CN102116156A CN2010101572758A CN201010157275A CN102116156A CN 102116156 A CN102116156 A CN 102116156A CN 2010101572758 A CN2010101572758 A CN 2010101572758A CN 201010157275 A CN201010157275 A CN 201010157275A CN 102116156 A CN102116156 A CN 102116156A
Authority
CN
China
Prior art keywords
hole
detonator
design
delay
deep
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101572758A
Other languages
Chinese (zh)
Inventor
徐连生
王志忠
张宝才
杨志富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Group Mining Co Ltd
Original Assignee
Angang Group Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Group Mining Co Ltd filed Critical Angang Group Mining Co Ltd
Priority to CN2010101572758A priority Critical patent/CN102116156A/en
Publication of CN102116156A publication Critical patent/CN102116156A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a slope expansion and blasting method for mining a deep concave open-pit mine by stages. The method comprises the following steps: sequentially performing hole distribution design of deep holes, perforation construction, setting of primer detonators in the deep holes and the construction of charging explosive in the deep holes, performing time delay detonation design of the detonators in a surface network, connecting the detonators in blast holes with the detonators in the surface network, and detonating, and the method is characterized in that, under the condition that the width of the slope expansion part is greater than 20 meters, the hole distribution design of the deep holes is used for designing the blast holes in a control row of a blasting area to be vertical to a bench crest of a main stope, the time delay detonation design of the detonators in the surface network is used for designing the detonation sequence to hole-by-hole differential detonation, and the time delay detonation design of the detonators in the surface network is used for designing delay time of the detonators to enable the inter-hole detonator time delay to be shorter than the inter-row detonator time delay. Under the condition that the width of the slope expansion part is smaller than 20 meters, the hole distribution design of the deep holes is used for designing the blast holes in the control row of the blasting area to be parallel to the bench crest of the main stope, and the time delay design of the detonator is used for designing the delay time of the detonators to enable the inter-hole detonator time delay to be longer than the inter-row detonator time delay. The method is strong in operability, safe, practical and reliable.

Description

Group's blasting method is expanded in the deep open pit mining by stages
Technical field
The invention belongs to surface mining deep hole blasting technology field, group's blasting method is expanded in particularly a kind of deep open pit mining by stages.
Background technology
At present, domestic surface mine expands in group's explosion in mining by stages, and generally the blasting method of Cai Yonging is deep hole blasting, and control artillery salvo hole, blast area is parallel to main stope bench crest, and firing order is a millisecond detonating scheme between oblique line elementary errors and V-type row.Quick-fried heap preshoot was bigger to operation area, its underpart influence when there was explosion in these blasting methods, the safety that jeopardizes the equipment and the transportation route of operation area, its underpart.These problems when expanding group in order to solve, the scheme of reserving dike or staying the temporary transient not explosion of platform of certain width commonly used, and this expansion group blasting scheme is very big to the tissue influence that produces, and greatly reduces the production efficiency of power shovel simultaneously.
Summary of the invention
The object of the present invention is to provide a kind of deep open pit mining by stages to expand group's blasting method, can effectively control quick-fried heap moving direction, reduce explosion preshoot distance significantly, reach and guarantee that the deep open pit mining by stages expands safe, the purpose efficiently of group's explosion.
The present invention seeks to realize by following technical proposals:
Group's blasting method is expanded in a kind of deep open pit mining by stages of the present invention, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that expansion help the position width greater than 20 meters condition under:
1) in the design of described deep hole cloth hole, artillery salvo hole is controlled in the blast area is designed to perpendicular to main stope bench crest,
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating,
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being shorter than between detonator delay time design pore-forming.
The pattern of described deep hole cloth hole design is square, rectangle or triangle.
The aperture of described deep hole cloth hole design is 100-310mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
The design that primer detonator adopts time-delay 400ms is set in the described deep hole hole.
The detonator time-delay is 9ms~65ms between described hole, and the detonator time-delay is 17ms~100ms between described row.
Group's blasting method is expanded in a kind of deep open pit mining by stages, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that expansion help the position width less than 20 meters condition under:
1) in the design of described deep hole cloth hole, artillery salvo hole is controlled in the blast area is designed to be parallel to main stope bench crest,
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating,
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being longer than between detonator delay time design pore-forming.
The pattern of described deep hole cloth hole design is square, rectangle or triangle.
The aperture of described deep hole cloth hole design is 100-310mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
The design that primer detonator adopts time-delay 400ms is set in the described deep hole hole.
The detonator time-delay is 17ms~100ms between described hole, and the detonator time-delay is 9ms~65ms between described row.
Deep open pit mining by stages of the present invention is expanded group's blasting method and is had following advantage:
1, workable, safe, practical, reliable;
2, in expanding group's explosion, do not stay the back quick-fried platform of reserving dike or not staying certain width, improved blasting quality;
3, can effectively control quick-fried heap moving direction, reduce explosion preshoot distance significantly, reduce the influence of explosion stope bottom production and transport circuit;
4, improve shovel dress efficient, expanded group's fltting speed when having accelerated the mining by stages transition, guaranteed the lasting and stable of mine capacity.
Description of drawings
Fig. 1 is the network detonator time-delay plan that detonates in the face of land during greater than 20 meters for expansion of the present invention group position width.
Fig. 2 is the network detonator time-delay plan that detonates in the face of land during less than 20 meters for expansion of the present invention group position width.
The specific embodiment
Given embodiment further specifies the specific embodiment of the present utility model below in conjunction with accompanying drawing.
As shown in Figure 1, A is main stope bench crest among the figure, and B is control artillery salvo hole, and 1 be fire point, and the numeral in the square frame is the time of time-delay, and the numeral on circle side is a firing order number.
Expand group's position width greater than 20 meters condition under, group's blasting method is expanded in a kind of deep open pit mining by stages, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that:
1) in described deep hole cloth hole design, artillery salvo hole B is controlled in the blast area be designed to perpendicular to main stope bench crest A, the pattern of deep hole cloth hole design is square, rectangle or triangle, its aperture is 100-310mm, pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.Because the scope of freedom of quick-fried heap side is bigger, can make full use of the compensation space of its side, more help moving of quick-fried heap rock.
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating, its demolition effect is good.
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being shorter than between detonator delay time design pore-forming, the detonator time-delay is 9ms~65ms between the hole, and the detonator time-delay is 17ms~100ms between row.The design that primer detonator adopts time-delay 400ms is set in the deep hole hole.Quick-fried heap is moved along being parallel to main stope bench crest direction, reduce its preshoot distance perpendicular to the bench crest direction.
As shown in Figure 2, expand group's position width less than 20 meters condition under, group's blasting method is expanded in a kind of deep open pit mining by stages, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that:
1) in described deep hole cloth hole design, artillery salvo hole B is controlled in the blast area be designed to be parallel to main stope bench crest A, the pattern of deep hole cloth hole design is square, rectangle or triangle, its aperture is 100-310mm, pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.Because the scope of freedom of its side is less; available side compensation space is less; therefore can only adopt the scheme of control platoon leader time-delay; quick-fried heap is moved along being parallel to main stope bench crest direction; reduce preshoot distance, the equipment of protection operation area, bottom, blast area and the safety of transportation route perpendicular to main stope bench crest.
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating, its demolition effect is good.
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being longer than between detonator delay time design pore-forming, the detonator time-delay is 17ms~100ms between the hole, and the detonator time-delay is 9ms~65ms between row.The design that primer detonator adopts time-delay 400ms is set in the deep hole hole.Quick-fried heap is moved along being parallel to main stope bench crest direction, reduce its preshoot distance perpendicular to main stope bench crest direction.
Embodiment 1:
Expand group's position width greater than 20 meters condition under, adopt a kind of deep open pit mining by stages to expand group's blasting method, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that:
1) in the design of described deep hole cloth hole, artillery salvo hole B is controlled in the blast area be designed to perpendicular to main stope bench crest A, the cloth hole of shot hole is 5 rows, 6 row.The aperture of deep hole cloth hole design is 200mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating.
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being shorter than between detonator delay time design pore-forming, the detonator time-delay is 9ms between the hole, and the detonator time-delay is 42ms between row, and the design that primer detonator adopts time-delay 400ms is set in the deep hole hole.
Embodiment 2:
Expand group's position width less than 20 meters condition under, adopt a kind of deep open pit mining by stages to expand group's blasting method, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that:
1) in the design of described deep hole cloth hole, artillery salvo hole B is controlled in the blast area be designed to be parallel to main stope bench crest A, the cloth hole of shot hole is 3 rows, 10 row.The aperture of deep hole cloth hole design is 200mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating.
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being longer than between detonator delay time design pore-forming, the detonator time-delay is 42ms between the hole, and the detonator time-delay is 9ms between row, and the design that primer detonator adopts time-delay 400ms is set in the deep hole hole.
The present invention under the bigger and less situation in the scope of freedom, side, can effectively control the moving direction of quick-fried heap respectively, reduces its preshoot distance perpendicular to main stope bench crest direction, guarantees the equipment of operation area, bottom, blast area and the safety of transportation route.Improve shovel dress efficient, guaranteed the lasting and stable of mine capacity.It is workable, and is safe, practical, reliable.

Claims (10)

1. group's blasting method is expanded in a deep open pit mining by stages, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that expansion help the position width greater than 20 meters condition under:
1) in the design of described deep hole cloth hole, artillery salvo hole is controlled in the blast area is designed to perpendicular to main stope bench crest,
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating,
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being shorter than between detonator delay time design pore-forming.
2. group's blasting method is expanded in deep open pit mining by stages according to claim 1, and the pattern that it is characterized in that the design of described deep hole cloth hole is square, rectangle or triangle.
3. group's blasting method is expanded in deep open pit mining by stages according to claim 1, it is characterized in that the aperture of described deep hole cloth hole design is 100-310mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
4. group's blasting method is expanded in deep open pit mining by stages according to claim 1, it is characterized in that being provided with in the described deep hole hole design that primer detonator adopts time-delay 400ms.
5. group's blasting method is expanded in deep open pit mining by stages according to claim 1, it is characterized in that the detonator time-delay is 9ms~65ms between described hole, and the detonator time-delay is 17ms~100ms between described row.
6. group's blasting method is expanded in a deep open pit mining by stages, comprise carry out deep hole cloth hole design, perforation construction, primer detonator be set in the deep hole hole, the construction of deep hole blasting charge, carry out face of land network detonator time-delay detonate design, detonator in the hole, big gun hole is connected, detonates with face of land network detonator, it is characterized in that expansion help the position width less than 20 meters condition under:
1) in the design of described deep hole cloth hole, artillery salvo hole is controlled in the blast area is designed to be parallel to main stope bench crest,
2) in design is detonated in network detonator time-delay in the described face of land, firing order is designed to by the hole millisecond detonating,
3) in design is detonated in network detonator time-delay in the described face of land, with detonator time-delay between the detonator time-delay row of being longer than between detonator delay time design pore-forming.
7. group's blasting method is expanded in deep open pit mining by stages according to claim 6, and the pattern that it is characterized in that the design of described deep hole cloth hole is square, rectangle or triangle.
8. group's blasting method is expanded in deep open pit mining by stages according to claim 6, it is characterized in that the aperture of described deep hole cloth hole design is 100-310mm, and pitch-row is 7.5m, and array pitch is 7.5m, and hole depth is 15m.
9. group's blasting method is expanded in deep open pit mining by stages according to claim 6, it is characterized in that being provided with in the described deep hole hole design that primer detonator adopts time-delay 400ms.
10. group's blasting method is expanded in deep open pit mining by stages according to claim 6, it is characterized in that the detonator time-delay is 17ms~100ms between described hole, and the detonator time-delay is 9ms~65ms between described row.
CN2010101572758A 2010-04-28 2010-04-28 Slope expansion and blasting method for mining deep concave open-pit mine by stages Pending CN102116156A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101572758A CN102116156A (en) 2010-04-28 2010-04-28 Slope expansion and blasting method for mining deep concave open-pit mine by stages

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101572758A CN102116156A (en) 2010-04-28 2010-04-28 Slope expansion and blasting method for mining deep concave open-pit mine by stages

Publications (1)

Publication Number Publication Date
CN102116156A true CN102116156A (en) 2011-07-06

Family

ID=44215069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101572758A Pending CN102116156A (en) 2010-04-28 2010-04-28 Slope expansion and blasting method for mining deep concave open-pit mine by stages

Country Status (1)

Country Link
CN (1) CN102116156A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
WO2014026603A1 (en) * 2012-08-17 2014-02-20 北京北方邦杰科技发展有限公司 Application method of digital electronic detonator
CN105333777A (en) * 2015-11-10 2016-02-17 攀钢集团矿业有限公司 Ditching blasting method for deep open pit mine
CN105444630A (en) * 2015-11-10 2016-03-30 攀钢集团矿业有限公司 Presplit hole explosion device and explosion device
CN110595308A (en) * 2019-09-20 2019-12-20 鞍钢集团矿业有限公司 Method for treating goaf by ultra-deep hole blasting of strip mine
CN113654424A (en) * 2021-09-02 2021-11-16 攀钢集团矿业有限公司 New horizontal ditching method for deep open pit mine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2116612C1 (en) * 1997-01-10 1998-07-27 Институт горного дела Дальневосточного отделения РАН Method of execution of blasting operations
CN1375680A (en) * 2001-03-20 2002-10-23 T&Rb株式会社 Rock stepped blasting method of increasing blasting efficiency and reducing blasting damage
KR100507303B1 (en) * 2002-10-04 2005-08-09 지케이건설(주) Vibration-controlled safe blasting method using detonating fuses
CN101319862A (en) * 2007-06-08 2008-12-10 鞍钢集团矿业公司 Novel horizontal trenching and vertical deep borehole initiation method for deep concave strip mine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2116612C1 (en) * 1997-01-10 1998-07-27 Институт горного дела Дальневосточного отделения РАН Method of execution of blasting operations
CN1375680A (en) * 2001-03-20 2002-10-23 T&Rb株式会社 Rock stepped blasting method of increasing blasting efficiency and reducing blasting damage
KR100507303B1 (en) * 2002-10-04 2005-08-09 지케이건설(주) Vibration-controlled safe blasting method using detonating fuses
CN101319862A (en) * 2007-06-08 2008-12-10 鞍钢集团矿业公司 Novel horizontal trenching and vertical deep borehole initiation method for deep concave strip mine

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《中国矿业》 20040515 付天光等 利用高精度导爆管雷管实现露天矿中深孔"逐孔起爆"技术 第37-40页 1-10 第13卷, 第5期 *
付天光等: "利用高精度导爆管雷管实现露天矿中深孔"逐孔起爆"技术", 《中国矿业》 *
徐连生: "高精度导爆管雷管的应用研究与工业试验", 《金属矿山》 *
徐连生等: "逐孔减震控制爆破技术在大孤山铁矿的应用", 《矿业工程》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014026603A1 (en) * 2012-08-17 2014-02-20 北京北方邦杰科技发展有限公司 Application method of digital electronic detonator
CN102927866A (en) * 2012-11-16 2013-02-13 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN102927866B (en) * 2012-11-16 2014-11-05 鞍钢集团矿业公司 Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN105333777A (en) * 2015-11-10 2016-02-17 攀钢集团矿业有限公司 Ditching blasting method for deep open pit mine
CN105444630A (en) * 2015-11-10 2016-03-30 攀钢集团矿业有限公司 Presplit hole explosion device and explosion device
CN105444630B (en) * 2015-11-10 2017-10-24 攀钢集团矿业有限公司 Pre- ceasma demolition set and demolition set
CN110595308A (en) * 2019-09-20 2019-12-20 鞍钢集团矿业有限公司 Method for treating goaf by ultra-deep hole blasting of strip mine
CN110595308B (en) * 2019-09-20 2022-02-18 鞍钢集团矿业有限公司 Method for treating goaf by ultra-deep hole blasting of strip mine
CN113654424A (en) * 2021-09-02 2021-11-16 攀钢集团矿业有限公司 New horizontal ditching method for deep open pit mine

Similar Documents

Publication Publication Date Title
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN104154830B (en) Medium-length hole blasting method for underground mining
CN102116156A (en) Slope expansion and blasting method for mining deep concave open-pit mine by stages
CN104634199B (en) Method for realizing smooth blasting of tunnel peripheral eyes by using detonating cord and detonating tube detonator
CN108007285B (en) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN101319862B (en) Novel horizontal trenching and vertical deep borehole initiation method for deep concave strip mine
CN105135962A (en) Method for improving deep-hole step blasting quality of extremely hard rock
CN105333778A (en) Medium-deep hole large-section composite cut blasting structure and method
CN205262309U (en) Compound undercutting blasting structure of big section of medium -length hole
CN106091848B (en) It is a kind of to realize overlength, the method for high inclination-angle tunnel anchorage top bar explosion
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103195466A (en) Directional water pressure blasting method for improving coal bed gas permeability
CN108489350A (en) Smooth blasting construction method for rapid tunneling of upper step of grade-III surrounding rock tunnel
CN103344154A (en) Carbonaceous schist tunnel blasting method and construction method
CN102506623A (en) Deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate
CN112943262A (en) Karst landform tunnel energy-gathering water pressure smooth blasting structure and method
CN105823387A (en) Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN110196002B (en) Safe and efficient blasting construction method for vertical shaft wall beam nest
CN101893415A (en) Blasting method by arch roof control and smooth-surface pillar control
CN108204775A (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN204495211U (en) A kind of blasting hole arrangement system of tunnel open excavation section
CN104457466A (en) Explosion method of open-cut tunnel segment
CN104089548A (en) Fan-shaped arrangement blast mining method
CN209623525U (en) The steel for shot structure of roadway development blasting
CN114111478A (en) Detonating circuit combining electronic detonator and detonating cord and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110706