CN105201548A - Horizontal well pressure relief extraction method - Google Patents
Horizontal well pressure relief extraction method Download PDFInfo
- Publication number
- CN105201548A CN105201548A CN201510651672.3A CN201510651672A CN105201548A CN 105201548 A CN105201548 A CN 105201548A CN 201510651672 A CN201510651672 A CN 201510651672A CN 105201548 A CN105201548 A CN 105201548A
- Authority
- CN
- China
- Prior art keywords
- coal
- extraction
- horizontal well
- gas
- lower group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000605 extraction Methods 0.000 title claims abstract description 50
- 239000003245 coal Substances 0.000 claims abstract description 87
- 238000000034 method Methods 0.000 claims abstract description 16
- 238000005086 pumping Methods 0.000 claims description 14
- 238000005065 mining Methods 0.000 claims description 11
- 238000003032 molecular docking Methods 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000005553 drilling Methods 0.000 abstract description 5
- 239000003034 coal gas Substances 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 230000035699 permeability Effects 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 230000000149 penetrating effect Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000003795 desorption Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Solid Fuels And Fuel-Associated Substances (AREA)
Abstract
The invention relates to a novel extraction method of pre-extracting lower group coal gas through a ground well, in particular to a horizontal well pressure relief extraction method and solves the technical problem that current lower group coal gas is difficult to extract. The horizontal well pressure relief extraction method is used for extracting the gas of lower group coal; the method comprises the following steps: 1, constructing a horizontal well in a coal bed of the lower group coal by penetrating through a coal pillar of upper group coal before the upper group coal is exploited; 2, after the working face of the upper group coal is back-exploited, utilizing a ground gas extraction system for extracting gas of the coal bed of the lower group coal located within the pressure relief range through the horizontal well. According to the method, the coal seam group exploration mine pressure displaying principle, the ground well gas extraction drilling technology, the coal bed gas extraction principle and technical principles such as system construction are combined, the method has the advantages that the extraction effect is improved, the advanced property is great, the difficult problems that lower group coal is low in air permeability, difficult to extract and insufficient in extraction time are solved, and the method is ranked at the internationally leading level.
Description
Technical field
The present invention relates to a kind of utilize the pre-extraction of surface well under organize the novel extraction way of coal gas, be specially a kind of horizontal well release pumping method.
Background technology
Jin Mei group adopts surface well extraction technology to adopt 3# coal-bed gas to main in the block of Jincheng, and achieve good extracting result, ground gas extraction technology is in domestically leading level.For realizing the rational mixed mining of mine, the pre-extraction of lower group coal must be realized in advance.
From preliminary grasp Qinshui coalfield organize coal (based on 9# coal, 15# coal) gas pumping basic data viewed from, for upper group of coal (3# coal seam), lower group of coal gas bearing capacity is higher, gas pressure is larger, threaten more serious to the gas of mine, but the taking out property of lower group coal and extraction difficulty are larger, and the time of extraction is more limited.
For solving the problems of the technologies described above, the new extraction way of necessary research carries out advanced pre-extraction, for the gas control of lower group of coal creates conditions to lower group of coal.
Summary of the invention
The present invention solves the lower gas organizing coal to be at present difficult to the technical problem of extraction, provides a kind of horizontal well release pumping method.
The present invention adopts following technology case to realize: a kind of horizontal well release pumping method, and the gas for lower group of coal carries out extraction; Comprise the steps: that (1) is passed before upper group of coal mining to organize coal coal column and to construct in lower group of coal coal seam water horizontal well; (2) when after upper group of coal working face extraction, ground gas extraction system is utilized to carry out extraction by horizontal well to the lower group of coal coal-bed gas be in relief range.
Horizontal well release pumping method is organized coal (3# coal seam) and is about to the time before exploiting on utilizing, complete the layout of lower group of coal seam surface well extraction engineering, be in relief range when group coal lower after upper group of coal (3# coal seam) back production and improve gas gas permeability and desorption ability, realizing extraction in the short period of time up to standard; Group coal is passed through in the accurately location that is arranged through of lower group of coal seam surface well extraction engineering, then utilizes horizontal well technology to cover lower group coal and implements pre-extraction.Meanwhile, for adapting to the feature of lower group of coal release extraction, need to be equipped with corresponding lower negative pressure, large discharge ground extraction equipment.The described relief range time of release is in other words that those skilled in the art can determine according to back production situation and coal seam conditions.
Further, horizontal well and ground gas extraction system be laid in 3# seam mining before within 3-6 month, complete.
Further, horizontal well adopts far-end to dock U-shaped well, near-end docking horizontal pinnate well.
The layout of lower group of coal seam surface well extraction engineering is connected according to coal mine excavation opportunity, selects within 3-6 month before 3# seam mining, complete.Equipment, electric power system, the construction in place and installation will be carried out in time after surface well engineering completes.Carry out draining in time subsequently, for lower group of coal enter relief range after can extraction create conditions in time.
The space of ground drilling is furnished with two important contents.One is accurately to pass through 3# coal seam coal column.Two is will according to the rational horizontal well form of mining operation layout design of ocurrence of coal seam feature and lower group coal.Current comparative maturity be far-end dock U-shaped well, near-end docking horizontal pinnate well.
There is after lower group of coal release the feature that gas pressure reduces, gas permeability of coal seam increases, drilling gas flow increases.For this reason, the original gas pressure in coal seam was originally utilized to carry out the mode of malleation mining just no longer applicable.Meanwhile, having of distressed zone is certain ageing, steady and sure gradually along with upper group of coal goaf, and release effect can progressively reduce.For this reason, need the time making full use of distressed zone existence, just need the ground extraction equipment being equipped with lower negative pressure, large discharge, respective capabilities.
This method combines the know-whies such as coal seam group mining strata-pressure behavior, surface well gas pumping drilling technology, the construction of coal bed gas extraction principle and system, have and improve extracting result, advanced strong advantage, solve that lower group of coal low-permeable hard-pumped is adopted, a difficult problem for extraction deficiency of time, be in level leading in the world.
The present invention has following beneficial effect: arrange suitable well type by lower group of coal ground drilling in the suitable time, and utilize ground extraction equipment to realize gas pumping within a short period of time up to standard, the gas control for lower group of coal gains time and space.
Detailed description of the invention
A kind of horizontal well release pumping method, the gas for lower group of coal carries out extraction; Comprise the steps: that (1) is passed before upper group of coal mining to organize coal coal column and to construct in lower group of coal coal seam water horizontal well; (2) when after upper group of coal working face extraction, ground gas extraction system is utilized to carry out extraction by horizontal well to the lower group of coal coal-bed gas be in relief range.
Described lower group of coal is based on 9# coal, 15# coal; Day-coal is 3# coal seam.
Adapt to the feature of lower group coal release extraction, need to be equipped with corresponding lower negative pressure, large discharge ground extraction equipment.
Horizontal well and ground gas extraction system be laid in 3# seam mining before within 3-6 month, complete.
Horizontal well adopts far-end to dock U-shaped well, near-end docking horizontal pinnate well.The arrangement of this horizontal well is very applicable to upper group of coal of the present invention and lower group coal.
Claims (5)
1. a horizontal well release pumping method, the gas for lower group of coal carries out extraction; It is characterized in that, comprise the steps: that (1) is passed before upper group of coal mining and organize coal coal column and to construct in lower group of coal coal seam water horizontal well; (2) when after upper group of coal working face extraction, ground gas extraction system is utilized to carry out extraction by horizontal well to the lower group of coal coal-bed gas be in relief range.
2. horizontal well release pumping method as claimed in claim 1, it is characterized in that, described lower group of coal is based on 9# coal, 15# coal; Day-coal is 3# coal seam.
3. horizontal well release pumping method as claimed in claim 1 or 2, is characterized in that, adapts to the feature of lower group coal release extraction, needs to be equipped with corresponding lower negative pressure, large discharge ground extraction equipment.
4. horizontal well release pumping method as claimed in claim 2, is characterized in that, horizontal well and ground gas extraction system be laid in 3# seam mining before within 3-6 month, complete.
5. the horizontal well release pumping method as described in claim 2 or 4, is characterized in that, horizontal well adopts far-end to dock U-shaped well, near-end docking horizontal pinnate well.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510651672.3A CN105201548A (en) | 2015-10-10 | 2015-10-10 | Horizontal well pressure relief extraction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510651672.3A CN105201548A (en) | 2015-10-10 | 2015-10-10 | Horizontal well pressure relief extraction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105201548A true CN105201548A (en) | 2015-12-30 |
Family
ID=54949461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510651672.3A Pending CN105201548A (en) | 2015-10-10 | 2015-10-10 | Horizontal well pressure relief extraction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105201548A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541727A (en) * | 2019-09-20 | 2019-12-06 | 西安闪光能源科技有限公司 | coal bed gas ground treatment method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116140A (en) * | 2011-01-25 | 2011-07-06 | 煤炭科学研究总院西安研究院 | Construction method for enhancing extraction effect of ground coal bed gas |
CN102828768A (en) * | 2012-08-28 | 2012-12-19 | 山西潞安集团余吾煤业有限责任公司 | Method and system for gas pumping of high-gas coal mines |
CN103306714A (en) * | 2013-06-09 | 2013-09-18 | 中国矿业大学 | Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway |
CN103967472A (en) * | 2014-05-26 | 2014-08-06 | 中煤科工集团西安研究院有限公司 | Horizontal well forced gas drainage method with coal bed gas subjected to staged fracturing |
CN104131831A (en) * | 2014-06-12 | 2014-11-05 | 中国矿业大学 | Coal-bed gas well vertical three-dimensional united extraction method |
EP2899363A1 (en) * | 2012-09-21 | 2015-07-29 | Enn Coal Gasification Mining Co. Ltd. | Method for joint-mining of coalbed gas and coal |
-
2015
- 2015-10-10 CN CN201510651672.3A patent/CN105201548A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102116140A (en) * | 2011-01-25 | 2011-07-06 | 煤炭科学研究总院西安研究院 | Construction method for enhancing extraction effect of ground coal bed gas |
CN102828768A (en) * | 2012-08-28 | 2012-12-19 | 山西潞安集团余吾煤业有限责任公司 | Method and system for gas pumping of high-gas coal mines |
EP2899363A1 (en) * | 2012-09-21 | 2015-07-29 | Enn Coal Gasification Mining Co. Ltd. | Method for joint-mining of coalbed gas and coal |
CN103306714A (en) * | 2013-06-09 | 2013-09-18 | 中国矿业大学 | Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway |
CN103967472A (en) * | 2014-05-26 | 2014-08-06 | 中煤科工集团西安研究院有限公司 | Horizontal well forced gas drainage method with coal bed gas subjected to staged fracturing |
CN104131831A (en) * | 2014-06-12 | 2014-11-05 | 中国矿业大学 | Coal-bed gas well vertical three-dimensional united extraction method |
Non-Patent Citations (1)
Title |
---|
迈克尔?斯勒恩贝茨等: "水平井在地下硬煤开采中的瓦斯抽采潜力", 《中国煤层气》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541727A (en) * | 2019-09-20 | 2019-12-06 | 西安闪光能源科技有限公司 | coal bed gas ground treatment method |
CN110541727B (en) * | 2019-09-20 | 2021-05-04 | 西安闪光能源科技有限公司 | Coal bed gas ground treatment method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103541710B (en) | Underground coal mine gas-liquid two-phase alternately drives pressure break coal body strengthening gas pumping method mutually | |
CN103306714B (en) | Gas control method for drilling hole and hole three-purpose in close-range coal seam group bottom drainage roadway | |
CN102587959B (en) | Method for draining coal seam gas | |
CN103758560B (en) | A kind of multiple topping packet zone mash gas harnessing method that goes forward one by one | |
CN103821515B (en) | A kind of double face filling coal mining technique | |
CN102926804B (en) | Distributed underground reservoir group and transfer method for mine water in distributed underground reservoir group | |
CN102877884B (en) | The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method | |
CN101793158B (en) | Semi-unload alternately push type razor-thin coal seam hydraulic support | |
CN102392678A (en) | Gas drainage method combining surface and underground fracturing and permeability improvement | |
CN101915085B (en) | Low-air-permeability coal-bed gas extraction method | |
CN109209474A (en) | A kind of method that dual-lateral well extracts lower coal seam and top more goaf gas and ponding | |
CN102518412A (en) | Method for mining coal and gas by hydraulic jet grouting washout | |
CN104895531A (en) | Single thick coal seam ground mining well extraction process | |
CN104847401A (en) | Regional coal and gas outburst coal seam coal face outburst preventing and controlling method | |
CN102003201B (en) | Gas drainage method in gob of coal mine | |
CN102926732B (en) | A kind of cbm development well-arranging procedure of top board High water cut coal seam reservoirs | |
CN202731991U (en) | Test model for banded filling, replacement and mining of fault protective coal pillar | |
CN105201548A (en) | Horizontal well pressure relief extraction method | |
CN202914135U (en) | Distribution type underground reservoir | |
CN103557029B (en) | A kind of by sublevel caving method without sill pillar upwards to the method for horizontal cut and fill stoping transition | |
CN204327172U (en) | Formula boring goaf extraction structure before and after high-rise position | |
CN102635394B (en) | Gas, water and coal separation device of coal-mine gas spray hole | |
CN104453983B (en) | On a kind of half-edge coal seam layer-through drilling, anti-reflection and pumping method is let out in pressure | |
CN103603642A (en) | Method for using CO2 (carbon dioxide) to displace high-salinity bittern deep in ground | |
CN106437826A (en) | Coal-bed gas extraction method achieving automatic adjustment of negative-pressure drill-hole zoning and source differentiating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151230 |
|
RJ01 | Rejection of invention patent application after publication |