CN102330413B - 架桥机独立上下运梁车的施工方法 - Google Patents
架桥机独立上下运梁车的施工方法 Download PDFInfo
- Publication number
- CN102330413B CN102330413B CN 201110199905 CN201110199905A CN102330413B CN 102330413 B CN102330413 B CN 102330413B CN 201110199905 CN201110199905 CN 201110199905 CN 201110199905 A CN201110199905 A CN 201110199905A CN 102330413 B CN102330413 B CN 102330413B
- Authority
- CN
- China
- Prior art keywords
- leg
- supporting leg
- outriggers
- transportation vehicle
- auxiliary supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title abstract description 4
- 210000001364 upper extremity Anatomy 0.000 claims description 11
- 241000272165 Charadriidae Species 0.000 claims description 3
- 230000008602 contraction Effects 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 3
- 239000000725 suspension Substances 0.000 abstract 1
- 241001669679 Eleotris Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明具体为一种架桥机独立上下运梁车的施工方法,解决了移动架桥机存在费时费力的问题。a、架桥机主梁前端的左右两侧均固定有辅助支腿;b、前托辊移动至辅助支腿前方,并将C型腿和后支腿折叠固定;c、折叠前支腿和前支腿斜撑,后托辊移动至辅助支腿前方;d、通过钢丝绳和前走行支腿共同作业提升下导梁;e、下导梁和架桥机全部落在运梁车上;f、使架桥机脱离地面;g、运送到位后,C型腿和辅助支腿伸长支撑于地面,后吊梁行车和前走行支腿将下导梁提升;h、抽出运梁车后将下导梁降落,前托辊和后托辊复位;i、架桥机顶升到位,支立后支腿后将C型腿和前支腿设至架梁状态。本发明操作方法合理简单,劳动强度小,而且上下运梁车方便快捷,施工效率大幅提升。
Description
技术领域
本发明涉及桥梁工程中架桥机运输的施工方法,具体为一种架桥机独立上下运梁车的施工方法。
背景技术
在以往的运梁车驮运架桥机都是采用梁场的提梁设备把整个架桥机全部放置在运梁车上,而施工现场往往不具备这样的条件。施工现场大部分的情况是架桥机架完箱梁后就需要马上撤离施工现场,如果单靠架桥机的爬行(一天的进度500多米)会耽误很多宝贵的时间。
发明内容
本发明为了解决施工现场没有提梁设备将架桥机放置在运梁车上运输而直接移动架桥机存在费时费力的问题,提供了一种架桥机独立上下运梁车的施工方法。
本发明是采用如下技术方案实现的:架桥机独立上下运梁车的施工方法,采用如下步骤:a、架设完最后一孔梁,架桥机主梁前端的左右两侧均固定有辅助支腿;b、前托辊移动至辅助支腿前方,并将C型腿和后支腿折叠固定;c、支立辅助支腿后折叠前支腿和前支腿斜撑,后托辊移动至辅助支腿前方;d、将后吊梁行车的扁担替换为钢丝绳,通过钢丝绳和前走行支腿共同作业提升下导梁;e、运梁车移动至下导梁的下方,后吊梁行车(9)钢丝绳和前走行支腿(10)共同伸长将下导梁(11)落在运梁车上,收缩C型腿和前走行支腿至下导梁和架桥机全部落在运梁车上;f、顶升运梁车使C型腿和辅助支腿离开地面,收缩C型腿和辅助支腿至两者在运输过程中不会与地面产生接触;g、运送到位后,C型腿和辅助支腿伸长支撑于地面,后吊梁行车和前走行支腿将下导梁提升;h、抽出运梁车后将下导梁降落,前托辊和后托辊复位;i、架桥机顶升到位,支立后支腿后将C型腿和前支腿设至架梁状态。在原有的架桥机主梁前端增设辅助支腿来承受架桥机前端的重量,通过前走行支腿起吊下导梁的前端,即可快速方便的实现架桥机独立下上运梁车的目的。
本发明所述的施工方法解决了施工现场没有提梁设备将架桥机放置在运梁车上运输而直接移动架桥机存在费时费力的问题,操作方法合理简单,劳动强度小,而且上下运梁车方便快捷,施工效率大幅提升。
附图说明
图1为本发明的结构示意图。
图中:1-主梁,2-辅助支腿,3-前托辊,4-C型腿,5-后支腿,6-前支腿,7-前支腿斜撑,8-后托辊,9-后吊梁行车,10-前走行支腿,11-下导梁。
具体实施方式
架桥机独立上下运梁车的施工方法,采用如下步骤:a、架设完最后一孔梁,架桥机主梁1前端的左右两侧均固定有辅助支腿2;b、前托辊3移动至辅助支腿2前方,并将C型腿4和后支腿5折叠固定;c、支立辅助支腿2后折叠前支腿6和前支腿斜撑7,后托辊8移动至辅助支腿2前方;d、将后吊梁行车9的扁担替换为钢丝绳,通过钢丝绳和前走行支腿10共同作业提升下导梁11;e、运梁车移动至下导梁11的下方,后吊梁行车9钢丝绳和前走行支腿10共同伸长将下导梁11落在运梁车上,收缩C型腿4和前走行支腿10至下导梁11和架桥机全部落在运梁车上;f、顶升运梁车使C型腿4和辅助支腿2离开地面,收缩C型腿4和辅助支腿2至两者在运输过程中不会与地面产生接触;g、运送到位后,C型腿4和辅助支腿2伸长支撑于地面,后吊梁行车9和前走行支腿10将下导梁11提升;h、抽出运梁车后将下导梁11降落,前托辊3和后托辊8复位;i、架桥机顶升到位,支立后支腿5后将C型腿4和前支腿6设至架梁状态。具体实施过程中,在下导梁11前侧垫好枕木,便于前托辊3和后托辊8移动;通过折叠油缸将C型腿4向后支腿方向折叠90度,然后用螺杆将C型腿4和主梁1连接在一起,去掉后支腿横梁后,向后折叠后支腿5;前支腿6向后折起90度,前支腿斜撑7向前折叠至水平位置;后吊梁行车9的扁担向前移动固定在下导梁11上,用7.8米长Φ72的钢丝绳捆绑下导梁11,把钢丝绳挂在动滑轮的销轴上。
Claims (1)
1.一种架桥机独立上下运梁车的施工方法,其特征在于:采用如下步骤:a、架设完最后一孔梁,架桥机主梁(1)前端的左右两侧均固定有辅助支腿(2);b、前托辊(3)移动至辅助支腿(2)前方,并将C型腿(4)和后支腿(5)折叠固定;c、支立辅助支腿(2)后折叠前支腿(6)和前支腿斜撑(7),后托辊(8)移动至辅助支腿(2)前方;d、将后吊梁行车(9)的扁担替换为钢丝绳,通过钢丝绳和前走行支腿(10)共同作业提升下导梁(11);e、运梁车移动至下导梁(11)的下方,后吊梁行车(9)钢丝绳和前走行支腿(10)共同伸长将下导梁(11)落在运梁车上,收缩C型腿(4)和前走行支腿(10)至下导梁(11)和架桥机全部落在运梁车上;f、顶升运梁车使C型腿(4)和辅助支腿(2)离开地面,收缩C型腿(4)和辅助支腿(2)至两者在运输过程中不会与地面产生接触;g、运送到位后,C型腿(4)和辅助支腿(2)伸长支撑于地面,后吊梁行车(9)和前走行支腿(10)将下导梁(11)提升;h、抽出运梁车后将下导梁(11)降落,前托辊(3)和后托辊(8)复位;i、架桥机顶升到位,支立后支腿(5)后将C型腿(4)和前支腿(6)设至架梁状态。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110199905 CN102330413B (zh) | 2011-07-18 | 2011-07-18 | 架桥机独立上下运梁车的施工方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201110199905 CN102330413B (zh) | 2011-07-18 | 2011-07-18 | 架桥机独立上下运梁车的施工方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102330413A CN102330413A (zh) | 2012-01-25 |
| CN102330413B true CN102330413B (zh) | 2013-04-17 |
Family
ID=45482359
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201110199905 Active CN102330413B (zh) | 2011-07-18 | 2011-07-18 | 架桥机独立上下运梁车的施工方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102330413B (zh) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103147398B (zh) * | 2013-02-04 | 2015-07-29 | 秦皇岛天业通联重工股份有限公司 | 一种架桥机实现桥间转移或穿过隧道的方法 |
| CN104499433B (zh) * | 2014-11-04 | 2016-03-30 | 中铁二十四局集团有限公司 | 一种成锐角交叉下穿高铁低净空架梁施工方法 |
| CN104328742B (zh) * | 2014-11-14 | 2016-04-20 | 中铁大桥局集团有限公司 | 一种水上栈桥的施工方法 |
| CN105297637B (zh) * | 2015-11-25 | 2017-03-15 | 中铁二十局集团有限公司 | 下行式移动模架造桥机整体拆卸方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10114915A (ja) | 1996-10-14 | 1998-05-06 | Kawada Kensetsu Kk | 床版鉄筋組立用の移動足場 |
| JP2004232426A (ja) * | 2003-02-03 | 2004-08-19 | Kawada Construction Co Ltd | 床版架設装置 |
| CN2753788Y (zh) * | 2005-01-06 | 2006-01-25 | 北京万桥兴业机械有限公司 | 辅助导梁式架桥机 |
| CN101864736A (zh) * | 2010-04-29 | 2010-10-20 | 郑州市华中建机有限公司 | 客运专线整孔箱梁过隧道架桥机 |
-
2011
- 2011-07-18 CN CN 201110199905 patent/CN102330413B/zh active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10114915A (ja) | 1996-10-14 | 1998-05-06 | Kawada Kensetsu Kk | 床版鉄筋組立用の移動足場 |
| JP2004232426A (ja) * | 2003-02-03 | 2004-08-19 | Kawada Construction Co Ltd | 床版架設装置 |
| CN2753788Y (zh) * | 2005-01-06 | 2006-01-25 | 北京万桥兴业机械有限公司 | 辅助导梁式架桥机 |
| CN101864736A (zh) * | 2010-04-29 | 2010-10-20 | 郑州市华中建机有限公司 | 客运专线整孔箱梁过隧道架桥机 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN102330413A (zh) | 2012-01-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103243658B (zh) | 斜拉桥牵索挂篮的组拼方法 | |
| CN202023158U (zh) | 移动式桥梁维护装置 | |
| CN101851898A (zh) | 能通过隧道且实现隧道口架梁的架桥机及其架桥工序 | |
| CN104195952A (zh) | 应用于钢混混合梁斜拉桥钢箱梁架设方法 | |
| CN204780608U (zh) | 一种桥面防撞护栏施工用自行式起重转运装置 | |
| CN101736703B (zh) | 120米跨度双层四线公铁两用钢桁桥整孔架设之3000吨级特种架桥机 | |
| CN207714163U (zh) | 一种复合式挂篮 | |
| CN106544958B (zh) | 辅助导梁式900吨架桥机低位过提梁拱的施工方法 | |
| CN102330413B (zh) | 架桥机独立上下运梁车的施工方法 | |
| CN202544854U (zh) | 地铁车站衬砌台车 | |
| CN203393639U (zh) | 一种用于路桥施工的菱形自锚式挂篮 | |
| CN103147406B (zh) | 一种小曲线穿越山岭隧道箱梁运架一体机及其首末孔箱梁架设方法 | |
| CN201459732U (zh) | 护筒沉放简支导向装置 | |
| CN103194977A (zh) | 运架一体式架桥机架设首孔箱梁前导梁机就位方法 | |
| CN101294369B (zh) | 移动模架托架吊挂转运方法及装置 | |
| CN103174141B (zh) | 滩涂区梁下支架钢管桩拔出设备 | |
| CN104179123A (zh) | 一种两孔连做节段拼装造桥机 | |
| CN108086169B (zh) | 桥梁施工用移动模架的安装提升方法 | |
| CN206051351U (zh) | 一种用于桥梁防撞墙模板装拆施工的桁吊 | |
| CN104294763B (zh) | 一种移动模架钢筋网片转运装置 | |
| CN206328685U (zh) | 辅助导梁式900吨架桥机低位过提梁拱用后顶升支架 | |
| CN103422436A (zh) | 用波形钢腹板承担施工荷载的施工方法 | |
| CN202829357U (zh) | 一种小型农业机械吊装机 | |
| CN110952997B (zh) | 隧道内施工模板台车自行拆卸设备 | |
| CN203402829U (zh) | 一种便携式变压器起吊机的车架 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |