CN210458914U - Connecting structure of prefabricated bridge pier stud and capping beam - Google Patents

Connecting structure of prefabricated bridge pier stud and capping beam Download PDF

Info

Publication number
CN210458914U
CN210458914U CN201920888793.3U CN201920888793U CN210458914U CN 210458914 U CN210458914 U CN 210458914U CN 201920888793 U CN201920888793 U CN 201920888793U CN 210458914 U CN210458914 U CN 210458914U
Authority
CN
China
Prior art keywords
bridge pier
pier stud
bent cap
connection
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920888793.3U
Other languages
Chinese (zh)
Inventor
王彪
肖绪烜
张文进
梅向福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaxin New Building Materials Wuhan Co ltd
Huaxin Cement Co Ltd
Original Assignee
Huaxin New Building Materials Wuhan Co ltd
Huaxin Cement Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaxin New Building Materials Wuhan Co ltd, Huaxin Cement Co Ltd filed Critical Huaxin New Building Materials Wuhan Co ltd
Priority to CN201920888793.3U priority Critical patent/CN210458914U/en
Application granted granted Critical
Publication of CN210458914U publication Critical patent/CN210458914U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a connection structure of prefabricated bridge pier stud and bent cap, the top of bridge pier stud is equipped with the concrete arch, bridge pier stud top still is equipped with the longitudinal reinforcement that stretches out, the bent cap is at the pre-buried vertical reinforcement of the region of connection that corresponds with the bridge pier stud, and the grout hole is reserved to the region of connection that bent cap and bridge pier stud correspond, and wet seam between bridge pier stud and the bent cap adopts the ultra-high performance concrete to pour once at the scene and forms, is connected the longitudinal reinforcement of bridge pier stud and the pre-buried vertical reinforcement anchor of bent cap through the ultra-high performance concrete. The utility model discloses connection structure's simple structure, construction convenience, save time limit for a project, the durability is good, has good economic nature.

Description

Connecting structure of prefabricated bridge pier stud and capping beam
Technical Field
The utility model relates to a bridge technical field, more specifically say, relate to a connection structure of prefabricated bridge pier stud and bent cap.
Background
The assembled bridge can not only ensure the engineering quality, but also accelerate the construction speed and reduce the environmental pollution, so the assembled bridge technology has wide application prospect.
The node connection of the assembled bridge is always an engineering problem, and the common connection modes of the pier stud and the bent cap comprise connection modes such as bonding post-tensioned prestressed rib connection, grouting sleeve connection, grouting metal corrugated pipe connection and the like at present, but the connection modes have complex processes and very high requirements on site construction precision, so that the site construction is inconvenient, and the quality of the node connection is not well controlled.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model lies in providing a connection structure of simple structure, the convenient prefabricated bridge pier stud of construction and bent cap.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a connection structure of prefabricated bridge pier stud and bent cap, the top of bridge pier stud is equipped with the concrete arch, bridge pier stud top is equipped with the longitudinal reinforcement that stretches out, the bent cap is at the pre-buried vertical reinforcement of the region of connection that corresponds with the bridge pier stud, and the bent cap corresponds the region of connection with the bridge pier stud and reserves the grout hole, and wet seam between bridge pier stud and the bent cap adopts the ultra-high performance concrete to pour at the scene once and forms, is connected the longitudinal reinforcement of bridge pier stud and the pre-buried vertical reinforcement anchor of bent cap through the ultra-high performance concrete.
In the scheme, a steel template is arranged at the joint of the bridge pier column and the cover beam, and 2-4 grout outlet holes are reserved in the upper portion of the template.
In the above scheme, the bridge pier is a precast concrete pier, and the cross section of the bridge pier is circular or rectangular.
In the scheme, the cross section of the concrete bulge reserved in the middle area of the bridge pier column is circular or rectangular.
Implement the utility model discloses a connection structure of prefabricated bridge pier stud and bent cap has following beneficial effect:
the ultra-high performance concrete has the characteristics of self-leveling and self-compacting, and a wet joint can be poured and compacted during field construction. And the anchoring force of the ultrahigh-performance concrete and the steel bars is strong, the length of the reserved steel bars is short, and the workload of field construction operation is reduced. The utility model discloses connection structure's simple structure, construction convenience, save time limit for a project, the durability is good, has good economic nature.
Drawings
The invention will be further explained with reference to the drawings and examples, wherein:
FIG. 1 is a schematic view of a connection structure of a prefabricated bridge pier stud and a bent cap of the present invention;
fig. 2 is a sectional view a-a of fig. 1.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 and 2, the utility model discloses a connection structure of prefabricated bridge pier stud 1 and bent cap 2 includes bridge pier stud 1, bent cap 2, the wet seam of ultra-high performance concrete and bent cap 2 and bridge pier stud 1's connection structure.
The longitudinal steel bars 3 at the top end of the bridge pier stud 1 are all extended out, and the extension length of the steel bars meets the steel bar anchoring requirement. And stirrups 4 are arranged on the outer sides of the longitudinal steel bars 3. Concrete bulges 9 are reserved in the middle area of the top end of the bridge pier stud 1. The bridge pier column 1 is a precast concrete pier, the cross section of the bridge pier column 1 is a circular cross section, and the diameter of the bridge pier column is 1000 mm; the concrete bulge 9 reserved in the middle area of the bridge pier stud 1 is a cylinder, the height of the bulge is 800mm, and the diameter is 500 mm. The longitudinal steel bar 3 of the bridge pier column 1 is 15 phi 25, and the reserved length is 500 mm.
The bent cap 2 corresponds pre-buried vertical reinforcement 5 in connection area with bridge pier stud 1, and the extension length of reinforcing bar satisfies the reinforcing bar anchor requirement. And reserving grouting holes 6 in the corresponding connection areas of the bent cap 2 and the bridge pier stud 1, wherein the diameter of the reserved grouting holes 6 is 50 mm. The height of the cross section of the precast capping beam 2 is 1200mm and the width is 1000 mm. The embedded steel bar of the bent cap 2 is 14 phi 25.
The wet joint 7 is formed by pouring ultrahigh-performance concrete at one time on site, and the longitudinal steel bars 3 of the bridge pier stud 1 and the embedded steel bars 4 of the bent cap 2 are connected in an anchoring mode through the ultrahigh-performance concrete. The mechanical properties of the ultra-high performance concrete are as follows: the standard value of the compressive strength of 1 day is more than 80MPa, the standard value of the compressive strength of 28 days is 150MPa, and the standard value of the tensile strength is 8.5 MPa. The ultra-high performance concrete is an existing product, and belongs to the prior art. The ultrahigh-performance concrete flows into the connecting node of the bridge pier stud 1 and the bent cap 2 through the reserved grouting hole 6 in the bent cap 2. The ultra-high performance concrete has the characteristics of self-leveling and self-compacting, the wet joint 7 can be poured compactly, and the anchoring force of the ultra-high performance concrete and the reinforcing steel bar is extremely strong.
Bridge pier stud 1 sets up steel form 8 with bent cap 2 junction, and 2 ~ 4 grout outlet holes are reserved on 8 upper portions of steel form in order to observe whether the super high performance concrete is pour and is accomplished. The inner diameter of the steel template 8 is 1000mm, the steel template consists of two semicircles, and the thickness of the steel template is 6 mm; 2 grout outlet holes with the aperture of 10mm are reserved on the steel template 8.
While the embodiments of the present invention have been described with reference to the accompanying drawings, the present invention is not limited to the above-described embodiments, which are merely illustrative and not restrictive, and many modifications may be made by one skilled in the art without departing from the spirit and scope of the present invention as defined in the appended claims.

Claims (4)

1. The utility model provides a connection structure of prefabricated bridge pier stud and bent cap, a serial communication port, the top of bridge pier stud is equipped with the concrete arch, bridge pier stud top is equipped with the longitudinal reinforcement that stretches out, the bent cap is at the pre-buried vertical reinforcement of the region of connection that corresponds with the bridge pier stud, and the grout hole is reserved with the corresponding region of connection of bridge pier stud to the bent cap, and wet seam between bridge pier stud and the bent cap adopts the ultra high performance concrete to form at the on-the-spot pouring once, is connected the longitudinal reinforcement of bridge pier stud and the pre-buried vertical reinforcement anchor of bent cap through the ultra high performance concrete.
2. The connecting structure of the precast bridge pier column and the capping beam according to claim 1, wherein a steel formwork is arranged at the joint of the bridge pier column and the capping beam, and 2-4 grout outlet holes are reserved in the upper portion of the steel formwork.
3. The structure for connecting a precast bridge pier stud and a capping beam according to claim 1, wherein the bridge pier stud is a precast concrete pier, and the cross section of the bridge pier stud is circular or rectangular.
4. The connecting structure of the precast bridge pier column and the capping beam according to claim 1, wherein the cross section of the concrete bulge reserved in the middle area of the bridge pier column is circular or rectangular.
CN201920888793.3U 2019-06-13 2019-06-13 Connecting structure of prefabricated bridge pier stud and capping beam Active CN210458914U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920888793.3U CN210458914U (en) 2019-06-13 2019-06-13 Connecting structure of prefabricated bridge pier stud and capping beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920888793.3U CN210458914U (en) 2019-06-13 2019-06-13 Connecting structure of prefabricated bridge pier stud and capping beam

Publications (1)

Publication Number Publication Date
CN210458914U true CN210458914U (en) 2020-05-05

Family

ID=70440500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920888793.3U Active CN210458914U (en) 2019-06-13 2019-06-13 Connecting structure of prefabricated bridge pier stud and capping beam

Country Status (1)

Country Link
CN (1) CN210458914U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691310A (en) * 2020-07-07 2020-09-22 郑琼华 Bridge construction method
CN111962381A (en) * 2020-09-11 2020-11-20 福州大学 Double-diabolo-shaped steel-concrete combined pier-beam connecting structure and construction method thereof
CN112030720A (en) * 2020-08-21 2020-12-04 中交第二公路勘察设计研究院有限公司 Prefabricated bent cap and pier stud socket type connecting structure and construction method
CN113123213A (en) * 2020-01-10 2021-07-16 中国国家铁路集团有限公司 Connecting structure between precast concrete beam and pier column and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123213A (en) * 2020-01-10 2021-07-16 中国国家铁路集团有限公司 Connecting structure between precast concrete beam and pier column and construction method
CN111691310A (en) * 2020-07-07 2020-09-22 郑琼华 Bridge construction method
CN112030720A (en) * 2020-08-21 2020-12-04 中交第二公路勘察设计研究院有限公司 Prefabricated bent cap and pier stud socket type connecting structure and construction method
CN111962381A (en) * 2020-09-11 2020-11-20 福州大学 Double-diabolo-shaped steel-concrete combined pier-beam connecting structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN210458914U (en) Connecting structure of prefabricated bridge pier stud and capping beam
CN106869017B (en) A kind of the precast assembly bridge pier-cushion cap node connection type and its practice of pier bottom setting flexible layer
CN109487686A (en) A kind of unit construction bridge panel transverse joint using UHPC grouting material
CN100999913B (en) Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN101215855A (en) Combination beam
CN201661009U (en) Concrete-filled square steel tubular column
CN102116075B (en) Novel joint prepared from cement grout and steel bars
CN209443766U (en) Pouring model for building
CN212670274U (en) Cast-in-place seam structure of super high performance concrete beam slab with pre-buried reinforced steel plate
CN109208825A (en) A kind of assembled arthitecutral structure convenient for docking and being in the milk
CN208763204U (en) A kind of vertical connecting structure of low layer assembled architecture prefabricated panel
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN106149878A (en) Attachment structure at concrete frame structure prefabricated post and beam slab node and method
CN109537775A (en) The method for preparing assembly concrete shear wall using local corrugated thin-wall steel pipe
CN204691081U (en) Containing constraint bellows reinforcement lapping connection component with ribbing
CN106149877A (en) Docking structure at concrete frame structure prefabricated post and beam slab node and method
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN200999389Y (en) Panel point for steel pipe concrete column and reinforced concrete beam
CN207032010U (en) A kind of assembled solid steel tube constrains armored concrete pillar height pier
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN105625571B (en) The precast concrete bean column node of strength prestressed muscle in a kind of use
CN210508061U (en) Improved generation connection structure suitable for steel bar connection between assembled concrete member
CN204456088U (en) Solid square pile end plate pile joint
CN207193949U (en) A kind of pile for prestressed pipe of convenient construction
CN211736420U (en) Concrete windowsill coping combination formula construction structures

Legal Events

Date Code Title Description
GR01 Patent grant