CN102041918A - 煤塔料仓斜壁双曲面混凝土结构的施工方法 - Google Patents
煤塔料仓斜壁双曲面混凝土结构的施工方法 Download PDFInfo
- Publication number
- CN102041918A CN102041918A CN2009100709286A CN200910070928A CN102041918A CN 102041918 A CN102041918 A CN 102041918A CN 2009100709286 A CN2009100709286 A CN 2009100709286A CN 200910070928 A CN200910070928 A CN 200910070928A CN 102041918 A CN102041918 A CN 102041918A
- Authority
- CN
- China
- Prior art keywords
- concrete structure
- concrete
- coal
- coal tower
- feed bin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明涉及一种煤塔料仓斜壁双曲面混凝土结构的施工方法,其步骤为:(1)搭建煤塔料仓斜粱;(2)紧贴煤塔料仓斜梁从上到下梯级式砌筑加气混凝土砌块,砌筑的过程中在相应的位置埋设风力振煤管;(3)在梯级式加气混凝土砌块外侧绑扎钢筋网片;(4)按照梯级式加气混凝土砌块分梯级支模浇筑混凝土,形成双曲面混凝土结构;(5)在双曲面混凝土结构外体上固装耐磨板材,整体施工完毕。本发明降低了整体结构的使用荷载,施工工艺步骤简单,混凝土浇注质量以及精度较高,有效降低了施工难度以及施工成本,是一种创新性较高的煤塔料仓斜壁双曲面混凝土结构的施工方法。
Description
技术领域
本发明属于建筑施工领域,尤其是一种煤塔料仓斜壁双曲面混凝土结构的施工方法。
背景技术
煤塔是每个焦化厂的必备设施,为了顺畅出煤和减轻自重,煤塔料仓斜壁通常设计为双曲面陶粒素混凝土结构,在双曲面混凝土结构的施工中,在陶粒素混凝土内埋设有风力振煤管,并在双曲面表面敷设一层耐磨板材。现有的施工工艺步骤为:(1)搭建煤塔料仓斜粱;(2)模板支护;(3)在模板上打孔安装风力振煤管;(4)浇注陶粒素混凝土;(5)安装一层耐磨板材,整个煤塔料仓斜壁双曲面混凝土结构施工完毕。虽然该施工工艺能够完成整个工艺要求,但是存在以下缺陷:1、难以保证混凝土浇注质量:由于煤塔料仓斜壁双曲面混凝土结构较高,双曲面模板支设难度较大,很难保证陶粒素混凝土浇注后的曲面精度和混凝土质量,影响后续耐磨板材的安装精度,降低整个结构的使用寿命;2、风力振煤管埋设难度大:风力振煤管的一般允许偏差是2mm,在模板上打孔安装风力振煤管后由于浇注陶粒素混凝土,模板容易位移,致使风力振煤管很容易移到允许的偏差之外,影响生产过程中的出煤效果;3、耐磨板材容易松脱:耐磨板材是通过膨胀螺栓将其固定在陶粒混凝土上,由于陶粒混凝土的特性,膨胀螺栓难以固定的很牢固,并极易在使用过程不间断的震动影响下松脱;4、施工难度大:由于陶粒混凝土是在搭建煤塔料仓斜粱主体结构完工之后浇筑,浇筑下料口在地面以上30m的进煤口,进煤口与最低的浇筑点有近20m的垂直距离,两者之间没有依托处,因此无论备料、泵送混凝土、浇筑混凝土都有很大难度。
发明内容
本发明的目的在于克服现有技术的不足,提供一种煤塔料仓斜壁双曲面混凝土结构的施工方法,该方法降低了整体结构的使用荷载,施工工艺步骤简单,混凝土浇注质量以及精度较高,有效降低了施工难度以及施工成本。
本发明解决其技术问题是通过以下技术方案实现的:
一种煤塔料仓斜壁双曲面混凝土结构的施工方法,其步骤为:
(1)搭建煤塔料仓斜粱;
(2)紧贴煤塔料仓斜梁从上到下砌筑梯级式加气混凝土砌块,砌筑的过程中在相应的位置埋设风力振煤管;
(3)在梯级式加气混凝土砌块外侧绑扎钢筋网片;
(4)按照梯级式加气混凝土砌块分梯级支模浇筑混凝土,形成双曲面混凝土结构;
(5)在双曲面混凝土结构外体上固装耐磨板材,整体施工完毕。
而且,所述的步骤(2)中在埋设风力振煤管的四周用砂浆填充密实。
而且,所述的步骤(4)中分梯级支模浇筑C15混凝土。
而且,所述的耐磨板材通过膨胀螺栓固装在双曲面混凝土结构外体上。
本发明的优点和有益效果为:
1、本煤塔料仓斜壁双曲面混凝土结构的施工方法首先采用紧贴煤塔料仓斜梁从上到下梯级式砌筑加气混凝土砌块,能够有效降低整体结构的使用荷载,增加整体结构的安全性以及稳定性。
2、本煤塔料仓斜壁双曲面混凝土结构的施工方法在砌筑加气混凝土砌块的过程中相应的位置埋设风力振煤管,使风力振煤管埋设更加方便,而且易于保证风力振煤管的埋设精度,提高出煤效果。
3、本煤塔料仓斜壁双曲面混凝土结构的施工方法在梯级式加气混凝土砌块外侧绑扎钢筋网片,有效增加浇注混凝土时的附着力,保障混凝土的顺利浇注,而且可提高固装耐磨板材的膨胀螺栓的稳定性,防止在使用过程中松脱。
4、本煤塔料仓斜壁双曲面混凝土结构的施工方法按照梯级式加气混凝土砌块分梯级支模浇筑混凝土,形成双曲面混凝土结构,有效保障混凝土双曲面的精度,每个梯级施工混凝土用量少,施工较方便,且易于保证浇注混凝土质量。
5、本发明降低了整体结构的使用荷载,施工工艺步骤简单,混凝土浇注质量以及精度较高,有效降低了施工难度以及施工成本,是一种创新性较高的煤塔料仓斜壁双曲面混凝土结构的施工方法。
附图说明
图1为本发明煤塔料仓斜壁双曲面混凝土结构的结构示意图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种煤塔料仓斜壁双曲面混凝土结构的施工方法,其步骤为:
(1)按照图纸要求搭建煤塔料仓斜粱结构3;
(2)紧贴煤塔料仓斜梁从上到下梯级式砌筑加气混凝土砌块2,砌筑的过程中在相应的位置埋设风力振煤管1,在埋设风力振煤管的四周用砂浆填充密实,使用加气混凝土砌块是为了降低自重,不降低煤塔的有效装载量;现有技术中陶粒混凝土自重为19.5KN/m3,加气混凝土砌块的砌体自重为7.5KN/m3,相比较下自重可降低约2/3,对结构更为有利;
(3)在梯级式加气混凝土砌块外侧绑扎钢筋网片4,钢丝网片可以按照每一梯级进行绑扎,而且容易固定;
(4)按照梯级式加气混凝土砌块分梯级支模浇筑C15混凝土5,形成双曲面混凝土结构;在施工时按照一个梯级支一次模板进行C15混凝土的浇注,可以一次从上到下按照梯级依次浇注混凝土,也可以从下到上按照梯级依次浇注混凝土,如果需要更高强度的混凝土可以使用C20以上的混凝土;
(5)在双曲面混凝土结构外体上固装耐磨板材6,所述的耐磨板材通过膨胀螺栓固装在双曲面混凝土结构外体上,整体施工完毕,在施工过程中可以从上至下施工,也可以从下至上进行耐磨板材的安装。
本发明中用的耐磨板材为现有技术中的耐磨板材,市场可以购买得到,本发明使用的主要施工机械是塔吊,负责吊运支架、模板以及吊运C15混凝土等。
Claims (4)
1.一种煤塔料仓斜壁双曲面混凝土结构的施工方法,其特征在于:该方法包括如下步骤:
(1)搭建煤塔料仓斜粱;
(2)紧贴煤塔料仓斜梁从上到下砌筑梯级式加气混凝土砌块,砌筑的过程中在相应的位置埋设风力振煤管;
(3)在梯级式加气混凝土砌块外侧绑扎钢筋网片;
(4)按照梯级式加气混凝土砌块分梯级支模浇筑混凝土,形成双曲面混凝土结构;
(5)在双曲面混凝土结构外体上固装耐磨板材,整体施工完毕。
2.根据权利要求1所述的煤塔料仓斜壁双曲面混凝土结构的施工方法,其特征在于:所述的步骤(2)中在埋设风力振煤管时其四周用砂浆填充密实。
3.根据权利要求1所述的煤塔料仓斜壁双曲面混凝土结构的施工方法,其特征在于:所述的步骤(4)中分梯级支模浇筑C15混凝土。
4.根据权利要求1所述的煤塔料仓斜壁双曲面混凝土结构的施工方法,其特征在于:所述的耐磨板材通过膨胀螺栓固装在双曲面混凝土结构外体上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100709286A CN102041918B (zh) | 2009-10-22 | 2009-10-22 | 煤塔料仓斜壁双曲面混凝土结构的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100709286A CN102041918B (zh) | 2009-10-22 | 2009-10-22 | 煤塔料仓斜壁双曲面混凝土结构的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102041918A true CN102041918A (zh) | 2011-05-04 |
CN102041918B CN102041918B (zh) | 2012-05-30 |
Family
ID=43908427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100709286A Active CN102041918B (zh) | 2009-10-22 | 2009-10-22 | 煤塔料仓斜壁双曲面混凝土结构的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102041918B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561694A (zh) * | 2011-12-29 | 2012-07-11 | 山西四建集团有限公司 | 大曲率球形混凝土结构支模施工方法 |
CN103805216A (zh) * | 2014-02-14 | 2014-05-21 | 辽宁科技大学工程技术有限公司 | 一种7.63m顶装焦炉改进为捣固炼焦的捣固站 |
CN109441190A (zh) * | 2018-12-19 | 2019-03-08 | 中建局集团第三建筑有限公司 | 一种仓底堆坡结构及其施工方法 |
CN113863755A (zh) * | 2021-09-23 | 2021-12-31 | 中国二十冶集团有限公司 | 一种轻质砌块填充的料仓底板及其施工方法 |
CN114961253A (zh) * | 2022-05-29 | 2022-08-30 | 中国五冶集团有限公司 | 一种污水处理站水池三角锥体的施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2320623Y (zh) * | 1998-02-09 | 1999-05-26 | 铁岭焦化厂 | 焦炉加煤塔保温装置 |
CN1982554A (zh) * | 2005-05-23 | 2007-06-20 | 吴淑环 | 有支撑的捆绑式保温复合墙体 |
CN201059083Y (zh) * | 2007-07-10 | 2008-05-14 | 北京国电华北电力工程有限公司 | 具有直线缝式沟槽的封闭式球形薄壳混凝土储料仓 |
CN100572726C (zh) * | 2007-12-04 | 2009-12-23 | 中国电力建设工程咨询公司 | 球形煤场 |
CN101469268B (zh) * | 2007-12-29 | 2012-08-22 | 首钢总公司 | 捣固焦炉固定式大跨度煤塔 |
CN201241493Y (zh) * | 2008-08-08 | 2009-05-20 | 中煤国际工程集团沈阳设计研究院 | 封闭式储煤仓 |
CN101509328B (zh) * | 2009-03-30 | 2011-03-23 | 许国森 | 一种圆顶密封储煤仓 |
-
2009
- 2009-10-22 CN CN2009100709286A patent/CN102041918B/zh active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561694A (zh) * | 2011-12-29 | 2012-07-11 | 山西四建集团有限公司 | 大曲率球形混凝土结构支模施工方法 |
CN102561694B (zh) * | 2011-12-29 | 2014-01-15 | 山西四建集团有限公司 | 大曲率球形混凝土结构支模施工方法 |
CN103805216A (zh) * | 2014-02-14 | 2014-05-21 | 辽宁科技大学工程技术有限公司 | 一种7.63m顶装焦炉改进为捣固炼焦的捣固站 |
CN109441190A (zh) * | 2018-12-19 | 2019-03-08 | 中建局集团第三建筑有限公司 | 一种仓底堆坡结构及其施工方法 |
CN109441190B (zh) * | 2018-12-19 | 2024-01-23 | 中建一局集团第三建筑有限公司 | 一种仓底堆坡结构及其施工方法 |
CN113863755A (zh) * | 2021-09-23 | 2021-12-31 | 中国二十冶集团有限公司 | 一种轻质砌块填充的料仓底板及其施工方法 |
CN114961253A (zh) * | 2022-05-29 | 2022-08-30 | 中国五冶集团有限公司 | 一种污水处理站水池三角锥体的施工方法 |
CN114961253B (zh) * | 2022-05-29 | 2023-08-29 | 中国五冶集团有限公司 | 一种污水处理站水池三角锥体的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102041918B (zh) | 2012-05-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204054323U (zh) | 钢结构装配式制梁台座 | |
CN105464244A (zh) | 预制装配整体式剪力墙施工方法 | |
CN102041918B (zh) | 煤塔料仓斜壁双曲面混凝土结构的施工方法 | |
CN102828468B (zh) | 高温干燥环境下高强薄壁箱梁预制裂缝控制施工方法 | |
CN103469825A (zh) | 后浇带预制抗水模板及安装方法 | |
CN103015719A (zh) | 钻前工程钢筋混凝土废水池整体浇筑工艺 | |
CN106836463A (zh) | 承台及地梁结构的施工装置和施工方法 | |
CN103225422A (zh) | 采用轻钢结构直接加层技术的既有砌体结构及其施工方法 | |
CN102733406B (zh) | 大型工业厂房内整体道床铁路施工方法 | |
CN203066470U (zh) | 一种用于砌体和混凝土复合结构单侧模板的多功能对拉螺栓 | |
CN109881699B (zh) | 装配式企口密勒型通用筏板基础混凝土胎模制作安装方法 | |
CN210117716U (zh) | 一种电梯井梯形基坑侧壁混凝土定型模板 | |
CN205296197U (zh) | 抗腐蚀工业厂房混凝土杯口式预制承台 | |
CN101666122B (zh) | 微距离架空大梁底模施工方法 | |
CN103882883A (zh) | 塔吊与车库框架柱共用一个基础施工方法 | |
CN103397778A (zh) | 高层商住楼结构转换层施工方法 | |
CN206529881U (zh) | 承台及地梁结构的施工装置 | |
CN210459229U (zh) | 一种深基坑内支撑装配式换撑施工工装 | |
CN103334362B (zh) | 装配式预制钢筋混凝土耐磨路面板及路面施工方法 | |
CN105839824B (zh) | 车库顶板结构施工方法 | |
CN113090013A (zh) | 一种变形缝剪力墙同时施工免支木模板的施工方法 | |
CN102433961A (zh) | 一种预制梁结构施工构件 | |
CN111333390A (zh) | 混凝土预制空心柱及其生产方法 | |
CN104908150A (zh) | 一种管道井制作模板及基于工厂化生产管道井的方法 | |
CN209975579U (zh) | 一种快捷组合式预制综合管廊结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |