CN209211649U - A kind of pre-buried anchor ear casing - Google Patents
A kind of pre-buried anchor ear casing Download PDFInfo
- Publication number
- CN209211649U CN209211649U CN201821847831.2U CN201821847831U CN209211649U CN 209211649 U CN209211649 U CN 209211649U CN 201821847831 U CN201821847831 U CN 201821847831U CN 209211649 U CN209211649 U CN 209211649U
- Authority
- CN
- China
- Prior art keywords
- plastic sheet
- anchor ear
- round tube
- pvc round
- buried anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of pre-buried anchor ear casings, including more PVC round tubes, multiple first plastic sheets and multiple second plastic sheets, the more pvc pipes are set gradually in order, every two is successively connected between adjacent PVC round tube by first plastic sheet, is connected between the spaced pvc pipe of every two by the second plastic sheet.The pre-buried anchor ear casing of the utility model saves the link that concrete component is transported to perforation of boring machine behind scene, reduces time duration, improve the relative accuracy in anchor ear hole, Forming Quality is good through pre-buried anchor ear casing in concrete component;Its structure is simple simultaneously, improves work efficiency.
Description
Technical field
The utility model relates to overhang outrigger anchor ear technical field, in particular to a kind of pre-buried anchor ear casing.
Background technique
Currently, in assembled construction project, concrete structure is transported to construction site after the prefabrication.Compared to
Traditional cast-in-place concrete structure, when installation overhangs outrigger anchor ear, precast concrete, which needs to drill, buries anchor ear casing,
Time-consuming.
Therefore, the application can substantially reduce the anchor ear preformed hole construction time on this basis, improve reserved hole precision, a step
In place, it greatly improves work efficiency, facilitates site operation.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of pre-buried anchor ear casings, change existing Construction Mode
Anchor ear service sleeve device, exempt later period prefabricated components and drill the work of embedded casing, improve work efficiency.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of pre-buried anchor ear casing, including more PVC round tubes, multiple first plastic sheets and multiple second plastic sheets, institute
More pvc pipes to be stated to set gradually in order, every two is successively connected between adjacent PVC round tube by first plastic sheet,
It is connected between the spaced pvc pipe of every two by the second plastic sheet.
Preferably, in above-mentioned technical proposal, the quantity of the PVC round tube is four, and first plastic sheet is four long
Bar plastic piece, second plastic sheet are X-type plastic sheet.
Preferably, in above-mentioned technical proposal, four PVC round tubes surround square structure, and the PVC round tube is square structure
Four vertex, first plastic sheet form four sides of square structure, and second plastic sheet forms square structure
Two diagonal lines.
Preferably, in above-mentioned technical proposal, the PVC round tube, first plastic sheet and second plastic sheet are
One-pass molding integrated connection.
Preferably, in above-mentioned technical proposal, the lower section of the PVC round tube is embedded in concrete component in advance, and is embedded in coagulation
The depth of native component is 60mm, and the length that the PVC round tube stretches out concrete component is 100mm.
Preferably, in above-mentioned technical proposal, the diameter of the PVC round tube is 30mm, length 160mm;First modeling
Tablet with a thickness of 10mm;Second plastic sheet with a thickness of 10mm.
Preferably, in above-mentioned technical proposal, four first plastic sheets include two 200mm long plastic sheet and two
The plastic sheet of 150mm long, and identical two plastic sheets of length are set to opposite position.
The utility model above-mentioned technical proposal, has the following beneficial effects:
Compared with existing construction technology, the pre-buried anchor ear casing of the utility model, by pre-buried anchor ear casing in coagulation
In native component, the link that concrete component is transported to perforation of boring machine behind scene is saved, time duration is reduced, improves anchor ear hole
Relative accuracy, Forming Quality is good;Its structure is simple simultaneously, improves work efficiency.
Detailed description of the invention
Fig. 1 is the top view of the pre-buried anchor ear casing of the utility model.
Fig. 2 is the main view of the pre-buried anchor ear casing of the utility model.
Fig. 3 is the left view of the pre-buried anchor ear casing of the utility model.
Wherein: 1-PVC round tube, the first plastic sheet of 2-, the second plastic sheet of 3-.
Specific embodiment
Specific embodiment of the present utility model is described in detail below, it is practical new in order to further understand this
Type.
A kind of pre-buried anchor ear casing, including more PVC round tubes 1, multiple first plastic sheets 2 and multiple second plastic sheets 3,
More pvc pipes 1 are set gradually in order, and every two is successively connected between adjacent PVC round tube 1 by the first plastic sheet 2, and every two
It is connected between a spaced pvc pipe 1 by the second plastic sheet 3.PVC round tube 1, the first plastic sheet 2 and the second plastic sheet 3
For one-pass molding integrated connection.
Preferably, the quantity of above-mentioned PVC round tube 1 is four, and the quantity of the first plastic sheet 2 is four, the second plastic sheet 3
Quantity be 1.That is, four PVC 1 pipes of circle surround square structure, PVC round tube 1 is four vertex of square structure, the
One plastic sheet 2 forms four sides of square structure, and the second plastic sheet 3 forms two diagonal lines of square structure.Preferably,
First plastic sheet is strip plastic sheet, and the second plastic sheet is X-type plastic sheet.
Preferably, the lower section of PVC round tube is embedded in concrete component in advance, and the depth for being embedded in concrete component is 60mm,
The length that PVC round tube stretches out concrete component is 100mm.The diameter of PVC round tube 1 is 30mm, length 160mm;First plastics
Piece with a thickness of 10mm;Second plastic sheet with a thickness of 10mm.Preferably, four first plastic sheets include two 200mm long
The plastic sheet of plastic sheet and two 150mm long, and identical two plastic sheets of length are set to opposite position.
In concrete prefabricated element installation process, as shown in figure two, figure three.
The positioning of PVC round tube 1 that device lower part includes plastic sheet is embedded in component, after component completes, PVC round tube 1
Stretching concrete component length is 100mm, is cast in 60mm in prefabricated components.
In prefabricated components workshop, member reinforcing steel bar binds in place, positions, be embedded into reinforced mesh according to drawing.In advance
During burying, pay attention to clearing up barrier, this casing must not be made breakage occur, fracture, distort, deforming.After absolute position determines,
It is firm using tied silk binding and fixing.In casting process, reinforce the protection to casing, it is ensured that do not occur deformation, deviation, contamination and plugging
Phenomenon.The protection for reinforcing finished product during component conservation, component conveying, lifting component, reinforcement installation, concreting, prevents out
The missing of existing built-in fitting.When anchor ear is installed, the concrete in preformed hole need to be cleared up in advance, reaffirms pre-buried anchor ear sleeve position
With the presence or absence of deviation.Bias phenomenon or deviation can be mounted directly anchor ear in adjustable extent if it does not exist;For there are deviations
Preformed hole, redrilling positioning, complete anchor ear it is pre-buried.
Although the utility model is disclosed as above with embodiment, so it is not intended to limit the utility model, any ability
Field technique personnel can make a variety of different selections and modification, therefore this without departing from the spirit and scope of the utility model
The protection scope of utility model is limited by claims and its equivalents.
Claims (7)
1. a kind of pre-buried anchor ear casing, which is characterized in that including more PVC round tubes (1), multiple first plastic sheets (2) and more
A second plastic sheet (3), the more PVC round tubes (1) set gradually in order, every two successively adjacent PVC round tube (1) it
Between connected by first plastic sheet (2), between the spaced PVC round tube (1) of every two even by the second plastic sheet (3)
It connects.
2. pre-buried anchor ear casing according to claim 1, which is characterized in that the quantity of the PVC round tube (1) is four,
First plastic sheet (2) is four long strip type plastic sheets, and second plastic sheet (3) is X-type plastic sheet.
3. pre-buried anchor ear casing according to claim 2, which is characterized in that four PVC round tubes (1) surround square structure,
The PVC round tube (1) is four vertex of square structure, and first plastic sheet (2) forms four sides of square structure, institute
State two diagonal lines that the second plastic sheet (3) forms square structure.
4. pre-buried anchor ear casing according to claim 1, which is characterized in that the PVC round tube (1), first plastics
Piece (2) and second plastic sheet (3) are one-pass molding integrated connection.
5. pre-buried anchor ear casing according to claim 1, which is characterized in that the lower section of the PVC round tube (1) is embedded in mixed in advance
In solidifying soil component, and the depth for being embedded in concrete component is 60mm, and the length that the PVC round tube (1) stretches out concrete component is
100mm。
6. pre-buried anchor ear casing according to claim 1, which is characterized in that the PVC round tube (1), diameter be 30mm,
Length is 160mm;First plastic sheet (2) with a thickness of 10mm;Second plastic sheet (3) with a thickness of 10mm.
7. pre-buried anchor ear casing according to claim 2, which is characterized in that four first plastic sheets (2) include two
The plastic sheet of the plastic sheet of 200mm long and two 150mm long, and identical two plastic sheets of length are set to opposite position.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821847831.2U CN209211649U (en) | 2018-11-09 | 2018-11-09 | A kind of pre-buried anchor ear casing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821847831.2U CN209211649U (en) | 2018-11-09 | 2018-11-09 | A kind of pre-buried anchor ear casing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209211649U true CN209211649U (en) | 2019-08-06 |
Family
ID=67458952
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821847831.2U Active CN209211649U (en) | 2018-11-09 | 2018-11-09 | A kind of pre-buried anchor ear casing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209211649U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113325538A (en) * | 2021-05-28 | 2021-08-31 | 重庆锕维科技有限公司 | Embedding device for laying optical fibers in submarine gully environment |
-
2018
- 2018-11-09 CN CN201821847831.2U patent/CN209211649U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113325538A (en) * | 2021-05-28 | 2021-08-31 | 重庆锕维科技有限公司 | Embedding device for laying optical fibers in submarine gully environment |
CN113325538B (en) * | 2021-05-28 | 2022-10-04 | 浙江舟山海洋输电研究院有限公司 | Embedding device for laying optical fibers in submarine gully environment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN100476142C (en) | Construction method for combined V-shape steel pipe concrete pile | |
CN103089014A (en) | Construction method of through floor pipe | |
WO2016058275A1 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall thereof and manufacturing method thereof | |
CN206625428U (en) | Floor closed system is poured after a kind of pipe well | |
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN209211649U (en) | A kind of pre-buried anchor ear casing | |
CN207469307U (en) | A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline | |
CN104727552A (en) | Construction method for reserving water feed pipe grooves in prefabricated shear wall | |
CN105019606A (en) | Precast concrete unit steel bar grouting connecting piece and connecting method | |
CN102383601B (en) | Method and device for leading pre-embedded pipes in concrete out of side wall joints | |
CN108443590A (en) | Side-type direct-burried part and its construction method | |
CN103741949B (en) | Treatment of juncture between vertical structure and horizontal structure | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN202220346U (en) | Water-stopping seepage-proof wall of service entrance of optical fiber feeding room of basement | |
CN202248368U (en) | Water-stopping and leakage-preventing reinforced concrete shear wall of optical fiber wiring room | |
CN204001270U (en) | A kind of reinforced concrete wall and masonry wall syndeton | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN108149711A (en) | Prefabricated entirety box culvert and connection method | |
CN104153451A (en) | Construction method for installing concrete pipeline through prefabricated supporting block | |
CN104047423A (en) | Mold and construction method for precisely reserving hole in floorslab | |
CN203878999U (en) | Embedded structure for tube well casings | |
CN104911999A (en) | Construction method for deeply burying anchor | |
CN208074294U (en) | Side-type direct-burried part | |
CN103161311A (en) | Construction method for transverse penetration of long-diameter reinforced concrete pipeline through bridge abutment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |