectively improving sleeve and grouting material
With, while avoiding the occurrence of sleeve-grouting material sliding rupture, also avoid sleeve stress maximum position punching to sleeve carry
Weakening caused by power.From grout sleeve body both ends to two connected reinforcing bars of insertion, then to grout sleeve body both ends
It is blocked, then pours into mating ultra-high performance concrete (Ultra High Performance from the injected hole
Concrete, UHPC) grouting material, until the plasma discharge hole has the UHPC grouting materials to flow out, grouting works are completed, by supporting
Shield, the adhesion strength of reinforcing bar and grouting material can be improved, be avoided out using UHPC grouting materials by forming steel reinforcement abutting joints jointing
Existing reinforcing bar is destroyed from the extraction in grouting material, meanwhile, it also avoids due to grouting caused by the problem of stress concentration that pin is brought
Expect cleavage fracture.By the way that assembly concrete bridge structure prefabricated components are made above, the bar connecting is closed complete with slurry pin bank
Grout sleeve structure provides reliable connection method for bar connecting, contributes to the company for solving Large-size rebar in bridge structure
Problem is connect, and processing technology is simple, can be widely applied in prefabricated concrete structure, there is wide future in engineering applications.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (7)
1. a kind of bar connecting closes full grout sleeve with slurry pin bank, which is characterized in that include in hollow columnar grout sleeve body,
Through the grout sleeve body setting pin hole, be inserted into the pin hole and be fixed on the grout sleeve body pin,
Extend through the injected hole and plasma discharge hole, the UHPC for pouring into the grout sleeve body of the grout sleeve body and spaced setting
Grouting material and two connected reinforcing bars;The injected hole and the plasma discharge hole along the grout sleeve body axis direction side by side
Setting, two connected reinforcing bars are by grout sleeve body both ends to being inserted into and being sealed to grout sleeve body both ends
It is stifled, by pouring into the UHPC grouting materials by the grouting port until being flowed out by the thick liquid discharge mouth.
2. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the pin hole packet
At least four are included, and the pin hole divides equally the both ends formation symmetrical structure for being set to the grout sleeve body, pin actual number
Amount and pin stretch into the length in grouting material according to adhesion strength between grouting material and grout sleeve body after being inserted into the pin hole
It adjusts.
3. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the pin includes
The head of a nail and the nail rod extended by the head of a nail, the nail rod include the first segment extended from the head of a nail and from the first segment to
The second segment that direction far from the head of a nail extends;The outer surface of the first segment is equipped with external screw thread, the inner wall of the pin hole
Equipped with the internal thread coordinated with the external screw thread, the pin is engaged in the internal thread by the external screw thread by is fixed on institute
Grout sleeve body is stated, the second segment extends in the grout sleeve body.
4. bar connecting according to claim 3 closes full grout sleeve with slurry pin bank, which is characterized in that the first segment
Cross-sectional area is more than the cross-sectional area of the second segment, and for easy for installation, and the first segment section bearing capacity is big
In the second segment, for processing screw thread, the pin is fixed to be formed with the grout sleeve body stress by the first segment
It is whole.
5. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the injected hole and
The plasma discharge hole is circle, pours into the grouting material in the injected hole as the UHPC grouting materials of no steel fibre, prevents from filling
Slurry directly bears the pin extruding force and cleaves;The UHPC grouting materials increase grouting material and the connected reinforcing bar
Adhesion strength, the anchorage length of the connected reinforcing bar in the grout sleeve body is reduced, to reduce the grouting
Sleeve body length.
6. bar connecting according to claim 1 closes full grout sleeve with slurry pin bank, which is characterized in that the bar connecting
It further includes from the injected hole to the slip casting far from the extension of grout sleeve body direction to close full grout sleeve structure with slurry pin bank
Hole wall extension and the plasma discharge hole wall extension extended from the plasma discharge hole to separate grout sleeve body direction.
7. bar connecting according to claim 2 closes full grout sleeve with slurry pin bank, which is characterized in that the injected hole and
The plasma discharge hole is respectively positioned between two pin holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392426.4A CN108678287A (en) | 2018-04-27 | 2018-04-27 | A kind of bar connecting full grout sleeve of slurry pin bank conjunction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392426.4A CN108678287A (en) | 2018-04-27 | 2018-04-27 | A kind of bar connecting full grout sleeve of slurry pin bank conjunction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108678287A true CN108678287A (en) | 2018-10-19 |
Family
ID=63802528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810392426.4A Pending CN108678287A (en) | 2018-04-27 | 2018-04-27 | A kind of bar connecting full grout sleeve of slurry pin bank conjunction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108678287A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284660A (en) * | 2019-07-22 | 2019-09-27 | 西安建筑科技大学 | It is a kind of in a row three and muscle connection can the fixed grout sleeve of self compaction |
CN110656733A (en) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | Pre-grouting type full-grouting sleeve structure and construction method |
CN111719861A (en) * | 2020-06-29 | 2020-09-29 | 中冶天工集团天津有限公司 | Construction device and construction method for grouting plugging of fabricated building |
CN112282217A (en) * | 2019-07-25 | 2021-01-29 | 沈阳建筑大学 | Special-shaped grouting sleeve for steel bar connection and preparation method thereof |
CN113530295A (en) * | 2021-07-19 | 2021-10-22 | 彭超 | Prefabricated assembly type historic building reinforcing and mounting structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1997017511A1 (en) * | 1995-11-10 | 1997-05-15 | Tokyo Tekko Co., Ltd. | Mortar filling type reinforcement joint |
CN103758292A (en) * | 2014-01-24 | 2014-04-30 | 东南大学 | Shearing reinforcing type full-grouting sleeve |
CN103899044A (en) * | 2014-04-10 | 2014-07-02 | 东南大学 | Full-grouting sleeve embedded with cones |
CN204266475U (en) * | 2014-11-28 | 2015-04-15 | 沈阳建筑大学 | A kind of reinforcing steel bar connecting sleeve tube |
CN106088483A (en) * | 2016-07-29 | 2016-11-09 | 上海建工二建集团有限公司 | A kind of grout sleeve and using method |
CN106812258A (en) * | 2016-12-29 | 2017-06-09 | 合肥工业大学 | A kind of full grout sleeves of GFRP |
-
2018
- 2018-04-27 CN CN201810392426.4A patent/CN108678287A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1997017511A1 (en) * | 1995-11-10 | 1997-05-15 | Tokyo Tekko Co., Ltd. | Mortar filling type reinforcement joint |
CN103758292A (en) * | 2014-01-24 | 2014-04-30 | 东南大学 | Shearing reinforcing type full-grouting sleeve |
CN103899044A (en) * | 2014-04-10 | 2014-07-02 | 东南大学 | Full-grouting sleeve embedded with cones |
CN204266475U (en) * | 2014-11-28 | 2015-04-15 | 沈阳建筑大学 | A kind of reinforcing steel bar connecting sleeve tube |
CN106088483A (en) * | 2016-07-29 | 2016-11-09 | 上海建工二建集团有限公司 | A kind of grout sleeve and using method |
CN106812258A (en) * | 2016-12-29 | 2017-06-09 | 合肥工业大学 | A kind of full grout sleeves of GFRP |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284660A (en) * | 2019-07-22 | 2019-09-27 | 西安建筑科技大学 | It is a kind of in a row three and muscle connection can the fixed grout sleeve of self compaction |
CN112282217A (en) * | 2019-07-25 | 2021-01-29 | 沈阳建筑大学 | Special-shaped grouting sleeve for steel bar connection and preparation method thereof |
CN110656733A (en) * | 2019-10-09 | 2020-01-07 | 上海建工二建集团有限公司 | Pre-grouting type full-grouting sleeve structure and construction method |
CN111719861A (en) * | 2020-06-29 | 2020-09-29 | 中冶天工集团天津有限公司 | Construction device and construction method for grouting plugging of fabricated building |
CN113530295A (en) * | 2021-07-19 | 2021-10-22 | 彭超 | Prefabricated assembly type historic building reinforcing and mounting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678287A (en) | A kind of bar connecting full grout sleeve of slurry pin bank conjunction | |
CN102425310B (en) | Assembly-type residential shear wall structural wall body vertical connection construction method | |
CN107700361B (en) | A kind of dumb-bell shape grout sleeve and the method for carrying out assembly construction with the grout sleeve | |
CN100577923C (en) | Prestressed concrete steel pipe congruent pile and its manufacture and construction method | |
CN207700443U (en) | Exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey | |
CN202391019U (en) | End part thickened grouting connector of steel bar | |
CN108625536A (en) | A kind of precast concrete vertical member grouting channel design method | |
CN103485334B (en) | Bi-layer plastic-bushing inverted-arch cambered hollow special-shaped pile and construction method | |
CN108252458A (en) | The cast-in-place connection of bean column node precast beam reinforced bar half grout sleeve component and its application | |
CN103726586B (en) | H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method | |
CN104264909A (en) | Precast concrete members connected by locking and anchoring pier heads and grouting variable diameter sleeve, prefabricated concrete member and manufacturing method of prefabricated concrete member | |
CN108265629A (en) | A kind of half grouting reinforced steel coupling sleeve of prefabricated assembled column | |
CN104631440B (en) | A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method | |
CN104264787B (en) | Prefabricated concrete member, assembled concrete member and fabricating method through straight thread and nut locking anchor grouting sleeve connection | |
CN103726589B (en) | I-shaped steel and steel and steel pipe framework interface drum projection diagonal reinforcement assembling shear wall and the practice | |
CN104963461A (en) | Connection method of steel bars between prefabricated parts by adopting steel fiber mortar grouting sleeve | |
CN109440623A (en) | The interim splicing structure of concrete segment precast bridge | |
CN112853946A (en) | Grouting sleeve, grouting sleeve connected assembled pier and construction method thereof | |
US11753936B2 (en) | Composite support system based on steel-concrete support and shotcrete arch and construction process thereof | |
CN110700439B (en) | Prefabricated assembly type shear wall rapid formwork erecting connection construction method | |
CN108708452A (en) | The U-shaped integral prefabricated window member that floats, assembled float window joint structure and its construction method | |
CN220550582U (en) | Concrete pile with drum part and root pile for prefabricating pile foundation structure | |
CN212103637U (en) | Quick connection structure between prefabricated pier stud and base | |
CN106958203A (en) | The packaged type bridges grouting connecting-type sleeve of large scale high intensity half | |
CN206706588U (en) | Packaged type bridges are integrally in the milk connecting-type sleeve with large scale high intensity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181019 |