CN102357861A - 复合型风扇总成安装模具 - Google Patents
复合型风扇总成安装模具 Download PDFInfo
- Publication number
- CN102357861A CN102357861A CN2011103136762A CN201110313676A CN102357861A CN 102357861 A CN102357861 A CN 102357861A CN 2011103136762 A CN2011103136762 A CN 2011103136762A CN 201110313676 A CN201110313676 A CN 201110313676A CN 102357861 A CN102357861 A CN 102357861A
- Authority
- CN
- China
- Prior art keywords
- vertical
- staged
- slide rail
- vertical slide
- sliding motion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
一种复合型风扇总成安装模具,包括矩形底架、四个上下移动定位脚、两纵向滑轨、螺杆式上下调节机构、阶梯式上下调节机构和用于定位风扇的定位盘。本发明综合了不同型号的多付总成安装模具的共同点,运用了合理的调节方法,具有多个产品都能同时使用的特点。四周的定位脚能上下左右滑动,做到迅速调节风扇安装脚的不同位置和不同高度。中间定位风扇的圆盘,一个架设在阶梯式上下调节机构上,可以大幅度调节高低,另一个架设在螺杆式上下调节机构上,可以小幅度调节高低。在更换不同类型风扇总成时,拆装调节高低很方便,给试制新产品带来了许多方便。
Description
技术领域
本发明涉及安装模具,特别涉及一种复合型风扇总成安装模具。
背景技术
用于汽车发动机的冷却风扇产品型号多种多样,风扇总成的装配需要通过风扇总成安装模具来进行。现有技术在风扇总成装配时,针对不同型号的风扇,需要采用不同型号的模具。另外,现有技术的风扇总成安装模具还存在固定安装脚不牢固、安装风扇的高低不一致的问题,导致装配速度慢、不稳定、容易损坏产品,产品质量得不到保证。
发明内容
本发明的目的,就是针对现有技术中存在的上述问题,提供一种可适合各种型号风扇的复合型风扇总成安装模具。
为了实现上述目的,本发明采用了以下技术方案:一种复合型风扇总成安装模具,其包括:
矩形底架,其两横边上分别设有横向滑槽,两纵边上分别设有纵向滑槽;
四个上下移动定位脚,每两个一组分别安装在矩形底架两纵边的纵向滑槽上并可沿纵向滑槽作纵向移动;
两纵向滑轨,分别架设在矩形底架的两横边之间并可沿两横边上的横向滑槽作横向移动,在两纵向滑轨上分别设有纵向滑槽;
螺杆式上下调节机构,设置在一个纵向滑轨上并可沿该纵向滑轨作纵向移动;
阶梯式上下调节机构,设置在另一个纵向滑轨上并可沿该纵向滑轨作纵向移动;
用于定位风扇的定位盘,共两个,一个定位盘安装在螺杆式调节机构上,另一个定位盘安装在阶梯式调节机构上。
所述的上下移动定位脚包括一个纵向滑动块和一个上下移动块,纵向滑动块安装在矩形底架纵边的纵向滑槽上并可沿纵向滑槽作纵向移动,上下移动块嵌装在纵向滑动块上并可沿纵向滑动块上下移动。
所述的纵向滑动块上设有竖向燕尾槽,所述的上下移动块上设有竖向燕尾榫,上下移动块的竖向燕尾榫嵌装在纵向滑动块的竖向燕尾槽内可上下移动,并通过一个紧固螺钉定位。
所述的螺杆式上下调节机构包括纵向滑动架、螺杆和支撑座,纵向滑动架安装在一个纵向滑轨上并可沿该纵向滑轨作纵向移动,螺杆与纵向滑动架固定连接,支撑座与螺杆螺纹连接进行上下调节,所述的一个定位盘固定在支撑座上。
所述的阶梯式上下调节机构包括底盘、三个支撑架和阶梯式圆锥形体,底盘安装在另一个纵向滑轨上并可沿该纵向滑轨作纵向移动,三个支撑架均匀间隔活动连接在底盘上并可沿底盘的直径作内外移动,三个支撑架围合而成的内圆大小可通过三个支撑架调节,阶梯式圆锥形体活动架设在三个支撑架上,所述的另一个定位盘固定在阶梯式圆锥形体上。
所述的三个支撑架的内侧分别设有与阶梯式圆锥形体适配的阶梯式斜面结构。
本发明的复合型风扇总成安装模具,由于采用了以上技术方案,具有以下的优点和积极效果;
(1)可适合各种型号风扇的风扇总成安装;
(2)通过四周的上下移动定位脚,有利于调节安装脚的高低左右位置,可以适用任何高度以及任何位置。
(3)中间的定位盘一个架设在阶梯式上下调节机构上,可以大幅度调节高低,另一个架设在螺杆式上下调节机构上,通过M10×1螺杆的精准调节(1圈1mm),可以小幅度调节高低。
附图说明
图1是本发明复合型风扇总成安装模具的正视结构示意图;
图2是本发明复合型风扇总成安装模具的俯视结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
参见图1、图2,本发明的复合型风扇总成安装模具,包括矩形底架1、四个上下移动定位脚2、两纵向滑轨3、螺杆式上下调节机构4、阶梯式上下调节机构5和用于定位风扇的定位盘6。
矩形底架1的两横边上分别设有横向滑槽11,两纵边上分别设有纵向滑槽12。
四个上下移动定位脚2每两个一组分别安装在矩形底架两纵边的纵向滑槽12上并可沿纵向滑槽作纵向移动;每个上下移动定位脚2各包括一个纵向滑动块21和一个上下移动块22,纵向滑动块21安装在矩形底架纵边的纵向滑槽12上并可沿纵向滑槽作纵向移动,上下移动块22嵌装在纵向滑动块21上并可沿纵向滑动块上下移动。在纵向滑动块21上设有竖向燕尾槽211,在上下移动块22上设有竖向燕尾榫221,上下移动块的竖向燕尾榫嵌装在纵向滑动块的竖向燕尾槽内可上下移动,并通过一个紧固螺钉定位。
两纵向滑轨3分别架设在矩形底架的两横边之间并可沿两横边上的横向滑槽11作横向移动,在两纵向滑轨上分别设有纵向滑槽31。
螺杆式上下调节机构4设置在一个纵向滑轨上并可沿该纵向滑轨作纵向移动。该螺杆式上下调节机构4包括纵向滑动架41、螺杆42和支撑座43,纵向滑动架41安装在一个纵向滑轨3上并可沿该纵向滑轨作纵向移动,螺杆42与纵向滑动架固定连接,支撑座43与螺杆螺纹连接进行上下调节。
阶梯式上下调节机构5设置在另一个纵向滑轨3上并可沿该纵向滑轨作纵向移动。该阶梯式上下调节机构5包括底盘51、三个支撑架52和阶梯式圆锥形体53,底盘51安装在另一个纵向滑轨3上并可沿该纵向滑轨作纵向移动,三个支撑架52均匀间隔活动连接在底盘上并可沿底盘的直径作内外移动,三个支撑架围合而成的内圆大小可通过三个支撑架调节,阶梯式圆锥形体53活动架设在三个支撑架52上。在三个支撑架52的内侧分别设有与阶梯式圆锥形体适配的阶梯式斜面结构。
用于定位风扇的定位盘6共两个,一个定位盘安装在螺杆式调节机构4的支撑板43上,另一个定位盘安装在阶梯式调节机构5的阶梯式圆锥形体53上。
Claims (6)
1.一种复合型风扇总成安装模具,其特征在于包括:
矩形底架,其两横边上分别设有横向滑槽,两纵边上分别设有纵向滑槽;
四个上下移动定位脚,每两个一组分别安装在矩形底架两纵边的纵向滑槽上并可沿纵向滑槽作纵向移动;
两纵向滑轨,分别架设在矩形底架的两横边之间并可沿两横边上的横向滑槽作横向移动,在两纵向滑轨上分别设有纵向滑槽;
螺杆式上下调节机构,设置在一个纵向滑轨上并可沿该纵向滑轨作纵向移动;
阶梯式上下调节机构,设置在另一个纵向滑轨上并可沿该纵向滑轨作纵向移动;
用于定位风扇的定位盘,共两个,一个定位盘安装在螺杆式调节机构上,另一个定位盘安装在阶梯式调节机构上。
2.如权利要求1所述的复合型风扇总成安装模具,其特征在于:所述的上下移动定位脚包括一个纵向滑动块和一个上下移动块,纵向滑动块安装在矩形底架纵边的纵向滑槽上并可沿纵向滑槽作纵向移动,上下移动块嵌装在纵向滑动块上并可沿纵向滑动块上下移动。
3.如权利要求2所述的复合型风扇总成安装模具,其特征在于:所述的纵向滑动块上设有竖向燕尾槽,所述的上下移动块上设有竖向燕尾榫,上下移动块的竖向燕尾榫嵌装在纵向滑动块的竖向燕尾槽内可上下移动,并通过一个紧固螺钉定位。
4.如权利要求1所述的复合型风扇总成安装模具,其特征在于:所述的螺杆式上下调节机构包括纵向滑动架、螺杆和支撑座,纵向滑动架安装在一个纵向滑轨上并可沿该纵向滑轨作纵向移动,螺杆与纵向滑动架固定连接,支撑座与螺杆螺纹连接进行上下调节,所述的一个定位盘固定在支撑座上。
5.如权利要求1所述的复合型风扇总成安装模具,其特征在于:所述的阶梯式上下调节机构包括底盘、三个支撑架和阶梯式圆锥形体,底盘安装在另一个纵向滑轨上并可沿该纵向滑轨作纵向移动,三个支撑架均匀间隔活动连接在底盘上并可沿底盘的直径作内外移动,三个支撑架围合而成的内圆大小可通过三个支撑架调节,阶梯式圆锥形体活动架设在三个支撑架上,所述的另一个定位盘固定在阶梯式圆锥形体上。
6.如权利要求5所述的复合型风扇总成安装模具,其特征在于:所述的三个支撑架的内侧分别设有与阶梯式圆锥形体适配的阶梯式斜面结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110313676 CN102357861B (zh) | 2011-10-16 | 2011-10-16 | 复合型风扇总成安装模具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110313676 CN102357861B (zh) | 2011-10-16 | 2011-10-16 | 复合型风扇总成安装模具 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102357861A true CN102357861A (zh) | 2012-02-22 |
CN102357861B CN102357861B (zh) | 2013-07-31 |
Family
ID=45583270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110313676 Active CN102357861B (zh) | 2011-10-16 | 2011-10-16 | 复合型风扇总成安装模具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102357861B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875149A (zh) * | 2015-06-06 | 2015-09-02 | 合肥铭锋模具铸造有限公司 | 一种便于安装法兰的冷凝器风扇组装夹具 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2779090A (en) * | 1953-09-18 | 1957-01-29 | Walter L Johnson | Tool for removing and installing vehicle fans |
US5680689A (en) * | 1995-11-13 | 1997-10-28 | Holladay; Ray S. | Hub removal tool and method |
CN1190276A (zh) * | 1997-01-28 | 1998-08-12 | 三星电子株式会社 | 冷却风扇与马达总成的组装设备 |
CN201427236Y (zh) * | 2009-07-09 | 2010-03-24 | 湖州银轴输送机械制造有限公司 | 手动复合式组框机 |
CN201483404U (zh) * | 2009-08-27 | 2010-05-26 | 奇瑞汽车股份有限公司 | 一种新型发动机总成定位夹具 |
CN201529865U (zh) * | 2009-11-19 | 2010-07-21 | 天津新伟祥工业有限公司 | 自动环形焊接机 |
CN201596987U (zh) * | 2009-12-16 | 2010-10-06 | 东明机电(深圳)有限公司 | 将冷却风扇装配到电机转子轴上的专用夹具 |
CN202271330U (zh) * | 2011-10-16 | 2012-06-13 | 上海日用-友捷汽车电气有限公司 | 复合型风扇总成安装模具 |
-
2011
- 2011-10-16 CN CN 201110313676 patent/CN102357861B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2779090A (en) * | 1953-09-18 | 1957-01-29 | Walter L Johnson | Tool for removing and installing vehicle fans |
US5680689A (en) * | 1995-11-13 | 1997-10-28 | Holladay; Ray S. | Hub removal tool and method |
CN1190276A (zh) * | 1997-01-28 | 1998-08-12 | 三星电子株式会社 | 冷却风扇与马达总成的组装设备 |
CN201427236Y (zh) * | 2009-07-09 | 2010-03-24 | 湖州银轴输送机械制造有限公司 | 手动复合式组框机 |
CN201483404U (zh) * | 2009-08-27 | 2010-05-26 | 奇瑞汽车股份有限公司 | 一种新型发动机总成定位夹具 |
CN201529865U (zh) * | 2009-11-19 | 2010-07-21 | 天津新伟祥工业有限公司 | 自动环形焊接机 |
CN201596987U (zh) * | 2009-12-16 | 2010-10-06 | 东明机电(深圳)有限公司 | 将冷却风扇装配到电机转子轴上的专用夹具 |
CN202271330U (zh) * | 2011-10-16 | 2012-06-13 | 上海日用-友捷汽车电气有限公司 | 复合型风扇总成安装模具 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104875149A (zh) * | 2015-06-06 | 2015-09-02 | 合肥铭锋模具铸造有限公司 | 一种便于安装法兰的冷凝器风扇组装夹具 |
Also Published As
Publication number | Publication date |
---|---|
CN102357861B (zh) | 2013-07-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103895316B (zh) | 一种贴膜机 | |
CN202572363U (zh) | 重载型半自动精密微调高低调整机构 | |
CN104760000A (zh) | 一种机床立柱式柔性工装 | |
CN206264050U (zh) | 一种汽车零部件用切割装置 | |
CN206899175U (zh) | 一种长行程的龙门双驱直线电机平台 | |
CN102357861B (zh) | 复合型风扇总成安装模具 | |
CN206498599U (zh) | 一种高效自动贴片设备 | |
CN204402506U (zh) | 一种可伸缩式隧道衬砌台车 | |
CN202271330U (zh) | 复合型风扇总成安装模具 | |
CN203119319U (zh) | 配电柜开关元器件调平装置 | |
CN104841891A (zh) | 一种高精确度手工造型砂箱 | |
CN102490022B (zh) | 一种多向调节的切割装置 | |
CN203254464U (zh) | 轮胎三角胶裁切装置 | |
CN104816154A (zh) | 一种可调节竖直方向上移动的双层微调机构 | |
CN205032531U (zh) | 极片冲裁装置 | |
CN208117024U (zh) | 用于车灯零件油漆造型的激光雕刻设备 | |
CN203439174U (zh) | 发动机分装台及其分装台导轨 | |
CN203306645U (zh) | 一种精密搬运装置 | |
CN204368693U (zh) | 一种橡胶胶片的冷却存放装置 | |
CN209021445U (zh) | 百叶窗叶片的激光切割机 | |
CN202239623U (zh) | 粉末冶金压机冲头快速调整装置 | |
CN105033018A (zh) | 极片冲裁装置 | |
CN204687281U (zh) | 一种新型取料治具 | |
CN204711133U (zh) | 一种高精确度手工造型砂箱 | |
CN203812861U (zh) | 一种机械手结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |