CN102061663B - Boarding bridge - Google Patents

Boarding bridge Download PDF

Info

Publication number
CN102061663B
CN102061663B CN 200910237531 CN200910237531A CN102061663B CN 102061663 B CN102061663 B CN 102061663B CN 200910237531 CN200910237531 CN 200910237531 CN 200910237531 A CN200910237531 A CN 200910237531A CN 102061663 B CN102061663 B CN 102061663B
Authority
CN
China
Prior art keywords
corridor
gallery
fixed
short
boarding bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910237531
Other languages
Chinese (zh)
Other versions
CN102061663A (en
Inventor
杨月峰
栾有钧
李国华
黄龙惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen CIMC Tianda Airport Support Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Shenzhen CIMC Tianda Airport Support Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, Shenzhen CIMC Tianda Airport Support Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN 200910237531 priority Critical patent/CN102061663B/en
Publication of CN102061663A publication Critical patent/CN102061663A/en
Application granted granted Critical
Publication of CN102061663B publication Critical patent/CN102061663B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

本发明公开一种用于在侯船楼与邮轮之间运送旅客的登船桥,其包括有:以预定间隔并列设置的第一机架和第二机架;一接口廊道,固定到该第一机架,与所述侯船楼对接;一接船口装置,设置在该第二机架一个端部,包括一升降短廊;和一接船口,设置在所述升降短廊的一侧,用于与油轮对接;一固定短廊,固定到该第二机架的另一个端部,其中该固定短廊与该升降短廊相连接;一固定长廊,连接在所述接口廊道和所述固定短廊之间。本发明的登船桥,通过至少一个长廊道分解了落差,平缓了坡度,即使在候船楼与邮轮间距小时,也能为旅客提供安全舒适的环境。

Figure 200910237531

The invention discloses a boarding bridge for transporting passengers between a waiting ship building and a cruise ship, which includes: a first frame and a second frame arranged side by side at predetermined intervals; an interface corridor fixed to the The first frame is docked with the waiting ship building; a port device is arranged at one end of the second frame, including a short lift corridor; and a ship port is arranged at the short lift corridor One side is used for docking with the tanker; a fixed gallery is fixed to the other end of the second frame, wherein the fixed gallery is connected to the lifting gallery; a fixed gallery is connected to the interface between the corridor and the fixed short corridor. The boarding bridge of the present invention decomposes the drop through at least one long corridor, makes the slope gentle, and can provide passengers with a safe and comfortable environment even when the distance between the waiting building and the cruise ship is small.

Figure 200910237531

Description

一种登船桥a boarding bridge

技术领域 technical field

本发明涉及一种登船设备,尤其涉及一种在侯船楼和邮轮之间用于旅客通行的登船桥。The invention relates to a boarding device, in particular to a boarding bridge for passengers to pass between a waiting ship building and a cruise ship.

背景技术 Background technique

发展邮轮经济的先决条件之一加强邮轮基础设施的建设。在国际邮轮在靠泊期间,邮轮客人具有“短时间,大流量”的特点。对于那种被成为露天港的客运码头,乘客只能利用邮轮的备用舷梯上下船,上下极为不便,这样客运码头不适宜做豪华邮轮的停泊码头,不能满足豪华邮轮的停靠条件。One of the prerequisites for developing the cruise economy is to strengthen the construction of cruise infrastructure. During the berthing period of international cruise ships, cruise guests have the characteristics of "short time and large flow". For the passenger terminal known as an open-air port, passengers can only use the spare gangway of the cruise ship to get on and off the ship, which is extremely inconvenient, so the passenger terminal is not suitable for berthing docks for luxury cruise ships, and cannot meet the berthing conditions of luxury cruise ships.

随着现代国际邮轮业的高速发展,邮轮码头建设向着空港化发展将成为趋势。登船桥的使用,给旅客从候船楼到邮轮提供了舒适的环境。With the rapid development of the modern international cruise industry, it will become a trend for the construction of cruise terminals to become an airport. The use of the boarding bridge provides a comfortable environment for passengers to go from the terminal building to the cruise ship.

如图1所示,中国实用新型专利CN201202086Y公开了一种登船桥12,该登船桥采用轮式大车行走方式,旅客通道4与两个升降平台3和6分别固定铰接和滑动铰接,变频调速制动电机2和10、丝杆/升降器垂直驱动升降动作,液压缸驱动旅客通道4伸缩、接船渡板1俯仰和浮动动作,监测接船渡板浮动角度来控制升降平台自动升降,实现了旅客通道在高度、水平、前后方向与邮轮对接,可以自动适应因潮差和海浪引起的邮轮舱口地面升沉、摇晃等动作。As shown in Figure 1, the Chinese utility model patent CN201202086Y discloses a boarding bridge 12, the boarding bridge adopts a wheeled cart walking mode, and the passenger channel 4 and two lifting platforms 3 and 6 are respectively fixedly hinged and slidingly hinged, Frequency conversion speed regulation brake motors 2 and 10, screw rod/lifter vertically drive the lifting action, hydraulic cylinder drives the passenger channel 4 to expand and contract, the ferry board 1 pitches and floats, monitors the floating angle of the ferry board to control the automatic lifting of the lifting platform, It realizes the docking of the passenger channel with the cruise ship in the height, horizontal, front and rear directions, and can automatically adapt to the heave and shaking of the cruise ship hatch ground caused by tidal range and waves.

应用这种现有技术的登船桥由于旅客通道4直接连接在侯船楼和邮轮之间,其要求侯船楼到邮轮之间必须具有足够的间距,才能在接船口处于高位时,不至于使旅客在很大的坡度上行走。然而,各个客运码头的条件不同。在一些候船楼与邮轮距离较近时,现有技术的登船桥,会形成很大的坡度,导致旅客无法通行。The boarding bridge using this prior art is because the passenger channel 4 is directly connected between the waiting ship building and the cruise ship, and it requires that there must be enough distance between the waiting ship building and the cruise ship, so that when the ship port is at a high position, there will be no As for making passengers walk on a very large slope. However, conditions vary from passenger terminal to terminal. When the distance between some terminal buildings and cruise ships is relatively close, the boarding bridge of the prior art will form a large slope, causing passengers to be unable to pass.

发明内容 Contents of the invention

本发明要解决的技术问题是提供一种登船桥,通过多个迂回设置的廊道来分解邮轮与侯船楼之间的落差(以下简称“落差”),以平缓所形成的通道坡度,使得在候船楼与邮轮间距较小时,也能令旅客在通道上舒适地行走。The technical problem to be solved by the present invention is to provide a boarding bridge, which decomposes the drop between the cruise ship and the waiting ship building (hereinafter referred to as "drop") through a plurality of circuitously arranged corridors, so as to ease the slope of the formed passage, This makes it possible for passengers to walk comfortably on the channel when the distance between the terminal building and the cruise ship is small.

本发明的一种登船桥,用于在候船楼与邮轮之间运送旅客,其包括有:以预定间隔并列设置的第一机架和第二机架;一接口廊道,固定到该第一机架,与所述侯船楼对接;一接船口装置,设置在该第二机架一个端部,包括一升降短廊和一接船口,设置在所述升降短廊的一侧,用于与邮轮对接;一固定短廊,固定到该第二机架的另一个端部,其中该固定短廊与该升降短廊相连接;一固定长廊,连接在所述接口廊道和所述固定短廊之间。A boarding bridge of the present invention is used for transporting passengers between the waiting building and the cruise ship, and it includes: a first frame and a second frame arranged side by side at predetermined intervals; an interface corridor fixed to the The first frame is docked with the waiting ship building; a docking device is arranged at one end of the second frame, including a short lifting corridor and a docking port, and is arranged on one of the short lifting corridors. side, for docking with the cruise ship; a fixed gallery, fixed to the other end of the second frame, wherein the fixed gallery is connected to the lift gallery; a fixed gallery, connected to the interface gallery between the road and the fixed corridor.

上述的登船桥的固定短廊高于所述接口廊道。The fixed corridor of the boarding bridge mentioned above is higher than the interface corridor.

上述的登船桥的升降短廊被驱动后高度可调节,其中当所述升降短廊位于高位时,其高度高于所述固定短廊。The height of the short lift gallery of the above-mentioned boarding bridge is adjustable after being driven, wherein when the short lift gallery is at a high position, its height is higher than that of the fixed short gallery.

上述的登船桥的升降短廊在低位时,其高度与所述固定短廊基本上一致。When the above-mentioned short lifting gallery of the boarding bridge is at a low position, its height is basically the same as that of the fixed short gallery.

上述的登船桥的接船口与所述第一升降短廊滑动连接。The port of the above-mentioned boarding bridge is slidably connected with the first short lifting corridor.

本发明的一种登船桥,用于在候船楼与邮轮之间运送旅客,其包括有:以预定间隔并列设置的第一机架和第二机架;一接船口装置,设置在该第一机架,包括第一升降短廊;和一接船口,设置在所述第一升降短廊的一侧,用于与邮轮对接;一接口廊道,固定到该第二机架的一个端部,与所述侯船楼对接;第二升降短廊,设置在该第二机架的另一个端部;一固定短廊,固定到所述第一机架;第一升降长廊,连接在所述第一升降短廊的另一侧和所述第二升降短廊之间;第二升降长廊,连接在所述固定短廊和所述第二升降短廊之间,以及固定长廊,连接在所述第一接口廊道和所述固定短廊之间。A boarding bridge of the present invention is used to transport passengers between the waiting building and the cruise ship, and it includes: a first frame and a second frame arranged side by side with a predetermined interval; The first frame includes a first lift gallery; and a ship port, arranged on one side of the first lift gallery, for docking with the cruise ship; an interface gallery, fixed to the second frame One end of which is docked with the waiting ship building; the second short lift corridor is arranged on the other end of the second frame; a fixed short corridor is fixed to the first frame; the first lift length corridor, connected between the other side of the first short corridor and the second short corridor; a second long corridor, connected between the fixed short corridor and the second short corridor, And a fixed corridor connected between the first interface corridor and the fixed short corridor.

上述的登船桥的固定短廊高于所述接口廊道。The fixed corridor of the boarding bridge mentioned above is higher than the interface corridor.

上述的登船桥的第一升降短廊被驱动后高度可调节,其中当所述第一升降短廊位于高位时,其高于所述固定长廊。The height of the first short elevator corridor of the boarding bridge can be adjusted after being driven, wherein when the first short elevator corridor is at a high position, it is higher than the fixed gallery.

当上述的登船桥的第一升降短廊被驱动至高位时,所述第二升降短廊被驱动升高,其高度处于第一升降短廊与所述固定短廊之间。When the first lift corridor of the above-mentioned boarding bridge is driven to a high position, the second lift corridor is driven to rise, and its height is between the first lift corridor and the fixed corridor.

当上述的登船桥的第一升降短廊在低位时,其高度与所述接口廊道基本上一致。When the first lifting corridor of the boarding bridge is at a low position, its height is basically the same as that of the interface corridor.

当上述的登船桥的第一升降短廊在低位时,所述第二升降短廊的高度处于所述接口廊道与所述固定短廊之间。When the above-mentioned first lifting corridor of the boarding bridge is at a low position, the height of the second lifting corridor is between the interface corridor and the fixed corridor.

当上述的登船桥的第一升降短廊在低位时,所述第二升降短廊的高度与所述接口廊道的高度基本一致。When the first short lifting gallery of the boarding bridge is at a low position, the height of the second short lifting gallery is basically the same as that of the interface corridor.

上述的登船桥的接船口装置被限定在所述第一机架的内侧,而所述固定短廊设置在所述第一机架的外侧。The above-mentioned ship access device of the boarding bridge is defined on the inside of the first frame, and the fixed corridor is arranged on the outside of the first frame.

上述的登船桥的固定短廊与所述接口廊道和第二升降短廊彼此邻近的端部对应。The above-mentioned fixed gallery of the boarding bridge corresponds to the ends where the interface gallery and the second lifting gallery are adjacent to each other.

上述的登船桥的接船口与所述第一升降短廊滑动连接。The port of the above-mentioned boarding bridge is slidably connected with the first short lifting corridor.

根据本发明的一个方面,通过至少一个长廊道与邮轮的平行设置,通过多个廊道的转接分解了落差,平缓了坡度以供旅客行走。因此,实现了在候船楼与邮轮间距小坡度较大时,也能通过登船桥为旅客提供安全舒适的环境。According to one aspect of the present invention, through the arrangement of at least one long corridor parallel to the cruise ship, the transition of multiple corridors decomposes the drop and makes the slope gentle for passengers to walk on. Therefore, when the distance between the terminal building and the cruise ship is small and the slope is large, a safe and comfortable environment can be provided for passengers through the boarding bridge.

根据本发明的另一个方面,通过更多的与邮轮平行设置的廊道,以逐级分解坡度,并使各个长廊具有趋于一致的坡度,以增加旅客的舒适感和安全感。According to another aspect of the present invention, more corridors arranged parallel to the cruise ship are used to decompose the slope step by step, and make each corridor have a slope that tends to be consistent, so as to increase passengers' sense of comfort and safety.

附图说明 Description of drawings

下面将结合附图及实施例对本发明作进一步说明,附图中:The present invention will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:

图1是现有技术登船桥的结构示意图,显示了旅客通道直接连接在邮轮与侯船楼之间;Fig. 1 is a structural schematic diagram of the boarding bridge in the prior art, showing that the passenger channel is directly connected between the cruise ship and the waiting ship building;

图2是本发明登船桥的一个实施例,显示了连接在候船楼与邮轮之间的示意图;Fig. 2 is an embodiment of the boarding bridge of the present invention, showing the schematic diagram connected between the waiting building and the cruise ship;

图3是图2所示登船桥的放大示意图;Figure 3 is an enlarged schematic view of the boarding bridge shown in Figure 2;

图4是图2中登船桥的端部示意图,其中移除了长廊道;Fig. 4 is a schematic diagram of the end of the boarding bridge in Fig. 2, wherein the long corridor is removed;

图5是图2中的登船桥的侧视图,显示了接船口装置处于低位;Fig. 5 is a side view of the boarding bridge in Fig. 2, showing that the port device is in a low position;

图6是图2中的登船桥的侧视图,显示了接船口装置处于高位;Fig. 6 is a side view of the boarding bridge in Fig. 2, showing that the port device is in a high position;

图7是本发明登船桥的另一个实施例;Fig. 7 is another embodiment of the boarding bridge of the present invention;

图8是图7中登船桥的端部示意图,其中移除了长廊道;Fig. 8 is a schematic diagram of the end of the boarding bridge in Fig. 7, wherein the long corridor has been removed;

图9是图7中登船桥的侧视图,显示了接船口装置处于低位;Fig. 9 is a side view of the boarding bridge in Fig. 7, showing that the port device is in a low position;

图10是图7中登船桥的侧视图,显示了接船口装置处于高位。Fig. 10 is a side view of the boarding bridge in Fig. 7, showing that the port device is in a high position.

具体实施方式 Detailed ways

下文,将详细描述本发明。Hereinafter, the present invention will be described in detail.

如图2所示,在候船大楼22的一侧设置有候船大楼回廊24,本发明的行车式登船桥20在地轨23上行走。首先,行车式登船桥20的一端连接到候船大楼回廊24,另一端连接到邮轮21。本发明的设计思路是在候船大楼回廊24与邮轮21之间的狭窄的间距S中,利用至少三个长廊来缓解坡度,再利用多个短廊道设置成用于转接至少三个长廊道,而行程迂回设置的廊道,从而分解了落差。由于在靠近邮轮的一侧,廊道需要能够进行高度的调节,因此需要考虑能对其进行升降操作,而另一侧由于靠近地面建筑物,可采用固定的廊道,以增加登船桥整体的稳定性。因此,本发明登船桥20具有以预定间隔并列设置的第一机架25和第二机架26,这个间隔的设计应考虑能够设置较长的廊道,以平缓坡度。同时,在两个机架25和26上可以设置行走系统27和28,以能够沿地轨23行走。登船桥20的首端连接有接船口装置201,接船口,用于与邮轮21对接,登船桥的尾端设一接口廊道202,用于与候船大楼回廊24连接。As shown in FIG. 2 , a waiting building corridor 24 is arranged on one side of the waiting building 22 , and the driving type boarding bridge 20 of the present invention walks on the ground rail 23 . First, one end of the driving boarding bridge 20 is connected to the corridor 24 of the terminal building, and the other end is connected to the cruise ship 21 . The design idea of the present invention is to use at least three long corridors to alleviate the slope in the narrow space S between the corridor 24 of the terminal building and the cruise ship 21, and then use a plurality of short corridors to set up for connecting at least three The long corridor, and the corridor set in a roundabout way, thus decomposing the drop. Since the corridor needs to be able to be adjusted in height on the side close to the cruise ship, it needs to be considered to be able to lift it, while on the other side, since it is close to the ground building, a fixed corridor can be used to increase the overall boarding bridge. stability. Therefore, the boarding bridge 20 of the present invention has the first frame 25 and the second frame 26 arranged side by side at a predetermined interval, and the design of this interval should consider that a longer corridor can be set to gently slope. Meanwhile, walking systems 27 and 28 can be set on the two frames 25 and 26 to be able to walk along the ground rail 23 . The head end of the boarding bridge 20 is connected with a docking device 201 for docking with the cruise ship 21 , and an interface corridor 202 is provided at the tail end of the boarding bridge for connecting with the corridor 24 of the waiting building.

