CN206693653U - Concrete pouring structure exposed steel bar safeguard structure - Google Patents

Concrete pouring structure exposed steel bar safeguard structure Download PDF

Info

Publication number
CN206693653U
CN206693653U CN201720441969.1U CN201720441969U CN206693653U CN 206693653 U CN206693653 U CN 206693653U CN 201720441969 U CN201720441969 U CN 201720441969U CN 206693653 U CN206693653 U CN 206693653U
Authority
CN
China
Prior art keywords
plastic
adapter
reinforcing bar
concrete structure
structure body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720441969.1U
Other languages
Chinese (zh)
Inventor
杜小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201720441969.1U priority Critical patent/CN206693653U/en
Application granted granted Critical
Publication of CN206693653U publication Critical patent/CN206693653U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a kind of concrete pouring structure exposed steel bar safeguard structure, including concrete structure body and expose to the reinforcing bar of concrete structure body, in reinforcing bar an adapter of plastic is arranged with close to one end of concrete structure body, cement mortar is filled with the inside of adapter of plastic, the adapter of plastic is fixed together by cement mortar and concrete structure body and reinforcing bar;A plastic bushing is arranged with reinforcing bar, the front end of the plastic bushing is connected by binding agent with adapter of plastic sealing, after its rear end extends to outside of the reinforcing bar away from concrete structure body one end, is connected by binding agent with plug sealing.The utility model is simple in construction, easy for construction, can effectively improve efficiency of construction, and reduce construction cost.

Description

Concrete pouring structure exposed steel bar safeguard structure
Technical field
It the utility model is related to technical field of building construction, more particularly to a kind of protection of concrete pouring structure exposed steel bar Structure.
Background technology
At present, in Building Construction, especially in reinforced concrete structure pouring construction, to meet setting for building Meter and construction requirement, often can be by concrete the problems such as such as eliminating contraction distortion in course of hardening and cause structure crack Structural segmented construction, according to the construction technology of concrete structure, would generally be left unused after the completion of one section of building structure construction one section when Between, generally 30 days~90 days, some was even longer, was spaced more than 1 year, or because some reason project treatments Downtime.During idle, the exposed reinforcing bar of concrete structure easily gets rusty quickly in atmosphere, so as to influence subsequently to apply Work, and lengthening over time, will appear from corrosion, reinforcing steel area is diminished, or even easily cause structure malicious event.
In the prior art, typically antirust is carried out in modes such as rebar surface brushing cement mortar, antirust paints;But construct Process is more troublesome, less efficient;And cement mortar antirust is used, with the extension of time, weathering easily occurs in cement, is made Come off into cement;And construction cost, and not easy-clear can be greatly increased using antirust paint.
Utility model content
For deficiencies of the prior art, the purpose of this utility model is that solving exposed reinforcement anti-rust structure applies The problem of work bothers, low construction efficiency, and cost is high, there is provided a kind of concrete pouring structure exposed steel bar safeguard structure, apply Work is convenient, can effectively improve efficiency of construction, and reduce construction cost.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is such:A kind of concreting Structure exposed steel bar safeguard structure, including concrete structure body and the reinforcing bar for exposing to concrete structure body, its feature exist In:In reinforcing bar an adapter of plastic, and the adapter of plastic and concrete structure sheet are arranged with close to one end of concrete structure body Body is close to, and cement mortar is filled with the inside of adapter of plastic, and the adapter of plastic passes through cement mortar and concrete structure body And reinforcing bar is fixed together;
A plastic bushing is arranged with reinforcing bar, the front end of the plastic bushing seals phase by binding agent and adapter of plastic Even, after its rear end extends to outside of the reinforcing bar away from concrete structure body one end, it is connected by binding agent with plug sealing.
Further, it is provided with along its length on plastic bushing some around the plastic bushing tearing groove of one week.
Further, the adapter of plastic is tapered, and its bigger diameter end diameter is more than plastic bushing diameter, and miner diameter end diameter is small In plastic bushing diameter, and the bigger diameter end of adapter of plastic is close to concrete structure body.
Further, a sealing gasket is also arranged with respectively close to one end of one end of adapter of plastic and close plug in reinforcing bar Circle.
Compared with prior art, the utility model has the following advantages that:
1st, it is simple in construction, it is easy for construction, quick, efficiency of construction can be effectively improved;Exposed steel bar is sealed in sleeve pipe, So that exposed steel bar and air, rainwater etc. completely cut off, so as to effectively prevent exposed steel bar from getting rusty and corrosion etc..
2nd, protected using plastic bushing, need to only damage plastic bushing fore-end can complete to dismantle, and remaining Plastic bushing can continue on for shorter exposed steel bar, or continue to make after connecting segment plastic bushing by jointing With so as to effectively reduce construction cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the enlarged drawing of local A in Fig. 1.
In figure:1-concrete structure body, 2-reinforcing bar, 3-adapter of plastic, 4-cement mortar, 5-plastic bushing, 6-plug, 7-tearing groove.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment:Referring to Fig. 1, Fig. 2, a kind of concrete pouring structure exposed steel bar safeguard structure, including concrete structure Body 1 and the reinforcing bar 2 for exposing to concrete structure body 1.In reinforcing bar 2 one is arranged with close to one end of concrete structure body 1 Adapter of plastic 3, and the adapter of plastic 3 is close to concrete structure body 1, and cement mortar 4 is filled with the inner side of adapter of plastic 3, The adapter of plastic 3 is fixed together by cement mortar 4 and concrete structure body 1 and reinforcing bar 2;When it is implemented, The cement mortar 4 is broken into pieces using low-grade cement mortar 4, during in order to remove;Embedding is carried out by cement mortar 4, not only Sealing effectiveness can be improved, and the strength and stability of adapter of plastic 3 can be improved;Construction is also more convenient.
A plastic bushing 5 is arranged with reinforcing bar 2, if when it is implemented, being provided with along its length on plastic bushing 5 Do around the plastic bushing tearing groove of 5 one weeks 7, and the axial direction of tearing groove 7 is axially consistent with plastic bushing 5;So, it is existing in construction , only need to be according to the length of exposed steel bar 2, you can excessive plastic bushing 5 broken by tearing groove 7 it is disconnected so that plastic sheath The length of pipe 5 and reinforcing bar 2 matches, and makes construction more convenient, further improves efficiency of construction.The front end of the plastic bushing 5 It is connected by binding agent with the sealing of adapter of plastic 3, its rear end extends to outside of the reinforcing bar 2 away from the one end of concrete structure body 1 Afterwards, it is connected by binding agent with a plug 6 sealing.To improve the sealing effectiveness of plastic bushing 5, in reinforcing bar 2 close to adapter of plastic 3 One end and be also arranged with a seal washer respectively close to one end of plug 6;Also, can so make the both ends of plastic bushing 5 with The connective stability of reinforcing bar 2 is more preferable.
The adapter of plastic 3 is tapered, and its bigger diameter end diameter is more than the diameter of plastic bushing 5, and miner diameter end diameter is less than plastics The diameter of sleeve pipe 5, and the bigger diameter end of adapter of plastic 3 is close to concrete structure body 1;So that plastic bushing 5 can be preferably Realize that sealing coordinates with adapter of plastic 3, to ensure the sealing effectiveness of reinforcing bar 2.
During practice of construction, the cement mortar 4 inserts the under-filled of adapter of plastic 3, the front end of plastic bushing 5 It is connected after adapter of plastic 3 with adapter of plastic 3;In such manner, it is possible to using the smaller plastic bushing 5 of diameter, so as to further reduce modeling Expect the cavity between sleeve pipe 5 and reinforcing bar 2, reduce the storage of air, got rusty so as to be better protected from reinforcing bar 2.
It is last it should be noted that above example is only illustrating the technical solution of the utility model rather than restriction technologies Scheme, it will be understood by those within the art that, those are modified or are equal to the technical solution of the utility model Replace, without departing from the objective and scope of the technical program, all should cover among right of the present utility model.

Claims (4)

1. a kind of concrete pouring structure exposed steel bar safeguard structure, including concrete structure body and expose to concrete structure The reinforcing bar of body, it is characterised in that:In reinforcing bar an adapter of plastic, and the plastics are arranged with close to one end of concrete structure body Joint is close to concrete structure body, and cement mortar is filled with the inside of adapter of plastic, and the adapter of plastic passes through cement bonded sand Slurry is fixed together with concrete structure body and reinforcing bar;
A plastic bushing is arranged with reinforcing bar, the front end of the plastic bushing is connected by binding agent with adapter of plastic sealing, After its rear end extends to outside of the reinforcing bar away from concrete structure body one end, it is connected by binding agent with plug sealing.
2. concrete pouring structure exposed steel bar safeguard structure according to claim 1, it is characterised in that:In plastic bushing On along its length be provided with it is some around the plastic bushing tearing groove of one week.
3. concrete pouring structure exposed steel bar safeguard structure according to claim 1, it is characterised in that:The plastics connect Tapered, its bigger diameter end diameter is more than plastic bushing diameter, and miner diameter end diameter is less than plastic bushing diameter, and adapter of plastic Bigger diameter end is close to concrete structure body.
4. concrete pouring structure exposed steel bar safeguard structure according to claim 1, it is characterised in that:It is close in reinforcing bar One end of adapter of plastic and one end of close plug are also arranged with a seal washer respectively.
CN201720441969.1U 2017-04-25 2017-04-25 Concrete pouring structure exposed steel bar safeguard structure Active CN206693653U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720441969.1U CN206693653U (en) 2017-04-25 2017-04-25 Concrete pouring structure exposed steel bar safeguard structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720441969.1U CN206693653U (en) 2017-04-25 2017-04-25 Concrete pouring structure exposed steel bar safeguard structure

Publications (1)

Publication Number Publication Date
CN206693653U true CN206693653U (en) 2017-12-01

Family

ID=60446089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720441969.1U Active CN206693653U (en) 2017-04-25 2017-04-25 Concrete pouring structure exposed steel bar safeguard structure

Country Status (1)

Country Link
CN (1) CN206693653U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067397A (en) * 2019-04-19 2019-07-30 安徽企服工程技术有限公司 A kind of pre-buried leakage reinforcing bar protection component of architectural engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067397A (en) * 2019-04-19 2019-07-30 安徽企服工程技术有限公司 A kind of pre-buried leakage reinforcing bar protection component of architectural engineering
CN110067397B (en) * 2019-04-19 2020-12-15 安徽省华腾农业科技有限公司经开区分公司 Pre-buried outer steel bar protection component that leaks of building engineering

Similar Documents

Publication Publication Date Title
CN101956388B (en) Novel clamp device and fixing method for grouting risers of ocean platform
CN103132690B (en) Basement exterior wall unilateral template and method for supporting template thereof
CN104895587B (en) Construction method for pressure pouring of concrete for tunnel secondary lining
CN208534047U (en) Sealing up screw can be recycled in combined type
CN106401205A (en) Construction method for reinforcement of externally bonded profile steel of reinforced concrete structure
CN106049493A (en) Anti-corrosion prefabricated grouting anchor rod for highly corrosive environment
CN206693653U (en) Concrete pouring structure exposed steel bar safeguard structure
CN205205695U (en) Consolidate pier
CN102383601B (en) Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN106760080B (en) Postposition concrete heat-insulating Curtainwall connector and construction method
CN203960812U (en) Hydraulic concrete structure shrinkage joint embedded water stop band repair structure
CN204267915U (en) Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection
CN103670439B (en) Lining construction method
CN206861072U (en) A kind of miniature compound jacking construction reinforced concrete sewer pipe of inside lining anti-corrosive
CN103343577B (en) The shear wall water-stopping method of removable docking screw rod
CN104612398B (en) Sunken wire tube position prevention and cure of crack construction method after masonry
CN202597912U (en) Novel anti-corrosion steel band clamp
CN205894070U (en) A corrosion -resistant prefabricated grouted rock bolt for strongly -corrosive environment
CN207935591U (en) A kind of quick coupling device for connecting Grouting Pipe and advanced tubule
CN203770346U (en) High-intensity corrosion-proof bolt kit for precast concrete slab joint
CN203213147U (en) Temporary plugging wall for underground reinforced concrete box culvert structure
CN106368215B (en) Pre-buried slip casting pipe assembly
CN205329900U (en) Prefabricated coincide wallboard underground waterproof construction
CN208918030U (en) A kind of outer wall of basement Screw arbor with nut at both-ends hole plugging structure
CN207959218U (en) A kind of assembly device of Grouting Pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant