CN102114799A - 水电站压力钢管运输专用车 - Google Patents
水电站压力钢管运输专用车 Download PDFInfo
- Publication number
- CN102114799A CN102114799A CN 201110026225 CN201110026225A CN102114799A CN 102114799 A CN102114799 A CN 102114799A CN 201110026225 CN201110026225 CN 201110026225 CN 201110026225 A CN201110026225 A CN 201110026225A CN 102114799 A CN102114799 A CN 102114799A
- Authority
- CN
- China
- Prior art keywords
- plate
- plateform body
- fixed
- steel pipe
- special vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Auxiliary Methods And Devices For Loading And Unloading (AREA)
Abstract
一种水电站压力钢管运输专用车,包括拖车牵引头,平板车身,平板车身上左、右两侧均安装固定有梯形形状的工字钢车架,两个工字钢车架之间安装有两个顶升油缸,油缸两侧安装有导向装置,前档装置固定在两个工字钢车架前部上方,后档装置固定在平板车身后部下方;平板车身两侧均设置有锁定装置,锁定装置结构为:悬臂前端固定有开口管节,悬臂后端固定在转轴上,转轴可转动地安装在平板车身上,紧固螺钉旋接在开口管节上;后轮后方的平板车身上安装有一对可升降装载行驶轮。使用本发明可节省一台大型起吊设备,因此能大大降低施工成本,同时,本发明能使压力钢管的运输实现高效、安全施工。
Description
技术领域
本发明涉及特殊用途机动车,特别是专用于水电站压力钢管运输的特殊运输车平板车身制造领域。
背景技术
水电站压力钢管二次倒运和运输,国内一直采用平板车和一台大型起重设备配合进行的。从钢管运输装载的方式来看,平板运输车的压力钢管装载方式一般是将压力钢管直接置于平板装置上,并采用电焊或者索具固定的方式,这就造成了压力钢管的重心偏高、无法有效固定、稳定性不强,而且装卸时间较长,运输效率较底,运输过程中道路通过性能不高。要完成压力钢管的倒运和运输的装卸任务,必须配备大型的起重设备配合作业,使用成本较高。因此,传统的平板车在水电站钢管倒运、运输存在许多限制。
发明内容
本发明的目的是提供一种水电站压力钢管运输专用车,以使压力钢管的运输高效、安全、限高道路通过性强。
本发明的目的是这样实现的:一种水电站压力钢管运输专用车,包括拖车牵引头,平板车身,平板车身上左、右两侧均安装固定有梯形形状的工字钢车架,两个工字钢车架之间安装有两个顶升油缸,油缸两侧安装有导向管,前档装置固定在两个工字钢车架前部上方,后档装置固定在平板车身后部下方;平板车身两侧均设置有锁定装置,锁定装置结构为:悬臂前端固定有开口管节,悬臂后端固定在转轴上,转轴可转动地安装在平板车身上,紧固螺钉旋接在开口管节上;后轮后方的平板车身上安装有一对可升降装载行驶轮;还具有导向装置:小管活动置入大管中组成套管,2对以上的套管设置在两个顶升油缸两侧,套管中的大管焊接固定在平板车身上,且大管下部开有用作插入销子的销孔,套管中的小管顶部焊接固定有用作承托压力钢管的两个顶块。
上述拖车牵引头和平板车身之间通过牵引机构联接,牵引机构为:上板、中板和下板顺次叠加,板与板之间经角焊缝连接为一整体叠板,下板通过角焊缝与平板车身连接,用作与拖车牵引头连接的销轴穿在上板、中板和下板的中部开孔之中,且上板和中板的开孔与销轴的转盘形成紧密配合,下板的开孔与销轴的转盘形成间隙配合,销轴的转盘上设置有用作与整体叠板连接的螺栓。
上述平板车身前部设置有配重装置。
上述套管为4对。
本发明的主要特点:
1、结合水电站压力钢管的技术参数,钢管内径(5m左右),外径(加劲环),最大运输重量以及最大运输长度,选择合适的车型和其他附件。确定钢管在运输过程中距离地面的高度,车辆从钢管内部穿过,形成了车架主体承载压力钢管的装载方式。
2、根据钢管的运输特点和技术参数,利用32#工字钢制作一适合高度的车架,利用拱形原理分散受力,达到力学平衡,提高了车辆行驶的稳定性。
3、按照钢管内径和板厚的特点,采用左右转向活动紧固支架(即左、右锁定装置),在不运输钢管的时候旋转紧靠车架,避免车辆空载行驶超宽。根据压力钢管单节长度设计前挡装置(即前档支架)、后挡装置(即后档支架),选择合适的间距,在钢管顶升时,前、后油缸同时升起,待钢管后下中心位置超过后挡最底端时,前面油缸升起速度减慢,使钢管前底后高,这样就使钢管前上中心和后下中心紧贴前挡和后挡,起到前后固定钢管的左右,在运输过程中保证钢管前后不滑移,而且不会对钢管本身产生任何损坏,在装卸钢管的同时自行就起到钢管的前后固定作用。
