CN102383601A - Method and device for leading pre-embedded pipes in concrete out of side wall joints - Google Patents

Method and device for leading pre-embedded pipes in concrete out of side wall joints Download PDF

Info

Publication number
CN102383601A
CN102383601A CN2011102473379A CN201110247337A CN102383601A CN 102383601 A CN102383601 A CN 102383601A CN 2011102473379 A CN2011102473379 A CN 2011102473379A CN 201110247337 A CN201110247337 A CN 201110247337A CN 102383601 A CN102383601 A CN 102383601A
Authority
CN
China
Prior art keywords
pipe
side wall
concrete
template
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102473379A
Other languages
Chinese (zh)
Other versions
CN102383601B (en
Inventor
戴志清
任崇峰
盛信平
商永红
覃志斌
黄家权
乐运红
齐界夷
关小猛
闫晓萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2011102473379A priority Critical patent/CN102383601B/en
Publication of CN102383601A publication Critical patent/CN102383601A/en
Application granted granted Critical
Publication of CN102383601B publication Critical patent/CN102383601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a method for leading pre-embedded pipes in concrete out of side wall joints, comprising the following steps: A, positioning a pipe pre-embedded in concrete; B, binding reinforcing steel bars of side walls according to the design requirements, and erecting a template of a side wall; C, connecting one end of a casing with the pre-embedded pipe, sealing the other end of the casing for protection, and clinging the other end of the casing to the template of the side wall; D, pouring concrete; and E, detaching the template of the side wall after the strength of the concrete reaches the mould stripping requirement, cleaning up the opening of the casing, connecting the casing with a pipe of same diameter, and leading out the casing. Due to the steps, the construction of leading the pre-embedded pipe in the concrete out of side wall joints is realized. Because the pre-embedded pipe in the concrete is connected with the casing through screw threads, the external sealing and internal unblocking of the pre-embedded pipe are ensured. After finishing pouring the concrete and stripping the mould, the pre-embedded casing is connected with the pipe of same diameter, and the pre-embedded casing is led out of the side wall joints without disposing holes on the template of the side wall, thus the template is kept complete, the cost is reduced, and the construction efficiency is improved.

Description

Pre-buried pipe is drawn the job practices and the device at side wall parting place in the concrete
Technical field
The present invention relates to the job practices that the pre-buried pipe mouth of pipe of a kind of inside concrete is drawn, particularly a kind of connection is poured into the job practices and the device of the pre-buried pipe of inside concrete.
Background technology
In the water power concrete construction, the concrete domestic demand is buried pipelines such as cooling water pipe and grout pipe underground, is used for dam concrete temperature control and joint grouting etc., and the pre-buried pipe of this kind is iron pipe mostly, and the mouth of pipe needs to draw from concrete side wall parting (or gallery side-walls).When pre-buried in the past pipe is crossed side wall parting place, need on side wall template face pore-creating or part to be adjusted into the wooden form construction, this all can be with damaged template, and has increased the form removable difficulty, influences construction period and construction quality.
Summary of the invention
Technical problem to be solved by this invention provides job practices and the device that pre-buried pipe in a kind of concrete is drawn side wall parting place, can solve the technical barrier that inside concrete pipe laying construction in the prior art needs to destroy template.
For solving the problems of the technologies described above, the technical scheme that the present invention adopted is: pre-buried pipe is drawn the job practices at side wall parting place in a kind of concrete, may further comprise the steps:
Pre-buried pipe in A, the location concrete causes the assigned address at side wall parting place with pre-buried pipe, and in mouth of pipe machining screw, pre-buried pipe is fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, upright side wall template;
One end of C, sleeve pipe is connected with pre-buried pipe, with sleeve pipe other end shutoff protection, and is close to the side wall template;
The protection of strengthening the sleeve pipe mouth of pipe is built in the process in D, concreting, and calibration template sideline at any time;
E, when treating that concrete strength reaches the form removal requirement, with the side wall form removable, the mouth of pipe of cleaning sleeve pipe, and connect with indentical tube and to draw;
Realize the pre-buried pipe of inside concrete is drawn the construction at side wall parting place through above-mentioned steps.
Described shutoff protection is with Polypropylence Sheet, butter and/or the shutoff of countersunk head plug.
Among the described step C,, make mark at the another side of side wall template according to the position that sleeve pipe is close to.
A kind of inside concrete pipe laying device, sleeve pipe one end is connected with pre-buried pipe, is close to the side wall template after the other end shutoff.
Be provided with the countersunk head plug in the described sleeve pipe.
Pre-buried pipe is drawn the job practices and the device at side wall parting place in a kind of concrete provided by the invention, and the method through adopting sleeve pipe to connect has changed the job practices that traditional pre-buried pipe directly passes the side wall template.Owing to screw thread is set at the service sleeve two ends, through screw thread pre-buried pipe in the concrete is connected with sleeve pipe, guarantee the outside seal of pre-buried pipe; Inner unimpeded, after form removal is accomplished in concreting, adopt indentical tube to be connected with service sleeve in earlier stage; It is drawn side wall parting place, do not need pore-creating on the side wall template, kept the integrality of side wall template; Reduce cost, also improved efficiency of construction; Pipe laying is installed at twice, avoids the crossed construction with the side wall template, has reduced difficulty of construction, has guaranteed construction quality and progress.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is described further:
Fig. 1 is an overall structure sketch map of the present invention.
Fig. 2 is the sketch map of countersunk head plug among the present invention.
The specific embodiment
In Fig. 1, pre-buried pipe is drawn the job practices at side wall parting place in a kind of concrete, may further comprise the steps:
A, according to design drawing and Construction Specifications, clear pipe of sign number and group number etc., pre-buried pipe 1 in the concrete of location causes the assigned address at side wall parting place with pre-buried pipe 1, and in mouth of pipe machining screw, pre-buried pipe 1 is fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, upright side wall template; And be fixed with steel pipe waling and tie rod etc.
One end of C, sleeve pipe 2 and pre-buried pipe 1 with sleeve pipe 2 other end shutoff protection, and are close to side wall template 4 through being threaded; Specifically; The pre-buried pipe 1 of needs being drawn the parting place causes side wall, and pre-buried pipe 1 nose end is installed the caliber sleeve pipe 2 bigger slightly than pre-buried pipe, and the length of sleeve pipe 2 can be confirmed according to construction is actual; The other end of sleeve pipe 2 need be close to the installation of side wall template, and the mouth of pipe is protected.According to the position that sleeve pipe 2 is close to, make mark at the another side of side wall template 4.
The mouth of pipe of sleeve pipe 2 can be with the mouth of pipe of Polypropylence Sheet and butter shutoff sleeve pipe 2, and the mode of optimization is to adopt 5 shutoff of countersunk head plug; Described countersunk head plug 5 is the plug of entire body screw thread, with sleeve pipe 2 be threaded engagement, can be fully go up in the sleeve pipe 2; Do not influence the space of sleeve pipe 2 mouths of pipe, promptly sleeve pipe 2 mouths of pipe still can be close to side wall template 4, cooperate Polypropylence Sheet and butter plugging effect more excellent; End face at countersunk head plug 5 is provided with cross recess, is beneficial to dismounting.
D, treat that constructions such as position in storehouse template, built-in fitting meet the requirements after, the beginning concreting, casting method is identical with conventional concrete construction, builds in the process protection of reinforcement to sleeve pipe 2 mouths of pipe, and calibration template sideline at any time, guarantees pouring quality.
E, when treating that concrete strength reaches the form removal requirement,, according to the mark on the side wall template 4, confirm the position of sleeve pipe 2 mouths of pipe during form removal with the side wall form removable.The purpose that makes marks is; When building, concrete grout smash shake with concrete self pressure under, might enter into the position between sleeve pipe 2 mouths of pipe and the side wall template; Thereby sleeve pipe 2 mouths of pipe are hidden; Can find the position of the mouth of pipe fast through mark, thereby increase work efficiency, this is especially effective for the occasion of having changed the constructor.
For the sleeve pipe that is provided with countersunk head plug 52, cleaning countersunk head plug 5 cross recesses can screw out countersunk head plug 5 easily.
Cleared up the mouth of pipe of sleeve pipe 2, can be connected with sleeve pipe 2 with footpath access tube 3;
Realize the pre-buried pipe of inside concrete is drawn the construction at side wall parting place through above-mentioned steps.
A kind of inside concrete pipe laying device that is used for said method, sleeve pipe 2 one ends are connected with pre-buried pipe 1, are close to gallery side wall template 4 after the other end shutoff.The scheme of optimizing is in Fig. 1, Fig. 2, to be provided with countersunk head plug 5 in the described sleeve pipe 2.

Claims (5)

1. pre-buried pipe is drawn the job practices at side wall parting place in the concrete, it is characterized in that may further comprise the steps:
Pre-buried pipe (1) in A, the location concrete causes the assigned address at side wall parting place with pre-buried pipe (1), and in mouth of pipe machining screw, pre-buried pipe (1) is fixedly connected with reinforcing bar with pipe clamp with iron wire;
B, according to the designing requirement assembling reinforcement, upright side wall template;
One end of C, sleeve pipe (2) is connected with pre-buried pipe (1), with sleeve pipe (2) other end shutoff protection, and is close to side wall template (4);
The protection of strengthening sleeve pipe (2) mouth of pipe is built in the process in D, concreting, and calibration template sideline at any time;
E, when treating that concrete strength reaches the form removal requirement, with the side wall form removable, the mouth of pipe of cleaning sleeve pipe (2), and connect with indentical tube and to draw;
Realize the pre-buried pipe of inside concrete is drawn the construction at side wall parting place through above-mentioned steps.
2. pre-buried pipe is drawn the job practices at side wall parting place in a kind of concrete according to claim 1, it is characterized in that: described shutoff protection is with Polypropylence Sheet, butter and/or countersunk head plug (5) shutoff.
3. pre-buried pipe is drawn the job practices at side wall parting place in a kind of concrete according to claim 1, it is characterized in that: among the described step C, according to the position that sleeve pipe (2) is close to, make mark at the another side of side wall template (4).
4. device that is used for each described method of claim 1-3, it is characterized in that: sleeve pipe (2) one ends are connected with pre-buried pipe (1), are close to side wall template (4) after the other end shutoff.
5. a kind of device according to claim 4 is characterized in that: be provided with countersunk head plug (5) in the described sleeve pipe (2).
CN2011102473379A 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints Active CN102383601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102473379A CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102473379A CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Publications (2)

Publication Number Publication Date
CN102383601A true CN102383601A (en) 2012-03-21
CN102383601B CN102383601B (en) 2013-12-04

Family

ID=45823401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102473379A Active CN102383601B (en) 2011-08-24 2011-08-24 Method and device for leading pre-embedded pipes in concrete out of side wall joints

Country Status (1)

Country Link
CN (1) CN102383601B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103944100A (en) * 2014-05-06 2014-07-23 葛洲坝集团第六工程有限公司 Cable seam crossing method for monitoring instrument
CN104631461A (en) * 2015-01-16 2015-05-20 长江勘测规划设计研究有限责任公司 Improved method for construction of reserved slot at downstream dam surface for cooling pipe installation
CN106567966A (en) * 2016-10-21 2017-04-19 上海市政工程设计研究总院(集团)有限公司 Underground composite pipe gallery group-pipe through-wall leakage prevention method
CN107313594A (en) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 After pour the pre-buried threaded sleeve connection method of member reinforcing steel bar
CN107604937A (en) * 2017-09-13 2018-01-19 中国电建集团北京勘测设计研究院有限公司 The foundation structure of wind-driven generator and its construction method of basic annular type with pre-buried madjack pipe
CN112878674A (en) * 2021-01-19 2021-06-01 上海建工四建集团有限公司 Electric wire tube connecting device and mounting method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809396Y (en) * 2005-07-22 2006-08-23 武汉劲野机械有限责任公司 Screw thread type pipe joint
CN2830851Y (en) * 2005-11-02 2006-10-25 武汉劲野机械有限责任公司 Telescopic union joint
CN200996508Y (en) * 2006-12-30 2007-12-26 武汉劲野机械有限责任公司 Shielding-sleeve threaded connecter
CN201089979Y (en) * 2007-07-05 2008-07-23 袁祥生 Construction built-in fitting for external wall heat-preservation composite wall
CN201166195Y (en) * 2008-03-18 2008-12-17 林月红 Pre-buried pipe sleeve
CN201268945Y (en) * 2008-08-19 2009-07-08 中建三局第一建设工程有限责任公司 Casing tube reserved pre-burying system
CN101537662A (en) * 2009-04-17 2009-09-23 从卫民 Connection channel positioning method in prefabrication of spliced tower crane foundation prefabricated by concrete
CN201593305U (en) * 2009-12-22 2010-09-29 浙江大学 Embedded pipe positioning and fixing device in concrete
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2809396Y (en) * 2005-07-22 2006-08-23 武汉劲野机械有限责任公司 Screw thread type pipe joint
CN2830851Y (en) * 2005-11-02 2006-10-25 武汉劲野机械有限责任公司 Telescopic union joint
CN200996508Y (en) * 2006-12-30 2007-12-26 武汉劲野机械有限责任公司 Shielding-sleeve threaded connecter
CN201089979Y (en) * 2007-07-05 2008-07-23 袁祥生 Construction built-in fitting for external wall heat-preservation composite wall
CN201166195Y (en) * 2008-03-18 2008-12-17 林月红 Pre-buried pipe sleeve
CN201268945Y (en) * 2008-08-19 2009-07-08 中建三局第一建设工程有限责任公司 Casing tube reserved pre-burying system
CN101537662A (en) * 2009-04-17 2009-09-23 从卫民 Connection channel positioning method in prefabrication of spliced tower crane foundation prefabricated by concrete
CN201593305U (en) * 2009-12-22 2010-09-29 浙江大学 Embedded pipe positioning and fixing device in concrete
CN101892738A (en) * 2010-08-20 2010-11-24 中太建设集团股份有限公司 Embedded scaffold connecting tube and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103944100A (en) * 2014-05-06 2014-07-23 葛洲坝集团第六工程有限公司 Cable seam crossing method for monitoring instrument
CN103944100B (en) * 2014-05-06 2017-02-15 中国葛洲坝集团第六工程有限公司 Cable seam crossing method for monitoring instrument
CN104631461A (en) * 2015-01-16 2015-05-20 长江勘测规划设计研究有限责任公司 Improved method for construction of reserved slot at downstream dam surface for cooling pipe installation
CN107313594A (en) * 2016-04-26 2017-11-03 湖北建科结构加固有限责任公司 After pour the pre-buried threaded sleeve connection method of member reinforcing steel bar
CN106567966A (en) * 2016-10-21 2017-04-19 上海市政工程设计研究总院(集团)有限公司 Underground composite pipe gallery group-pipe through-wall leakage prevention method
CN107604937A (en) * 2017-09-13 2018-01-19 中国电建集团北京勘测设计研究院有限公司 The foundation structure of wind-driven generator and its construction method of basic annular type with pre-buried madjack pipe
CN112878674A (en) * 2021-01-19 2021-06-01 上海建工四建集团有限公司 Electric wire tube connecting device and mounting method thereof

Also Published As

Publication number Publication date
CN102383601B (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN102383601B (en) Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN204112604U (en) The slip casting rebar connector of band cone tail
CN202391019U (en) End part thickened grouting connector of steel bar
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN104358360A (en) Full-grouting sleeve for connection of construction reinforcing steel bars
CN103993736A (en) Fastening bolt for shear wall formwork
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN202214989U (en) Device for leading out concrete internal embedded pipe to side-wall joint
CN102865087B (en) Embedded grout pipe device in lining concrete of chamber and construction method
CN204299044U (en) A kind of building iron connects uses full grout sleeve
CN203684409U (en) Armored concrete grouting connection sleeve
CN106381883B (en) Bar Seepage method through walls
CN102505847A (en) Mud jacking pipe device
CN208702007U (en) By the prefabricated assembled concrete structure of slurry anchor overlap joint connection structure connection
CN207194452U (en) Underground chamber outer wall wall pipeline hole waterproof embedding pipe fittingses device
CN103114726A (en) Disconnection method of post-cast strip steel bar
CN208981356U (en) A kind of concrete prefabricated piping lane with antiseep preset structure
CN210105129U (en) A grout sleeve for steel bar connection for assembly type structure
CN209211649U (en) A kind of pre-buried anchor ear casing
CN206693653U (en) Concrete pouring structure exposed steel bar safeguard structure
CN208734052U (en) Prefabrication construction external scaffolding connects wall member
CN111535173A (en) Bridge wet joint connecting structure and connecting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant