CN102121252A - 一种施工桩板挡土墙的方法 - Google Patents
一种施工桩板挡土墙的方法 Download PDFInfo
- Publication number
- CN102121252A CN102121252A CN2010103000819A CN201010300081A CN102121252A CN 102121252 A CN102121252 A CN 102121252A CN 2010103000819 A CN2010103000819 A CN 2010103000819A CN 201010300081 A CN201010300081 A CN 201010300081A CN 102121252 A CN102121252 A CN 102121252A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- retaining wall
- steel
- pile
- concrete pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种施工桩板挡土墙的方法,它包括钢筋混凝土挡板(2)和钢筋混凝土桩柱(3),在钢筋混凝土桩柱(3)的上部预埋钢管(4),方钢(1)套在钢管(4)的上部,在钢筋混凝土桩柱(3)的顶部和方钢(1)的外部浇筑钢筋混凝土挡板(2)。本发明利用钢筋混凝土桩柱上的预埋钢管与挡板上的方钢之间的可变空隙,解决了桩板挡土墙由温度所产生的变形,另外,本发明减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。
Description
技术领域
本发明涉及一种施工方法,具体来说,是一种施工桩板挡土墙的方法。
背景技术
在山区的建设中,我都会遇到高差很大的复杂的地形,这样就要对边坡进行处理,修建挡土墙就是其中之一。为了保证挡土墙在温度应力作用下不会发生变形,在设计中会在15m~30m段设置温度伸缩缝,常采用在温度伸缩缝两端处设置双柱。这种处理方法有三大不利因数,(1)这样将造成土方的开挖量增大,同时也出现较大施工安全隐患,增加了大施工难度。(2)施工周期长。(3)投资费用增加。本发明的目的就是解决这一问题。
发明内容
本发明所要解决的技术问题是提供一种施工桩板挡土墙的方法,它减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。
为了解决上述问题,本发明采取了如下技术方案:该施工桩板挡土墙的方法,它包括钢筋混凝土挡板和钢筋混凝土桩柱,在钢筋混凝土桩柱的上部预埋钢管,方钢套在钢管的上部,在钢筋混凝土桩柱的顶部和方钢的外部浇筑钢筋混凝土挡板。
预埋的钢管为2根,直径为100~150mm,间距为1000~1500mm;
方钢与钢管顶端的间距为10~20mm;
钢管埋入钢筋混凝土桩柱的长度为150~300mm。
与现有技术相比,本发明利用钢筋混凝土桩柱上的预埋钢管与挡板上的方钢之间的可变空隙,解决了桩板挡土墙由温度所产生的变形,另外,本发明减少了挖填土方量,较大缓解安全隐患,使复杂的施工工艺简单化,缩短了施工周期,降低了建设成本。
附图说明
图1是本发明的结构示意图。
具体实施方式
实施例1:在施工钢筋混凝土桩柱3时,按图1所示在钢筋混凝土桩柱3按竖向间距1200mm预埋2根钢管4至挡板2的最下端200mm,即钢管4埋入钢筋混凝土桩柱3内200mm,钢管4的直径为100mm,待在钢筋混凝土桩柱3达到强度时,将方钢1(规格为120mmx210mm)套在钢管4上顶端留10~20mm的空隙,最后从上往下分段浇筑钢筋混凝土挡板。
Claims (4)
1.一种施工桩板挡土墙的方法,它包括钢筋混凝土挡板(2)和钢筋混凝土桩柱(3),其特征在于:在钢筋混凝土桩柱(3)的上部预埋钢管(4),方钢(1)套在钢管(4)的上部,在钢筋混凝土桩柱(3)的顶部和方钢(1)的外部浇筑钢筋混凝土挡板(2)。
2.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:预埋的钢管(4)为2根,直径为100~150mm,间距为1000~1500mm。
3.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:方钢(1)与钢管(4)顶端的间距为10~20mm。
4.根据权利要求1所述的施工桩板挡土墙的方法,其特征在于:钢管(4)埋入钢筋混凝土桩柱(3)的长度为150~300mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010300081.9A CN102121252B (zh) | 2010-01-07 | 2010-01-07 | 一种施工桩板挡土墙的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010300081.9A CN102121252B (zh) | 2010-01-07 | 2010-01-07 | 一种施工桩板挡土墙的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102121252A true CN102121252A (zh) | 2011-07-13 |
CN102121252B CN102121252B (zh) | 2014-03-12 |
Family
ID=44249903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010300081.9A Expired - Fee Related CN102121252B (zh) | 2010-01-07 | 2010-01-07 | 一种施工桩板挡土墙的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102121252B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102787740A (zh) * | 2012-08-14 | 2012-11-21 | 中国大唐集团环境技术有限公司 | 组合受力无基础钢砼挡料墙 |
CN103572775B (zh) * | 2012-07-30 | 2016-02-10 | 深圳市工勘岩土工程有限公司 | 填土边坡的半装配式挡土墙的施工方法 |
CN109371990A (zh) * | 2018-11-12 | 2019-02-22 | 贵州大学 | 一种增加牢固性的矿山边坡支护 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1143703A (zh) * | 1996-08-02 | 1997-02-26 | 北京乾坤基础工程有限公司 | 三合一地下连续墙及其施工方法 |
JPH09310356A (ja) * | 1996-05-20 | 1997-12-02 | Gisuke Ebine | 基礎杭の耐震構造 |
KR20030046782A (ko) * | 2001-12-06 | 2003-06-18 | 김해영 | 옹벽의 신축연결부 |
US20080095585A1 (en) * | 2004-12-24 | 2008-04-24 | Research Institute Of Industrial Science & Technology | Double Wall Structure Type Mechanically Stabilized Earth Wall System |
CN201125354Y (zh) * | 2007-11-23 | 2008-10-01 | 中铁二院工程集团有限责任公司 | 陡坡路基支挡加固结构 |
-
2010
- 2010-01-07 CN CN201010300081.9A patent/CN102121252B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09310356A (ja) * | 1996-05-20 | 1997-12-02 | Gisuke Ebine | 基礎杭の耐震構造 |
CN1143703A (zh) * | 1996-08-02 | 1997-02-26 | 北京乾坤基础工程有限公司 | 三合一地下连续墙及其施工方法 |
KR20030046782A (ko) * | 2001-12-06 | 2003-06-18 | 김해영 | 옹벽의 신축연결부 |
US20080095585A1 (en) * | 2004-12-24 | 2008-04-24 | Research Institute Of Industrial Science & Technology | Double Wall Structure Type Mechanically Stabilized Earth Wall System |
CN201125354Y (zh) * | 2007-11-23 | 2008-10-01 | 中铁二院工程集团有限责任公司 | 陡坡路基支挡加固结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103572775B (zh) * | 2012-07-30 | 2016-02-10 | 深圳市工勘岩土工程有限公司 | 填土边坡的半装配式挡土墙的施工方法 |
CN102787740A (zh) * | 2012-08-14 | 2012-11-21 | 中国大唐集团环境技术有限公司 | 组合受力无基础钢砼挡料墙 |
CN102787740B (zh) * | 2012-08-14 | 2015-10-07 | 中国大唐集团环境技术有限公司 | 组合受力无基础钢砼挡料墙 |
CN109371990A (zh) * | 2018-11-12 | 2019-02-22 | 贵州大学 | 一种增加牢固性的矿山边坡支护 |
Also Published As
Publication number | Publication date |
---|---|
CN102121252B (zh) | 2014-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206681751U (zh) | 一种用于破碎围岩巷道锚注一体化支护系统 | |
CN205742213U (zh) | 基坑支护结构 | |
CN102383628B (zh) | 筒仓结构后施工减压锥的施工装置及施工方法 | |
CN202767522U (zh) | 变形缝处剪力墙加固体系 | |
CN104420486B (zh) | 一种在已有扩展浅基础底部增设钢管桩的方法及结构 | |
CN102605773B (zh) | 注浆成型扩底钻孔灌注桩的施工方法及其挤扩装置 | |
CN102877463B (zh) | 一种可回收基坑支护管桩及其使用与回收方法 | |
CN203614107U (zh) | 马头门复合支护结构 | |
CN102121252B (zh) | 一种施工桩板挡土墙的方法 | |
CN203238640U (zh) | 一种基坑支护内支撑用的复合式立柱 | |
CN206360705U (zh) | 用于地铁车站暗挖施工的大直径新型管幕支护结构 | |
CN105421488A (zh) | 地下复合围护体系中基础底板换撑的施工方法 | |
CN205591122U (zh) | 一种基于贝雷梁支架的简支桥梁支撑结构 | |
CN205024719U (zh) | 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系 | |
CN203925579U (zh) | 一种隧道底部排水设施结构 | |
CN103374915B (zh) | 一种锚喷倒挂连续封闭支护体系及其施工方法 | |
CN104908150B (zh) | 一种管道井制作模板及基于工厂化生产管道井的方法 | |
CN205369714U (zh) | 一种用于连接梁底与砖墙或楼板的构造柱结构 | |
CN102817376B (zh) | 大体积片石混凝土沉降缝施工方法 | |
CN204151807U (zh) | 可重复利用的组装式钢沉井 | |
CN105178356A (zh) | 逆作法中柱子竖向插筋的留设施工方法 | |
CN106759526B (zh) | 一种深基坑支撑梁爆破拆除前的围檩保护预处理方法 | |
CN103758122A (zh) | 一种环保型模块化混凝土管柱及其施工方法 | |
CN205152958U (zh) | 一种新型组合钢板桩 | |
CN204080820U (zh) | 一种混凝土结构基坑换撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140312 Termination date: 20150107 |
|
EXPY | Termination of patent right or utility model |