CN102116140A - Construction method for enhancing extraction effect of ground coal bed gas - Google Patents

Construction method for enhancing extraction effect of ground coal bed gas Download PDF

Info

Publication number
CN102116140A
CN102116140A CN 201110026912 CN201110026912A CN102116140A CN 102116140 A CN102116140 A CN 102116140A CN 201110026912 CN201110026912 CN 201110026912 CN 201110026912 A CN201110026912 A CN 201110026912A CN 102116140 A CN102116140 A CN 102116140A
Authority
CN
China
Prior art keywords
cave
well
horizontal
hole
top set
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110026912
Other languages
Chinese (zh)
Other versions
CN102116140B (en
Inventor
石智军
张群
胡振阳
祁宏军
李建武
叶根飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE filed Critical SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE
Priority to CN2011100269122A priority Critical patent/CN102116140B/en
Publication of CN102116140A publication Critical patent/CN102116140A/en
Application granted granted Critical
Publication of CN102116140B publication Critical patent/CN102116140B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a construction method for enhancing the extraction effect of a ground coal bed gas, comprising the following steps of: (1) constructing a vertical cave well, forging caves on coal beds with coal bed gases needed to extract, and placing fiberglass casings into the caves; (2) constructing a vertical well section and a lower branched main horizontal well hole of a horizontal well, respectively forwards constructing the lower branched main horizontal well hole and a horizontal branched well hole positioned in front of a lower branched cave after butting with the vertical cave well, returning to a position nearby the rear end of the vertical cave well and then constructing a horizontal branched well hole positioned at the rear of the lower branched cave; (3) after a lower branched well hole is constructed, carrying out side drilling to construct an upper branched well hole; (4) after an uppermost branched well hole is constructed, plugging inclined well sections of main horizontal well holes inside the horizontal well from a side drilling windowing point to a coal seeing point by using cementing cement; (5) drilling and flushing the vertical cave well, installing discharge and extraction equipment, and extracting the coal bed gas by discharging water and reducing pressure on the ground. The invention can shorten the construction period, reduce the construction and production cost, decrease the lands used for construction and extraction and enhance the extraction effect of the ground coal bed gas.

Description

A kind of job practices that improves ground coal bed gas extraction effect
Technical field
The invention belongs to the coal-bed gas exploitation technical field, be specifically related to a kind of job practices that improves ground coal bed gas extraction effect.
Background technology
At present the main mode of production coal bed gas has: the ground peupendicular hole, the pinniform horizontal well is set in the coal seam, and near-end butt joint horizontal well begins the branch well hole of constructing after crossing the cave, and far-end butt joint horizontal well begins the branch well hole of constructing after crossing the cave.
Find after deliberation, the ground peupendicular hole is low because of coal seam brill encountering rate, the extraction effect of coal bed gas is not as horizontal well to a certain extent, and horizontal well is because there is the internal resistance of flowing in the horizontal segment pit shaft, horizontal segment is long more, and internal resistance is big more, and the flowing pressure along end direction in the horizontal wellbore increases, the pressure drop of horizontal segment end is little than well head, causes the output of horizontal segment end to reduce.Therefore to make horizontal well economic benefit maximum, just have the reasonable levels segment length, thereby influenced the maximization of drilling depth.
When horizontal well is in the stratum of different occurrences, the stratum for example has a down dip, horizontal well can be because wellbore trace be descending, its terminal position is lower than horizontal segment starting point, cause terminal strata pressure big than the strata pressure at horizontal segment starting point place, therefore to separate pressure reduction big than horizontal segment starting point place on the ground of horizontal segment end, causes the output of horizontal segment end to reduce.Although and the terminal resistance of the horizontal segment on the updip stratum stratum that has a down dip relatively is less relatively, but still be subjected to the influence of terminal resistance, influence gas output.Therefore horizontal segment is longer, and pressure differential is bigger, and the poor efficiency horizontal segment just may be long more.
Traditional near-end butt joint horizontal well just begins the branch well hole of constructing after the cave of crossing vertical cave well, horizontal segment before the cave influences gas production because of the branch well hole of not constructing, and present far-end butt shaft is generally after the coal seam horizontal segment through 300~500m creeps into, carrying out the cave is communicated with, implement the Multilateral Wells job engineering after crossing the cave, coal seam section before the cave branch well hole of also not constructing, the horizontal segment drilling depth is less before the cave, and in certain control range under the equal conditions, the output of coal bed gas is to become certain linear with drilling depth, does not therefore reach the maximization of coal seam reservoirs drilling depth.
At present containing the coal measure strata exploiting coal bed methane of multilayer coal, one group of horizontal butt shaft is a horizontal well of construction and a cave well in same coal seam only.If need in the multilayer coal seam, also will build the needs of more well site with regard to needing the coal bed gas in the many groups of the construction horizontal wells different coal by exploiting coal bed methane, can not realize the maximizing the benefits of input and output with satisfied construction and extraction.
In sum, under equal geological conditions, existing coal bed gas extraction technology exists that methane output is little, his the producing cost height of constructing, construction and extraction land occupation are many, shortcomings such as long construction period.
Summary of the invention
Technical problem solved by the invention provides a kind of job practices that can shorten construction period, reduction operating expenses, minimizing construction extraction land used, improve ground coal bed gas extraction effect.
For solving above-mentioned technical problem, the technical scheme that the present invention takes:
A kind of job practices that improves ground coal bed gas extraction effect, realize by following steps:
(1), construction vertical cave well, this cave well is made the cave and is lowered to glass reinforced plastic sleeve in each the coal seam section that needs the extraction coal bed gas, with realize the horizontal well far-end with it smoothly butt joint guarantee that again cave, coal seam section can not cave in after butt joint;
(2), constructing is used to realize the horizontal well peupendicular hole section and the darkest inferior division inclination section and the inferior division master horizontal hole of buried depth of far-end butt joint, is lowered to protective casing on roof top; Continue to creep into along the coal seam after the construction landing enters horizontal segment, at far-end with after dock in the peupendicular hole cave, continuation horizontal branch well before main horizontal hole and the inferior division cave before coal seam, forward position construction inferior division cave, crossing the cave has constructed before the inferior division cave before the main horizontal hole and inferior division cave after the horizontal branch well, return to horizontal branch well behind near the posterior inferior division cave of constructing again the well rear end, cave, whenever finish a Multilateral Wells Duan Jun and replace into solid free completion fluid;
(3), after the construction of inferior division well is finished, be lowered to the recoverable whipstock at top set kickoff point (KOP) place, the sidetracking construction master of top set horizontal hole, after the orientation construction, dock with the peupendicular hole cave section in the superjacent, and continue before coal seam, forward position construction top set cave horizontal branch well before the main horizontal hole and top set cave, finish before the top set cave before the main horizontal hole and top set cave after the horizontal branch well, return behind the cave horizontal branch well behind the construction top set cave, according to the corresponding numbers of branches of peupendicular hole cave quantity construction, every construction is finished a Multilateral Wells Duan Jun and is replaced into solid free completion fluid;
(4), the construction finish topmost branch well after, take out the recoverable whipstock respectively, with the lower curved section of each the main horizontal hole in the horizontal well, window a little to seeing the cementing concrete shutoff of coal point from sidetracking;
(5), vertical down-hole, cave bores well-flushing, removes to be communicated with landwaste and the sediment that construction produces, equipment, land drainage step-down extraction coal bed gas are adopted by the row of installation.
Above-mentioned horizontal well comprises horizontal well peupendicular hole section, the master of top set horizontal hole, inferior division master horizontal hole, vertical cave well, main horizontal hole before the top set cave, main horizontal hole before the inferior division cave, one end of the master of top set horizontal hole and inferior division master horizontal hole all is communicated with horizontal well peupendicular hole section, the master of top set horizontal hole all is connected with the corresponding cave of vertical cave well with inferior division master horizontal hole, the master of top set horizontal hole is the horizontal branch well before the front and back of vertical cave well are respectively arranged with the top set cave, horizontal branch well behind the top set cave, inferior division master horizontal hole is the horizontal branch well before the front and back of vertical cave well are respectively arranged with the inferior division cave, horizontal branch well behind the inferior division cave, the master of top set horizontal hole and inferior division master horizontal hole continue to extend to forward the coal seam main horizontal hole of constructing being connected the back with vertical cave well.
Above-mentioned vertical cave well with the top set cave before be installed on glass reinforced plastic sleeve in main horizontal hole docks before the main horizontal hole, inferior division cave the coal seam section.
The above-mentioned master of top set horizontal hole, inferior division master horizontal hole are connected by top set's inclination section, inferior division inclination section respectively with horizontal well peupendicular hole section.
Compared with prior art, the present invention can shorten construction period, reduces construction and producing cost, minimizing construction extraction land used, improve ground coal bed gas extraction effect.
Description of drawings
Fig. 1 is the schematic perspective view of job practices of the present invention;
Fig. 2 is the vertical cut-away schematic view of job practices of the present invention.
1. vertical cave wells among the figure; 2. cave, coal seam section; 3. horizontal well; 4. horizontal well vertical section; 5. inferior division inclination section; 6. inferior division master horizontal hole; 7. main horizontal hole before the inferior division cave; 8. horizontal branch well before the inferior division cave; 9. horizontal branch well behind the inferior division cave; 10. top set's inclination section; 11. the master of top set horizontal hole; 12. main horizontal hole before the top set cave; 13. horizontal branch well before the top set cave; 14. horizontal branch well behind the top set cave; 15. glass reinforced plastic sleeve.
The specific embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
The present invention realizes by following steps:
(1), construction vertical cave well 1, this cave well is made the cave and is lowered to glass reinforced plastic sleeve 15 in each the coal seam section that needs the extraction coal bed gas, with realize horizontal well 3 far-ends with it smoothly butt joint guarantee that again cave, coal seam section 2 can not cave in after butt joint;
(2), constructing is used to realize the horizontal well peupendicular hole section 4 and the darkest inferior division inclination section 5 and the inferior division master horizontal hole 6 of buried depth of far-end butt joint, is lowered to protective casing on roof top; Continue to creep into along the coal seam after the construction landing enters horizontal segment, at far-end with after dock in the peupendicular hole cave, continuation horizontal branch well 8 before main horizontal hole 7 and the inferior division cave before coal seam, forward position construction inferior division cave, crossing the cave has constructed before the inferior division cave before the main horizontal hole and inferior division cave after the horizontal branch well, return to horizontal branch well 9 behind near the posterior inferior division cave of constructing again the well rear end, cave, whenever finish a Multilateral Wells Duan Jun and replace into solid free completion fluid;
(3), after the construction of inferior division well is finished, be lowered to the recoverable whipstock at top set kickoff point (KOP) place, the sidetracking construction master of top set horizontal hole 11, after the orientation construction, dock with the peupendicular hole cave section 2 in the superjacent, and continue before coal seam, forward position construction top set cave horizontal branch well 13 before the main horizontal hole 12 and top set cave, finish before the top set cave before the main horizontal hole 11 and top set cave after the horizontal branch well 13, return behind the cave horizontal branch well 14 behind the construction top set cave, according to the corresponding numbers of branches of peupendicular hole cave quantity construction, every construction is finished a Multilateral Wells Duan Jun and is replaced into solid free completion fluid;
(4) after topmost branch well is finished in construction, take out the recoverable whipstock respectively,, window a little to seeing the cementing concrete shutoff of coal point from sidetracking with the lower curved section of each the main horizontal hole in the horizontal well;
(5) vertical 1 time brill well-flushing of cave well is removed the landwaste and the sediment that are communicated with the construction generation, and equipment, land drainage step-down extraction coal bed gas are adopted by the row of installation.
Above-mentioned horizontal well 3 comprises horizontal well peupendicular hole section 4, the master of top set horizontal hole 11, inferior division master horizontal hole 6, vertical cave well 1, main horizontal hole 12 before the top set cave, main horizontal hole 7 before the inferior division cave, one end of the master of top set horizontal hole 11 and inferior division master horizontal hole 6 all is communicated with horizontal well peupendicular hole section 4, the master of top set horizontal hole 11 all is connected with the corresponding cave of vertical cave well 1 with inferior division master horizontal hole 6, the master of top set horizontal hole 11 is horizontal branch well 13 before the front and back of vertical cave well 1 are respectively arranged with the top set cave, horizontal branch well 14 behind the top set cave, inferior division master horizontal hole 6 is horizontal branch well 8 before the front and back of vertical cave well 1 are respectively arranged with the inferior division cave, horizontal branch well 9 behind the inferior division cave, the master of top set horizontal hole 11 and inferior division master horizontal hole 6 continue to extend to forward the coal seam main horizontal hole of constructing being connected the back with vertical cave well 1.
Above-mentioned vertical cave well 1 with the top set cave before be installed on glass reinforced plastic sleeve 15 in main horizontal hole 7 docks before the main horizontal hole 12, inferior division cave the coal seam section.
The master of top set horizontal hole 11, inferior division master horizontal hole 6 are connected by top set's inclination section 10, inferior division inclination section 5 respectively with horizontal well peupendicular hole section 4.

Claims (4)

1. job practices that improves ground coal bed gas extraction effect is characterized in that: realize by following steps:
(1), construction vertical cave well (1), this cave well is made the cave and is lowered to glass reinforced plastic sleeve (15) in each the coal seam section that needs the extraction coal bed gas, with realize horizontal well (3) far-end with it smoothly butt joint guarantee that again cave, coal seam section (2) can not cave in after butt joint;
(2), constructing is used to realize the horizontal well peupendicular hole section (4) and the darkest inferior division inclination section (5) and the inferior division master horizontal hole (6) of buried depth of far-end butt joint, is lowered to protective casing on roof top; Continue to creep into along the coal seam after the construction landing enters horizontal segment, at far-end with after dock in the peupendicular hole cave, continuation horizontal branch well (8) before main horizontal hole (7) and the inferior division cave before coal seam, forward position construction inferior division cave, crossing the cave has constructed before the inferior division cave before the main horizontal hole and inferior division cave after the horizontal branch well, return to horizontal branch well (9) behind near the posterior inferior division cave of constructing again the well rear end, cave, whenever finish a Multilateral Wells Duan Jun and replace into solid free completion fluid;
(3), after the construction of inferior division well is finished, be lowered to the recoverable whipstock at top set kickoff point (KOP) place, the sidetracking construction master of top set horizontal hole (11), after the orientation construction, dock with the peupendicular hole cave section (2) in the superjacent, and continue before coal seam, forward position construction top set cave horizontal branch well (13) before the main horizontal hole (12) and top set cave, finish before the top set cave before the main horizontal hole (11) and top set cave after the horizontal branch well (13), return behind the cave horizontal branch well (14) behind the construction top set cave, according to the corresponding numbers of branches of peupendicular hole cave quantity construction, every construction is finished a Multilateral Wells Duan Jun and is replaced into solid free completion fluid;
(4), the construction finish topmost branch well after, take out the recoverable whipstock respectively, with the lower curved section of each the main horizontal hole in the horizontal well, window a little to seeing the cementing concrete shutoff of coal point from sidetracking;
(5), vertical down-hole, cave bores well-flushing, removes to be communicated with landwaste and the sediment that construction produces, equipment, land drainage step-down extraction coal bed gas are adopted by the row of installation.
2. a kind of job practices that improves ground coal bed gas extraction effect according to claim 1, it is characterized in that: described horizontal well (3) comprises horizontal well peupendicular hole section (4), the master of top set horizontal hole (11), inferior division master horizontal hole (6), vertical cave well (1), main horizontal hole (12) before the top set cave, main horizontal hole (7) before the inferior division cave, one end of the master of top set horizontal hole (11) and inferior division master horizontal hole (6) all is communicated with horizontal well peupendicular hole section (4), the master of top set horizontal hole (11) all is connected with the corresponding cave of vertical cave well (1) with inferior division master horizontal hole (6), the master of top set horizontal hole (11) is horizontal branch well (13) before the front and back of vertical cave well (1) are respectively arranged with the top set cave, horizontal branch well (14) behind the top set cave, inferior division master horizontal hole (6) is horizontal branch well (8) before the front and back of vertical cave well (1) are respectively arranged with the inferior division cave, horizontal branch well (9) behind the inferior division cave, the master of top set horizontal hole (11) and inferior division master horizontal hole (6) continue to extend to forward the coal seam main horizontal hole of constructing being connected the back with vertical cave well (1).
3. a kind of job practices that improves ground coal bed gas extraction effect according to claim 2 is characterized in that: described vertical cave well (1) with the top set cave before be installed on glass reinforced plastic sleeve (15) in main horizontal hole (7) docks before the main horizontal hole (12), inferior division cave the coal seam section.
4. a kind of job practices that improves ground coal bed gas extraction effect according to claim 2 is characterized in that: the described master of top set horizontal hole (11), inferior division master horizontal hole (6) are connected by top set's inclination section (10), inferior division inclination section (5) respectively with horizontal well peupendicular hole section (4).
CN2011100269122A 2011-01-25 2011-01-25 Construction method for enhancing extraction effect of ground coal bed gas Active CN102116140B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100269122A CN102116140B (en) 2011-01-25 2011-01-25 Construction method for enhancing extraction effect of ground coal bed gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100269122A CN102116140B (en) 2011-01-25 2011-01-25 Construction method for enhancing extraction effect of ground coal bed gas

Publications (2)

Publication Number Publication Date
CN102116140A true CN102116140A (en) 2011-07-06
CN102116140B CN102116140B (en) 2012-01-18

Family

ID=44215053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100269122A Active CN102116140B (en) 2011-01-25 2011-01-25 Construction method for enhancing extraction effect of ground coal bed gas

Country Status (1)

Country Link
CN (1) CN102116140B (en)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383830A (en) * 2011-09-30 2012-03-21 中煤科工集团重庆研究院 Comprehensive outburst prevention method for outburst coal seam region
CN102852490A (en) * 2012-09-07 2013-01-02 北京九尊能源技术股份有限公司 High gas suction and discharge process method for complex well
CN102926732A (en) * 2012-10-12 2013-02-13 唐书恒 Coalbed methane developing and well spacing method for high-water content coal reservoir of head plate
CN103362442A (en) * 2012-03-30 2013-10-23 刘洪斌 Drilling multi-point communication geothermal circulating collection method
CN103422813A (en) * 2013-08-02 2013-12-04 奥瑞安能源国际有限公司 Single-well coal bed gas multi-branch horizontal well system and well drilling method
CN103924917A (en) * 2013-09-11 2014-07-16 华北石油管理局 Drilling construction method for coal-bed gas multi-branch horizontal wells
CN103924944A (en) * 2013-09-11 2014-07-16 华北石油管理局 Well abandoning operation method for coal-bed gas horizontal wells
CN103924937A (en) * 2013-09-11 2014-07-16 华北石油管理局 Well washing operation method for coal-bed gas multi-branch horizontal wells
CN104018820A (en) * 2014-06-16 2014-09-03 北京中矿科能煤炭地下气化技术研究中心 Coal underground gasification process system
CN104196453A (en) * 2014-08-29 2014-12-10 富地柳林燃气有限公司 Coalbed methane development well
CN104481495A (en) * 2014-11-05 2015-04-01 辽宁石油化工大学 Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system
CN104612691A (en) * 2014-11-27 2015-05-13 中盐勘察设计院有限公司 Single borehole multilateral directional butted well salt mining method
CN104653119A (en) * 2015-02-04 2015-05-27 新奥气化采煤有限公司 Multilayer coal gasification vertical well casing pipe
CN104790915A (en) * 2015-04-22 2015-07-22 西南石油大学 Coal bed methane recovery method
CN104847263A (en) * 2015-04-30 2015-08-19 中煤科工集团西安研究院有限公司 Coal bed methane far-end butt joint horizontal well drilling method
CN105134162A (en) * 2015-08-28 2015-12-09 中国神华能源股份有限公司 U-shaped well system and drilling method thereof
CN105201548A (en) * 2015-10-10 2015-12-30 山西晋煤集团技术研究院有限责任公司 Horizontal well pressure relief extraction method
CN106050208A (en) * 2016-05-25 2016-10-26 新疆工程学院 Dual horizontal well for improving reservoir space physical property and enhancing gas production efficiency and construction method
CN106285475A (en) * 2016-08-30 2017-01-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of geothermal well thermal circulation method
CN107366531A (en) * 2017-08-22 2017-11-21 陕西省煤田地质集团有限公司 One kind is based on the horizontal docking style geothermal well borehole track of inclined shaft and design method
CN107387056A (en) * 2017-08-22 2017-11-24 陕西省煤田地质集团有限公司 A kind of casing programme of the horizontal docking geothermal well of heat exchange type
CN107476797A (en) * 2017-08-22 2017-12-15 陕西省煤田地质集团有限公司 A kind of construction method of the casing programme of the horizontal docking geothermal well of heat exchange type
CN108086957A (en) * 2017-12-23 2018-05-29 山西蓝焰煤层气集团有限责任公司 A kind of method of the U-shaped coal bed gas well construction in double coal seams
CN109057768A (en) * 2018-08-02 2018-12-21 四川盐业地质钻井大队 Recovery method suitable for thin interbed native soda deposit
CN110185418A (en) * 2019-06-20 2019-08-30 中联煤层气有限责任公司 A kind of coal bed methane exploring method of coal seam group
CN110242254A (en) * 2018-08-24 2019-09-17 北京奥瑞安能源技术开发有限公司 A kind of coal bed methane exploring method
CN111396011A (en) * 2019-01-02 2020-07-10 中国石油天然气股份有限公司 Method and device for improving gas production rate of double-branch U-shaped well
CN111677450A (en) * 2020-05-22 2020-09-18 中煤科工集团西安研究院有限公司 Device and method for drilling branch hole of underground directional drilling of coal mine
CN111706299A (en) * 2020-06-09 2020-09-25 天地科技股份有限公司 Stoping construction method for waste oil and gas well passing coal face
CN112377168A (en) * 2020-11-11 2021-02-19 中联煤层气有限责任公司 Coal bed gas multi-branch horizontal well suitable for tectonic coal and drilling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1847619A (en) * 2005-04-12 2006-10-18 山东中科纳米管材有限公司 Coal mine gas pumping apparatus
CN101775975A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed gas by hydraulic drilling and pressure relieving
CN101915084A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Process for pumping and exploiting coal bed gas by together using ground well drilling and underground hole drilling
CN101915083A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Method for extracting coalbed gases from coal mines by upper and lower combination

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1847619A (en) * 2005-04-12 2006-10-18 山东中科纳米管材有限公司 Coal mine gas pumping apparatus
CN101775975A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed gas by hydraulic drilling and pressure relieving
CN101915084A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Process for pumping and exploiting coal bed gas by together using ground well drilling and underground hole drilling
CN101915083A (en) * 2010-08-13 2010-12-15 山西晋城无烟煤矿业集团有限责任公司 Method for extracting coalbed gases from coal mines by upper and lower combination

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《中国煤炭》 20071130 张群 关于我国煤矿区煤层气开发的战略思考 9-11 1-4 第33卷, 第11期 2 *

Cited By (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383830A (en) * 2011-09-30 2012-03-21 中煤科工集团重庆研究院 Comprehensive outburst prevention method for outburst coal seam region
CN103362442A (en) * 2012-03-30 2013-10-23 刘洪斌 Drilling multi-point communication geothermal circulating collection method
CN103362442B (en) * 2012-03-30 2016-01-13 刘洪斌 Drilling well multiple spot communication loop gathers geothermal method
CN102852490A (en) * 2012-09-07 2013-01-02 北京九尊能源技术股份有限公司 High gas suction and discharge process method for complex well
CN102926732A (en) * 2012-10-12 2013-02-13 唐书恒 Coalbed methane developing and well spacing method for high-water content coal reservoir of head plate
CN102926732B (en) * 2012-10-12 2016-12-21 唐书恒 A kind of cbm development well-arranging procedure of top board High water cut coal seam reservoirs
CN103422813A (en) * 2013-08-02 2013-12-04 奥瑞安能源国际有限公司 Single-well coal bed gas multi-branch horizontal well system and well drilling method
CN103422813B (en) * 2013-08-02 2015-11-25 奥瑞安能源国际有限公司 Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN103924944A (en) * 2013-09-11 2014-07-16 华北石油管理局 Well abandoning operation method for coal-bed gas horizontal wells
CN103924944B (en) * 2013-09-11 2017-01-18 华北石油管理局 Well abandoning operation method for coal-bed gas horizontal wells
CN103924937A (en) * 2013-09-11 2014-07-16 华北石油管理局 Well washing operation method for coal-bed gas multi-branch horizontal wells
CN103924917A (en) * 2013-09-11 2014-07-16 华北石油管理局 Drilling construction method for coal-bed gas multi-branch horizontal wells
CN104018820A (en) * 2014-06-16 2014-09-03 北京中矿科能煤炭地下气化技术研究中心 Coal underground gasification process system
CN104018820B (en) * 2014-06-16 2017-01-04 北京中矿科能煤炭地下气化技术研究中心 A kind of coal underground gasifying technology system
CN104196453A (en) * 2014-08-29 2014-12-10 富地柳林燃气有限公司 Coalbed methane development well
CN104481495A (en) * 2014-11-05 2015-04-01 辽宁石油化工大学 Coalbed methane (CBM) cluster double multi-branch horizontal well and drilling method relative to discharging and mining vertical well system
CN104612691B (en) * 2014-11-27 2017-02-22 中盐勘察设计院有限公司 Single borehole multilateral directional butted well salt mining method
CN104612691A (en) * 2014-11-27 2015-05-13 中盐勘察设计院有限公司 Single borehole multilateral directional butted well salt mining method
CN104653119B (en) * 2015-02-04 2018-10-23 新奥科技发展有限公司 A kind of vertical casing of multilayer coal gasification
CN104653119A (en) * 2015-02-04 2015-05-27 新奥气化采煤有限公司 Multilayer coal gasification vertical well casing pipe
CN104790915A (en) * 2015-04-22 2015-07-22 西南石油大学 Coal bed methane recovery method
CN104847263A (en) * 2015-04-30 2015-08-19 中煤科工集团西安研究院有限公司 Coal bed methane far-end butt joint horizontal well drilling method
CN105134162A (en) * 2015-08-28 2015-12-09 中国神华能源股份有限公司 U-shaped well system and drilling method thereof
CN105201548A (en) * 2015-10-10 2015-12-30 山西晋煤集团技术研究院有限责任公司 Horizontal well pressure relief extraction method
CN106050208A (en) * 2016-05-25 2016-10-26 新疆工程学院 Dual horizontal well for improving reservoir space physical property and enhancing gas production efficiency and construction method
CN106285475A (en) * 2016-08-30 2017-01-04 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of geothermal well thermal circulation method
CN106285475B (en) * 2016-08-30 2018-07-17 中国石油集团川庆钻探工程有限公司工程技术研究院 A kind of geothermal well thermal circulation method
CN107366531A (en) * 2017-08-22 2017-11-21 陕西省煤田地质集团有限公司 One kind is based on the horizontal docking style geothermal well borehole track of inclined shaft and design method
CN107387056A (en) * 2017-08-22 2017-11-24 陕西省煤田地质集团有限公司 A kind of casing programme of the horizontal docking geothermal well of heat exchange type
CN107476797A (en) * 2017-08-22 2017-12-15 陕西省煤田地质集团有限公司 A kind of construction method of the casing programme of the horizontal docking geothermal well of heat exchange type
CN107366531B (en) * 2017-08-22 2019-08-27 陕西省煤田地质集团有限公司 One kind being based on the horizontal docking style geothermal well borehole track of inclined shaft and design method
CN108086957A (en) * 2017-12-23 2018-05-29 山西蓝焰煤层气集团有限责任公司 A kind of method of the U-shaped coal bed gas well construction in double coal seams
CN109057768A (en) * 2018-08-02 2018-12-21 四川盐业地质钻井大队 Recovery method suitable for thin interbed native soda deposit
CN110242254A (en) * 2018-08-24 2019-09-17 北京奥瑞安能源技术开发有限公司 A kind of coal bed methane exploring method
CN110242254B (en) * 2018-08-24 2021-08-20 北京奥瑞安能源技术开发有限公司 Coal bed gas mining method
CN111396011A (en) * 2019-01-02 2020-07-10 中国石油天然气股份有限公司 Method and device for improving gas production rate of double-branch U-shaped well
CN111396011B (en) * 2019-01-02 2022-06-03 中国石油天然气股份有限公司 Method and device for improving gas production rate of double-branch U-shaped well
CN110185418A (en) * 2019-06-20 2019-08-30 中联煤层气有限责任公司 A kind of coal bed methane exploring method of coal seam group
CN111677450A (en) * 2020-05-22 2020-09-18 中煤科工集团西安研究院有限公司 Device and method for drilling branch hole of underground directional drilling of coal mine
CN111677450B (en) * 2020-05-22 2022-03-15 中煤科工集团西安研究院有限公司 Device and method for drilling branch hole of underground directional drilling of coal mine
CN111706299A (en) * 2020-06-09 2020-09-25 天地科技股份有限公司 Stoping construction method for waste oil and gas well passing coal face
CN112377168A (en) * 2020-11-11 2021-02-19 中联煤层气有限责任公司 Coal bed gas multi-branch horizontal well suitable for tectonic coal and drilling method

Also Published As

Publication number Publication date
CN102116140B (en) 2012-01-18

Similar Documents

Publication Publication Date Title
CN102116140B (en) Construction method for enhancing extraction effect of ground coal bed gas
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN102979498B (en) A kind of multi-lateral horizontal well system for coal bed gas
CN102116167B (en) Ground and underground three-dimensional extraction system of coal seam gas
WO2020113870A1 (en) Method for cooperatively draining roof separation water and mining coal-measure gas
CN102661167B (en) Protected seam bottom plate upward comb-shaped drilled hole gas extraction method
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
CN104806217A (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN201593405U (en) Integrated tubular column for horizontal well completion and fracturing production
CN102518411A (en) Method for mining coal bed gas by hydraulic washout of butted well in manner of pressure relief
CN102852490A (en) High gas suction and discharge process method for complex well
CN1912338A (en) Period injection-production method of waterflooding sandstone oil field
CN103161440A (en) Single-well coalbed methane horizontal well system and finishing method thereof
CN108086957A (en) A kind of method of the U-shaped coal bed gas well construction in double coal seams
CN102587959A (en) Method for draining coal seam gas
CN110306965A (en) A kind of method for increasing for coal bed gas low yield wellblock
CN101956544A (en) Method for oil extraction in multi-bottom and multi-branch well by artesian injection
CN106640018A (en) Method for mining coalbed gas through V-shaped well set
CN103321613A (en) Method and device for exploiting coal bed methane by discharging water and pulverized coal
CN104790918A (en) Method for achieving ground coal bed gas production through cluster well and horizontal well under complex terrain condition
CN107246254A (en) Coal-based gas U-shaped well drilling and development method
CN206000529U (en) A kind of coal bed gas well with multi-lateral horizontal well system based on straight well transformation
CN103422813B (en) Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN104989330A (en) Coalbed gas recovery method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RE

Free format text: FORMER NAME: SIAN BRANCH OF CHINA COAL RESEARCH INSTITUTE

CP03 Change of name, title or address

Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Patentee after: China Coal Technology & Engineering Group Xi'an Research Institute

Address before: 710054 No. 52, Yanta Road, Xi'an, Shaanxi

Patentee before: Sian Branch Of China Coal Research Institute

C56 Change in the name or address of the patentee

Owner name: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY

Free format text: FORMER NAME: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RESEARCH INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Patentee after: Xi'an Research Institute, CCTEG

Address before: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Patentee before: China Coal Technology & Engineering Group Xi'an Research Institute