CN201593405U - Integrated tubular column for horizontal well completion and fracturing production - Google Patents
Integrated tubular column for horizontal well completion and fracturing production Download PDFInfo
- Publication number
- CN201593405U CN201593405U CN2009202489799U CN200920248979U CN201593405U CN 201593405 U CN201593405 U CN 201593405U CN 2009202489799 U CN2009202489799 U CN 2009202489799U CN 200920248979 U CN200920248979 U CN 200920248979U CN 201593405 U CN201593405 U CN 201593405U
- Authority
- CN
- China
- Prior art keywords
- sliding sleeve
- tubular column
- sealer
- completion
- open hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 12
- 230000010354 integration Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 6
- 238000004904 shortening Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 238000005553 drilling Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000009931 harmful effect Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model relates to an integrated tubular column for horizontal well completion and fracturing production. The tubular column comprises a safety valve, a hydraulic anchor, an inserted sealer, a tail pipe hanging sealer, a 4'/2'' tail pipe, expanding open hole packers, bowling sliding sleeves, a pressure sliding sleeve and a float shoe; a vertical well section above a storage layer adopts a sleeve for well completion, and the tubular column in the sleeve is connected in series with the safety valve, the hydraulic anchor and the inserted sealer from top to bottom; and a horizontal well section adopts open holes for well completion, and the well completion tubular column in a 6'' well hole is connected in series with the tail pipe hanging sealer, the 4'/2'' tail pipe, one bowling sliding sleeve, one expanding open hole packers, the other bowling sliding sleeve, the other open hole packer, the pressure sliding sleeve and the float shoe in sequence from top to bottom. The integrated tubular column provided by the utility model adopts one tubular column to realize the open hole well completion, the sectioned fracturing reformation and the commingled production of a horizontal well, thereby solving the problems such as poor fracturing effect caused by the overlong horizontal well section, and the like, and further not only reducing the construction requirement for ground equipment and the operating risk and shortening the construction time, but also saving the production cost and improving the overall development effect.
Description
Technical field:
The utility model relates to a kind of down-hole string that is used for horizontal well completion, staged fracturing transformation and combination producing integral process.
Background technology: in horizontal oil gas well manufacturing process,, often will carry out fracturing reform to reservoir in order to improve production of hydrocarbons and exploitation effect.Yet, because producing, existing horizontal well completion technology and later stage pressure break on technology, do not match, there is certain contradiction on each link, thereby is difficult to obtain desirable pressure break and effect of increasing production.And, because oil gas well completion pressure break and to produce be not a down-hole string, cause construction operation excessive cycle, cost too high, oil-gas field development effect and economic benefit are caused harmful effect.
The utility model content: the purpose of this utility model is to provide a kind of well fracturing technological effect of can improving the standard greatly, reduces the horizontal well completion pressure break production integration tubing string that operating risk also can shorten the engineering time greatly, reduce reservoir pollution, reduces production costs.
The utility model is to realize like this.This kind integrated pipe column is by safety valve, hydraulic anchor, plug-in type sealer, tail tube hanging sealer, 4 '/2 " tail pipe, expanding open hole packer, pitching sliding sleeve, pressure sliding sleeve, float shoe are formed; its structure, assembled relation are as follows: the above peupendicular hole section of reservoir adopts cased hole completion, and tubing string is serially connected with safety valve, hydraulic anchor and plug-in type sealer from top to bottom in the sleeve pipe; Net horizontal section adopts barefoot completion, 6 " completion tubular column is serially connected with from top to bottom successively in the well: tail tube hanging packer+4 '/2 " tail pipe+pitching sliding sleeve+expanding open hole packer+pitching sliding sleeve+open hole packer+pressure sliding sleeve+float shoe.In the construction operation process, at first in horizontal bare hole well section, be lowered to according to the completion tubular column that is connected in series with co-relation to design attitude by drilling rod and special tool, throw 1.25 " ball is fallen sealing tubing string in the float shoe; suppress 14Mpa then and set tail tube hanging sealer and expanding open hole packer; load the sealing that 180KN finishes the tail tube hanging sealer, release pressure and load when keep-uping pressure; On carry drilling rod and special tool it separated from tail tube hanging packer, the pipe column tools that breaks away from is proposed from pit shaft then; Be lowered to construction flow string safety valve+2
7/ 8 " oil pipe+hydraulic anchor+2
7/ 8 " oil pipe+plug-in type sealer is to design attitude, and the plug-in type sealer is inserted into and forms excellent sealing in the extension hanger; After ground surface works is in place, begin to carry out fracturing reform: at first well head is suppressed, the pressure sliding sleeve of opening the tubing string end by pressure carries out pressure break to nexine, " the ball; suppress and open interlude pitching sliding sleeve, interlude is carried out pressure break, throw 2.00 " balls at last of and then throwing 1.75, suppress and open outermost section pitching sliding sleeve, fracturing reform outermost section; Pressure break is finished, and drops into combination producing after the discharge opeing.
The utility model adopts integrated pipe column can realize horizontal well barefoot completion, staged fracturing transformation and combination producing with one-trip string, thereby can avoid the long problems such as fracturing effect difference that cause of net horizontal section, both can reduce requirement and the operating risk of construction to ground installation, shorten the engineering time, can save production cost again, improve the whole development effect.
Description of drawings: accompanying drawing is duty of the present utility model and structural representation.
The specific embodiment: enforcement of the present utility model is illustrated below in conjunction with accompanying drawing.
As shown in the figure, the utility model is by safety valve 1, hydraulic anchor 2, plug-in type sealer 3, tail tube hanging sealer 4,4/2 tail pipe 5, expanding open hole packer 6, pitching sliding sleeve 7
1, 7
2, pressure sliding sleeve 9, float shoe 10 form.Number in the figure " 8 " is 6 " barefoot intervals.Label " 11 " is a sleeve pipe.
Claims (1)
1. horizontal well completion pressure break production integration tubing string is by safety valve (1), hydraulic anchor (2), plug-in type sealer (3), tail tube hanging sealer (4), 4/2 tail pipe (5), expanding open hole packer (6), pitching sliding sleeve (7
1, 7
2), pressure sliding sleeve (9), float shoe (10) form, it is characterized in that: the above peupendicular hole section employing of reservoir cased hole completion, the interior tubing string of sleeve pipe (11) is serially connected with safety valve (1), hydraulic anchor (2) and plug-in type sealer (3) from top to bottom; Net horizontal section adopts barefoot completion, 6 " completion tubular column is serially connected with from top to bottom successively in the well: tail tube hanging packer (4)+4 '/2 " tail pipe (5)+pitching sliding sleeve (7
1)+expanding open hole packer (6)+pitching sliding sleeve (7
2)+open hole packer+pressure sliding sleeve (9)+float shoe (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202489799U CN201593405U (en) | 2009-11-27 | 2009-11-27 | Integrated tubular column for horizontal well completion and fracturing production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202489799U CN201593405U (en) | 2009-11-27 | 2009-11-27 | Integrated tubular column for horizontal well completion and fracturing production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201593405U true CN201593405U (en) | 2010-09-29 |
Family
ID=42775472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202489799U Expired - Fee Related CN201593405U (en) | 2009-11-27 | 2009-11-27 | Integrated tubular column for horizontal well completion and fracturing production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201593405U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454381A (en) * | 2010-10-22 | 2012-05-16 | 中国石油化工股份有限公司 | Oil-gas reservoir barefoot well cementing and completion method and device |
CN102758598A (en) * | 2012-08-03 | 2012-10-31 | 中国海洋石油总公司 | Integrated pipe column for accurate quantitative injection and seal examination and seal examination method thereof |
CN102979495A (en) * | 2012-12-28 | 2013-03-20 | 中国石油集团渤海钻探工程有限公司 | Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof |
CN103015955A (en) * | 2012-12-28 | 2013-04-03 | 中国石油集团渤海钻探工程有限公司 | Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof |
CN103132967A (en) * | 2011-12-01 | 2013-06-05 | 阜新驰宇石油机械有限公司 | Multilateral well fracturing hanging well completion process device |
CN103422846A (en) * | 2013-07-19 | 2013-12-04 | 中国石油天然气股份有限公司 | Open hole horizontal well completion fracturing integrated pipe column |
CN103806837A (en) * | 2012-11-12 | 2014-05-21 | 中国石油天然气股份有限公司 | Completion process for horizontal well of oil field |
CN104100250A (en) * | 2013-04-15 | 2014-10-15 | 中国石油化工股份有限公司 | Integrated pipe column system and fracturing process method for staged fracturing well completion of open hole horizontal well |
CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Well completion device and method for horizontal well repeated fracturing |
CN114427423A (en) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | Multi-cluster balanced extension device and use method thereof |
CN114458230A (en) * | 2021-09-23 | 2022-05-10 | 中海油能源发展股份有限公司 | Underground high-concentration working solution injection nipple and using method thereof |
-
2009
- 2009-11-27 CN CN2009202489799U patent/CN201593405U/en not_active Expired - Fee Related
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102454381A (en) * | 2010-10-22 | 2012-05-16 | 中国石油化工股份有限公司 | Oil-gas reservoir barefoot well cementing and completion method and device |
CN102454381B (en) * | 2010-10-22 | 2014-09-17 | 中国石油化工股份有限公司 | Oil-gas reservoir barefoot well cementing and completion method and device |
CN103132967A (en) * | 2011-12-01 | 2013-06-05 | 阜新驰宇石油机械有限公司 | Multilateral well fracturing hanging well completion process device |
CN102758598A (en) * | 2012-08-03 | 2012-10-31 | 中国海洋石油总公司 | Integrated pipe column for accurate quantitative injection and seal examination and seal examination method thereof |
CN102758598B (en) * | 2012-08-03 | 2015-04-22 | 中国海洋石油总公司 | Integrated pipe column for accurate quantitative injection and seal examination and seal examination method thereof |
CN103806837A (en) * | 2012-11-12 | 2014-05-21 | 中国石油天然气股份有限公司 | Completion process for horizontal well of oil field |
CN102979495B (en) * | 2012-12-28 | 2016-06-29 | 中国石油集团渤海钻探工程有限公司 | Many bunches of Limited entry fracturing tubing strings of open-hole horizontal well and fracturing process thereof |
CN103015955A (en) * | 2012-12-28 | 2013-04-03 | 中国石油集团渤海钻探工程有限公司 | Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof |
CN103015955B (en) * | 2012-12-28 | 2015-06-24 | 中国石油集团渤海钻探工程有限公司 | Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof |
CN102979495A (en) * | 2012-12-28 | 2013-03-20 | 中国石油集团渤海钻探工程有限公司 | Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof |
CN104100250A (en) * | 2013-04-15 | 2014-10-15 | 中国石油化工股份有限公司 | Integrated pipe column system and fracturing process method for staged fracturing well completion of open hole horizontal well |
CN103422846A (en) * | 2013-07-19 | 2013-12-04 | 中国石油天然气股份有限公司 | Open hole horizontal well completion fracturing integrated pipe column |
CN103422846B (en) * | 2013-07-19 | 2015-11-18 | 中国石油天然气股份有限公司 | Open hole horizontal well completion fracturing integrated pipe column |
CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Well completion device and method for horizontal well repeated fracturing |
CN114427423A (en) * | 2020-09-25 | 2022-05-03 | 中国石油化工股份有限公司 | Multi-cluster balanced extension device and use method thereof |
CN114458230A (en) * | 2021-09-23 | 2022-05-10 | 中海油能源发展股份有限公司 | Underground high-concentration working solution injection nipple and using method thereof |
CN114458230B (en) * | 2021-09-23 | 2024-03-08 | 中海油能源发展股份有限公司 | Underground high-concentration working solution injection nipple and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201593405U (en) | Integrated tubular column for horizontal well completion and fracturing production | |
CN103015955B (en) | Open-hole horizontal well multi-cluster sliding sleeve staged fracturing string and fracturing method thereof | |
CN104278978B (en) | Soluble bridge plug fracturing process pipe column and fracturing method thereof | |
CN201802376U (en) | Open hole well completion hydraulic sand blasting immovable pipe string staged fracturing pipe string | |
CN101787854B (en) | Subsection well completion system of bottom water reservoir horizontal well | |
CN201714364U (en) | Staged fracturing acidizing tool string for open hole completion of horizontal well | |
CN201705219U (en) | Lateral drilling gravel pack completion string | |
CN201165866Y (en) | Horizontal well division and combination extracting pipe column | |
CN201212387Y (en) | Gas injection, gas production and brine discharge integration process pipe column for underground gas storage | |
CN202370489U (en) | Parallel double-pipe gas-lift production process pipe column | |
CN201567960U (en) | Floating casing pipe installing pipe series | |
CN106014346A (en) | Method and device for water drainage and gas production by speed string matched with plunger gas lift | |
CN100538003C (en) | The expansion sieve tube hanging method | |
CN104564003A (en) | Drilling plug-free pumping type hydraulic bridge plug staged fracturing method | |
CN101089360A (en) | Well completion method and device of diverticulum with outer packer combined with sieve tube | |
CN104420835A (en) | Multi-cluster perforation fracturing well completion pipe string and construction method | |
CN109611061B (en) | Method for floating and running sieve tube | |
CN102434192A (en) | Device and method for enhancing coal seam fracturing effect | |
CN202338316U (en) | Five-layer separate-layer fracturing process pipe column with mechanical isolation and step-by-step deblocking | |
CN203515342U (en) | Multi-cluster perforation fracturing well completion pipe string | |
CN201738822U (en) | String for upper horizontal well cementation and lower screen pipe gravel pack completion | |
CN202108424U (en) | Oil well perforation fracturing and liquid drainage integrated pipe column | |
CN202152670U (en) | Construction pipe column for horizontal well sectional measure | |
CN201292800Y (en) | Six-grade branch well window sealing mechanism | |
CN202596633U (en) | Tool for expandable casing in open hole section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100929 Termination date: 20121127 |