CN102121252B - 一种施工桩板挡土墙的方法 - Google Patents

一种施工桩板挡土墙的方法 Download PDF

Info

Publication number
CN102121252B
CN102121252B CN201010300081.9A CN201010300081A CN102121252B CN 102121252 B CN102121252 B CN 102121252B CN 201010300081 A CN201010300081 A CN 201010300081A CN 102121252 B CN102121252 B CN 102121252B
Authority
CN
China
Prior art keywords
steel
pile
reinforced concrete
retaining wall
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010300081.9A
Other languages
English (en)
Other versions
CN102121252A (zh
Inventor
刘建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201010300081.9A priority Critical patent/CN102121252B/zh
Publication of CN102121252A publication Critical patent/CN102121252A/zh
Application granted granted Critical
Publication of CN102121252B publication Critical patent/CN102121252B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种施工桩板挡土墙的方法,它包括钢筋混凝土挡板(2)和钢筋混凝土桩柱(3),在钢筋混凝土桩柱(3)的上部预埋钢管(4),方钢(1)套在钢管(4)的上部,在钢筋混凝土桩柱(3)的顶部和方钢(1)的外部浇筑钢筋混凝土挡板(2)。本发明利用钢筋混凝土桩柱上的预埋钢管与挡板上的方钢之间的可变空隙,解决了桩板挡土墙由温度所产生的变形,另外,本发明减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。

Description

一种施工桩板挡土墙的方法
技术领域
本发明涉及一种施工方法,具体来说,是一种施工桩板挡土墙的方法。
背景技术
在山区的建设中,我都会遇到高差很大的复杂的地形,这样就要对边坡进行处理,修建挡土墙就是其中之一。为了保证挡土墙在温度应力作用下不会发生变形,在设计中会在15m~30m段设置温度伸缩缝,常采用在温度伸缩缝两端处设置双柱。这种处理方法有三大不利因数,(1)这样将造成土方的开挖量增大,同时也出现较大施工安全隐患,增加了大施工难度。(2)施工周期长。(3)投资费用增加。本发明的目的就是解决这一问题。
发明内容
本发明所要解决的技术问题是提供一种施工桩板挡土墙的方法,它减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。
为了解决上述问题,本发明采取了如下技术方案:该施工桩板挡土墙的方法,它包括钢筋混凝土挡板和钢筋混凝土桩柱,在钢筋混凝土桩柱的上部预埋钢管,方钢套在钢管的上部,在钢筋混凝土桩柱的顶部和方钢的外部浇筑钢筋混凝土挡板;预埋钢管的位置与伸缩缝两端的钢筋混凝土挡板相对应,方钢位于伸缩缝两端的钢筋混凝土挡板内部、方钢与钢管之间存在空隙。
预埋的钢管为2根,直径为100~150mm,间距为1000~1500mm;
方钢与钢管顶端的间距为10~20mm;
钢管埋入钢筋混凝土桩柱的长度为150~300mm。
与现有技术相比,本发明利用钢筋混凝土桩柱上的预埋钢管与挡板上的方钢之间的可变空隙,解决了桩板挡土墙由温度所产生的变形,另外,本发明减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。
附图说明
图1是本发明的结构示意图。
具体实施方式
实施例1:在施工钢筋混凝土桩柱3时,按图1所示在钢筋混凝土桩柱3按竖向间距1200mm预埋2根钢管4至挡板2的最下端200mm,即钢管4埋入钢筋混凝土桩柱3内200mm,钢管4的直径为100mm,待在钢筋混凝土桩柱3达到强度时,将方钢1(规格为120mmx210mm)套在钢管4上顶端留10~20mm的空隙,最后从上往下分段浇筑钢筋混凝土挡板。

Claims (4)

1.一种施工桩板挡土墙的方法,它包括钢筋混凝土挡板(2)和钢筋混凝土桩柱(3),其特征在于:在钢筋混凝土桩柱(3)的上部预埋钢管(4),方钢(1)套在钢管(4)的上部,在钢筋混凝土桩柱(3)的顶部和方钢(1)的外部浇筑钢筋混凝土挡板(2);预埋钢管(4)的位置与伸缩缝两端的钢筋混凝土挡板(2)相对应,方钢(1)位于伸缩缝两端的钢筋混凝土挡板(2)内部、方钢(1)与钢管(4)之间存在空隙。
2.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:预埋的钢管(4)为2根,直径为100~150mm,间距为1000~1500mm。
3.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:方钢(1)与钢管(4)顶端的间距为10~20mm。
4.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:钢管(4)埋入钢筋混凝土桩柱(3)的长度为150~300mm。
CN201010300081.9A 2010-01-07 2010-01-07 一种施工桩板挡土墙的方法 Expired - Fee Related CN102121252B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010300081.9A CN102121252B (zh) 2010-01-07 2010-01-07 一种施工桩板挡土墙的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010300081.9A CN102121252B (zh) 2010-01-07 2010-01-07 一种施工桩板挡土墙的方法

Publications (2)

Publication Number Publication Date
CN102121252A CN102121252A (zh) 2011-07-13
CN102121252B true CN102121252B (zh) 2014-03-12

Family

ID=44249903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010300081.9A Expired - Fee Related CN102121252B (zh) 2010-01-07 2010-01-07 一种施工桩板挡土墙的方法

Country Status (1)

Country Link
CN (1) CN102121252B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103572775B (zh) * 2012-07-30 2016-02-10 深圳市工勘岩土工程有限公司 填土边坡的半装配式挡土墙的施工方法
CN102787740B (zh) * 2012-08-14 2015-10-07 中国大唐集团环境技术有限公司 组合受力无基础钢砼挡料墙
CN109371990A (zh) * 2018-11-12 2019-02-22 贵州大学 一种增加牢固性的矿山边坡支护

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1143703A (zh) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 三合一地下连续墙及其施工方法
KR20030046782A (ko) * 2001-12-06 2003-06-18 김해영 옹벽의 신축연결부
CN201125354Y (zh) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 陡坡路基支挡加固结构

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3702378B2 (ja) * 1996-05-20 2005-10-05 儀助 海老根 基礎杭の耐震構造
KR100714790B1 (ko) * 2004-12-24 2007-05-08 재단법인 포항산업과학연구원 이중벽 구조를 갖는 보강토 옹벽 시스템

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1143703A (zh) * 1996-08-02 1997-02-26 北京乾坤基础工程有限公司 三合一地下连续墙及其施工方法
KR20030046782A (ko) * 2001-12-06 2003-06-18 김해영 옹벽의 신축연결부
CN201125354Y (zh) * 2007-11-23 2008-10-01 中铁二院工程集团有限责任公司 陡坡路基支挡加固结构

Also Published As

Publication number Publication date
CN102121252A (zh) 2011-07-13

Similar Documents

Publication Publication Date Title
CN104420486B (zh) 一种在已有扩展浅基础底部增设钢管桩的方法及结构
CN102562097A (zh) 三维非对称支护系统
CN102535519A (zh) 地下连续墙工字钢接头结构及其施工方法
CN102605773B (zh) 注浆成型扩底钻孔灌注桩的施工方法及其挤扩装置
CN102121252B (zh) 一种施工桩板挡土墙的方法
CN205806684U (zh) 一种横跨基坑工程管线悬吊结构
CN206752667U (zh) 一种地下室挡墙结构
CN206204972U (zh) 一种兼作井点降水的预制管桩
CN204959787U (zh) 一种新型塔吊组合式基础
CN206360705U (zh) 用于地铁车站暗挖施工的大直径新型管幕支护结构
CN203238640U (zh) 一种基坑支护内支撑用的复合式立柱
CN104005414B (zh) 大直径钢筋混凝土灌注桩支撑立柱的施工方法
CN105421488A (zh) 地下复合围护体系中基础底板换撑的施工方法
CN205024719U (zh) 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系
CN103374915B (zh) 一种锚喷倒挂连续封闭支护体系及其施工方法
CN105178356A (zh) 逆作法中柱子竖向插筋的留设施工方法
CN204059361U (zh) 一种采用抗拔phc管桩做立柱的支撑结构
CN108205055B (zh) 一种运营公路下浅埋暗挖隧道地层变形试验系统
CN204151807U (zh) 可重复利用的组装式钢沉井
CN104908150B (zh) 一种管道井制作模板及基于工厂化生产管道井的方法
CN103758122A (zh) 一种环保型模块化混凝土管柱及其施工方法
CN204570718U (zh) 一种带有液体管道通路的筏板基础
CN205152958U (zh) 一种新型组合钢板桩
CN204080820U (zh) 一种混凝土结构基坑换撑装置
CN103374920B (zh) 一种竖井一衬结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20150107

EXPY Termination of patent right or utility model