CN102865087A - Embedded grout pipe device in lining concrete of chamber and construction method - Google Patents
Embedded grout pipe device in lining concrete of chamber and construction method Download PDFInfo
- Publication number
- CN102865087A CN102865087A CN2012103733753A CN201210373375A CN102865087A CN 102865087 A CN102865087 A CN 102865087A CN 2012103733753 A CN2012103733753 A CN 2012103733753A CN 201210373375 A CN201210373375 A CN 201210373375A CN 102865087 A CN102865087 A CN 102865087A
- Authority
- CN
- China
- Prior art keywords
- pipe
- plunger
- embedment
- grouting pipe
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Disclosed are an embedded grout pipe device in lining concrete of a chamber and a construction method. The embedded grout pipe device comprises an embedded grout pipe used for being embedded in the concrete, a spring is arranged in the embedded grout pipe, and plungers are arranged at two ends of the spring and are close to orifices of the embedded grout pipe. The diameter of each plunger is slightly smaller than the inner diameter of the embedded grout pipe, so that the plunger can slide in the embedded grout pipe while the concrete cannot flow into the embedded grout pipe. A combination of the plunger and the spring is arranged in the embedded pipe, the plunger at the orifice ends of the embedded grout pipe always cling to the surface of a formwork without a gap after the formwork is accurately adjusted in place, the problem that orifices of an existing embedded grout pipe are covered by cement grout of concrete is avoided, the orifices of the embedded grout pipe are clearly visible after the formwork is detached, and accordingly the technical problem that the existing embedded grout pipe in lining concrete of a chamber in the prior art is accurately positioned difficultly is solved.
Description
Technical field
The present invention relates to embedded part construction field in the concrete, be specifically related to pre-buried grouting conduit device and job practices in a kind of chamber lining concrete.
Background technology
In chamber lining concrete engineering, generally all be designed with backfill, the grout hole such as fixed, do not destroy the structure reinforcing bars in the concrete when holing in order to make, need to be in concrete pre-buried grouting conduit, this kind pre-embedment grouting pipe mostly is greatly iron pipe, must before concreting, install, fixing, after concreting, hole again, grouting construction.When the built-in pipe installation, the built-in pipe mouth of pipe and template contact position often are reserved with certain gap, so that the precision of adjusting template, yet after concreting, gap location is by the cement grout filling, hidden the built-in pipe mouth of pipe, operating personnel are difficult to find its accurately position, in this case, usually adopt the treatment measures of finding out built-in pipe behind air drill or the artificial chisel skim-coat concrete.In real work, not only take time and effort, increase engineering cost, and concrete has been produced destruction to a certain degree, be unfavorable for workmanship, also strengthened the workload of later stage repairing.
Summary of the invention
Technical problem to be solved by this invention provides pre-buried grouting conduit device and job practices in a kind of chamber lining concrete, is convenient to confirm behind the concreting position of pre-embedment grouting pipe.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is: pre-buried grouting conduit device in a kind of chamber lining concrete, comprise be used to the pre-embedment grouting pipe that is embedded in the concrete, be provided with spring in the described pre-embedment grouting pipe, the two ends of spring are provided with plunger in the position near the pre-embedment grouting pipe mouth of pipe.
The diameter of described plunger is slightly less than the internal diameter of pre-embedment grouting pipe, so that plunger can slide in pre-embedment grouting pipe, and concrete can't enter.
One end of described pre-embedment grouting pipe also is provided be used to the adhesive tape that prevents that plunger is ejected.
Described plunger adopts hard foam to make.