如图3所示,在本发明的第一机架25的一端上设置了一接船口装置201,而由于接船口装置201需要与邮轮对接,其需要适应邮轮上下旅客而产生的高度落差,其可以被驱动沿该第一机架25升降。较佳的是,本发明的接船口装置201包括第一升降短廊203,其可以沿第一机架25升降,以调节高度,以及一接船口204。其中,接船口204固定在第一升降短廊203的一侧。较佳的是,为了本发明的使接船口更加灵活地适应甲板的波动(例如:受潮汐或海浪影响而产生的波动等),接船口204可以被设计成能够沿第一升降短廊203的一侧滑动。As shown in Figure 3, one end of the first frame 25 of the present invention is provided with a docking device 201, and because the docking device 201 needs to be docked with the cruise ship, it needs to adapt to the height drop caused by the passengers getting on and off the cruise ship , which can be driven up and down along the first frame 25 . Preferably, the ship port device 201 of the present invention includes a first lift gallery 203 that can be lifted and lowered along the first frame 25 to adjust the height, and a ship port 204 . Wherein, the docking port 204 is fixed on one side of the first short elevator corridor 203 . Preferably, in order to make the dock more flexibly adapt to deck fluctuations (for example: fluctuations caused by tides or waves) of the present invention, the dock 204 can be designed to be able to move along the first short corridor. 203 slides on one side.

在本方面的第二机架26的一端上设置了一接口廊道202。该接口廊道202由于与侯船楼对接,因此其可以直接固定到第二机架26上。在本发明的第二机架26的另一端上设置了第二升降短廊206,它是为本发明的长廊提供了转接的通道而设置的。由于靠近邮轮的一侧需要考虑位置的变化,第二升降短廊206也需要能够沿第二机架26做升降调节。An interface gallery 202 is provided at one end of the second rack 26 of this aspect. The interface corridor 202 can be directly fixed on the second frame 26 because it is docked with the waiting ship building. On the other end of the second frame 26 of the present invention, a second lift short gallery 206 is provided, which provides a transition passage for the gallery of the present invention. Since the position change needs to be considered on the side close to the cruise ship, the second lift gallery 206 also needs to be able to be adjusted up and down along the second frame 26 .

本发明的登船桥20还包括固定短廊207,固定到第一机架25的外侧。这样,在接口廊道202和固定短廊207之间可以连接固定长廊210。由于其两端是相对固定的,该固定长廊210的高度也是不可调的,以增加登船桥整体的稳定性。The boarding bridge 20 of the present invention also includes a fixed gallery 207 fixed to the outside of the first frame 25 . In this way, the fixed corridor 210 can be connected between the interface corridor 202 and the fixed short corridor 207 . Since its two ends are relatively fixed, the height of the fixed corridor 210 is also non-adjustable, so as to increase the overall stability of the boarding bridge.

同样地,本发明的第一升降长廊211可以连接在所述第二升降短廊206另一侧和第一升降短廊203之间。由于第一升降长廊211靠近邮轮,需要能够被灵活地调节,因此在对其端部上的两个升降短廊203和206的高度进行调整的时候,该第一升降长廊211也将随之被调节,而且形成舒适的坡度。Likewise, the first elevator corridor 211 of the present invention may be connected between the other side of the second elevator short corridor 206 and the first elevator short corridor 203 . Since the first elevator corridor 211 is close to the cruise ship, it needs to be able to be adjusted flexibly, so when the heights of the two elevator corridors 203 and 206 on its ends are adjusted, the first elevator corridor 211 will also be adjusted accordingly. It is adjusted and forms a comfortable slope.

优选的是,本发明的固定短廊207基本上设置在第一机架25外侧的中部,即与接口廊道202和第二升降短廊206彼此邻近的端部对应。并且,固定短廊207与第二升降短廊206之间设置有第二升降长廊213。这样,本发明的固定长廊210和第二升降长廊213可以基本上与第一升降长廊211一样,平行于侯船楼(或邮轮)布置,使得本发明的登船桥整体结构紧凑,升降操作灵活,易于实现。Preferably, the fixed short gallery 207 of the present invention is basically arranged in the middle of the outer side of the first frame 25 , that is, corresponding to the ends where the interface gallery 202 and the second lifting gallery 206 are adjacent to each other. Moreover, a second lifting corridor 213 is provided between the fixed short corridor 207 and the second lifting corridor 206 . In this way, the fixed corridor 210 of the present invention and the second elevator corridor 213 can basically be the same as the first elevator corridor 211, arranged parallel to the waiting ship building (or cruise ship), so that the overall structure of the boarding bridge of the present invention is compact, The lifting operation is flexible and easy to realize.

从图4可以看出本发明的多个用于转接的廊道或短廊在高度上的位置关系。接口廊道202与候船楼回廊24的地面平齐连接。而在接船口204位于低位P1时,接口廊道202与第一升降短廊203距离地面的高度相当。It can be seen from Fig. 4 that the positional relationship in height of multiple corridors or short corridors used for transfer in the present invention. The interface corridor 202 is flush with the ground of the terminal corridor 24 . And when the docking port 204 is at the low position P1, the height of the interface corridor 202 and the first short lifting corridor 203 from the ground is equivalent.

较佳的是,固定短廊207的位置可以高于接口廊道202,以使连接在其间的固定长廊210形成适宜的坡度,以达到分解一部分的落差的目的。Preferably, the position of the short fixed corridor 207 can be higher than the interface corridor 202, so that the fixed long corridor 210 connected therebetween can form an appropriate slope, so as to achieve the purpose of decomposing a part of the drop.

参阅图5,在本实施例中,接船口204位于低位P1时,第二升降短廊206基本上位于第二机架26的中位P3。这一位置P3所处的高度较佳的是处于接口廊道202和固定短廊207之间,以帮助与之连接的各个长廊形成平缓坡度。Referring to FIG. 5 , in this embodiment, when the docking port 204 is at the low position P1 , the second lift gallery 206 is basically at the middle position P3 of the second frame 26 . The height of this position P3 is preferably between the interface corridor 202 and the fixed short corridor 207, so as to help the various long corridors connected therewith to form a gentle slope.

优选的是,可以选择在接船口204处于最低位时,第二升降短廊206的高度与接口廊道202的基本一致,所以图5中,接口廊道202会被第二升降短廊206遮挡,第一固定长廊210会被第二升降长廊213遮挡。Preferably, it can be selected that when the docking port 204 is at the lowest position, the height of the second lift corridor 206 is basically the same as that of the interface corridor 202, so in FIG. If it is blocked, the first fixed corridor 210 will be blocked by the second lift corridor 213 .

参阅图6,在接船口204位于高位P2时,第二升降短廊206也位于高位P4。较佳的是,该位置P4的高度处于接船口204的高位P2,即第一升降短廊203和固定短廊207之间,以帮助与之连接的各个长廊形成平缓的坡度。Referring to FIG. 6 , when the docking port 204 is at the high position P2, the second lift gallery 206 is also at the high position P4. Preferably, the height of the position P4 is at the high position P2 of the dock 204 , that is, between the first lifting corridor 203 and the fixed corridor 207 , so as to help the corridors connected therewith to form a gentle slope.

以这样的方式,本发明的迂回设置的多个廊道逐级分解了落差,以使各个长廊具有趋于均匀的坡度,以此增加了旅客舒适感和安全感。旅客可以按照图3中多个箭头所指示的路径依次通过各个廊道。应当指出,第一升降短廊203需要与接船口204连接,例如铰接,以形成如途中箭头所指示的路径。In this way, the multiple corridors arranged in a circuitous manner in the present invention decompose the drop step by step, so that each corridor has a slope that tends to be uniform, thereby increasing the sense of comfort and safety of passengers. Passengers can pass through various corridors in sequence according to the paths indicated by multiple arrows in FIG. 3 . It should be pointed out that the first elevator gallery 203 needs to be connected with the docking port 204, for example hinged, so as to form a path as indicated by the arrow on the way.

本发明是根据候船大楼回廊与邮轮的相对距离S,落差以及期望的坡度来推算出具体通道的长度和数量的。The present invention calculates the length and quantity of specific passages according to the relative distance S between the corridor of the terminal building and the cruise ship, the drop and the expected slope.

根据本发明的技术方案,图7显示了本发明登船桥的另一个实施例。According to the technical solution of the present invention, Fig. 7 shows another embodiment of the boarding bridge of the present invention.

与图3所示实施例所不同的是,本实施例的登船桥30对调了接口廊道202和接船口装置201的在两个机架上的位置,并省去了图3中的固定廊道207,以及与其间相连的升降长廊213和211,以及升降短廊206,这样,本发明的登船桥30可以仅仅利用一个长廊来分解落差。What is different from the embodiment shown in Figure 3 is that the boarding bridge 30 of this embodiment has reversed the positions of the interface gallery 202 and the port device 201 on the two frames, and omitted the The fixed corridor 207, and the lifting corridors 213 and 211 connected therebetween, and the short lifting corridor 206, like this, the boarding bridge 30 of the present invention can only use one corridor to break down the drop.

如图7可见,本发明的接船口装置201包括升降短廊208,其可以沿第二机架26升降,以调节高度,以及一接船口204。接船口204固定在升降短廊208的一侧。较佳的是,接船口204也可以被设计成能够沿升降短廊208的一侧滑动。为了为本发明的长廊提供转接的通道,在本发明的第二机架26的另一端上设置了固定短廊209。As can be seen from FIG. 7 , the docking device 201 of the present invention includes a short lift corridor 208 that can be lifted and lowered along the second frame 26 to adjust the height, and a docking port 204 . The ship port 204 is fixed on one side of the short lift gallery 208. Preferably, the docking port 204 can also be designed to be able to slide along one side of the short lift corridor 208 . In order to provide a transition channel for the corridor of the present invention, a fixed short corridor 209 is provided on the other end of the second frame 26 of the present invention.

该实施例的登船桥30在接口廊道202和固定短廊209之间可以连接固定长廊214。由于其两端是相对固定的,为了增加登船桥整体的稳定性,该固定长廊214的高度也是不可调的。较佳的是,固定短廊209的位置可以高于接口廊道202,以使连接在其间的固定长廊214形成适宜的坡度,以达到分解一部分的落差的目的。The boarding bridge 30 of this embodiment can be connected with a fixed corridor 214 between the interface corridor 202 and the fixed short corridor 209 . Since its two ends are relatively fixed, in order to increase the overall stability of the boarding bridge, the height of the fixed corridor 214 is also non-adjustable. Preferably, the position of the short fixed corridor 209 may be higher than the interface corridor 202, so that the fixed long corridor 214 connected therebetween forms an appropriate slope, so as to achieve the purpose of decomposing a part of the drop.

同时,根据本发明的实施例,需要将固定短廊209与接船口装置的升降短廊208连接,例如升降短廊208可以铰接在固定廊道209上,以形成通道,并最终形成如图中箭头所指示的路径。因此,升降廊道208在被驱动升降时,其另一端可以在适度的范围内升降,以形成平缓的坡度,也是就,在低位P1时,升降短廊208可以低于固定短廊209,而在高位P2是,可以高于固定短廊209。At the same time, according to the embodiment of the present invention, it is necessary to connect the fixed gallery 209 with the lift gallery 208 connected to the port device, for example, the lift gallery 208 can be hinged on the fixed gallery 209 to form a channel, and finally form a The path indicated by the arrow. Therefore, when the lift corridor 208 is driven to lift, its other end can be lifted within a moderate range to form a gentle slope, that is, at the low position P1, the lift corridor 208 can be lower than the fixed corridor 209, and At the high position P2, it can be higher than the fixed corridor 209.

从图8可以看出本实施例的多个用于转接的廊道在高度上的位置关系。接口廊道202与候船楼回廊24的地面平齐连接。而在接船口204位于低位P1时,接口廊道202与升降短廊208距离地面的高度相当。It can be seen from FIG. 8 that the positional relationship in height of the corridors used for transfer in this embodiment. The interface corridor 202 is flush with the ground of the terminal corridor 24 . And when the docking port 204 is located at the low position P1, the height of the interface corridor 202 and the short lifting corridor 208 from the ground is equivalent.

较佳的是,固定短廊209的位置可以高于接口廊道202,以使连接在其间的固定长廊214形成适宜的坡度,以达到分解一部分的落差的目的。Preferably, the position of the short fixed corridor 209 may be higher than the interface corridor 202, so that the fixed long corridor 214 connected therebetween forms an appropriate slope, so as to achieve the purpose of decomposing a part of the drop.

参见图9和图10,在本实施例中,接船口204位于低位P1时,升降短廊208的高度与固定短廊209基本一致。当接船口204位于高位P3时,升降短廊208的高度高于所述固定短廊209。Referring to Fig. 9 and Fig. 10, in this embodiment, when the docking port 204 is at the low position P1, the height of the short lifting corridor 208 is basically the same as that of the fixed short corridor 209. When the ship port 204 is at the high position P3, the height of the short lifting corridor 208 is higher than that of the fixed short corridor 209 .

可以理解,本发明是通过一些实施例进行描述的,本领域技术人员知悉的,在不脱离本发明的精神和范围的情况下,可以对这些特征和实施例进行各种改变或等效替换。例如:在图3中,可以取消固定长廊210,固定短廊207,第二升降长廊213,将第二升降短廊与接口廊道202连接形成平的或有一定坡度的新的固定廊道。新的固定廊道与第一升降长廊211连接,第一升降长廊连接接船口装置201。另外,在本发明的教导下,可以对这些特征和实施例进行修改以适应具体的情况及材料而不会脱离本发明的精神和范围。因此,本发明不受此处所公开的具体实施例的限制,所有落入本申请的权利要求范围内的实施例都属于本发明的保护范围。It can be understood that the present invention is described through some embodiments, and those skilled in the art know that various changes or equivalent substitutions can be made to these features and embodiments without departing from the spirit and scope of the present invention. For example: in Fig. 3, fixed corridor 210, fixed short corridor 207, second lifting corridor 213 can be canceled, and the second lifting short corridor and interface corridor 202 are connected to form a new fixed corridor that is flat or has a certain slope road. The new fixed corridor is connected with the first lifting corridor 211, and the first lifting corridor is connected with the port device 201. In addition, the features and examples may be modified to adapt a particular situation and material to the teachings of the invention without departing from the spirit and scope of the invention. Therefore, the present invention is not limited by the specific embodiments disclosed here, and all embodiments falling within the scope of the claims of the present application belong to the protection scope of the present invention.

Claims (16)

1.一种登船桥,用于在侯船楼与邮轮之间运送旅客,其特征在于,所述登船桥包括1. A boarding bridge for transporting passengers between a waiting ship building and a cruise ship, characterized in that the boarding bridge includes 以预定间隔并列设置的第一机架和第二机架;a first rack and a second rack arranged side by side at predetermined intervals; 一接口廊道,固定到该第一机架,与所述侯船楼对接;An interface corridor, fixed to the first frame, docked with the waiting ship building; 接船口装置,设置在该第二机架一个端部,包括The port device is arranged at one end of the second frame, including 一升降短廊;和a short walkway; and 一接船口,设置在所述升降短廊的一侧,用于与邮轮对接;A ship port, set on one side of the short lift corridor, for docking with cruise ships; 一固定短廊,固定到该第二机架的另一个端部,其中该固定短廊与该升降短廊相连接;a fixed gallery fixed to the other end of the second frame, wherein the fixed gallery is connected to the lifting gallery; 一固定长廊,连接在所述接口廊道和所述固定短廊之间。A fixed corridor connected between the interface corridor and the fixed short corridor. 2.根据权利要求1所述的登船桥,其特征在于,所述固定短廊高于所述接口廊道。2. The boarding bridge according to claim 1, characterized in that, the short fixed corridor is higher than the interface corridor. 3.根据权利要求2所述的登船桥,其特征在于,所述升降短廊被驱动后高度可调节,其中当所述升降短廊位于高位时,其高度高于所述固定短廊。3 . The boarding bridge according to claim 2 , wherein the height of the short lifting gallery is adjustable after being driven, wherein when the short lifting gallery is at a high position, its height is higher than that of the fixed short gallery. 4 . 4.根据权利要求3所述的登船桥,其特征在于,所述升降短廊在低位时,其高度低于所述固定短廊。4. The boarding bridge according to claim 3, characterized in that, when the short lifting corridor is in a low position, its height is lower than that of the fixed short corridor. 5.根据权利要求1至4任一项所述的登船桥,其特征在于,所述接船口与所述升降短廊滑动连接。5. The boarding bridge according to any one of claims 1 to 4, characterized in that, the docking port is slidably connected with the short lift corridor. 6.一种登船桥,用于在侯船楼与邮轮之间运送旅客,其特征在于,所述登船桥包括6. A boarding bridge for transporting passengers between the waiting ship building and the cruise ship, characterized in that the boarding bridge includes 以预定间隔并列设置的第一机架和第二机架;a first rack and a second rack arranged side by side at predetermined intervals; 一接船口装置,设置在该第一机架,包括a docking device, disposed on the first frame, comprising 第一升降短廊;和the first catwalk; and 一接船口,设置在所述第一升降短廊的一侧,用于与邮轮对接;A docking port, which is arranged on one side of the first short elevator corridor, and is used for docking with the cruise ship; 一接口廊道,固定到该第二机架的一个端部,与所述侯船楼对接;An interface corridor, fixed to one end of the second frame, docked with the waiting ship building; 第二升降短廊,设置在该第二机架的另一个端部;a second catwalk disposed at the other end of the second frame; 一固定短廊,固定到所述第一机架;a fixed gallery secured to said first frame; 第一升降长廊,连接在所述第一升降短廊的另一侧和所述第二升降短廊之间;a first elevator corridor connected between the other side of the first elevator corridor and the second elevator corridor; 第二升降长廊,连接在所述固定短廊和所述第二升降短廊之间,以及a second elevator gallery connected between said fixed gallery and said second elevator gallery, and 固定长廊,连接在所述接口廊道和所述固定短廊之间。A fixed corridor connected between the interface corridor and the fixed short corridor. 7.根据权利要求6所述的登船桥,其特征在于,所述固定短廊高于所述接口廊道。7. The boarding bridge according to claim 6, characterized in that, the short fixed corridor is higher than the interface corridor. 8.根据权利要求7所述的登船桥,其特征在于,所述第一升降短廊被驱动后高度可调节,其中当所述第一升降短廊位于高位时,其高于所述固定长廊。8. The boarding bridge according to claim 7, characterized in that, the height of the first lift gallery is adjustable after being driven, wherein when the first lift gallery is at a high position, it is higher than the fixed gallery. 9.根据权利要求8所述的登船桥,其特征在于,当所述第一升降短廊被驱动至高位时,所述第二升降短廊被驱动升高,其高度处于第一升降短廊与所述固定短廊之间。9. The boarding bridge according to claim 8, characterized in that, when the first elevator gallery is driven to a high position, the second elevator gallery is driven to rise, and its height is at the height of the first elevator gallery. between the corridor and the fixed short corridor. 10.根据权利要求9所述的登船桥,其特征在于,当所述第一升降短廊在低位时,其高度与所述接口廊道基本上一致。10. The boarding bridge according to claim 9, characterized in that, when the first short elevator gallery is at a low position, its height is substantially the same as that of the interface gallery. 11.根据权利要求10所述的登船桥,其特征在于,当所述第一升降短廊在低位时,所述第二升降短廊的高度处于所述接口廊道与所述固定短廊之间。11. The boarding bridge according to claim 10, wherein when the first short lifting gallery is at a low position, the height of the second short lifting gallery is between the interface gallery and the fixed short gallery. between. 12.根据权利要求11所述的登船桥,其特征在于,当所述第一升降短廊在低位时,所述第二升降短廊的高度与所述接口廊道的高度基本一致。12. The boarding bridge according to claim 11, wherein when the first short lifting gallery is at a low position, the height of the second short lifting gallery is substantially the same as the height of the interface corridor. 13.根据权利要求6至12任一项所述的登船桥,其特征在于,所述接船口装置被限定在所述第一机架的内侧,而所述固定短廊设置在所述第一机架的外侧。13. The boarding bridge according to any one of claims 6 to 12, characterized in that, the ship access device is defined on the inner side of the first frame, and the fixed gallery is arranged on the The outside of the first rack. 14.根据权利要求13所述的登船桥,其特征在于,所述固定短廊与所述接口廊道和第二升降短廊彼此邻近的端部对应。14. The boarding bridge according to claim 13, characterized in that the fixed gallery corresponds to the ends of the interface gallery and the second lifting gallery adjacent to each other. 15.根据权利要求6至12和14中任一项所述的登船桥,其特征在于,所述接船口与所述第一升降短廊滑动连接。15. The boarding bridge according to any one of claims 6 to 12 and 14, characterized in that, the docking port is slidably connected to the first lifting corridor. 16.根据权利要求13所述的登船桥,其特征在于,所述接船口与所述第一升降短廊滑动连接。16 . The boarding bridge according to claim 13 , characterized in that, the docking port is slidably connected to the first lifting gallery. 17 .
CN 200910237531 2009-11-11 2009-11-11 Boarding bridge Active CN102061663B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910237531 CN102061663B (en) 2009-11-11 2009-11-11 Boarding bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910237531 CN102061663B (en) 2009-11-11 2009-11-11 Boarding bridge

Publications (2)

Publication Number Publication Date
CN102061663A CN102061663A (en) 2011-05-18
CN102061663B true CN102061663B (en) 2012-12-12

Family

ID=43997145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910237531 Active CN102061663B (en) 2009-11-11 2009-11-11 Boarding bridge

Country Status (1)

Country Link
CN (1) CN102061663B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108528644A (en) * 2018-04-02 2018-09-14 广州宾模工程管理有限公司 Cruise boarding bridge and its control method
CN108725293A (en) * 2018-05-29 2018-11-02 广州宾模工程管理有限公司 A kind of chassis structure and boarding bridge of self-propelled boarding bridge
CN108951400A (en) * 2018-05-29 2018-12-07 广州宾模工程管理有限公司 A kind of boarding bridge and equipment of going on board with double-layer lifting gallery
CN108945318B (en) * 2018-09-19 2024-06-18 华德宝机械(昆山)有限公司 Self-adaptive suspension system for channel
CN110683002A (en) * 2019-11-08 2020-01-14 广州宾模工程管理有限公司 Marine passenger elevator device and system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08268382A (en) 1995-02-01 1996-10-15 Hitachi Zosen Corp Vehicle boarding and alighting equipment
WO2004005127A1 (en) * 2002-07-08 2004-01-15 Tts Ships Equipment As Ramp structure of a ship for handling of cargo
CN101177929A (en) * 2006-11-07 2008-05-14 中国国际海运集装箱(集团)股份有限公司 A method for leveling boarding bridge ferry device and boarding bridge
CN201202086Y (en) * 2007-12-25 2009-03-04 交通部水运科学研究所 Mobile lifting passenger boarding bridge
CN101531236A (en) * 2009-04-21 2009-09-16 姜堰市船舶舾装件有限公司 Long-distance overhanging flip gangway
EP1854715B1 (en) * 2006-05-11 2010-10-06 Besenzoni S.p.A. Telescopic walkway for boats with integrable and entirely foldaway structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08268382A (en) 1995-02-01 1996-10-15 Hitachi Zosen Corp Vehicle boarding and alighting equipment
WO2004005127A1 (en) * 2002-07-08 2004-01-15 Tts Ships Equipment As Ramp structure of a ship for handling of cargo
CN1675102A (en) * 2002-07-08 2005-09-28 Tts船舶设备公司 Ramp structure of a ship for handling of cargo
EP1854715B1 (en) * 2006-05-11 2010-10-06 Besenzoni S.p.A. Telescopic walkway for boats with integrable and entirely foldaway structure
CN101177929A (en) * 2006-11-07 2008-05-14 中国国际海运集装箱(集团)股份有限公司 A method for leveling boarding bridge ferry device and boarding bridge
CN201202086Y (en) * 2007-12-25 2009-03-04 交通部水运科学研究所 Mobile lifting passenger boarding bridge
CN101531236A (en) * 2009-04-21 2009-09-16 姜堰市船舶舾装件有限公司 Long-distance overhanging flip gangway

Also Published As

Publication number Publication date
CN102061663A (en) 2011-05-18

Similar Documents

Publication Publication Date Title
CN102061663B (en) Boarding bridge
US20230348102A1 (en) Microbridges for regional aircraft and methods of using same
CN201202086Y (en) Mobile lifting passenger boarding bridge
DK2616318T3 (en) Ship with gangway
EP3535181B1 (en) A transport system and method
US7402017B2 (en) Mechanized support for boats
CN204507191U (en) A kind of wharf boarding ladder
CN102061664A (en) Boarding bridge
WO2019227965A1 (en) Offshore platform embarkation apparatus and offshore platform
CN103204227A (en) Self-unloading bulk cargo transport ship and unloading method thereof
CN101306718A (en) Marine telescope pole
KR102076677B1 (en) Large-size container carriers
CN107489392B (en) A kind of double subsea blow out preventer group processing systems and its application method
CN207176476U (en) movable boarding bridge
CN210737334U (en) Passenger vertical conveying device for wharf with vertical structure
CN116142418A (en) A ship docking support system and launching method
JP2014136469A (en) Inboard elevator device used for disembarkation
US20050056725A1 (en) Regional aircraft boarding modules, and methods of using same
CN101768918B (en) Ferry board device and boarding bridge thereof
CN202202251U (en) Boarding bridge
CN206141768U (en) A system of going on board fast for harbour passenger boat
CN212981801U (en) Discharging equipment
CN101748684B (en) A ship receiving device for a boarding bridge
CN204432948U (en) A kind of ladder vehicle of ship
CN206691340U (en) A kind of jack up offshore recreational is spent a holiday platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yang Yuefeng

Inventor after: Luan Youjun

Inventor after: Li Guohua

Inventor after: Huang Longhui

Inventor before: Yang Yuefeng

Inventor before: Zhang Zhaohong

Inventor before: Huang Longhui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG YUEFENG ZHANG ZHAOHONG HUANG LONGHUI TO: YANG YUEFENG LUAN YOUJUN LI GUOHUA HUANG LONGHUI

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210616

Address after: 518103 No.9, Fuyuan 2nd Road, Fuyong street, Bao'an District, Shenzhen City, Guangdong Province

Patentee after: SHENZHEN CIMC-TIANDA AIRPORT SUPPORT Co.,Ltd.

Address before: Four No. four industrial road, Shekou Industrial Zone, Guangdong, Shenzhen 518067, China

Patentee before: SHENZHEN CIMC-TIANDA AIRPORT SUPPORT Co.,Ltd.

Patentee before: China International Marine Containers (Group) Co.,Ltd.

TR01 Transfer of patent right