CN104358360A - Full-grouting sleeve for connection of construction reinforcing steel bars - Google Patents

Full-grouting sleeve for connection of construction reinforcing steel bars Download PDF

Info

Publication number
CN104358360A
CN104358360A CN201410610385.3A CN201410610385A CN104358360A CN 104358360 A CN104358360 A CN 104358360A CN 201410610385 A CN201410610385 A CN 201410610385A CN 104358360 A CN104358360 A CN 104358360A
Authority
CN
China
Prior art keywords
sleeve
sleeve body
grouting
port
full grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410610385.3A
Other languages
Chinese (zh)
Other versions
CN104358360B (en
Inventor
田野
孙红
张耀煌
陈瑞三
田璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201410610385.3A priority Critical patent/CN104358360B/en
Publication of CN104358360A publication Critical patent/CN104358360A/en
Application granted granted Critical
Publication of CN104358360B publication Critical patent/CN104358360B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a full-grouting sleeve for connection of construction reinforcing steel bars, and belongs to the technical field of building projects. A reinforcing steel bar axial-limiting guide stop dog is arranged on the inner wall in the middle of a sleeve main body; guide slopes are arranged between the stop dog and the inner wall of the sleeve main body; a positioning bolt is arranged on the sleeve main body at the prefabricated end; the reinforcing steel bar at the prefabricated end is axially and radially fixed through the positioning bolt; the sleeve main body is molded by one-step casting of spheroidal graphite cast iron, so that the production cost is low; the outer surface of the sleeve main body serves as a roughened surface, so as to ensure the anchoring force between the grouting sleeve and the concrete; a plurality of convex hooping ribs are arranged on the inner wall of the grouting sleeve; an identification gap is formed in the port face of the sleeve main body at the field poured end, so as to prevent the situation that the grouting sleeve is installed reversely; a seal ring is arranged inside the port of the sleeve main body at the prefabricated end. When the grouting sleeve disclosed by the invention is in axial butt joint with the reinforcing steel bar, the precise axial control can be automatically realized, and the radial positioning can be automatically realized, so as to ensure the positioning accuracy between the reinforcing steel bar and the grouting sleeve, and meet the requirements on building construction quality.

Description

A kind of building iron connects uses full grout sleeve
Technical field
The invention belongs to civil works technical field, particularly relate to the connection of a kind of building iron and use full grout sleeve.
Background technology
At present, in the reinforced concrete buildings of China, for the connection of building iron, what the overwhelming majority adopted is traditional connecting method for reinforcing bars, i.e. strapping, welding and screw thread method.
When adopting strapping and screw thread method, therefore and be not suitable for member reinforcing steel bar and connect than the joint reinforcing bar of comparatively dense when the interstitial position of member reinforcing steel bar is smaller, utilize instrument colligation difficulty large, and construction quality is affected by human factors relatively more serious, skeleton is yielding simultaneously.
When adopting welding, be not suitable for member reinforcing steel bar equally and connect than the joint reinforcing bar of comparatively dense, and solder technology requires high, because the technical level of constructor is uneven, construction quality is affected by human factors more serious, and solder yield is unstable.And welding power consumption is high, is sometimes also subject to execution conditions restriction, causes electricity consumption lack of standardization, unnecessary hidden danger can be brought to construction safety.
Along with the continuous progress of modern building technology, require more and more higher to Construction Quality, traditional connecting method for reinforcing bars has been difficult to adapt to modern architecture construction requirement, in this context, person skilled in field develops a kind of brand-new connecting method for reinforcing bars, namely utilize grout sleeve to connect reinforcing bar, this brand-new rebar connecting technology comes across Japan the earliest, and is generalized to the whole world gradually.
Grout sleeve is as the core members of bar connecting, comprise full grout sleeve and half grout sleeve, half grout sleeve one end adopts with reinforcing bar and is threaded, the other end and reinforcing bar adopt to be in the milk and are connected, but adopt half grout sleeve to carry out bar connecting, there is labour intensity large, and reinforcing bar and sleeve be threaded whether put in place judge not directly perceived, easily be affected by human factors, and workmanship is wayward.And although existing full grout sleeve no longer adopts and is threaded, but reinforcing bar and sleeve carry out axis when docking, cannot realize axially controlling accurately, and not possess radial location function, the positioning precision extreme difference of reinforcing bar and sleeve, is difficult to meet Construction Quality requirement.
Summary of the invention
For prior art Problems existing, the invention provides the connection of a kind of building iron and use full grout sleeve, when reinforcing bar and grout sleeve carry out can automatically realizing when axis is docked axially controlling accurately, and automatically can realize radial location, ensure that the positioning precision between reinforcing bar and grout sleeve, meet Construction Quality requirement.
To achieve these goals, the present invention adopts following technical scheme: a kind of building iron connects uses full grout sleeve, comprise sleeve body, first grouting port and the second grouting port, described sleeve body one end is cast-in-site end, the sleeve body other end is prefabricated end, described first grouting port is arranged on the cast-in-site end of sleeve body, described second grouting port is arranged on the prefabricated end of sleeve body, described first grouting port and the second grouting port are all connected with grouting guiding tube, the middle part inwall of described sleeve body is provided with reinforcing bar axial limiting guide stopper, guiding surface is provided with between described reinforcing bar axial limiting guide stopper and sleeve body inwall.
The quantity of described reinforcing bar axial limiting guide stopper is some, and along the uniform setting of sleeve body inwall circumference.
Sleeve body port and the cast-in-site end bar of the sleeve body port of described prefabricated end and prefabricated end bar, cast-in-site end all adopt matched in clearance.
The sleeve body of described prefabricated end is also provided with positioning bolt hole, in positioning bolt hole, positioning bolt is installed, by positioning bolt axis is carried out to prefabricated end bar and radial direction is fixed.
Described sleeve body adopts ductile iron one-step casting shaping.
In order to ensure the anchored force between full grout sleeve and concrete and grouting material, the inside and outside surface of described sleeve body all adopts rough surface.
In order to prevent full grout sleeve anti-loaded when mounted, the sleeve body port surface of described cast-in-site end is provided with identification breach.
Described sleeve body inwall is provided with some protruding ring muscle.
Sealing ring is provided with in the sleeve body port of described prefabricated end.
Beneficial effect of the present invention:
Compared with prior art, reinforcing bar and grout sleeve carry out axis when docking in the present invention, can automatically realize axially controlling accurately, and automatically can realize radial location, ensure that the positioning precision between reinforcing bar and grout sleeve, meet Construction Quality requirement; Grout sleeve cast on-site end devises identification breach, prevents grout sleeve anti-loaded when mounted; Grout sleeve adopts ductile iron one-step casting shaping, and cost of production is lower, is applicable to producing in enormous quantities; The inside and outside surface of grout sleeve adopts rough surface design, ensure that the anchored force between grout sleeve and concrete and grouting material.
Accompanying drawing explanation
Fig. 1 is that a kind of building iron of the present invention connects with full grout sleeve structural representation;
Fig. 2 is A direction view in Fig. 1;
Fig. 3 is B-B sectional view in Fig. 1;
Fig. 4 is C direction view in Fig. 1;
In figure, 1-sleeve body, the 2-the first grouting port, 3-the second grouting port, 4-reinforcing bar axial limiting guide stopper, 5-guiding surface, 6-grouting guiding tube, 7-positioning bolt hole, 8-positioning bolt, 9-prefabricated end bar, 10-cast-in-site end bar, 11-sealing ring, 12-protruding ring muscle, 13-identify breach, 14-grouting material.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
As Fig. 1, 2, 3, shown in 4, a kind of building iron connects uses full grout sleeve, comprise sleeve body 1, first grouting port 2 and the second grouting port 3, described sleeve body 1 one end is cast-in-site end, sleeve body 1 other end is prefabricated end, described first grouting port 2 is arranged on the cast-in-site end of sleeve body 1, described second grouting port 3 is arranged on the prefabricated end of sleeve body 1, described first grouting port 2 and the second grouting port 3 are all connected with grouting guiding tube 6, the middle part inwall of described sleeve body 1 is provided with reinforcing bar axial limiting guide stopper 4, guiding surface 5 is provided with between described reinforcing bar axial limiting guide stopper 4 and sleeve body 1 inwall.
The quantity of described reinforcing bar axial limiting guide stopper 4 is 3 ~ 6, and along the uniform setting of sleeve body 1 inwall circumference.
Sleeve body 1 port and the cast-in-site end bar 10 of sleeve body 1 port of described prefabricated end and prefabricated end bar 9, cast-in-site end all adopt matched in clearance.
The sleeve body 1 of described prefabricated end is also provided with positioning bolt hole 7, positioning bolt 8 is installed in positioning bolt hole 7, by positioning bolt 8 axis is carried out to prefabricated end bar 9 and radial direction is fixed.
Described sleeve body 1 adopts ductile iron one-step casting shaping.
In order to ensure the anchored force between full grout sleeve and concrete and grouting material, the inside and outside surface of described sleeve body 1 adopts rough surface.
In order to prevent full grout sleeve anti-loaded when mounted, sleeve body 1 port surface of described cast-in-site end being provided with and identifying breach 13.
Described sleeve body 1 inwall is provided with some protruding ring muscle 12.
Sealing ring 11 is provided with in sleeve body 1 port of described prefabricated end.
Below in conjunction with accompanying drawing, a use procedure of the present invention is described:
Before full grout sleeve is installed, need first to observe identifying that breach 13 is to determine installation direction, prevents sleeve body 1 anti-loaded.
First prefabricated end bar 9 is inserted in the sleeve body 1 of prefabricated end, until the reinforcing bar head of prefabricated end bar 9 touches guiding surface 5, hold out against in axial limiting guide stopper 4 under the guiding of guiding surface 5, prefabricated end bar 9 is in place, under guiding surface 5 acts on, axis and the radial direction of prefabricated end bar 9 are located all automatically, sealed by sealing ring 11 between sleeve body 1 port of prefabricated end and prefabricated end bar 9 simultaneously, last screwed in place bolt 8, makes the axis of prefabricated end bar 9 and radial position be fixed.
In the manner described above, the prefabricated end bar 9 connected is needed to connect with corresponding full grout sleeve other, be installed to according to Architectural Design Requirements configuration again in the precast-concrete form of specifying, grouting guiding tube 6 quantity intercepting suitable length is some, grouting guiding tube 6 one end is inserted respectively in the first grouting port 2, second grouting port 3, grouting guiding tube 6 other end must stretch out outer 80 ~ 100 millimeters of prefabricated units, the pouring concrete of prefabricated units of being now allowed for access.
To be furnished with the concrete prefabricated element handling of full grout sleeve after building operations corresponding position, then inserted in the sleeve body 1 of cast-in-site end successively by the cast-in-site end bar 10 of corresponding position, cast-in-site end bar 10 is in place.
Depending on building operations component connection, in sleeve body 1, grouting material 14 is injected by the grouting guiding tube 6 of the first grouting port 2 (or second grouting port 3), until grouting material 14 is full of sleeve body 1 inner chamber and flows out from the second grouting port 3 (or first grouting port 2), then the first grouting port 2 and the second grouting port 3 are closed, until grouting material 14 solidifies completely, namely bar connecting completes.
Scheme in embodiment is also not used to limit scope of patent protection of the present invention, and the equivalence that all the present invention of disengaging do is implemented or changed, and is all contained in the scope of the claims of this case.

Claims (9)

1. full grout sleeve is used in a building iron connection, comprise sleeve body, first grouting port and the second grouting port, described sleeve body one end is cast-in-site end, the sleeve body other end is prefabricated end, described first grouting port is arranged on the cast-in-site end of sleeve body, described second grouting port is arranged on the prefabricated end of sleeve body, described first grouting port and the second grouting port are all connected with grouting guiding tube, it is characterized in that: on the middle part inwall of described sleeve body, be provided with reinforcing bar axial limiting guide stopper, guiding surface is provided with between described reinforcing bar axial limiting guide stopper and sleeve body inwall.
2. full grout sleeve is used in a kind of building iron connection according to claim 1, it is characterized in that: the quantity of described reinforcing bar axial limiting guide stopper is some, and along the uniform setting of sleeve body inwall circumference.
3. a kind of building iron according to claim 1 connects and uses full grout sleeve, it is characterized in that: sleeve body port and the cast-in-site end bar of the sleeve body port of described prefabricated end and prefabricated end bar, cast-in-site end all adopt matched in clearance.
4. full grout sleeve is used in a kind of building iron connection according to claim 1, it is characterized in that: in the sleeve body of described prefabricated end, be also provided with positioning bolt hole, in positioning bolt hole, positioning bolt is installed, by positioning bolt axis is carried out to prefabricated end bar and radial direction is fixed.
5. full grout sleeve is used in a kind of building iron connection according to claim 1, it is characterized in that: described sleeve body adopts ductile iron one-step casting shaping.
6. a kind of building iron according to claim 1 connects and uses full grout sleeve, in order to ensure the anchored force between full grout sleeve and concrete and grouting material, it is characterized in that: the inside and outside surface of described sleeve body all adopts rough surface.
7. full grout sleeve is used in a kind of building iron connection according to claim 1, in order to prevent full grout sleeve anti-loaded when mounted, it is characterized in that: on the sleeve body port surface of described cast-in-site end, be provided with identification breach.
8. full grout sleeve is used in a kind of building iron connection according to claim 1, it is characterized in that: on described sleeve body inwall, be provided with some protruding ring muscle.
9. full grout sleeve is used in a kind of building iron connection according to claim 1, it is characterized in that: in the sleeve body port of described prefabricated end, be provided with sealing ring.
CN201410610385.3A 2014-10-31 2014-10-31 A kind of building iron connects uses full grout sleeve Expired - Fee Related CN104358360B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410610385.3A CN104358360B (en) 2014-10-31 2014-10-31 A kind of building iron connects uses full grout sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410610385.3A CN104358360B (en) 2014-10-31 2014-10-31 A kind of building iron connects uses full grout sleeve

Publications (2)

Publication Number Publication Date
CN104358360A true CN104358360A (en) 2015-02-18
CN104358360B CN104358360B (en) 2016-08-24

Family

ID=52525657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410610385.3A Expired - Fee Related CN104358360B (en) 2014-10-31 2014-10-31 A kind of building iron connects uses full grout sleeve

Country Status (1)

Country Link
CN (1) CN104358360B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625641A (en) * 2016-02-16 2016-06-01 沈阳建筑大学 FRP (fiber reinforced polymer) grouting sleeve for connecting reinforced steel bars
CN106501495A (en) * 2016-10-21 2017-03-15 河海大学 The detection means and detection method of grouting material degree of compaction in a kind of sleeve
CN106812258A (en) * 2016-12-29 2017-06-09 合肥工业大学 A kind of full grout sleeves of GFRP
CN106930472A (en) * 2015-12-31 2017-07-07 中冶建筑研究总院有限公司 Short sleeve grouting reinforcement connecting joint and its branch sleeve and bearing ring
CN107044192A (en) * 2017-03-17 2017-08-15 合肥工业大学 A kind of full grout sleeve of detachable assembling type
CN107268896A (en) * 2017-07-10 2017-10-20 河北易达钢筋连接技术有限公司 A kind of grout sleeve for bar connecting
CN107476499A (en) * 2017-08-15 2017-12-15 河北易达钢筋连接技术有限公司 A kind of jackscrew sleeve for bar connecting
CN108824705A (en) * 2018-06-25 2018-11-16 江北建设有限公司 A kind of novel building column reinforcing steel bar connecting device
CN110593491A (en) * 2019-10-18 2019-12-20 湖北亚钢金属制造有限公司 Multi-positioning reinforced grouting sleeve and casting and pouring method
CN110905125A (en) * 2019-11-23 2020-03-24 南京市第二建筑设计院有限公司 Fabricated steel bar grouting sleeve for building and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008163556A (en) * 2006-12-27 2008-07-17 Tokyo Tekko Co Ltd Reinforcing bar connecting device
CN201217889Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type grouting reinforced steel coupling sleeve
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN204299044U (en) * 2014-10-31 2015-04-29 沈阳建筑大学 A kind of building iron connects uses full grout sleeve

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008163556A (en) * 2006-12-27 2008-07-17 Tokyo Tekko Co Ltd Reinforcing bar connecting device
CN201217889Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type grouting reinforced steel coupling sleeve
CN103758292A (en) * 2014-01-24 2014-04-30 东南大学 Shearing reinforcing type full-grouting sleeve
CN204299044U (en) * 2014-10-31 2015-04-29 沈阳建筑大学 A kind of building iron connects uses full grout sleeve

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930472B (en) * 2015-12-31 2020-01-03 中冶建筑研究总院有限公司 Short sleeve grouting steel bar connecting joint
CN106930472A (en) * 2015-12-31 2017-07-07 中冶建筑研究总院有限公司 Short sleeve grouting reinforcement connecting joint and its branch sleeve and bearing ring
CN105625641B (en) * 2016-02-16 2018-06-12 沈阳建筑大学 A kind of FRP grout sleeves for bar connecting
CN105625641A (en) * 2016-02-16 2016-06-01 沈阳建筑大学 FRP (fiber reinforced polymer) grouting sleeve for connecting reinforced steel bars
CN106501495A (en) * 2016-10-21 2017-03-15 河海大学 The detection means and detection method of grouting material degree of compaction in a kind of sleeve
CN106812258B (en) * 2016-12-29 2019-05-14 合肥工业大学 A kind of full grout sleeve of GFRP
CN106812258A (en) * 2016-12-29 2017-06-09 合肥工业大学 A kind of full grout sleeves of GFRP
CN107044192A (en) * 2017-03-17 2017-08-15 合肥工业大学 A kind of full grout sleeve of detachable assembling type
CN107268896A (en) * 2017-07-10 2017-10-20 河北易达钢筋连接技术有限公司 A kind of grout sleeve for bar connecting
CN107476499A (en) * 2017-08-15 2017-12-15 河北易达钢筋连接技术有限公司 A kind of jackscrew sleeve for bar connecting
CN108824705A (en) * 2018-06-25 2018-11-16 江北建设有限公司 A kind of novel building column reinforcing steel bar connecting device
CN110593491A (en) * 2019-10-18 2019-12-20 湖北亚钢金属制造有限公司 Multi-positioning reinforced grouting sleeve and casting and pouring method
CN110905125A (en) * 2019-11-23 2020-03-24 南京市第二建筑设计院有限公司 Fabricated steel bar grouting sleeve for building and construction method
CN110905125B (en) * 2019-11-23 2021-11-09 南京市第二建筑设计院有限公司 Fabricated steel bar grouting sleeve for building and construction method

Also Published As

Publication number Publication date
CN104358360B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104358360A (en) Full-grouting sleeve for connection of construction reinforcing steel bars
CN104533021B (en) Full grouting sleeve for connecting steel bars
WO2020024268A1 (en) Tunnel precast lining assembly structure and method therefor
CN204299044U (en) A kind of building iron connects uses full grout sleeve
CN201704878U (en) Combined type reinforcement connecting sleeve
CN207453276U (en) A kind of full grout sleeve for bar connecting
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN202745404U (en) External repairing and reinforcing device of reinforced concrete chimney cylinder wall after tapping and sampling
CN103114722A (en) Three-sectional water stopping screw for basement exterior wall
CN104895585A (en) Construction method of reserved grouting pipe of tunnel vault
CN103590541A (en) Grout sleeve for connecting prefabricated member steel bars and construction method of grout sleeve
CN104963461A (en) Connection method of steel bars between prefabricated parts by adopting steel fiber mortar grouting sleeve
CN205617661U (en) Short sleeve grout steel bar connection connects and connecting sleeve and pressure -bearing ring that have thereof
CN102383601B (en) Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN107762135B (en) Construction method of scaffold wall connecting piece of building outer wall
CN102979183B (en) Embedded cylindrical nut anchor bed and use method thereof
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN106194210B (en) The installation method of tunnel lining trolley, working method and pre-pouring grout pipe fixing device
CN105781019B (en) Assembled architecture bar connecting full grout sleeve and grouting method
CN107740542A (en) One kind three and the connection of muscle bunchy full grout sleeve and three and muscle bunchy connection method
CN204626791U (en) A kind of straight thread reinforced bar live-knot connecting device
CN106638307A (en) Deeply-buried anchorage device
CN103556786A (en) Connecting and grouting sleeve for assembled prefabricated member steel bars and construction method thereof
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN205712499U (en) A kind of concrete body built-in fitting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20201031

CF01 Termination of patent right due to non-payment of annual fee