A kind of job practices that adopts above-mentioned device to carry out pre-buried grouting conduit in the chamber lining concrete:
One, the position mark by the design grout hole goes out the position that need to bury pre-embedment grouting pipe underground on the bedrock surface of chamber side wall and crown;
Two, according to designing requirement binding structure reinforcing bar, in the assembling reinforcement process, make reinforcing bar avoid to bury underground the position of pre-embedment grouting pipe;
Three, pre-embedment grouting pipe is installed;
Four, in pre-embedment grouting pipe, insert plunger, spring and plunger successively, adopt adhesive tape to seal upper orifice after being pressed in the pipe, in order to avoid plunger, spring are deviate from;
Five, after all pre-embedment grouting pipes in the storehouse install, the frame shuttering; After template is preliminary in place, remove the adhesive tape at all pre-embedment grouting pipe mouth of pipe places, the interior plunger of pre-embedment grouting pipe this moment is ejected a part and is close to the surface of template under the effect of spring; The accurate adjustment template is until reach designing requirement;
Six, concreting;
Seven, after concrete strength reaches solidifying phase requirement, with form removable, the plunger at cleaning pre-embedment grouting pipe mouth of pipe place, and the spring in will managing takes out;
Realize the burial and construction of pre-buried grouting conduit in the chamber lining concrete by above-mentioned steps.
In the step 6, notice that in the process of building, vibrate reinforcement is to the protection of pre-embedment grouting pipe.
In the step 3, the end mouth of pipe of pre-embedment grouting pipe aimed at and be close to mark on the batholith face, the pipe shaft of pre-embedment grouting pipe and design grout hole direction are consistent, with iron wire and bar dowel with built-in pipe and structure reinforcing bars colligation/or be welded and fixed.
In the step 4, the plunger that will be positioned at batholith face one side is connected with spring.
Continuing turnover after described plunger and spring reclaim uses.
Pre-buried grouting conduit device and job practices in a kind of chamber lining concrete provided by the invention compared with prior art, have following beneficial effect:
1) by plunger and spring assembly are set in built-in pipe, plunger is under the telescopic action of spring, after the template accurate adjustment is in place, the plunger of pre-embedment grouting pipe nose end always is close to the surface of template and is not produced the gap, the problem of having avoided pre-embedment grouting pipe mouth of pipe position to be covered by the concrete cement slurries, after form removable, the pre-embedment grouting pipe nozzle position is high-visible, thereby solved in the prior art technical barrier that pre-embedment grouting pipe in the chamber lining concrete is difficult to confirm accurate location, the problems that conventional pipe laying method is brought have been overcome, as take time and effort, increase engineering cost, to concrete generation destruction to a certain degree, be unfavorable for workmanship, and strengthened the problems such as workload of later stage repairing.
2) plunger outer diameter of design is slightly less than the pre-embedment grouting pipe internal diameter, in pre-embedment grouting pipe, can move but basic gapless is advisable with plunger, this being designed with is beneficial to that cement grout pours in the pre-embedment grouting pipe when preventing concreting, thereby reduce the some work amount of concrete drill hole, effectively reduced engineering cost.
3) plunger adopts hard foam to make, be conducive to remove quickly and easily, and also with low cost.
The plunger that 4) will be positioned at batholith face one side is connected with spring, specifically can adopt cord, steel wire or direct affixed mode, thereby be convenient to the plunger of batholith face one side is taken out.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is the structural representation of apparatus of the present invention.
Fig. 2 is the overall structure schematic diagram in the use procedure of the present invention.
Among the figure: pre-embedment grouting pipe 1, plunger 2, spring 3, template 4, batholith face 5, adhesive tape 6.
The specific embodiment
In Fig. 1, pre-buried grouting conduit device in a kind of chamber lining concrete comprises being provided with spring 3 be used to the pre-embedment grouting pipe 1 that is embedded in the concrete in the described pre-embedment grouting pipe 1, and the two ends of spring 3 are provided with plunger 2 in the position near pre-embedment grouting pipe 1 mouth of pipe.
The diameter of described plunger 2 is slightly less than the internal diameter of pre-embedment grouting pipe 1, so that plunger 2 can be in pre-embedment grouting pipe 1 interior slip, and concrete can't enter.One end of described pre-embedment grouting pipe 1 also is provided be used to the adhesive tape 6 that prevents that plunger 2 is ejected.Described plunger 2 adopts hard foam to make, is conducive to remove quickly and easily, and with low cost.
In Fig. 2, a kind of job practices that adopts above-mentioned device to carry out pre-buried grouting conduit in the chamber lining concrete:
One, the position by the design grout hole marks the position that need to bury pre-embedment grouting pipe 1 underground with red paint on the bedrock surface 5 of chamber side wall and crown;
Two, according to designing requirement binding structure reinforcing bar, in the assembling reinforcement process, make as far as possible reinforcing bar avoid to bury underground the position of pre-embedment grouting pipe 1, to reduce the burial place deviation of pre-embedment grouting pipe 1.
Three, pre-embedment grouting pipe 1 is installed; The one end mouth of pipe of pre-embedment grouting pipe 1 aimed at and be close to mark on the batholith face 5, the pipe shaft of pre-embedment grouting pipe 1 and design grout hole direction are consistent, with iron wire and bar dowel with built-in pipe 1 and structure reinforcing bars colligation/or be welded and fixed.
Four, in pre-embedment grouting pipe 1, insert plunger 2, spring 3 and plunger 2 successively, adopt adhesive tape 6 to seal upper orifice after being pressed in the pipe, in order to avoid plunger 2, spring 3 are deviate from; In the scheme of optimizing, the plunger 2 that will be positioned at batholith face 5 one sides is connected with spring 3, so that be convenient to the plunger 2 of batholith face 5 one sides is taken out in subsequent handling.
Five, after all pre-embedment grouting pipes 1 in the storehouse install, frame shuttering 4; After template 4 is preliminary in place, remove the adhesive tape 6 at all pre-embedment grouting pipe 1 mouth of pipe places, the plunger 2 in this moment pre-embedment grouting pipe 1 is ejected a part and is close to the surface of template 4 under the effect of spring 3; Accurate adjustment template 4 is until reach designing requirement.
Six, concreting; Notice that in the process of building, vibrate reinforcement is to the protection of pre-embedment grouting pipe 1.
Seven, after concrete strength reaches solidifying phase requirement, template 4 is removed, the plunger 2 at cleaning pre-embedment grouting pipe 1 mouth of pipe place, and the spring in will managing 3 takes out; Continuing turnover after described plunger 2 and spring 3 reclaim uses.
Realize the burial and construction of pre-buried grouting conduit in the chamber lining concrete by above-mentioned steps.
Claims (9)
1. pre-buried grouting conduit device in the chamber lining concrete, comprise be used to the pre-embedment grouting pipe (1) that is embedded in the concrete, it is characterized in that: be provided with spring (3) in the described pre-embedment grouting pipe (1), the two ends of spring (3) are provided with plunger (2) in the position near pre-embedment grouting pipe (1) mouth of pipe.
2. pre-buried grouting conduit device in a kind of chamber lining concrete according to claim 1, it is characterized in that: the diameter of described plunger (2) is slightly less than the internal diameter of pre-embedment grouting pipe (1), so that plunger (2) can slide in pre-embedment grouting pipe (1), and concrete can't enter.
3. pre-buried grouting conduit device in a kind of chamber lining concrete according to claim 1, it is characterized in that: an end of described pre-embedment grouting pipe (1) also is provided be used to the adhesive tape (6) that prevents that plunger (2) is ejected.
4. pre-buried grouting conduit device in each described a kind of chamber lining concrete according to claim 1~3, it is characterized in that: described plunger (2) adopts hard foam to make.
5. job practices that adopts each described device of claim 1~4 to carry out pre-buried grouting conduit in the chamber lining concrete is characterized in that:
One, goes out the position that to bury pre-embedment grouting pipe (1) underground at the upper position mark by the design grout hole of the bedrock surface (5) of chamber side wall and crown;
Two, according to designing requirement binding structure reinforcing bar, in the assembling reinforcement process, make reinforcing bar avoid to bury underground the position of pre-embedment grouting pipe (1);
Three, pre-embedment grouting pipe (1) is installed;
Four, in pre-embedment grouting pipe (1), insert plunger (2), spring (3) and plunger (2) successively, adopt adhesive tape (6) to seal upper orifice after being pressed in the pipe, in order to avoid plunger (2), spring (3) are deviate from;
Five, after all pre-embedment grouting pipes (1) in the storehouse install, frame shuttering (4); After template (4) is preliminary in place, remove the adhesive tape (6) at all pre-embedment grouting pipes (1) mouth of pipe place, the plunger (2) in pre-embedment grouting pipe this moment (1) is ejected a part and is close to the surface of template (4) under the effect of spring (3); Accurate adjustment template (4) is until reach designing requirement;
Six, concreting;
Seven, after concrete strength reaches solidifying phase requirement, template (4) is removed, the plunger (2) at cleaning pre-embedment grouting pipe (1) mouth of pipe place, and the spring (3) in will managing takes out;
Realize the burial and construction of pre-buried grouting conduit in the chamber lining concrete by above-mentioned steps.
6. the job practices of pre-buried grouting conduit in a kind of chamber lining concrete according to claim 5 is characterized in that: in the step 6, notice that in the process of building, vibrate reinforcement is to the protection of pre-embedment grouting pipe (1).
7. the job practices of pre-buried grouting conduit in a kind of chamber lining concrete according to claim 5, it is characterized in that: in the step 3, the one end mouth of pipe of pre-embedment grouting pipe (1) aimed at and be close to mark on the batholith face (5), the pipe shaft that makes simultaneously pre-embedment grouting pipe (1) is consistent with design grout hole direction, with iron wire and bar dowel with built-in pipe (1) and structure reinforcing bars colligation/or be welded and fixed.
8. the job practices of pre-buried grouting conduit in a kind of chamber lining concrete according to claim 5, it is characterized in that: in the step 4, the plunger (2) that will be positioned at batholith face (5) one sides is connected with spring (3).
9. the job practices of pre-buried grouting conduit in a kind of chamber lining concrete according to claim 5 is characterized in that: continue turnover after described plunger (2) and spring (3) reclaim and use.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210373375.3A CN102865087B (en) | 2012-09-27 | 2012-09-27 | Embedded grout pipe device in lining concrete of chamber and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210373375.3A CN102865087B (en) | 2012-09-27 | 2012-09-27 | Embedded grout pipe device in lining concrete of chamber and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102865087A true CN102865087A (en) | 2013-01-09 |
CN102865087B CN102865087B (en) | 2014-12-10 |
Family
ID=47444188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210373375.3A Active CN102865087B (en) | 2012-09-27 | 2012-09-27 | Embedded grout pipe device in lining concrete of chamber and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102865087B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107419710A (en) * | 2017-09-28 | 2017-12-01 | 国家电网公司 | A kind of pre-buried technique of cavern's lining concrete grout pipe |
CN107653891A (en) * | 2017-10-25 | 2018-02-02 | 中国电建集团华东勘测设计研究院有限公司 | The slding form operation concrete structure of pre-buried cable pipe laying |
CN109184221A (en) * | 2018-08-27 | 2019-01-11 | 中国水利水电第十四工程局有限公司 | Anchor rib construction method is planted after a kind of concrete |
CN111466946A (en) * | 2020-03-11 | 2020-07-31 | 朱冯森 | Medical silica gel receiver and manufacturing method and processing die thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130980A (en) * | 2017-06-28 | 2017-09-05 | 中国水利水电第十四工程局有限公司 | A kind of construction method of tunnel bad geological section consolidation by grouting |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005179891A (en) * | 2003-12-16 | 2005-07-07 | Kfc Ltd | Construction method of tunnel lining concrete |
CN2921134Y (en) * | 2006-06-06 | 2007-07-11 | 曹世贵 | Construction joint built-in slip casting pipe |
JP4557941B2 (en) * | 2006-08-31 | 2010-10-06 | 株式会社奥村組 | Tunnel lining concrete placement method and placement structure |
CN202325543U (en) * | 2011-10-31 | 2012-07-11 | 中国水利水电第十工程局有限公司 | Embedded grouting device |
CN202788874U (en) * | 2012-09-27 | 2013-03-13 | 中国葛洲坝集团股份有限公司 | Embedded grouting guide tube device in chamber lining concrete |
-
2012
- 2012-09-27 CN CN201210373375.3A patent/CN102865087B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005179891A (en) * | 2003-12-16 | 2005-07-07 | Kfc Ltd | Construction method of tunnel lining concrete |
CN2921134Y (en) * | 2006-06-06 | 2007-07-11 | 曹世贵 | Construction joint built-in slip casting pipe |
JP4557941B2 (en) * | 2006-08-31 | 2010-10-06 | 株式会社奥村組 | Tunnel lining concrete placement method and placement structure |
CN202325543U (en) * | 2011-10-31 | 2012-07-11 | 中国水利水电第十工程局有限公司 | Embedded grouting device |
CN202788874U (en) * | 2012-09-27 | 2013-03-13 | 中国葛洲坝集团股份有限公司 | Embedded grouting guide tube device in chamber lining concrete |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107419710A (en) * | 2017-09-28 | 2017-12-01 | 国家电网公司 | A kind of pre-buried technique of cavern's lining concrete grout pipe |
CN107419710B (en) * | 2017-09-28 | 2023-07-14 | 国家电网公司 | Pre-burying process of tunnel lining concrete grouting pipe |
CN107653891A (en) * | 2017-10-25 | 2018-02-02 | 中国电建集团华东勘测设计研究院有限公司 | The slding form operation concrete structure of pre-buried cable pipe laying |
CN109184221A (en) * | 2018-08-27 | 2019-01-11 | 中国水利水电第十四工程局有限公司 | Anchor rib construction method is planted after a kind of concrete |
CN111466946A (en) * | 2020-03-11 | 2020-07-31 | 朱冯森 | Medical silica gel receiver and manufacturing method and processing die thereof |
Also Published As
Publication number | Publication date |
---|---|
CN102865087B (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN103556819B (en) | A kind of construction method of reserved constructional column hole on beam slab | |
CN103276723A (en) | Construction method of concrete bored secant pile | |
CN107394648A (en) | Servicing unit for strong and weak electronic box location and installation | |
CN103437772A (en) | Pipe-jacking construction method of underground passage and tunnel structure | |
CN202788874U (en) | Embedded grouting guide tube device in chamber lining concrete | |
CN209686856U (en) | Deep basal pit outer wall of basement steel tube fastener diagonal brace single side formwork system | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN105065040B (en) | A kind of prefabricated underground space tunneling construction method of top plate | |
CN107762135A (en) | The construction method of skin scaffold wall connecting piece | |
CN206845195U (en) | A kind of tunnel grouting device | |
CN110552378A (en) | Underground space roof subsides post-cast strip and seals structure in advance | |
CN204781973U (en) | Antiseep plugging device in split bolt hole | |
CN102995666A (en) | Construction method for reducing effect of vibration on peripheral buildings (structures) | |
CN208685674U (en) | A kind of protective device of underground overlapping wall reinforcing bar connector | |
JP4897985B2 (en) | Hardener injection pipe for earth retaining work and earth retaining method | |
CN110985052A (en) | Self-compacting concrete pouring construction process method | |
CN203113332U (en) | Anchor rod construction structure device after construction | |
CN104963364A (en) | Disposing method for topdown structural slab lower side wall construction joint | |
CN209670134U (en) | Assembled wall right angle connecting structure | |
CN209924089U (en) | A well device of riding on horse for pipeline construction | |
CN209468762U (en) | A kind of novel grouting device | |
CN113898381B (en) | Grouting method for prestressed lining | |
CN211473397U (en) | Fixing device for pre-buried water pipe sleeve | |
CN205243059U (en) | Ancient building restoration structure reinforcing slip casting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |