CN102355042B - Super-capacitor-based direct current power device of power station and power supply method thereof - Google Patents

Super-capacitor-based direct current power device of power station and power supply method thereof Download PDF

Info

Publication number
CN102355042B
CN102355042B CN2011102732034A CN201110273203A CN102355042B CN 102355042 B CN102355042 B CN 102355042B CN 2011102732034 A CN2011102732034 A CN 2011102732034A CN 201110273203 A CN201110273203 A CN 201110273203A CN 102355042 B CN102355042 B CN 102355042B
Authority
CN
China
Prior art keywords
submodule
power
voltage
port
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011102732034A
Other languages
Chinese (zh)
Other versions
CN102355042A (en
Inventor
沈宏平
马如明
黄水生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING TIANSU AUTOMATION CONTROL SYSTEM CO Ltd
Original Assignee
NANJING TIANSU AUTOMATION CONTROL SYSTEM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING TIANSU AUTOMATION CONTROL SYSTEM CO Ltd filed Critical NANJING TIANSU AUTOMATION CONTROL SYSTEM CO Ltd
Priority to CN2011203456376U priority Critical patent/CN202197226U/en
Priority to CN2011102732034A priority patent/CN102355042B/en
Publication of CN102355042A publication Critical patent/CN102355042A/en
Application granted granted Critical
Publication of CN102355042B publication Critical patent/CN102355042B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a super-capacitor-based direct current power device of a power station and a power supply method. The direct current power device of the power station is arranged between a voltage transformer and a direct current load of a high-voltage switch cabinet of the power station, and comprises a power module and an energy storage module, wherein the power module consists of a rectification conditioning sub-module, a constant power charging sub-module and a current foldback circuit; and the energy storage module consists of a capacitor energy storage sub-module, a charging anddischarging control sub-module and a remaining power releasing sub-module. By the device and the method, a direct current operating power supply, gaining power from the voltage transformer of the high-voltage switch cabinet, of the power station is realized, stores energy based on a super capacitor, can be directly arranged on the switch cabinet, and has the characteristics of high instantaneous output power, high efficiency, high reliability, freedom from maintenance, small volume, low cost and the like.

Description

A kind of power station continuous-current plant and method of supplying power to thereof based on super capacitor
Technical field
The invention belongs to power station equipment power supply power supply technique category and super capacitor energy-storage technology category, refer to especially a kind of efficient height, in light weight, take up room little, can be directly installed on high-voltage switch gear and, not need power station continuous-current plant and the method for supplying power to thereof based on super capacitor making regular maintenance, can work alone for a long time cashier's office in a shop, be applicable to switching station by it.
Background technology
Along with the construction of China's extensive city net and deepening continuously of improvement project, the 10kV switching station is as the critical facility in the 10kV power distribution network, and the status in having the city medium voltage distribution network of certain load density is more and more important.Continuing to bring out of skyscraper and large public building more and more tends to reach perfection with complicated city function.Power consumer is had higher requirement to reliability and the flexibility of power distribution network.Build up the 10kV switching station, to making up 10kV town power distribution network main grid structure, improve the power supply capacity of power distribution network, very important effect is arranged.Reinforcement improves the flexibility of power distribution network operation and scheduling to the control of power distribution network, thereby improves the reliability of whole power distribution network power supply greatly.The switching station that some has been arranged.Can realize the optimization scheduling to power distribution network, during the net overhaul of the equipments of part city, can carry out the adjustment of operational mode, the user does not have a power failure when accomplishing overhaul of the equipments; When device fails.Switching station can be brought into play the advantage of its flexible operation, and the isolated fault unit reduces the power failure scope rapidly.
At present; what most switching station adopted is the alternating current operation power supply; it generally is that voltage transformer (PT) is gone up power taking in the on-the-spot PT cabinet; as JDZW2-12W type voltage transformer (PT); no-load voltage ratio is 10/0.22kV; capacity reaches 1200VA; moment, capacity can reach 3000VA, and the time can reach 30ms, carried the JDZRW2-12W2 of fuse (XRNP-10/0.5A) protection type for another example; for a long time use capacity to be 300VA; short-term uses capacity to be 800VA, and heap(ed) capacity is 960VA, similarly also has JDZC-10; JDZF8-10; the JDZX8-10 voltage ratio all can be 10000/100/220; capacity reaches 1000VA, and maximum can be accomplished 2000VA.This mode power supply ratio is easier to obtain; economical and practical; maintenance cost is low, implement simple, and shortcoming to be system lose electricity back alternating current operation power supply can break simultaneously; the switching station operational reliability is not high; than higher, the operation of inductive load can have influence on system's primary side power supply quality, and is unfavorable for the stability of system to the requirement meeting of PT for it; the action need of big capacity switching station can not be satisfied, the correct operation of route protection can not be guaranteed when sending electricity with fault.
Another kind of ac power supply method is that the alternating current operation power supply draws the distribution transforming station from nearby, this mode can not have influence on the primary side power supply quality of own system substantially, but the workload that can increase line length and equipment investment, maintenance also can increase accordingly, moreover switching station much all is unwatched now, and away from the residential area, the bad solution of line arrangement problem, expenditure of construction significantly rises; If obtain from the public change of overhead wire, safety and reliability are again less than assurance.
What also have a lot of switching stations employings is direct current operative power source, switching station need be equipped with the direct current cabinet of being made up of storage battery in this case, it can be able to store bigger electric energy and the direct current supply of the back long period of realizing having a power failure, as the wall-hanging direct current cabinet of PZDK-BG01, its output current is 0~6 ampere, and battery capacity is 220 volts/7~24 ampere-hours.The back direct current supply for a long time yet in fact switching station does not need to have a power failure, consider reliability that will assurance accident separating brake and used such equipment, can bring very high operation cost, and need frequent maintaining, the useful life of battery is not long yet.Also (any batteries has problem to failure rate, all will influence the work as usual of whole batteries because the multi-section serial of battery increases in addition.) from environmental angle, it is not a kind of green energy resource.
Ultracapacitor is a kind of extraordinary capacitor that is specifically designed to energy storage that just grew up in recent years, the super large capacitor amount that the farad level is arranged, the high hundreds of times of long-pending energy density than traditional electrolytic capacitor, leakage current is little nearly thousand times, its discharge specific power is high nearly ten times than storage battery, without any need for care and maintenance, life-span reached more than 10 years, it is a kind of desirable high-power physics secondary power supply, the successful startup power supply as explosive motor, the starting of electric motor car, accelerate, climbing power supply, the breaking-closing operating power supply of high-voltage switch gear reach and are used for the moving panzer of fax and large-scale magnetizing equipment.The main feature of super capacitor is summarized as: (1) charging rate is fast, charges can reach more than 95% of its rated capacity in 10 seconds~10 minutes; (2) it is long to recycle the life-span, and degree of depth charge and discharge cycles access times can reach 500,000 times, if super capacitor is discharged and recharged 20 times every day, use can reach 68 years continuously, does not have " memory effect "; (3) large current discharging capability is superpower, the energy conversion efficiency height, and the process loss is little, big current energy cycle efficieny 〉=90%; (4) power density height can reach 300W/KG~5000W/KG, is equivalent to 5~10 times of battery; (5) the product raw material constitute, produce, use, store and disassemble process all less than polluting, and are ideal green environmental protection power supplys; (6) it is simple to discharge and recharge circuit, need not the such charging circuit of rechargeable battery, and the coefficient of safety height uses non-maintaining for a long time; (7) the ultralow temperature characteristic is good, and temperature range is wide-40 ℃~+ 70 ℃; (8) easy to detect, dump energy can directly be read; (9) the common 0.1F--1000F of range of capacity.
Summary of the invention
The problem to be solved in the present invention is: the power supply technique of opening and closing operations power supply can not satisfy user demand in the existing network system, and reliability and the feature of environmental protection have much room for improvement.
Technical scheme of the present invention is: a kind of power station continuous-current plant based on super capacitor, be arranged between the voltage transformer and DC load of power station high-tension switch cabinet, described power station continuous-current plant comprises power module and energy-storage module, power module is made up of rectification conditioning submodule, permanent power charging submodule, electric current feedback circuit, energy-storage module by the capacitance energy storage submodule, discharge and recharge the control submodule, surplus electricity release submodule is formed; The electric current feedback circuit is the diode of a reverse withstand voltage 1000V, the maximum conducting electric current 10A that continues of described diode, power module is provided with an input: port 0, with two outputs: port one and port 2, energy-storage module is provided with the connectivity port: port 3, its middle port 0 connects the voltage transformer output of power station high-tension switch cabinet, port one connects DC load, port 2 connects the port 3 of energy-storage module, port 0 links to each other with the input of rectification conditioning submodule, rectification conditioning submodule output links to each other with permanent power charging submodule input and port one, permanent power charging submodule output links to each other with port 2, port 2 links to each other with the power module port one through the electric current feedback circuit, the direction of diode is to point to port one from port 2, and the port 3 of energy-storage module links to each other with the input that discharges and recharges the control submodule, and the output that discharges and recharges the control submodule links to each other with the input of capacitance energy storage submodule, the output of capacitance energy storage submodule links to each other with the input that surplus electricity discharges submodule
Described capacitance energy storage submodule is made up of n super capacitor and n group balance equalizer circuit, the super capacitor series connection, n group balance equalizer circuit is in parallel with n super capacitor respectively, the anode of the 1st super capacitor is as the positive pole of capacitance energy storage submodule, and the negative terminal of n super capacitor is as the negative pole of capacitance energy storage submodule.
The described control submodule that discharges and recharges is made up of voltage threshold circuit and switch execution unit, the voltage threshold circuit is driven by voltage threshold gear switch switch, bleeder circuit, working power, reference voltage, voltage comparator and execution unit to be formed, working power inserts bleeder circuit and reference voltage circuit, diverter switch inserts bleeder circuit, bleeder circuit and reference voltage insert voltage comparator, the voltage comparator output inserts the execution unit drive circuit, and the execution unit drive circuit inserts the switch execution unit; Wherein execution unit drives and is composed in parallel by heavy-duty diode, a plurality of P channel mosfet, the G utmost point of described a plurality of P channel mosfets, D level, S level are connected in parallel respectively, the common S of switch execution unit links to each other with the capacitance energy storage submodule for extreme mouthful, the common D of switch execution unit links to each other with the Switching Power Supply supply for extreme mouthful, the voltage threshold circuit has two-stage thresholding gear, switches by voltage threshold gear switch switch.
Described surplus electricity discharges submodule and is made up of discharge switch and m * n resistance, n resistance series connection is one group, and m group series resistance is in parallel again, obtains the resistance battle array, discharge switch is connected with described resistance battle array, and the disjunct end of discharge switch and resistance battle array is respectively two electrodes that surplus electricity discharges submodule.
Use the method for supplying power to of above-mentioned power station continuous-current plant based on super capacitor to be, the voltage transformer output AC power source of power station high-tension switch cabinet, input power module is carried out rectification and is boosted the direct current of output voltage stabilization by the rectification conditioning submodule; Described direct current is imported permanent power charging submodule and DC load respectively, permanent power charging submodule charges through discharging and recharging control submodule control capacitance energy storage submodule, be full of electricity back capacitance energy storage submodule and be in the charging hold mode, increase in short-term and surpassed under the situation of rectification conditioning output module peak power output in the DC load need for electricity, power module and energy-storage module are powered to DC load jointly; When the voltage transformer of power station high-tension switch cabinet cut off the power supply, energy-storage module was returned to port one through discharging and recharging the control submodule by the electric current feedback circuit with the electric energy that stores, and powers to DC load; Discharge and recharge the control submodule and be provided with two voltage threshold of height, switched by the gear switch switch, when the voltage of energy-storage module is lower than the high voltage thresholding that discharges and recharges the control submodule, by the discharge loop that discharges and recharges control submodule shutoff capacitance energy storage submodule, stop DC load being powered, this moment is as switching to low-voltage thresholding gear with voltage threshold gear switch switch, then the capacitance energy storage submodule will continue externally power supply, be lower than the low-voltage thresholding of setting until the voltage of capacitance energy storage submodule; Behind the voltage transformer service restoration of power station high-tension switch cabinet, permanent power charging submodule begins the energy-storage module charging is entered holding state after being full of through discharging and recharging the control submodule immediately, discharges and recharges the cycle until the next one.
The present invention overcomes the deficiency that existing switching station operating power power supply technique exists, and provides a kind of power plant operation power supply that does not need can not influence from other distribution transforming station external power supplys, by the power supply of high-tension switch cabinet PT secondary side system's primary side power supply quality with continuous-current plant and method of supplying power to.This continuous-current plant is based on super capacitor energy-storage; emergency power supply as switching station load and protection action; working power is provided under the normal operating position most switching station loads; also can be after system's dead electricity in 30 milliseconds; standby DC supply for emergency is provided for protective device and power station equipment; its long service life, the efficient height, in light weight, take up room little, can be directly installed on high-voltage switch gear and, not need to do regular maintenance cashier's office in a shop, can work alone for a long time.
The present invention compares with background technology, and the beneficial effect that has is:
1) supply unit is made up of power module and two standalone modules of energy-storage module.Power module is made up of rectification conditioning output sub-module, permanent power charging submodule, electric current feedback circuit.Energy-storage module by the capacitance energy storage submodule, discharge and recharge the control submodule, surplus electricity discharges submodule and forms.Module of the present invention is few; the integrated level height; two standalone modules can adopt 19 inches height cabinets of standard; shielding cabinet with protection equipment installs; any DC power supply product is all little a lot of on the volume ratio market; not only for the user saves the equipment construction cost, and place, city cost of possession that can saves valuable.
2) supply unit of the present invention solves the operation of switching station normal load and emergency power supply problem, compares other supply power modes, has the characteristics reliable and stable, that volume is small and exquisite.Because of the switching station One's name is legion with distribute wide; old supply power mode needs personnel's periodic maintenance and maintenance more, expends a large amount of human inputs, and supply unit of the present invention adopts super capacitor as energy-storage travelling wave tube; and corresponding design protection and control circuit, can accomplish non-maintaining operation.Supply unit of the present invention is applied to switching station and similar power station environment to the super capacitor technology for the first time, and adopts series system to realize high pressure 220V energy storage, and directly powering load is avoided the intermediate voltage conversion links, improves device reliability greatly.The method of supplying power to that the present invention discards tradition has solved the problem that perplexs the switching station power supply for many years, has good economy and social value.
3) the present invention adopts based on the DC power supply of super capacitor and compares employing alternating current operation power supply; has the investment of saving; be not subjected to the influence of electric power system wiring construction condition and safety factor; and can guarantee the externally situation of system cut-off; still can keep emergency service, and can ensure that when down subsystem powers on protective device can be protected correct operation under the situation of combined floodgate and three phase short circuit fault.Compare the alternating current operation power supply, also have the characteristics that the primary system quality of voltage is not subjected to the electrical secondary system load effect.
4) supply unit adopts the rectification conditioning output sub-module from a direct power taking of PT secondary side of switching station, and pass through permanent power charging submodule and directly forceful electric power 220V capacitance energy storage submodule is charged, cooperate to discharge and recharge the memory capacity that control submodule reasonable distribution discharges capacitance group, the emergence power the when system of assurance restores electricity is supplied with.Can replace from far-end power distribution station power taking pattern, reduce the switching station dependence of electric power system to external world, save construction cost and can reduce electricity consumption danger.
5) energy-storage module is because the integrated functions such as control, energy capacitance set, the release of surplus electricity that discharge and recharge.Possesses the stored energy capacitance that is applicable to most switching station transformer station load capacity; on method of supplying power to; also having the thresholding of discharging and recharging closes and opening function automatically; guarantee that supply unit can ensure the regular event of protective device at the enough energy of system failure power failure back preservation when sending electricity again in system.Surplus electric release function guarantee protection person when Installation and Debugging and maintenance uses safety.
6) power module is because integrated boosting and the anti-function such as send of the charging of rectification, permanent power and electric current.Possess the power output and the charge function that are applicable to most switching station transformer station, have overload protection simultaneously, load power consumption detects and the energy storage electric energy automaticallyes switch an anti-function of sending.Power module can be directly given switching station load power supply, and with the supporting use of energy-storage module, possess the complete function of power station emergency power supply.
7) the rectification conditioning output sub-module adopts the staggered CCM pfc circuit technology of two-phase, the maximum power that is used for the maximum 1500W of output, simultaneously can obtain almost pure sinusoidal current waveform at input, can not produce any interference and added burden to electrical network, can not influence system's primary side power supply quality, take into full account the requirement of transformer station's application to reliability.
8) permanent power charging submodule adopts high-performance fixed frequency current mode controller UC3843 as main control chip; possesses isolation features when possessing constant current constant voltage output; and has an overpower protection characteristic; even occur at charging capacitor under the condition of short trouble, utilize its good isolation characteristic can not influence the normal output of system's power supply.
9) the capacitance energy storage submodule adopts the super capacitor group to become forceful electric power direct current 220V energy-storage module with the voltage equalizing protection circuits built; appropriate stored energy capacitance; can guarantee the emergent use of most switching stations, and make the volume of module meet the operating position of most of switching stations more, save installing space.Rapid charge characteristic and heavy-current discharge characteristic make that the emergency character of DC power supply is stronger.The application of voltage equalizing protection circuit makes that the stability of DC power supply is higher, has the fault tolerance that single capacitance damage does not influence whole serviceability, and can accomplish non-maintaining use.
10) discharge and recharge the voltage threshold circuit that the control submodule is provided with 180V and 140V two-stage thresholding gear; avoid that the capacitance energy storage submodule all discharges after the PT dead electricity; ensure that the capacitance energy storage submodule leaves enough energy; guarantee to close a floodgate to send and enough work capacities are provided can under electricity and the system failure situation protective device and circuit breaker, the system that guarantees at least when closing a floodgate in fault protective device and circuit breaker can be within 0.5 second quick regular event once.Avoided simultaneously as direct current cabinet, after the PT outage, still the long unnecessary direct current of DC load being supplied with, reduced the design capacity of energy-storage module, further reduced cost, simultaneously energy savings; The switch execution unit adopts the mode of a plurality of MOSFET parallel connections, can cut-off up to 10A and above 220V high voltage direct current, replace the DC power relay as the G9EB-1 of Omron, use the cost of MOSFET only for using 1/10th of DC power relay, and the power consumption of the drive circuit of MOSFET is littler than DC power relay coil power dissipation, less than 0.1W, further reduced the own loss of continuous-current plant.
11) the power station inner breaker is being closed a floodgate or during sub-switching operation, the big electric current of transient state can appear in DC load, this moment is under the situation of rectification conditioning output sub-module power output deficiency, capacitance energy storage submodule and rectification conditioning output sub-module can be powered to DC load jointly, because super capacitor has the superpower characteristic of large current discharging capability, so can not cause situations such as rectification conditioning output sub-module overload or PT overload, safe and reliable.
12) described power station continuous-current plant based on super capacitor is provided with surplus electricity release submodule, compare to direct current cabinet, it need just can not discharge the surplus electricity in the capacitance energy storage module by external equipment, has taken into full account to carry out fail safe and the ease for operation of device when safeguarding.
Description of drawings
Fig. 1 is continuous-current plant structural representation of the present invention.
Fig. 2 is rectification conditioning output module circuit diagram of the present invention.
Fig. 3 is permanent power charging submodular circuits figure of the present invention.
Fig. 4 is capacitance energy storage submodular circuits block diagram of the present invention.
Fig. 5 is the control submodular circuits figure that discharges and recharges of the present invention.
Fig. 6 is that surplus electricity of the present invention discharges the submodular circuits block diagram.
Embodiment
Provide specific embodiment below in conjunction with accompanying drawing, further the present invention is described in detail.
As shown in Figure 1, power station continuous-current plant based on super capacitor is arranged between the voltage transformer and DC load of power station high-tension switch cabinet, described power station continuous-current plant comprises power module and energy-storage module, power module is made up of rectification conditioning submodule, permanent power charging submodule, electric current feedback circuit, energy-storage module by the capacitance energy storage submodule, discharge and recharge the control submodule, surplus electricity release submodule is formed; The electric current feedback circuit is the diode of a reverse withstand voltage 1000V, the maximum conducting electric current 10A that continues of described diode, power module is provided with an input: port 0, with two outputs: port one and port 2, energy-storage module is provided with the connectivity port: port 3, its middle port 0 connects the voltage transformer output of power station high-tension switch cabinet, port one connects DC load, port 2 connects the port 3 of energy-storage module, port 0 links to each other with the input of rectification conditioning submodule, rectification conditioning submodule output links to each other with permanent power charging submodule input and port one, permanent power charging submodule output links to each other with port 2, port 2 links to each other with the power module port one through the electric current feedback circuit, the direction of diode is to point to port one from port 2, and the port 3 of energy-storage module links to each other with the input that discharges and recharges the control submodule, and the output that discharges and recharges the control submodule links to each other with the input of capacitance energy storage submodule, the output of capacitance energy storage submodule links to each other with the input that surplus electricity discharges submodule
Described capacitance energy storage submodule is made up of n super capacitor and n group balance equalizer circuit, the super capacitor series connection, n group balance equalizer circuit is in parallel with n super capacitor respectively, the anode of the 1st super capacitor is as the positive pole of capacitance energy storage submodule, and the negative terminal of n super capacitor is as the negative pole of capacitance energy storage submodule.
As shown in Figure 2, the rectification conditioning output sub-module adopts the staggered CCM PFC technology of two-phase, the master chip pfc controller is the UCC28070 of TI company, the port one 4 (GDA) of UCC28070 links to each other with two MOSFET by two high-speed power mosfet driver TC4427AC, and the port one 7 (GDB) of UCC28070 links to each other with two MOSFET by two high-speed power mosfet driver TC4427AC.Concrete operation principle is: input ac voltage by rectifier bridge BD1 full-wave rectification, is formed the staggered pfc circuit of two-phase by inductance L 1, inductance L 2, MOSFET pipe Q1~Q4, diode D1, diode D2 and is finished boost function after choking-winding LF1, LF2 filtering; Instrument transformer CT1, CT2 form the current sampling loop; Form output voltage by R7, R8, R22 and detect the loop, amplify by master controller UCC28070 error ratio and realize the output voltage stabilizing; Be that main devices constitutes auxiliary source circuit with transformer T1 and VIPER22A chip IC 8, realize the power supply to master chip.
As shown in Figure 3, permanent power charging submodule by MOSFET manage Q1, MOSFET pipe Q2, transformer T2, diode D10, diode D11 form the single-ended reverse exciting circuit; Resistance R 38, resistance R 39 are finished the output current sampling, and sampled signal amplifies to handle by optocoupler PC1 through operational amplifier IC3 isolates the pin 1 that transfers to former limit master control chip UC3843, finishes closed loop PWM control; Be that main devices constitutes auxiliary source circuit with transformer T3 and VIPER22A chip IC 2, realize the power supply to master chip.
As shown in Figure 4, the capacitance energy storage submodule is made up of n super capacitor and n group balance equalizer circuit, the negative terminal of super capacitor 1 connects the anode of super capacitor 2, the negative terminal of super capacitor 2 connects the anode of super capacitor 3, by that analogy, the negative terminal of super capacitor n-1 connects the anode of super capacitor n, balance equalizer circuit 1 is in parallel with super capacitor 1, balance equalizer circuit 2 is in parallel with super capacitor 2, by that analogy, balance equalizer circuit n is in parallel with super capacitor n, the anode of super capacitor 1 is as the positive pole of capacitance energy storage submodule port, and the negative terminal of super capacitor n is as the negative pole of capacitance energy storage submodule port.Because switching station scarcely can surpass 4 units (circuit breaker, energy storage motor and supporting protective device); so the design capacity of capacitance energy storage submodule designs with reference to the energy consumption that 4 units move once simultaneously; field test data shows; the about 1.2A of the average operating current of once-through operation of a unit in the switching station; operating time 3.6s (oscilloscope reading); i.e. average each about 220 * 1.2 * 3.6S ≈ of energy consumption 950J; four units are all operated once then, and energy consumption is about 3800J; be not less than 80% of rated operational voltage according to the equipment operating voltage and consider then have:
3800J=1/2 * C * (220 2-(220 * 80%) 2) draw C ≈ 0.436F
Therefore, the specification with capacitance energy storage submodule design 0.6F/250V is enough to satisfy the switching station need for electricity.Accordingly, super capacitor is selected the specification of 60F/2.7V for use, and the rated voltage of 2.7V is suitably step-down processing when series connection, is calculated value with 2.5V usually, and the number n of monomer super capacitor is corresponding calculating also:
Module voltage=monomer capacitance voltage * monomer electric capacity quantity
Module voltage=250V=2.5V * 100
Be n=100
Ceiling voltage U Max>270V that module can be born in short-term
Module capacitance amount=monomer capacitance/monomer electric capacity quantity
Module capacitance amount=60F/100=0.6F
Total energy storage capacity=0.5 * module capacitance amount * (module voltage) 2 when module expires electricity
=0.5×0.6F×250V 2
=18.75kJ
The break-make of voltage detector driven MOS pipe that mainly adopted the balance equalizer circuit realizes that balance all presses, the voltage detector of selecting for use realize that voltage will equate with the rated voltage of monomer electric capacity or lower slightly.
As shown in Figure 5, discharging and recharging the control submodule is made up of voltage threshold circuit, switch execution unit, the voltage threshold circuit has: voltage threshold gear switch switch S 1, the bleeder circuit of being formed by RR3, RR4, RR11, RR12, mainly by 7812 working powers that realize, by the reference voltage that RR13, RR14 realize, select for use UA741 as voltage comparator, the execution unit of being made up of RR8, RR9, RR10 and Q1 drives; The switch execution unit is composed in parallel by heavy-duty diode VD1 and a plurality of P channel mosfet pipe Q2~Q4, the G utmost point of a plurality of P channel mosfets is connected in parallel, the D utmost point of a plurality of P channel mosfets is connected in parallel, the S utmost point of a plurality of P channel mosfets is connected in parallel, the common S of switch execution unit extreme mouthful (DC+) links to each other with the capacitance energy storage submodule, the extreme mouth of the common D of switch execution unit (DC+ ') link to each other with the Switching Power Supply supply, the voltage threshold circuit has two-stage thresholding gear, its high voltage appearance set point gear is used for normal mode of operation, low voltage set value gear is used for powering under the case of emergency, concrete set point can be decided according to practical application, usually high voltage set point gear is located between 180V~190V, low voltage set value gear is located at about 140V, the setting of value realizes by the resistance of the individual resistance of adjustment bleeder circuit, resistance also available voltage regulator substitutes, regulate more convenient like this, just can cause product export debugging trouble, need adjust the resistance of voltage regulator one by one, carry out gear switch by voltage threshold gear switch switch (S1).
As shown in Figure 6, surplus electricity discharges submodule by discharge switch, a plurality of resistance (11,12 ... mn) form, wherein an end (A) of discharge switch discharges a utmost point (general as anodal) of the port of submodule as surplus electricity, discharge switch passes through an end (B) of some resistance as another utmost point (generally as negative pole) of the port of surplus electricity release submodule, and resistance adopts the combination of series, parallel mode.Can not have influence on the operate as normal of capacitance energy storage submodule for the heating that guarantees to discharge, power and the velocity of discharge that surplus electricity discharges submodule need be done a comprehensive consideration, by investigation with to user communication, think that it is the time span that can bear that the capacitance energy storage submodule voltage that will be full of electricity about five minutes is reduced to below the safe voltage, so simultaneously for avoiding the surplus electricity release submodule short time to generate heat the excessive time of having won, the surplus electricity of this continuous-current plant discharges the metal film electric capacity that submodule has adopted 96 1.5K Ω/3W, the resistor matrix of having formed m * n=4 * 24, all-in resistance after the combination is about 250 Ω, maximum current when surplus electricity discharges is no more than 1A, the maximum power dissipation of each resistance is 2.5W, average power consumption is about 1W, evidence, it meets design requirement.
The method of supplying power to of the power station continuous-current plant based on super capacitor of the present invention is: from the AC power of voltage transformer (PT) input of power station high-tension switch cabinet, finish rectification and boost function by the rectification conditioning output module, the direct current of output voltage stabilization; Permanent power charging submodule has been realized quick-charge function and the isolation features (avoiding the capacitance short-circuit fault to the destruction of system) to the capacitance energy storage submodule, avoids simultaneously importing transient current very big in the connection process to the influence of electrical network at power supply; Under PT input normal condition, the DC power supply of rectification conditioning output port module 1 output high stability uses for DC load such as motor energy storage and signal guidance, 2 pairs of capacitance energy storage submodules of rectification conditioning output port module real time charging, be full of electricity back capacitance energy storage submodule and be in the charging hold mode, increase in short-term and surpassed under the situation of rectification conditioning output module peak power output in the load need for electricity, rectification conditioning output module and capacitance energy storage submodule can be powered to DC load jointly; After the PT outage, the capacitance energy storage submodule can be immediately powered through discharging and recharging the counter outlet of delivering to described power station continuous-current plant based on super capacitor of control submodule the electric energy that stores to DC load, when the voltage of capacitance energy storage submodule is lower than the high tap position set point of the voltage threshold gear switch switch that discharges and recharges the control submodule, discharge loop by discharging and recharging control submodule shutoff capacitance energy storage submodule stops DC load being powered; As voltage threshold gear switch switch is switched to low-grade location, the capacitance energy storage submodule will continue externally power supply, be lower than the low-grade location set point of voltage threshold gear switch switch until the voltage of capacitance energy storage submodule; Behind the PT service restoration, permanent power charging submodule begins the charging of capacitance energy storage submodule is entered holding state after being full of through discharging and recharging the control submodule immediately, discharges and recharges the cycle until the next one.
Present invention can be implemented in the power station direct current operative power source of power taking on the voltage transformer of high-tension switch cabinet, based on super capacitor energy-storage, it can be directly installed on the switch cubicle, not needing additionally increases the space, power station, has that instantaneous output is big, efficient is high, reliability is high, non-maintaining, characteristics such as volume is little, cost is low.

Claims (3)

1. power station continuous-current plant based on super capacitor, it is characterized in that being arranged between the voltage transformer and DC load of power station high-tension switch cabinet, described power station continuous-current plant comprises power module and energy-storage module, power module is made up of rectification conditioning submodule, permanent power charging submodule, electric current feedback circuit, energy-storage module by the capacitance energy storage submodule, discharge and recharge the control submodule, surplus electricity release submodule is formed; The electric current feedback circuit is the diode of a reverse withstand voltage 1000V, the maximum conducting electric current 10A that continues of described diode, power module is provided with an input: port 0, with two outputs: port one and port 2, energy-storage module is provided with the connectivity port: port 3, its middle port 0 connects the voltage transformer output of power station high-tension switch cabinet, port one connects DC load, port 2 connects the port 3 of energy-storage module, port 0 links to each other with the input of rectification conditioning submodule, rectification conditioning submodule output links to each other with permanent power charging submodule input and port one, permanent power charging submodule output links to each other with port 2, port 2 links to each other with the power module port one through the electric current feedback circuit, the direction of diode is to point to port one from port 2, and the port 3 of energy-storage module links to each other with the input that discharges and recharges the control submodule, and the output that discharges and recharges the control submodule links to each other with the input of capacitance energy storage submodule, the output of capacitance energy storage submodule links to each other with the input that surplus electricity discharges submodule
Described capacitance energy storage submodule is made up of n super capacitor and n group balance equalizer circuit, the super capacitor series connection, n group balance equalizer circuit is in parallel with n super capacitor respectively, the anode of the 1st super capacitor is as the positive pole of capacitance energy storage submodule, and the negative terminal of n super capacitor is as the negative pole of capacitance energy storage submodule;
The described control submodule that discharges and recharges is made up of voltage threshold circuit and switch execution unit, the voltage threshold circuit is driven by voltage threshold gear switch switch, bleeder circuit, working power, reference voltage, voltage comparator and execution unit to be formed, working power inserts bleeder circuit and reference voltage circuit, diverter switch inserts bleeder circuit, bleeder circuit and reference voltage insert voltage comparator, the voltage comparator output inserts the execution unit drive circuit, and the execution unit drive circuit inserts the switch execution unit; Wherein execution unit drives and is composed in parallel by heavy-duty diode, a plurality of P channel mosfet, the G utmost point of described a plurality of P channel mosfets, the D utmost point, the S utmost point are connected in parallel respectively, the common S of switch execution unit links to each other with the capacitance energy storage submodule for extreme mouthful, the common D of switch execution unit links to each other with the Switching Power Supply supply for extreme mouthful, the voltage threshold circuit has two-stage thresholding gear, switches by voltage threshold gear switch switch.
2. the power station continuous-current plant based on super capacitor according to claim 1, it is characterized in that described surplus electricity discharges submodule and is made up of discharge switch and m * n resistance, n resistance series connection is one group, m group series resistance is in parallel again, obtain the resistance battle array, discharge switch is connected with described resistance battle array, and the disjunct end of discharge switch and resistance battle array is respectively two electrodes that surplus electricity discharges submodule.
3. method of supplying power to that uses the power station continuous-current plant based on super capacitor as claimed in claim 1 or 2, it is characterized in that: the voltage transformer output AC power source of power station high-tension switch cabinet, input power module, carry out rectification and boost the direct current of output voltage stabilization by the rectification conditioning submodule; Described direct current is imported permanent power charging submodule and DC load respectively, permanent power charging submodule charges through discharging and recharging control submodule control capacitance energy storage submodule, be full of electricity back capacitance energy storage submodule and be in the charging hold mode, increase in short-term and surpassed under the situation of rectification conditioning output module peak power output in the DC load need for electricity, power module and energy-storage module are powered to DC load jointly; When the voltage transformer of power station high-tension switch cabinet cut off the power supply, energy-storage module was returned to port one through discharging and recharging the control submodule by the electric current feedback circuit with the electric energy that stores, and powers to DC load; Discharge and recharge the control submodule and be provided with two voltage threshold of height, switched by the gear switch switch, when the voltage of energy-storage module is lower than the high voltage thresholding that discharges and recharges the control submodule, by the discharge loop that discharges and recharges control submodule shutoff capacitance energy storage submodule, stop DC load being powered, this moment is as switching to low-voltage thresholding gear with voltage threshold gear switch switch, then the capacitance energy storage submodule will continue externally power supply, be lower than the low-voltage thresholding of setting until the voltage of capacitance energy storage submodule; Behind the voltage transformer service restoration of power station high-tension switch cabinet, permanent power charging submodule begins the energy-storage module charging is entered holding state after being full of through discharging and recharging the control submodule immediately, discharges and recharges the cycle until the next one.
CN2011102732034A 2011-09-14 2011-09-14 Super-capacitor-based direct current power device of power station and power supply method thereof Active CN102355042B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2011203456376U CN202197226U (en) 2011-09-14 2011-09-14 Power station direct current power supply device based on super capacitor
CN2011102732034A CN102355042B (en) 2011-09-14 2011-09-14 Super-capacitor-based direct current power device of power station and power supply method thereof

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2011203456376U CN202197226U (en) 2011-09-14 2011-09-14 Power station direct current power supply device based on super capacitor
CN2011102732034A CN102355042B (en) 2011-09-14 2011-09-14 Super-capacitor-based direct current power device of power station and power supply method thereof

Publications (2)

Publication Number Publication Date
CN102355042A CN102355042A (en) 2012-02-15
CN102355042B true CN102355042B (en) 2013-10-09

Family

ID=69375167

Family Applications (2)

Application Number Title Priority Date Filing Date
CN2011203456376U Withdrawn - After Issue CN202197226U (en) 2011-09-14 2011-09-14 Power station direct current power supply device based on super capacitor
CN2011102732034A Active CN102355042B (en) 2011-09-14 2011-09-14 Super-capacitor-based direct current power device of power station and power supply method thereof

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN2011203456376U Withdrawn - After Issue CN202197226U (en) 2011-09-14 2011-09-14 Power station direct current power supply device based on super capacitor

Country Status (1)

Country Link
CN (2) CN202197226U (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202197226U (en) * 2011-09-14 2012-04-18 南京天溯自动化控制系统有限公司 Power station direct current power supply device based on super capacitor
JP6008040B2 (en) * 2013-03-15 2016-10-19 富士電機株式会社 Uninterruptible power system
CN103532226A (en) * 2013-10-09 2014-01-22 武汉百楚科技有限公司 Electric operational power supply storing energy on basis of supercapacitor
CN103595102B (en) * 2013-11-23 2016-01-20 大连尚能科技发展有限公司 A kind of super capacitor equalizer circuit
CN104167813A (en) * 2014-09-11 2014-11-26 国家电网公司 Direct current power source system of transformer substation
CN104377833A (en) * 2014-11-28 2015-02-25 国家电网公司 Public power distribution transformer monitoring terminal
CN104393682A (en) * 2014-11-28 2015-03-04 国家电网公司 Low-voltage power failure monitoring terminal and low-voltage circuit board
WO2016119169A1 (en) * 2015-01-29 2016-08-04 王正权 Structure of electricity storage apparatus
CN104617658A (en) * 2015-02-09 2015-05-13 威胜百楚电力科技有限公司 Combined type continuous power-operated power supply applicable to indoor/ outdoor circuit breaker
CN105406576B (en) * 2015-12-31 2017-09-26 成都雷电微力科技有限公司 A kind of two-stage energy storage for power supply circuit
CN106936208A (en) * 2016-12-08 2017-07-07 苏州长风航空电子有限公司 One kind boosting maintains control circuit
CN106685024A (en) * 2017-03-28 2017-05-17 广东华中科技大学工业技术研究院 Capacitive energy storage device for servo press
CN107644501A (en) * 2017-07-31 2018-01-30 国网河南省电力公司漯河供电公司 A kind of anti-external force of high-tension line destroys intelligent caution system and method
CN107508276A (en) * 2017-09-20 2017-12-22 北京安达维尔测控技术有限公司 A kind of aircraft energizer car
CN107993861A (en) * 2017-11-17 2018-05-04 平高集团有限公司 The energy storage device and divide-shut brake control method of a kind of electromagnetic repulsion force operating mechanism
CN108092405A (en) * 2017-12-29 2018-05-29 上海新时达机器人有限公司 Electric power controller and robot control system
CN109188968B (en) * 2018-09-03 2023-08-15 中国人民解放军陆军工程大学 Autonomous power-on maintenance device and method for photoelectric equipment
CN109245282A (en) * 2018-10-16 2019-01-18 郑州多蒙控制技术有限公司 A kind of electric operator with the secondary automatic switching power supply unit of power loss
CN110034589B (en) * 2019-05-05 2020-09-01 重庆大学 Induction energy-taking type AC/DC combined power supply system and control method
WO2021134216A1 (en) * 2019-12-30 2021-07-08 成都海光集成电路设计有限公司 Power regulation system, method, and apparatus, chip, and electronic device
US11495974B2 (en) * 2020-02-25 2022-11-08 Ucap Power, Inc. Modular ultracapacitor energy storage/power delivery apparatus and methods
CN112350428A (en) * 2020-10-26 2021-02-09 青岛鼎信通讯股份有限公司 Medium-voltage communication standby power system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100523727B1 (en) * 2003-07-03 2005-10-26 (주)엡스코어 Uninterruptible power supply for the back up of ac-power supply
JP2009296719A (en) * 2008-06-03 2009-12-17 Nippon Telegr & Teleph Corp <Ntt> Dc backup power system and method of charging the same
CN101860084B (en) * 2010-05-31 2012-09-05 北京交通大学 Power supply source of high-voltage side measuring system
CN201844765U (en) * 2010-10-29 2011-05-25 北京矿冶研究总院 Time-delay exploder
CN202197226U (en) * 2011-09-14 2012-04-18 南京天溯自动化控制系统有限公司 Power station direct current power supply device based on super capacitor

Also Published As

Publication number Publication date
CN102355042A (en) 2012-02-15
CN202197226U (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN102355042B (en) Super-capacitor-based direct current power device of power station and power supply method thereof
TWI221695B (en) Uninterruptible power system
KR101277185B1 (en) Dc microgrid system and ac/dc hybrid microgrid system using it
CN102005817B (en) Uninterruptible power supply device based on microgrid and dispatching control method thereof
WO2010035338A1 (en) Power converting apparatus
CN205901410U (en) Modular emergent guarantee power
CN102709994A (en) Charge-discharge two-way power converter for battery for electric car
WO2012144357A1 (en) Power supply device, control method for power supply device, and dc power supply system
CN105914868A (en) Supercapacitor energy storage uninterruptible power supply based on current transformer, and power supply method thereof
JP2020530252A (en) Energy storage system
CN106059046A (en) Combined emergency guarantee power source and power supply method thereof
CN211089207U (en) Parallel charging module and double-mixed type direct current screen system applying same
US11949342B2 (en) Multiple port power converter device
CN211183508U (en) Power supply control device
TWI413336B (en) Device of bi-directional inverter and direct current power system thereof
CN204559131U (en) Be connected to the transformer and distribution power station of energy-storage system
CN111224419A (en) Energy storage inverter
CN202888860U (en) Off-grid and grid-connected photovoltaic inverter
CN104821594A (en) Transformation and distribution station connected with energy storage system
CN214590546U (en) Multi-mode combined power-taking and energy-supplying module for intelligent circuit breaker
CN115118000A (en) Energy storage type emergency power supply with bidirectional current transformation function
CN202651815U (en) Multiple-backup solar power supply system
CN110445172A (en) A kind of double loop residents photovoltaic energy storage system and its method of supplying power to
CN205846720U (en) A kind of low-voltage direct micro-capacitance sensor experiment porch
CN204089338U (en) Intelligent power distribution room power-supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 210012 3 of Tian Shu Science Park, 170-1 software Avenue, Yuhuatai District, Nanjing, Jiangsu.

Patentee after: NANJING TIANSU AUTOMATION CONTROL SYSTEM Co.,Ltd.