4、钢管运输车采用现有拖车牵引头,自行设计制造平板车身的工艺方法,转盘和牵引销轴设计是否合理直接影响行使的安全性,购置和牵引车头相匹配一成品销轴,直径90mm,在运行过程中销轴主要承载剪切力,为了有效解决这一方案,采用三层不同厚度钢板叠加,板与板之间用角焊缝连接,板1、板2中间开孔后通过金加工后和销轴紧密配合,对销轴承载剪切力,防止由于销轴左右晃动而对螺栓造成损伤,板3中间开孔直径大于螺栓最外缘的圆,保证螺帽不受磨损(具体装配如图三所示)。
5、压力钢管运输专用车根据装载和道路运输的需要,专门设计改造了两组不同功能的轮胎,一组为道路行驶轮胎,另一组为可升降的装载行驶轮,道路行驶车轮为车辆在道路运输过程中使用的行驶车轮。而另一组为可升降装载行驶车轮,平时该车轮向上收起,距离地面一定高度。在装载钢管过程中,可升降的装载行驶轮向下自动调节,承载起包括行驶车辆在内的整个车架体,然后该轮沿钢管内壁行驶,连同车架一起穿过管道,然后在自动收起该轮,完成整个穿过钢管的过程。
本发明的有益效果是:
1、解决了平板车运输水电站压力钢管装卸程序复杂、重心偏高的特点,使压力钢管运输高效、安全、限高道路通过性强。
2、节省一台大型起吊设备,大大降低施工成本,为企业增加经济效益。
3、节约大量的人力资源,减少人员投入,降低施工成本。
4、根据压力钢管单节最大运输长度确定平板车身长度,有效解决水电施工场地狭小的特点。
附图说明
图1是本运输车倒退驶入压力钢管后的右视图(从车尾向车头方向)。
图2是图1所示压力钢管被两个顶升油缸顶起后的右视图。
图3是用作连接拖车牵引头和平板车身的牵引机构的结构图。
图4是图2所示压力钢管呈顶起状态的主视图。
具体实施方式
图4示出,本发明包括拖车牵引头,平板车身,平板车身上左、右两侧均安装固定有梯形形状的工字钢车架1,两个工字钢车架之间安装有两个顶升油缸7(平板车身上设有油压装置6),前档装置2固定在两个工字钢车架前部上方,后档装置3固定在平板车身后部下方;平板车身两侧均设置有锁定装置,锁定装置结构为:悬臂9a前端固定有开口管节9b,悬臂后端固定在转轴8上,转轴可转动地安装在平板车身上,紧固螺钉10旋接在开口管节或夹板上;后轮后方的平板车身上安装有一对可升降装载行驶轮5(参见图1、图2,图1示出道路行驶轮胎17)。平板车身前部设置有配重装置16。配置装置16起调整承载压力钢管后整套装置重心和增大驱动轮与地面摩擦的作用,使该重心位于图4中后两对轮子的中部。
参见图2,还具有导向装置:小管18活动置入大管中组成套管,2对(车身左侧和右侧的对应位置上的两个套管为一对)以上的套管设置在两个顶升油缸两侧,套管中的大管焊接固定在平板车身上,且大管下部开有用作插入销子的销孔,套管中的小管顶部焊接固定有用作承托压力钢管的两个顶块19。
参见图3,拖车牵引头和平板车身之间通过牵引机构联接,牵引机构为:上板14、中板13和下板12顺次叠加,板与板之间经角焊缝连接为一整体叠板,下板12通过角焊缝和平板车身连接,用作与拖车牵引头连接的销轴11穿在上板、中板和下板的中部开孔之中,且上板和中板的开孔与销轴的转盘形成紧密配合,下板的开孔与销轴的转盘形成间隙配合,销轴的转盘上设置有用作与整体叠板连接的(高强)螺栓15。销轴由轴和转盘组成一整体件。
实施例:压力钢管的长度为4m,直径为4.6m。压力钢管4上均布焊接有加劲环4a(参见图2、图4)。前档装置2与后档装置3的间距为4.1m。
导向装置一般可采用四对(八个)套管(车身左侧和右侧各4个套管),八根大管焊接在平板车身上,八根小管顶部可焊接2个顶块(分列车身两侧4根小管之间焊接一个顶块)。两个顶升油缸分别位于两个顶块下方。工作时,顶升油缸的活塞上行,顶起顶块,顶块将压力钢管顶起到位后,可采用销子插入大管的开孔中,托起钢管并使小管不致下行,此时,使油缸停止工作,一方面,钢管托起运输时,油缸活塞不再受力,另一方面,可停止油压系统的运转。
Claims (4)
1.一种水电站压力钢管运输专用车,包括,拖车牵引头,平板车身,其特征是:所述平板车身上左、右两侧均安装固定有梯形形状的工字钢车架(1),两个工字钢车架之间安装有两个顶升油缸(7),前档装置(2)固定在两个工字钢车架前部上方,后档装置(3)固定在平板车身后部下方;平板车身两侧均设置有锁定装置,锁定装置结构为:悬臂(9a)前端固定有开口管节(9b),悬臂后端固定在转轴(8)上,转轴可转动地安装在平板车身上,紧固螺钉(10)旋接在开口管节上;后轮后方的平板车身上安装有一对可升降装载行驶轮(5);还具有导向装置:小管(18)活动置入大管中组成套管,2对以上的套管设置在两个顶升油缸两侧,套管中的大管焊接固定在平板车身上,且大管下部开有用作插入销子的销孔,套管中的小管顶部焊接固定有用作承托压力钢管的两个顶块(19)。
2.根据权利要求1所述的水电站压力钢管运输专用车,其特征是:所述拖车牵引头和平板车身之间通过牵引机构联接,牵引机构为:上板(14)、中板(13)和下板(12)顺次叠加,板与板之间经角焊缝连接为一整体叠板,下板通过角焊缝与平板车身连接,用作与拖车牵引头连接的销轴(11)穿在上板、中板和下板的中部开孔之中,且上板和中板的开孔与销轴的转盘形成紧密配合,下板的开孔与销轴的转盘形成间隙配合,销轴的转盘上设置有用作与整体叠板连接的螺栓(15)。
3.根据权利要求1或2所述的水电站压力钢管运输专用车,其特征是:所述平板车身前部设置有配重装置(16)。
4.根据权利要求3所述的水电站压力钢管运输专用车,其特征是:所述套管为4对。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100262250A CN102114799B (zh) | 2011-01-25 | 2011-01-25 | 水电站压力钢管运输专用车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100262250A CN102114799B (zh) | 2011-01-25 | 2011-01-25 | 水电站压力钢管运输专用车 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102114799A true CN102114799A (zh) | 2011-07-06 |
CN102114799B CN102114799B (zh) | 2012-05-30 |
Family
ID=44213761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100262250A Active CN102114799B (zh) | 2011-01-25 | 2011-01-25 | 水电站压力钢管运输专用车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102114799B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104553940A (zh) * | 2014-12-30 | 2015-04-29 | 中国长江三峡集团公司 | 自装卸管道运输装置及其自装卸运输方法 |
CN105484292A (zh) * | 2016-01-09 | 2016-04-13 | 安徽水利开发股份有限公司 | 管廊箱涵运输安装装置及其安装方法 |
CN108674295A (zh) * | 2018-05-25 | 2018-10-19 | 合肥汇之新机械科技有限公司 | 适用于圆钢管运输用小货车 |
CN109017533A (zh) * | 2018-07-25 | 2018-12-18 | 中国葛洲坝集团机械船舶有限公司 | 一种用于大型钢管运输安装的专用运输车辆及方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4800819A (en) * | 1984-11-09 | 1989-01-31 | Bethlehem Steel Corp. | Railway car |
JPH0952553A (ja) * | 1995-08-11 | 1997-02-25 | Nippon Steel Corp | 運搬車両およびそのカバー構造 |
JPH115483A (ja) * | 1997-06-17 | 1999-01-12 | Mitsui Eng & Shipbuild Co Ltd | 搬送台車 |
EP1598236A1 (en) * | 2004-05-21 | 2005-11-23 | Bj Services Company | Spooler for coiled tubing |
CN101323272A (zh) * | 2008-05-30 | 2008-12-17 | 东营市科威智能技术有限公司 | 隧道大口径钢管运送装置 |
CN201951321U (zh) * | 2011-01-25 | 2011-08-31 | 中国水利水电第五工程局有限公司 | 水电站压力钢管运输专用车 |
-
2011
- 2011-01-25 CN CN2011100262250A patent/CN102114799B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4800819A (en) * | 1984-11-09 | 1989-01-31 | Bethlehem Steel Corp. | Railway car |
JPH0952553A (ja) * | 1995-08-11 | 1997-02-25 | Nippon Steel Corp | 運搬車両およびそのカバー構造 |
JPH115483A (ja) * | 1997-06-17 | 1999-01-12 | Mitsui Eng & Shipbuild Co Ltd | 搬送台車 |
EP1598236A1 (en) * | 2004-05-21 | 2005-11-23 | Bj Services Company | Spooler for coiled tubing |
CN101323272A (zh) * | 2008-05-30 | 2008-12-17 | 东营市科威智能技术有限公司 | 隧道大口径钢管运送装置 |
CN201951321U (zh) * | 2011-01-25 | 2011-08-31 | 中国水利水电第五工程局有限公司 | 水电站压力钢管运输专用车 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104553940A (zh) * | 2014-12-30 | 2015-04-29 | 中国长江三峡集团公司 | 自装卸管道运输装置及其自装卸运输方法 |
CN105484292A (zh) * | 2016-01-09 | 2016-04-13 | 安徽水利开发股份有限公司 | 管廊箱涵运输安装装置及其安装方法 |
CN108674295A (zh) * | 2018-05-25 | 2018-10-19 | 合肥汇之新机械科技有限公司 | 适用于圆钢管运输用小货车 |
CN109017533A (zh) * | 2018-07-25 | 2018-12-18 | 中国葛洲坝集团机械船舶有限公司 | 一种用于大型钢管运输安装的专用运输车辆及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102114799B (zh) | 2012-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102114799B (zh) | 水电站压力钢管运输专用车 | |
CN202131023U (zh) | 一种双梁桥式起重机 | |
CN106698210A (zh) | 一种模块化柔性底盘、其应用及其起重机 | |
CN202499142U (zh) | 轮轨式运梁车 | |
CN201951321U (zh) | 水电站压力钢管运输专用车 | |
CN110216434B (zh) | 一种用于更换大型升船机安全卷筒轴的导向小车装置及方法 | |
CN102162333A (zh) | 全电动履带悬挂式遥控桩机 | |
CN202625655U (zh) | 塔筒搬运机 | |
CN103449313A (zh) | 轨道式集装箱门式起重机小车运行机构专用维修吊 | |
CN101695986A (zh) | 一种组拼式大跨度重荷载龙门起重机 | |
CN102530582A (zh) | 用于大型装船机整机上岸的方法 | |
CN104929000A (zh) | 一种节段式铁路铺轨机组及其组装方法 | |
CN205869865U (zh) | 一种悬臂摆杆式省力提取装置 | |
CN201785136U (zh) | 门座起重机大车运行垂直铰轴支承装置 | |
CN201258174Y (zh) | 轨道式圆棒料传送装置 | |
CN202130528U (zh) | 一种大吨位运梁车的副车装置 | |
CN203159027U (zh) | 一种预制装配式铁塔基础吊具 | |
CN204490302U (zh) | 轨道车辆整体提吊的提吊装置 | |
CN201903043U (zh) | 大板梁叠梁 | |
CN104590985A (zh) | 轨道车辆整体提吊的提吊装置及提吊方法 | |
CN211495715U (zh) | 变压器移动换轨输送机构 | |
CN203845692U (zh) | 一种轮轨式提梁机走行机构 | |
CN207959252U (zh) | 一种风电塔架基础环转运支架 | |
CN106672811A (zh) | 一种新型轻量化桥式起重机 | |
CN102797201B (zh) | 一种简支梁轨排铺设车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: No.13, section 3, Jinhua Road, xihanggang street, Shuangliu District, Chengdu, Sichuan 610225 Patentee after: SINOHYDRO BUREAU 5 Co.,Ltd. Address before: 610066 No.8, east section 4, 1st ring road, Chengdu, Sichuan Patentee before: SINOHYDRO BUREAU 5 Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |