CN207700443U - A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building - Google Patents

A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building Download PDF

Info

Publication number
CN207700443U
CN207700443U CN201721261478.5U CN201721261478U CN207700443U CN 207700443 U CN207700443 U CN 207700443U CN 201721261478 U CN201721261478 U CN 201721261478U CN 207700443 U CN207700443 U CN 207700443U
Authority
CN
China
Prior art keywords
wall
prefabricated
prefabricated wall
bellows
upper layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721261478.5U
Other languages
Chinese (zh)
Inventor
郑启智
蔡欣欣
洪建团
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jianchao Construction Group Co ltd
Original Assignee
Fujian Jianchao Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jianchao Construction Group Co ltd filed Critical Fujian Jianchao Construction Group Co ltd
Priority to CN201721261478.5U priority Critical patent/CN207700443U/en
Application granted granted Critical
Publication of CN207700443U publication Critical patent/CN207700443U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆接缝结构,它包括上层预制墙、下层预制墙、预制楼板、波纹管和连接钢筋;所述上层预制墙底部及下层预制墙顶部均预埋有波纹管和凹槽;所述预制楼板设于上层预制墙和下层预制墙之间;所述预制楼板端部设有穿板孔;所述上层预制墙体凹槽两侧均设有封口材料;所述上层预制墙中的波纹管上设有进浆孔和出浆孔。本新型通过施工安装时对下层预制墙顶部预留凹槽及预埋波纹管内灌注高一等级的混凝土,再通过进浆孔对上层预制墙底部预留凹槽、预制楼板穿板孔及预埋波纹管内加压灌注水泥基灌浆料,使水平冷缝改变方向,达到阻止渗水要求;同时根据结构计算要求在下层预制墙中预埋波纹管内插入需要的抗剪连接钢筋后,保证剪力墙的接缝抗剪强度,不影响剪力墙的受力性能。

A horizontal reinforced grouting joint structure of the exterior wall panels at the floors of an assembled shear wall building, comprising an upper prefabricated wall, a lower prefabricated wall, a prefabricated floor slab, a corrugated pipe and connecting steel bars; the bottom of the upper prefabricated wall and the top of the lower prefabricated wall are both pre-buried with corrugated pipes and grooves; the prefabricated floor slab is arranged between the upper prefabricated wall and the lower prefabricated wall; the end of the prefabricated floor slab is provided with a through-plate hole; both sides of the groove of the upper prefabricated wall are provided with sealing materials; the corrugated pipe in the upper prefabricated wall is provided with a slurry inlet hole and a slurry outlet hole. The new type of structure is constructed by pouring a higher grade of concrete into the reserved groove at the top of the lower prefabricated wall and the embedded corrugated pipe during installation, and then pressurizing the reserved groove at the bottom of the upper prefabricated wall, the through-plate hole of the prefabricated floor slab and the embedded corrugated pipe with cement-based grouting material through the grouting hole, so that the horizontal cold joint changes direction and meets the requirement of preventing water seepage; at the same time, according to the structural calculation requirements, the required shear-resistant connecting steel bars are inserted into the embedded corrugated pipe in the lower prefabricated wall to ensure the shear strength of the shear wall joint without affecting the stress-bearing performance of the shear wall.

Description

一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆接缝结构A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building

技术领域technical field

本实用新型涉及建筑领域,尤其涉及多层装配式剪力墙建筑楼层处外墙板水平接缝结构。The utility model relates to the field of construction, in particular to a horizontal joint structure of outer wall boards at the floor of a multi-layer assembled shear wall building.

背景技术Background technique

国务院印发《关于大力发展装配式建筑的指导意见》(国办发{2016}71号),决定大力发展装配式建筑,推动建筑业产业结构调整升级。按照推进供给侧结构性改革和新型城镇化发展的要求,大力发展钢结构装配式建筑(PS)、混凝土装配式建筑(PC)等,具有发展节能环保新产业、提高建筑安全水平、推动化解过剩产能等一举多得之效。预制装配式钢筋混凝土结构建筑作为目前市场的主流技术,部品、部件标准化设计、工厂化生产、装配化或机械化施工;一般经过全套建筑图纸设计,对结构施工图进行深化设计后,在工厂生产好预制混凝土的梁、柱、墙、板、楼梯等PC构件,运到现场进行装配化施工。The State Council issued the "Guiding Opinions on Vigorously Developing Prefabricated Buildings" (Guo Ban Fa {2016} No. 71), deciding to vigorously develop prefabricated buildings and promote the adjustment and upgrading of the construction industry. In accordance with the requirements of promoting supply-side structural reform and new urbanization development, vigorously develop steel structure prefabricated buildings (PS), concrete prefabricated buildings (PC), etc., which have the potential to develop new energy-saving and environmental protection industries, improve building safety levels, and promote the resolution of excess Production capacity, etc. serve multiple purposes. Prefabricated reinforced concrete structure buildings are the mainstream technology in the current market, with standardized design of parts and components, factory production, assembly or mechanized construction; generally after a full set of architectural drawing design and detailed design of structural construction drawings, they are produced in the factory PC components such as precast concrete beams, columns, walls, slabs, and stairs are transported to the site for assembly construction.

而目前装配式剪力墙的外墙水平接缝均采用直接水平接缝灌浆,水平冷缝因温度变形后而形成渗水通道,存在不能保证外墙的整体性和水密性等许多问题。At present, the horizontal joints of the external walls of the prefabricated shear walls are all directly grouted, and the horizontal cold joints form water seepage channels due to temperature deformation, and there are many problems such as the inability to guarantee the integrity and watertightness of the external walls.

发明内容Contents of the invention

为了克服上述问题,本新型提供了一种能够防止外墙产生水平冷缝,阻止渗水通道,保证外墙整体性和水密性的装配式剪力墙的外墙水平接缝。In order to overcome the above problems, the present invention provides a horizontal joint of the outer wall of the assembled shear wall which can prevent the horizontal cold seam of the outer wall, prevent the seepage channel, and ensure the integrity and watertightness of the outer wall.

为实现上述目的,本新型提供的技术方案是:In order to achieve the above object, the technical solution provided by the present invention is:

一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆接缝结构,所述预制楼板端部设有穿板孔;所述上层预制墙底部及下层预制墙顶部均预埋有波纹管和凹槽;所述上层预制墙体凹槽两侧均设有封口材料;所述上层预制墙中的波纹管上设有进浆孔和出浆孔。A horizontally ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building, the end of the prefabricated floor is provided with a plate-through hole; the bottom of the upper prefabricated wall and the top of the lower prefabricated wall are pre-embedded with bellows and grooves; both sides of the grooves of the upper prefabricated wall are provided with sealing materials; the corrugated pipes in the upper prefabricated wall are provided with grout inlet holes and grout outlet holes.

所述进浆孔设于上层预制墙中波纹管的底部;所述出浆孔设于上层预制墙中波纹管的顶部。The grout inlet hole is arranged at the bottom of the corrugated pipe in the upper prefabricated wall; the grout outlet hole is arranged at the top of the corrugated pipe in the upper prefabricated wall.

所述有筋灌浆接缝结构安装步骤为下层预制墙吊装就位后在的凹槽及波纹管内灌注混凝土、再吊装预制楼板、然后经穿板孔插入连接钢筋,最后吊装上层预制墙,使连接钢筋的另一端锚入上层预制墙中的波纹管内,再由上层预制墙中波纹管底部的进浆孔加压灌注水泥基灌浆料,直至波纹管顶部出浆孔流出水泥基灌浆料。The installation steps of the ribbed grouting joint structure are as follows: after the lower prefabricated wall is hoisted in place, concrete is poured into the groove and the bellows, then the prefabricated floor is hoisted, and then the connecting steel bars are inserted through the plate holes, and finally the upper prefabricated wall is hoisted to make the connection The other end of the steel bar is anchored into the corrugated pipe in the upper prefabricated wall, and then the cement-based grouting material is injected under pressure from the grout inlet hole at the bottom of the corrugated pipe in the upper prefabricated wall until the cement-based grouting material flows out from the grout outlet hole at the top of the corrugated pipe.

所述连接钢筋通过穿板孔插入下层预制墙中的波纹管内;所述连接钢筋锚入上层预制墙底部预埋波纹管内。The connecting steel bar is inserted into the bellows in the lower prefabricated wall through the hole through the plate; the connecting steel bar is anchored into the pre-embedded bellows at the bottom of the upper prefabricated wall.

所述连接钢筋根数和间距是根据结构计算确定的。The number and spacing of the connecting steel bars are determined according to structural calculations.

所述波纹管材料为金属。The material of the bellows is metal.

上述技术方案的有益之处在于:The benefits of the above technical solution are:

1、本新型提供了一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆接缝结构,通过对外墙板顶部、底部预留凹槽,使水平冷缝改变方向,达到阻止渗水要求;同时根据结构计算要求在下层墙顶插入需要的抗剪连接钢筋、连接钢筋在上层墙底锚入对应预埋金属波纹管内,并加压灌注水泥基灌浆料,保证剪力墙的接缝抗剪强度,不影响剪力墙的受力性能。1. This new model provides a horizontal ribbed grouting joint structure of the outer wall panels at the floor of the prefabricated shear wall building. By reserving grooves on the top and bottom of the outer wall panels, the direction of the horizontal cold joints can be changed to meet the requirement of preventing water seepage At the same time, according to the structural calculation requirements, the required shear connecting steel bars are inserted on the top of the lower wall, and the connecting steel bars are anchored into the corresponding pre-embedded metal bellows at the bottom of the upper wall, and the cement-based grouting material is pressurized to ensure the joint resistance of the shear wall. The shear strength does not affect the mechanical performance of the shear wall.

下面将结合附图对本新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本新型一部分实施例,而不是全部的实施例。基于本新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本新型保护的范围。The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are part of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present invention.

附图说明Description of drawings

图1为本新型实施例1装配式剪力墙建筑外墙示意图;Fig. 1 is the schematic diagram of the outer wall of the prefabricated shear wall building of the new embodiment 1;

图2为本新型实施例1装配式剪力墙建筑外墙剖面图;Fig. 2 is the sectional view of the exterior wall of the prefabricated shear wall building of Embodiment 1 of the present invention;

图3为本新型实施例1装配式剪力墙建筑外墙安装后的整体结构示意图。Fig. 3 is a schematic diagram of the overall structure of the assembled shear wall building exterior wall in Embodiment 1 of the present invention after installation.

具体实施方式Detailed ways

实施例1Example 1

如图1-3所示的一种装配式剪力墙建筑楼层处外墙板水平有筋灌浆结构,它包括上层预制墙1、下层预制墙2、预制楼板3和连接钢筋4;所述上层预制墙1底部预埋有波纹管5及预留有凹槽6;所述下层预制墙顶部预埋有波纹管7及预留有凹槽8;所述预制楼板3设于上层预制墙1和下层预制墙2之间;所述预制楼板3端部设有穿板孔9;所述上层预制墙1与预制楼板3接缝两侧设有封口材料10;所述上层预制墙1中的波纹管5上设有进浆孔11和出浆孔12。所述进浆孔11设于上层预制墙1中波纹管5的底部;所述出浆孔12设于上层预制墙1中波纹管5的顶部。As shown in Fig. 1-3, a kind of prefabricated shear wall building floor place exterior wall plate horizontal rib grouting structure, it comprises upper prefabricated wall 1, lower prefabricated wall 2, prefabricated floor slab 3 and connecting steel bar 4; The bottom of the prefabricated wall 1 is pre-embedded with a bellows 5 and a groove 6 is reserved; the top of the lower prefabricated wall is pre-embedded with a bellows 7 and a groove 8 is reserved; the prefabricated floor 3 is arranged on the upper prefabricated wall 1 and Between the lower prefabricated walls 2; the end of the prefabricated floor 3 is provided with plate-through holes 9; the upper prefabricated wall 1 and the prefabricated floor 3 are provided with sealing materials 10 on both sides of the joint; the corrugation in the upper prefabricated wall 1 The tube 5 is provided with a slurry inlet hole 11 and a slurry outlet hole 12 . The grout inlet hole 11 is set at the bottom of the bellows 5 in the upper prefabricated wall 1 ; the grout outlet 12 is set at the top of the bellows 5 in the upper precast wall 1 .

所述有筋灌浆接缝结构安装步骤为下层预制墙2吊装就位后在预留的凹槽8及波纹管7内灌注混凝土、再吊装预制楼板3、然后经穿板孔9向下层预制墙2中的波纹管7插入连接钢筋4,最后吊装上层预制墙1,使连接钢筋4的另一端锚入上层预制墙1中的预埋波纹管5内,并填封口材料10,再由上层预制墙1中波纹管5底部的进浆孔11加压灌注水泥基灌浆料,直至波纹管5顶部出浆孔12流出水泥基灌浆料,即各构件连接处的空腔内已充实水泥基灌浆料形成实体连接节点。The installation steps of the ribbed grouting joint structure are as follows: after the lower prefabricated wall 2 is hoisted in place, concrete is poured into the reserved groove 8 and bellows 7, then the prefabricated floor slab 3 is hoisted, and then the lower prefabricated wall is passed through the plate hole 9 The corrugated pipe 7 in 2 is inserted into the connecting steel bar 4, and finally the upper prefabricated wall 1 is hoisted so that the other end of the connecting steel bar 4 is anchored into the pre-embedded bellows 5 in the upper prefabricated wall 1, and the sealing material 10 is filled, and then the upper prefabricated wall 1 The grout inlet hole 11 at the bottom of the bellows 5 in the wall 1 is pressurized and poured with cement-based grouting material until the cement-based grouting material flows out from the grout outlet hole 12 at the top of the bellows 5, that is, the cavity at the joint of each component is filled with cement-based grouting material Form entity connection nodes.

本实施例中,所述连接钢筋根数和间距是根据结构计算确定的。In this embodiment, the number and spacing of the connecting steel bars are determined according to structural calculations.

通过这样的设置,对外墙板顶部、底部预留凹槽,使水平冷缝改变方向,达到阻止渗水要求;同时根据结构计算要求在墙顶预留需要的抗剪连接钢筋、在墙底对应预埋金属波纹管并加压灌注水泥基灌浆料,保证剪力墙的接缝抗剪强度,不影响剪力墙的受力性能。Through this setting, grooves are reserved on the top and bottom of the outer wall panels to change the direction of the horizontal cold joints to meet the requirements of preventing water seepage; Embed metal bellows and pressurize cement-based grouting material to ensure the shear strength of the joints of the shear wall without affecting the mechanical performance of the shear wall.

Claims (5)

1. exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey, it include upper layer dry wall, Lower layer's dry wall, precast floor slab and connection reinforcing bar;The precast floor slab is set between upper layer dry wall and lower layer's dry wall;It is described Precast floor slab end is equipped with threading hole;It is characterized in that:It is embedded at the top of upper layer dry wall bottom and lower layer's dry wall Bellows and groove;The upper layer precast wall body groove both sides are equipped with joint filling material;Bellows in the upper layer dry wall It is equipped with slurry-feeding hole and slurry outlet.
2. exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey as described in claim 1, It is characterized in that:The slurry-feeding hole is set to the bottom of bellows in the dry wall of upper layer;The slurry outlet is set in the dry wall of upper layer The top of bellows.
3. exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey as described in claim 1, It is characterized in that:It is described to have muscle grouting structure mounting steps to set concrete in the groove of lower layer's dry wall;The connection steel One end of muscle is inserted in concrete, and the other end for connecting reinforcing bar is set in the bellows of upper layer precast wall body.
4. exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey as described in claim 1, It is characterized in that:The connection reinforcing bar is inserted by threading hole in the bellows in lower layer's dry wall;The connection reinforcing bar anchors into In the pre-buried bellows in upper layer dry wall bottom.
5. exterior wall plate level has muscle grouted joint structure at a kind of fabricated shear wall architecture storey as described in claim 1, It is characterized in that:The bellows material is metal.
CN201721261478.5U 2017-09-28 2017-09-28 A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building Expired - Fee Related CN207700443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721261478.5U CN207700443U (en) 2017-09-28 2017-09-28 A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721261478.5U CN207700443U (en) 2017-09-28 2017-09-28 A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building

Publications (1)

Publication Number Publication Date
CN207700443U true CN207700443U (en) 2018-08-07

Family

ID=63021042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721261478.5U Expired - Fee Related CN207700443U (en) 2017-09-28 2017-09-28 A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building

Country Status (1)

Country Link
CN (1) CN207700443U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column
CN111058638A (en) * 2019-12-30 2020-04-24 赵玉玲 Splicing seam treatment process after construction of prefabricated building interlayer floor slab
CN111139861A (en) * 2019-12-05 2020-05-12 中设设计集团股份有限公司 Prefabricated box assembled structure
CN111321821A (en) * 2020-02-28 2020-06-23 南京工程学院 Adopt prefabricated shear force wall steel bar connection structure tied in a bundle of full assembled level seam
CN111648556A (en) * 2020-06-29 2020-09-11 湖南建工集团有限公司 Laminated precast concrete elevator shaft connection device
CN111980220A (en) * 2020-08-20 2020-11-24 中国建筑标准设计研究院有限公司 Assembled integral multi-cavity steel plate composite shear wall and construction method thereof
CN111980219A (en) * 2020-08-20 2020-11-24 中国建筑标准设计研究院有限公司 Assembled integral steel plate composite shear wall and construction method thereof
CN111997228A (en) * 2020-08-20 2020-11-27 中国建筑标准设计研究院有限公司 Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and construction method thereof
CN112900791A (en) * 2021-03-01 2021-06-04 桂林理工大学 Prefabricated elevator frame module, system and construction method
CN113513107A (en) * 2020-08-20 2021-10-19 中国建筑标准设计研究院有限公司 Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and manufacturing method thereof
CN114575522A (en) * 2020-11-30 2022-06-03 周俏 Installation method of shear wall
CN116517141A (en) * 2023-06-02 2023-08-01 浙江大学 Vertical connection structure of intensive reinforcement indirect lap joint precast shear wall and construction method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110725475A (en) * 2019-11-20 2020-01-24 中国建筑标准设计研究院有限公司 Prefabricated column with built-in high-corrugated pipe, frame structure of prefabricated column and construction method of prefabricated column
CN111139861A (en) * 2019-12-05 2020-05-12 中设设计集团股份有限公司 Prefabricated box assembled structure
CN111058638A (en) * 2019-12-30 2020-04-24 赵玉玲 Splicing seam treatment process after construction of prefabricated building interlayer floor slab
CN111058638B (en) * 2019-12-30 2021-05-04 通号建设集团第一工程有限公司 A post-construction joint seam treatment process for a prefabricated building interlayer floor slab
CN111321821A (en) * 2020-02-28 2020-06-23 南京工程学院 Adopt prefabricated shear force wall steel bar connection structure tied in a bundle of full assembled level seam
CN111648556A (en) * 2020-06-29 2020-09-11 湖南建工集团有限公司 Laminated precast concrete elevator shaft connection device
CN111980219A (en) * 2020-08-20 2020-11-24 中国建筑标准设计研究院有限公司 Assembled integral steel plate composite shear wall and construction method thereof
CN111997228A (en) * 2020-08-20 2020-11-27 中国建筑标准设计研究院有限公司 Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and construction method thereof
CN111980220A (en) * 2020-08-20 2020-11-24 中国建筑标准设计研究院有限公司 Assembled integral multi-cavity steel plate composite shear wall and construction method thereof
CN113513107A (en) * 2020-08-20 2021-10-19 中国建筑标准设计研究院有限公司 Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and manufacturing method thereof
CN111997228B (en) * 2020-08-20 2022-05-24 中国建筑标准设计研究院有限公司 Assembled integral mortise-tenon joint multi-cavity steel plate combined shear wall and construction method thereof
CN114575522A (en) * 2020-11-30 2022-06-03 周俏 Installation method of shear wall
CN114575522B (en) * 2020-11-30 2024-02-23 周俏 Method for mounting shear wall
CN112900791A (en) * 2021-03-01 2021-06-04 桂林理工大学 Prefabricated elevator frame module, system and construction method
CN116517141A (en) * 2023-06-02 2023-08-01 浙江大学 Vertical connection structure of intensive reinforcement indirect lap joint precast shear wall and construction method

Similar Documents

Publication Publication Date Title
CN207700443U (en) A horizontal ribbed grouting joint structure of exterior wall panels at the floor of a prefabricated shear wall building
CN108049498B (en) Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure
CN205046685U (en) External heated board of prefabricated masonry wall
CN103216044A (en) Moisture permeation and water proofing Cement grouting steel bar connecting structure of precast concrete unit
CN206189455U (en) a corridor
CN113445650B (en) A prefabricated steel structure composite floor system and its installation method
CN107989184A (en) Prefabricated frame system and method for node prefabrication and UHPC post-cast connection
CN110295681A (en) The high-strength foam concrete filled-in panel external wall self-insulation system of precast light
CN211114066U (en) Assembled lightweight concrete slab type house structure
CN110984359A (en) A low-rise prefabricated building structure
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN105089182B (en) A kind of concrete partition system and its construction method for steel construction
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN112064806A (en) A kind of double-sided superimposed concrete wall panel and base plate waterproof connection node
CN105735517B (en) Prefabricated reinforced concrete wall structure based on thermal bridge partition technology
CN204530982U (en) A kind of prefabricated assembled special-shaped wallette limb industrialization Housing Structure System
CN120006875B (en) Local cast-in-situ modularization building system of shear force wall
CN207405842U (en) An integral fully prefabricated floor slab unsupported connection structure
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN110878599B (en) Function differentiation type prefabricated assembly wall
CN108560585B (en) Fully assembled structure of basement exterior wall and its construction method
CN111305590A (en) Assembly type low-energy-consumption transformation structure and rapid transformation method for existing building balcony
CN207194228U (en) Wall is overlapped with overlapping the vertical openings connecting node of wall
CN110820983A (en) Longitudinal connection method for assembled prefabricated superposed wall boards
CN115653189A (en) A Fully Assembled Composite Shear Wall Panel with Keyway and Concentrated Reinforcement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180807