CN202788874U - Embedded grouting guide tube device in chamber lining concrete - Google Patents

Embedded grouting guide tube device in chamber lining concrete Download PDF

Info

Publication number
CN202788874U
CN202788874U CN 201220507783 CN201220507783U CN202788874U CN 202788874 U CN202788874 U CN 202788874U CN 201220507783 CN201220507783 CN 201220507783 CN 201220507783 U CN201220507783 U CN 201220507783U CN 202788874 U CN202788874 U CN 202788874U
Authority
CN
China
Prior art keywords
tube
plunger
embedded grouting
pipe
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220507783
Other languages
Chinese (zh)
Inventor
李国建
张开广
陈靖敏
黄家权
乐运红
向锐
阮皓
覃智斌
孙海全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN 201220507783 priority Critical patent/CN202788874U/en
Application granted granted Critical
Publication of CN202788874U publication Critical patent/CN202788874U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Provided are an embedded grouting guide tube device in chamber lining concrete and a construction method. The embedded grouting guide tube device comprises an embedded grouting tube embedded in the concrete, a spring is arranged in the embedded grouting tube, and plunger pistons are arranged at two ends of the spring close to a tube opening of the embedded grouting tube. The diameter of the plunger pistons is slightly smaller than the inner diameter of the embedded grouting tube to enable the plunger pistons to slide in the embedded grouting tube, and the concrete cannot enter. The plunger pistons and the spring are arranged in the embedded grouting tube, the plunger pistons at the tube opening of the embedded grouting tube cling to the surface of a template to avoid a gap when the template is accurately adjusted to be in place under the effects of the spring, a problem that the position of the tube opening of the embedded grouting tube is covered by concrete cement paste is solved, the position of the tube opening of the embedded grouting tube is clearly visible after the template is disassembled, and accordingly a technical problem that the embedded grouting tube in chamber lining concrete in the prior art is difficult in accurate position confirmation is solved.

Description

Pre-buried grouting conduit device in a kind of chamber lining concrete
Technical field
The utility model relates to embedded part construction field in the concrete, is specifically related to pre-buried grouting conduit device in a kind of chamber lining concrete.
Background technology
In chamber lining concrete engineering, generally all be designed with backfill, the grout hole such as fixed, do not destroy the structure reinforcing bars in the concrete when holing in order to make, need to be in concrete pre-buried grouting conduit, this kind pre-embedment grouting pipe mostly is greatly iron pipe, must before concreting, install, fixing, after concreting, hole again, grouting construction.When the built-in pipe installation, the built-in pipe mouth of pipe and template contact position often are reserved with certain gap, so that the precision of adjusting template, yet after concreting, gap location is by the cement grout filling, hidden the built-in pipe mouth of pipe, operating personnel are difficult to find its accurately position, in this case, usually adopt the treatment measures of finding out built-in pipe behind air drill or the artificial chisel skim-coat concrete.In real work, not only take time and effort, increase engineering cost, and concrete has been produced destruction to a certain degree, be unfavorable for workmanship, also strengthened the workload of later stage repairing.
Summary of the invention
Technical problem to be solved in the utility model provides pre-buried grouting conduit device in a kind of chamber lining concrete, is convenient to confirm behind the concreting position of pre-embedment grouting pipe.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: pre-buried grouting conduit device in a kind of chamber lining concrete, comprise be used to the pre-embedment grouting pipe that is embedded in the concrete, be provided with spring in the described pre-embedment grouting pipe, the two ends of spring are provided with plunger in the position near the pre-embedment grouting pipe mouth of pipe.
The diameter of described plunger is slightly less than the internal diameter of pre-embedment grouting pipe, so that plunger can slide in pre-embedment grouting pipe, and concrete can't enter.
One end of described pre-embedment grouting pipe also is provided be used to the adhesive tape that prevents that plunger is ejected.
Described plunger adopts hard foam to make.
A kind of job practices that adopts above-mentioned device to carry out pre-buried grouting conduit in the chamber lining concrete:
One, the position mark by the design grout hole goes out the position that need to bury pre-embedment grouting pipe underground on the bedrock surface of chamber side wall and crown;
Two, according to designing requirement binding structure reinforcing bar, in the assembling reinforcement process, make reinforcing bar avoid to bury underground the position of pre-embedment grouting pipe;
Three, pre-embedment grouting pipe is installed;
Four, in pre-embedment grouting pipe, insert plunger, spring and plunger successively, adopt adhesive tape to seal upper orifice after being pressed in the pipe, in order to avoid plunger, spring are deviate from;
Five, after all pre-embedment grouting pipes in the storehouse install, the frame shuttering; After template is preliminary in place, remove the adhesive tape at all pre-embedment grouting pipe mouth of pipe places, the interior plunger of pre-embedment grouting pipe this moment is ejected a part and is close to the surface of template under the effect of spring; The accurate adjustment template is until reach designing requirement;
Six, concreting;
Seven, after concrete strength reaches solidifying phase requirement, with form removable, the plunger at cleaning pre-embedment grouting pipe mouth of pipe place, and the spring in will managing takes out;
Realize the burial and construction of pre-buried grouting conduit in the chamber lining concrete by above-mentioned steps.
In the step 6, notice that in the process of building, vibrate reinforcement is to the protection of pre-embedment grouting pipe.
In the step 3, the end mouth of pipe of pre-embedment grouting pipe aimed at and be close to mark on the batholith face, the pipe shaft of pre-embedment grouting pipe and design grout hole direction are consistent, with iron wire and bar dowel with built-in pipe and structure reinforcing bars colligation/or be welded and fixed.
In the step 4, the plunger that will be positioned at batholith face one side is connected with spring.
Continuing turnover after described plunger and spring reclaim uses.
Pre-buried grouting conduit device in a kind of chamber lining concrete that the utility model provides compared with prior art, has following beneficial effect:
1) by plunger and spring assembly are set in built-in pipe, plunger is under the telescopic action of spring, after the template accurate adjustment is in place, the plunger of pre-embedment grouting pipe nose end always is close to the surface of template and is not produced the gap, the problem of having avoided pre-embedment grouting pipe mouth of pipe position to be covered by the concrete cement slurries, after form removable, the pre-embedment grouting pipe nozzle position is high-visible, thereby solved in the prior art technical barrier that pre-embedment grouting pipe in the chamber lining concrete is difficult to confirm accurate location, the problems that conventional pipe laying method is brought have been overcome, as take time and effort, increase engineering cost, to concrete generation destruction to a certain degree, be unfavorable for workmanship, and strengthened the problems such as workload of later stage repairing.
2) plunger outer diameter of design is slightly less than the pre-embedment grouting pipe internal diameter, in pre-embedment grouting pipe, can move but basic gapless is advisable with plunger, this being designed with is beneficial to that cement grout pours in the pre-embedment grouting pipe when preventing concreting, thereby reduce the some work amount of concrete drill hole, effectively reduced engineering cost.
3) plunger adopts hard foam to make, be conducive to remove quickly and easily, and also with low cost.
The plunger that 4) will be positioned at batholith face one side is connected with spring, specifically can adopt cord, steel wire or direct affixed mode, thereby be convenient to the plunger of batholith face one side is taken out.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is the structural representation of the utility model device.
Fig. 2 is the overall structure schematic diagram in the utility model use procedure.
Among the figure: pre-embedment grouting pipe 1, plunger 2, spring 3, template 4, batholith face 5, adhesive tape 6.
The specific embodiment
In Fig. 1, pre-buried grouting conduit device in a kind of chamber lining concrete comprises being provided with spring 3 be used to the pre-embedment grouting pipe 1 that is embedded in the concrete in the described pre-embedment grouting pipe 1, and the two ends of spring 3 are provided with plunger 2 in the position near pre-embedment grouting pipe 1 mouth of pipe.
The diameter of described plunger 2 is slightly less than the internal diameter of pre-embedment grouting pipe 1, so that plunger 2 can be in pre-embedment grouting pipe 1 interior slip, and concrete can't enter.One end of described pre-embedment grouting pipe 1 also is provided be used to the adhesive tape 6 that prevents that plunger 2 is ejected.Described plunger 2 adopts hard foam to make, is conducive to remove quickly and easily, and with low cost.
In Fig. 2, a kind of job practices that adopts above-mentioned device to carry out pre-buried grouting conduit in the chamber lining concrete:
One, the position by the design grout hole marks the position that need to bury pre-embedment grouting pipe 1 underground with red paint on the bedrock surface 5 of chamber side wall and crown;
Two, according to designing requirement binding structure reinforcing bar, in the assembling reinforcement process, make as far as possible reinforcing bar avoid to bury underground the position of pre-embedment grouting pipe 1, to reduce the burial place deviation of pre-embedment grouting pipe 1.
Three, pre-embedment grouting pipe 1 is installed; The one end mouth of pipe of pre-embedment grouting pipe 1 aimed at and be close to mark on the batholith face 5, the pipe shaft of pre-embedment grouting pipe 1 and design grout hole direction are consistent, with iron wire and bar dowel with built-in pipe 1 and structure reinforcing bars colligation/or be welded and fixed.
Four, in pre-embedment grouting pipe 1, insert plunger 2, spring 3 and plunger 2 successively, adopt adhesive tape 6 to seal upper orifice after being pressed in the pipe, in order to avoid plunger 2, spring 3 are deviate from; In the scheme of optimizing, the plunger 2 that will be positioned at batholith face 5 one sides is connected with spring 3, so that be convenient to the plunger 2 of batholith face 5 one sides is taken out in subsequent handling.
Five, after all pre-embedment grouting pipes 1 in the storehouse install, frame shuttering 4; After template 4 is preliminary in place, remove the adhesive tape 6 at all pre-embedment grouting pipe 1 mouth of pipe places, the plunger 2 in this moment pre-embedment grouting pipe 1 is ejected a part and is close to the surface of template 4 under the effect of spring 3; Accurate adjustment template 4 is until reach designing requirement.
Six, concreting; Notice that in the process of building, vibrate reinforcement is to the protection of pre-embedment grouting pipe 1.
Seven, after concrete strength reaches solidifying phase requirement, template 4 is removed, the plunger 2 at cleaning pre-embedment grouting pipe 1 mouth of pipe place, and the spring in will managing 3 takes out; Continuing turnover after described plunger 2 and spring 3 reclaim uses.
Realize the burial and construction of pre-buried grouting conduit in the chamber lining concrete by above-mentioned steps.

Claims (4)

1. pre-buried grouting conduit device in the chamber lining concrete, comprise be used to the pre-embedment grouting pipe (1) that is embedded in the concrete, it is characterized in that: be provided with spring (3) in the described pre-embedment grouting pipe (1), the two ends of spring (3) are provided with plunger (2) in the position near pre-embedment grouting pipe (1) mouth of pipe.
2. pre-buried grouting conduit device in a kind of chamber lining concrete according to claim 1, it is characterized in that: the diameter of described plunger (2) is slightly less than the internal diameter of pre-embedment grouting pipe (1), so that plunger (2) can slide in pre-embedment grouting pipe (1), and concrete can't enter.
3. pre-buried grouting conduit device in a kind of chamber lining concrete according to claim 1, it is characterized in that: an end of described pre-embedment grouting pipe (1) also is provided be used to the adhesive tape (6) that prevents that plunger (2) is ejected.
4. pre-buried grouting conduit device in each described a kind of chamber lining concrete according to claim 1~3, it is characterized in that: described plunger (2) adopts hard foam to make.
CN 201220507783 2012-09-27 2012-09-27 Embedded grouting guide tube device in chamber lining concrete Expired - Fee Related CN202788874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220507783 CN202788874U (en) 2012-09-27 2012-09-27 Embedded grouting guide tube device in chamber lining concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220507783 CN202788874U (en) 2012-09-27 2012-09-27 Embedded grouting guide tube device in chamber lining concrete

Publications (1)

Publication Number Publication Date
CN202788874U true CN202788874U (en) 2013-03-13

Family

ID=47816149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220507783 Expired - Fee Related CN202788874U (en) 2012-09-27 2012-09-27 Embedded grouting guide tube device in chamber lining concrete

Country Status (1)

Country Link
CN (1) CN202788874U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102865087A (en) * 2012-09-27 2013-01-09 中国葛洲坝集团股份有限公司 Embedded grout pipe device in lining concrete of chamber and construction method
CN105003285A (en) * 2015-06-12 2015-10-28 中国水利水电第三工程局有限公司 Nest sound-concentrating device for grouting and embedding of reinforced concrete works

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102865087A (en) * 2012-09-27 2013-01-09 中国葛洲坝集团股份有限公司 Embedded grout pipe device in lining concrete of chamber and construction method
CN102865087B (en) * 2012-09-27 2014-12-10 中国葛洲坝集团股份有限公司 Embedded grout pipe device in lining concrete of chamber and construction method
CN105003285A (en) * 2015-06-12 2015-10-28 中国水利水电第三工程局有限公司 Nest sound-concentrating device for grouting and embedding of reinforced concrete works

Similar Documents

Publication Publication Date Title
CN108916467B (en) Large-caliber S-shaped curve pipe jacking construction method
CN103321436A (en) Pre-installation construction method for wire box on building bricked body and pre-installation supporting frame thereof
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN104762978B (en) A kind of anchor pole Gravity Retaining Wall for high slope rockmass and manufacture method
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN103276723A (en) Construction method of concrete bored secant pile
CN203383508U (en) One-sided formwork body structure backing onto brick concrete retaining wall
CN202788874U (en) Embedded grouting guide tube device in chamber lining concrete
CN209686856U (en) Deep basal pit outer wall of basement steel tube fastener diagonal brace single side formwork system
CN204626453U (en) The supporting device of pipeline in Urban Underground pipe gallery
CN110306396A (en) A kind of assembly concrete road surface and construction method
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN204781973U (en) Antiseep plugging device in split bolt hole
CN203113332U (en) Anchor rod construction structure device after construction
CN208472692U (en) A kind of inclinometer pipe protective device for dam facing pipe connection method
CN110985052A (en) Self-compacting concrete pouring construction process method
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN104895401B (en) Combined type assembles enclosure wall and its construction method
CN209670134U (en) Assembled wall right angle connecting structure
CN209924089U (en) A well device of riding on horse for pipeline construction
CN202755381U (en) Joint box for underground continuous wall
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN105570532B (en) A kind of deviation rectification construction method of push pipe offset deviation
CN211473397U (en) Fixing device for pre-buried water pipe sleeve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20190927

CF01 Termination of patent right due to non-payment of annual fee