CN102003073A - 预应力结构钢绞线穿束的施工方法 - Google Patents
预应力结构钢绞线穿束的施工方法 Download PDFInfo
- Publication number
- CN102003073A CN102003073A CN 201010583097 CN201010583097A CN102003073A CN 102003073 A CN102003073 A CN 102003073A CN 201010583097 CN201010583097 CN 201010583097 CN 201010583097 A CN201010583097 A CN 201010583097A CN 102003073 A CN102003073 A CN 102003073A
- Authority
- CN
- China
- Prior art keywords
- bundle
- steel
- steel wire
- steel strand
- threading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明公开了预应力结构钢绞线穿束进入波纹管的施工方法,在制作每束钢绞线时,将其中的每根钢绞线的牵引端进行加工,使其中一根钢丝较其他钢丝露出一定长度,将将该束钢绞线的所有钢绞线捆绑成束;使每根钢绞线外露出的钢丝与穿线锚固件固定,穿线锚固件前端与牵引装置的牵引钢丝绳连接,其后端与钢绞线外露出的该根钢丝连接,牵引钢丝绳通过穿线锚固件带动钢绞线束在波纹管内移动而穿管。本发明的施工方法,不采端头焊接的方式,钢绞线束不存在热应力作用,不需要对端头进行再次切割加工,且具有较好的柔度、便于适应管道线形的变化,是整束穿束能提高施工速度;穿线锚固件能重复使用,也降低了施工成本、保证质量,保证建筑施工工期。
Description
技术领域
本发明涉及到一种建筑用预应力结构的制作施工方法,尤其是在预应力结构波纹管内穿设钢绞线束的施工方法。
背景技术
预应力结构(如预应力钢箱梁等)广泛应用在建筑领域,如桥梁、城市高架桥、大跨度结构、特殊形似结构等建筑,均为主要受力部件。在施工过程中,将钢绞线束穿过波纹管是其质量控制点,当然也是施工难点;现有技术中通常用牵引装置的钢丝绳(或钢绞线)带动钢绞线束穿过波纹管的制作方法,用稍微错开一定间距的方式,将每束钢绞线需要的钢绞线的前端焊接在一起形成梭形,其每束钢绞线前端焊接后的形状如图1所示,从该图中可以看出,从最前面的一根钢筋的前端,到最后面的一根钢筋的前端,根据每束钢绞线内钢绞线根数的不同和波纹管道线形情况,一般其距离可达到50—100㎝,在钢绞线束通过波纹管后,由于钢绞线焊接的影响,该段长度的钢绞线是要被切断不用的,造成了一定的材料的浪费;第二,由于是采用焊接的方式,存在热应力作用,需要被切断的钢绞线束的长度还会更长,要保证整束钢绞线受焊接影响的部分全部切除,实际浪费的材料更多;其三,由于是采用焊接的方式,焊接后的钢绞线束前端的硬度较高,钢绞线束整体的柔韧性和让性很差,在牵引装置带动钢绞线束穿过波纹管时,通过波纹管内的转弯的弯道时就很不顺畅,当其无法适应波纹管的线形变化时,则无法完成穿线;除了穿线施工速度较慢、操作费时以外,还容易将波纹管划破,重则使钢绞线束产生较大的位置偏差而造成严重的质量事故;而预应力结构作为桥梁、城市高架桥等的主要受力部件,如果其质量得不到保证,势必造成桥梁、城市高架桥等建筑实施的安全隐患。而目前部分采用的专业穿束机进行穿束的工艺由于是单根进行穿束,在施工速度和适用范围上受相当的局限。故,现有技术中将钢筋的前端焊接在一起的施工方式、穿束机穿束的施工方式,由于施工速度、适用范围、材料节约等方面的不足,存在相当大的局限,不能适应全部预应力结构的施工需要。
发明内容
本发明针对现有技术将钢筋的前端焊接在一起,然后用牵引装置将其穿过波纹管的施工方式,存在的浪费钢筋材料、柔韧性和让性很差、将波纹管划破、可能造成严重的质量事故等不足,以及专业穿束机进行穿束的工艺由于是单根进行穿束,在施工速度和适用范围上受相当大的局限的不足,提供了一种预应力结构内钢绞线穿过波纹管的施工方法。
本发明的技术方案是:预应力结构内钢绞线穿过波纹管的施工方法,其特征在于包括如下步骤:
(1)按照工艺设计要求,根据预应力结构设计的要求,确定其应该使用的钢绞线束的数量、每束钢绞线内的钢绞线数量,进行钢绞线下料加工;
(2)在制备每束钢绞线时,将每根钢绞线的端头钢丝(约5~10㎝)进行剥离、切除,只留中间的一根钢丝,即该根钢丝的前端比该根钢绞线的其他钢丝的前端露出一定长度(约5~10㎝);然后按照正常编束要求进行钢绞线编束;
(3)将编好束的钢绞线与穿线锚固件进行固定,即将每束钢绞线束上前端露出一定长度的钢丝分别连接在穿线锚固件上;
穿线锚固件需要提前进行加工制作;所述穿线锚固件的前端能与牵引装置的牵引钢丝绳(或工具钢绞线等)连接,所述穿线锚固件的后端能与每束钢绞线上前端露出一定长度的钢丝连接,在启动牵引装置后,牵引装置的牵引钢丝绳(或工具钢绞线等)通过穿线锚固件带动钢绞线束移动;
(4)将牵引装置的牵引钢丝绳(或工具钢绞线等)首先穿过预应力结构的波纹管,将牵引钢丝绳(或工具钢绞线等)的尾端连接在穿线锚固件上;启动牵引装置,牵引钢丝绳(或工具钢绞线等)就带动穿线锚固件和连接在穿线锚固件上的钢绞线束通过波纹管;牵引到位后,将每束钢绞线前端露出一定长度的钢丝切断,将钢绞线束与穿线锚固件分开;
(5)采用前述的连接和牵引方法,将预应力结构内需要设置的全部钢绞线束分别穿过对应波纹管,完成全部钢绞线束穿线的施工操作。
进一步的特征是:在每束钢绞线的前端位置,在完成与穿线锚固件的固定后要绑扎成束,并用胶带进行缠绕以封端头,减少穿束时对波纹管的摩擦、刮碰。
一种实现前述施工方法的穿线锚固件,其特征在于:包括本体,所述本体由锚盘、中空的锚头连接而成,锚盘上开设有若干个穿线孔,锚头前端开设有穿牵引钢丝绳(或工具钢绞线等)的孔,锚盘与锚头之间可拆卸式连接。
在锚头后端的内圆面上设置内螺纹,在锚盘的外圆面上设置外螺纹,通过内、外螺纹的配合,将锚盘连接在锚头上。
本发明预应力结构内钢绞线穿过波纹管的施工方法,相对于现有技术,具有如下特点:
1、不采用焊接的方式,钢绞线束不存在热应力作用,钢丝不会变硬,具有较好的柔韧性和让性,用牵引装置牵引将其穿过波纹管时,操作容易,尤其能方便通过波纹管,即使在通过波纹管内转弯的弯道时,也不会划破波纹管。
2、能节约钢筋材料:钢绞线束穿过波纹管到位后,只需要切断前端连接部分的钢丝,切割的距离通常就在5—10㎝,被切割而废弃的钢绞线很少,节省原材料。
3、穿线锚固件能重复使用,也降低了施工成本,加快了施工进度,保证建筑施工的工期。
4、与专业穿束机比施工工艺比,施工速度快。
5、适用范围广,避免了焊接方式、专业穿束机适用范围受局限的不足。
附图说明
图1是常用的钢绞线焊接穿束端头简图;
图2是本发明方法连接结构示意图;
图3是本发明穿线锚固件结构右视图;
图4是本发明方法第二种连接结构示意图。
具体实施方式
本发明预应力结构内钢绞线穿过波纹管的施工方法,其特征在于包括如下步骤:
1、按照工艺设计要求,根据预应力结构设计的要求,确定其应该使用的钢绞线束的数量、每束钢绞线内的钢绞线数量,进行钢绞线下料加工;
2、在制备每束钢绞线时,将每根钢绞线的端头钢丝(约5~10㎝)进行剥离、切除,只留中间的一根钢丝,即该根钢丝的前端比该根钢绞线的其他钢丝的前端露出一定长度(约5~10㎝),该束钢绞线其他钢丝的前端平齐或处于大致平齐的位置,然后按照正常编束要求进行钢绞线编束;
3、将编好束的钢绞线与穿线锚固件进行连接固定,即将钢绞线束上前端露出一定长度的钢丝分别连接在穿线锚固件上。
穿线锚固件需要提前进行加工制作;所述穿线锚固件其前端能与牵引装置的牵引钢丝绳或牵引线连接,其后端能与每束钢绞线上前端露出一定长度的钢丝连接;在启动牵引装置后,牵引装置的牵引钢丝绳或牵引线通过穿线锚固件带动钢绞线束移动;
所述穿线锚固件由锚盘、中空的锚头连接而成,锚盘上开设有若干个穿线孔,锚头前端开设有牵引钢丝绳孔,锚盘与锚头之间可拆卸式连接;
4、将牵引装置的牵引钢丝绳或牵引线首先穿过预应力结构的波纹管,将牵引钢丝绳或牵引线的尾端连接在穿线锚固件上;启动牵引装置,牵引钢丝绳或牵引线就带动穿线锚固件和连接在穿线锚固件上的钢绞线束通过波纹管;牵引到位后,将每束钢绞线前端露出一定长度的钢丝切断,将钢绞线束与穿线锚固件分开;
5、采用前述的连接和牵引方法,将预应力结构内需要设置的全部钢绞线束分别穿过对应波纹管,完成全部钢绞线束穿线的施工操作。
在每束钢绞线牵引端的端头部位,用扎丝进行捆绑,用胶带进行缠绕以封端头。
本发明首先根据工艺设计要求,针对各种型号的预应力构件,确定其应该使用的钢绞线束的数量、每束钢绞线内的钢绞线数量;进行钢绞线加工时将每根钢绞线的端头钢丝(约5~10㎝)进行剥离、切除,只留中间的一根钢丝,即该根钢丝的前端比该根钢绞线的其他钢丝的前端露出一定长度(约5~10㎝),如此能够大幅度减少穿线完毕后被切掉的钢绞线的长度;钢绞线束具体编束时按照正常编束要求进行,编束完毕后将钢绞线束牵引端的前端外露的钢丝(外漏钢丝)与穿线锚固件的锚板固定,该束钢绞线通过该根前端外露的钢丝连接在穿线锚固件上;在每束钢绞线牵引端的端头部位(靠近穿线锚固件锚板处)用扎丝进行捆绑,用胶带进行缠绕以封端头,能有效防止其他钢筋的前端端头在穿线操作时划破波纹管,同时能保证穿线施工的正常进行,加快穿线施工的进度。(参见图2、3所示)。
本发明的穿线锚固件,应该有多种结构,只要满足“其前端能与牵引装置的牵引钢丝绳或牵引线连接,其后端能与每束钢绞线上前端露出一定长度的钢丝连接;在启动牵引装置后,牵引装置的牵引钢丝绳或牵引线通过穿线锚固件带动钢绞线束移动”这样一个技术要求,就能实现本发明的连接、牵引的作用。
如图2、3所示,本发明提供一种具体结构的穿线锚固件,包括本体1,所述本体1由锚盘2、中空的锚头3连接而成,锚盘2上开设有若干个穿线小孔4,锚头3前端开设有牵引钢丝绳孔5,锚盘2与锚头3之间可拆卸式连接;图中所示,锚盘2与锚头3的具体连接结构,是在锚头3后端的内圆面上设置内螺纹,在锚盘2的外圆面上设置外螺纹,通过内、外螺纹的配合,将锚盘2连接在锚头3上。穿线锚固件连接时,首先将每束钢绞线上的前端露出一定长度的钢丝穿入锚盘2上的穿线孔4内(每孔一根钢丝,即连接1根钢绞线),将该钢丝与锚盘2连接,简单的连接结构是将钢丝的前端墩粗、使其前端的直径大于穿线孔4的直径而连接(也可采用其他方式保证其连接固定作用);再将牵引装置的牵引钢丝绳或牵引线穿入锚头3前端的牵引钢丝绳孔5内而连接,启动牵引装置后,牵引装置的牵引钢丝绳(或工具钢绞线等)通过带动穿线锚固件的锚头3、锚盘2往前移动,最终带动每束钢绞线移动,穿过波纹管。穿过波纹管后,将每束钢绞线前端露出的钢丝部分剪断,使钢绞线束与锚盘2分开,同时每束钢绞线内的钢绞线基本一样长;本发明的穿线锚固件能重复使用。
如图4中,本发明提供第二种具体结构的穿线锚固件,其与第一种结构的相同点不再描述,其不同点是:锚盘2与锚头3之间可拆卸式连接结构,是在锚头3与锚盘2之间对应设置插杆孔6,在插杆孔6内设置插杆7,通过在插杆孔6内设置插杆7将锚盘2与锚头3连接。穿线锚固件工作时,首先将每束钢绞线上的前端露出一定长度的钢丝穿入锚盘2上的穿线孔4内(每孔一根钢丝,即连接一根钢绞线),将该钢丝与锚盘2连接,简单的连接结构是将钢丝的前端墩粗、使其前端的直径大于穿线孔4的直径而连接(也可采用其他方式保证其连接固定作用);再将牵引装置的牵引钢丝绳或牵引线穿入锚头3前端的牵引钢丝绳孔5内而连接;然后,将锚盘2设置在锚头3的孔中,旋转并对位,使锚头3与锚盘2之间的插杆孔6连通,将插杆7穿入在插杆孔6内而连接成一个穿线锚固件。
本发明提供的本体1大致是圆柱状,具体设计时要考虑其外径的大小以能在波纹管内移动;穿线锚固件的结构应该有多种,如锚头3可以根据预应力预留孔道形状确定,可以是三角形、锥形等,锚盘2与锚头3的连接结构可以有多种,如采用卡槽、限位块等结构,均能满足实际施工的需要。
Claims (4)
1.预应力结构内钢绞线穿过波纹管的施工方法,其特征在于包括如下步骤:
(1)按照工艺设计要求,根据预应力结构设计的要求,确定其应该使用的钢绞线束的数量、每束钢绞线内的钢绞线数量,进行钢绞线下料加工;
(2)在制备每束钢绞线时,将每根钢绞线的端头钢丝进行剥离、切除,只留中间的一根钢丝,即该根钢丝的前端比该根钢绞线的其他钢丝的前端露出一定长度;然后按照正常编束要求进行钢绞线编束;
(3)将编好束的钢绞线与穿线锚固件进行连接固定;穿线锚固件连接时,将每束钢绞线上的前端露出一定长度的钢丝与穿线锚固件的后端进行连接;
所述穿线锚固件的前端能与牵引装置的牵引钢丝绳或牵引线连接,所述穿线锚固件的后端能与每束钢绞线上前端露出一定长度的钢丝连接;在启动牵引装置后,牵引装置的牵引钢丝绳或或牵引线通过穿线锚固件带动钢绞线束移动;
(4)将牵引装置的牵引钢丝绳或牵引线首先穿过预应力结构的波纹管,将牵引钢丝绳或牵引线的尾端连接在穿线锚固件上;启动牵引装置,牵引钢丝绳或牵引线就带动穿线锚固件和连接在穿线锚固件上的钢绞线束通过波纹管;牵引到位后,将每束钢绞线前端露出一定长度的钢丝切断,将钢绞线束与穿线锚固件分开;
(5)采用前述的连接和牵引方法,将预应力结构内需要设置的全部钢绞线束分别穿过对应波纹管,完成全部钢绞线束穿线的施工操作。
2.根据权利要求2所述预应力结构内钢绞线穿过波纹管的施工方法,其特征在于:在每束钢绞线牵引端的端头部位,用扎丝进行捆绑,用胶带进行缠绕以封端头。
3. 一种实现权利要求1或2所述施工方法的穿线锚固件,其特征在于: 包括本体(1),所述本体(1)由锚盘(2)、中空的锚头(3)连接而成,锚盘(2)上开设有若干个穿线孔(4),锚头(3)前端开设有牵引钢丝绳孔(5);锚盘(2)与锚头(3)之间可拆卸式连接。
4.根据权利要求3所述连接锚固件,其特征在于:在锚头(3)后端的内圆面上设置内螺纹,在锚盘(2)的外圆面上设置外螺纹,通过内、外螺纹的配合,将锚盘(2)连接在锚头(3)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010583097A CN102003073B (zh) | 2010-12-11 | 2010-12-11 | 预应力结构钢绞线穿束的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010583097A CN102003073B (zh) | 2010-12-11 | 2010-12-11 | 预应力结构钢绞线穿束的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102003073A true CN102003073A (zh) | 2011-04-06 |
CN102003073B CN102003073B (zh) | 2012-09-26 |
Family
ID=43810748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010583097A Expired - Fee Related CN102003073B (zh) | 2010-12-11 | 2010-12-11 | 预应力结构钢绞线穿束的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102003073B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561204A (zh) * | 2012-03-08 | 2012-07-11 | 中铁二十一局集团有限公司 | 在桥梁体浇筑前穿入超长钢绞线的施工方法 |
CN102864747A (zh) * | 2012-10-26 | 2013-01-09 | 上海市城市建设设计研究总院 | 超高差、超长、超大吨位预应力钢束的施工方法 |
CN103758352A (zh) * | 2011-12-31 | 2014-04-30 | 常熟古建园林建设集团有限公司 | 预应力钢绞线张拉方法 |
CN103938874A (zh) * | 2014-04-21 | 2014-07-23 | 中铁四局集团第二工程有限公司 | 预应力钢绞线穿束牵引装置及其穿送方法 |
CN103952976A (zh) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | 一种预应力管道疏通装置及其制作、使用方法 |
CN104846746A (zh) * | 2015-03-24 | 2015-08-19 | 交通运输部公路科学研究所 | 一种混凝土节段预制拼装中的波纹管定位和密封方法 |
CN104847120A (zh) * | 2015-04-29 | 2015-08-19 | 中国建筑第二工程局有限公司 | 倒u形管道穿束用锚固块辅助定位安装装置及其施工方法 |
CN105649341A (zh) * | 2016-01-11 | 2016-06-08 | 中国建筑第二工程局有限公司 | 一种远距离钢绞线穿束装置及穿束施工方法 |
CN105970816A (zh) * | 2016-05-23 | 2016-09-28 | 中交第航务工程局有限公司 | 一种桥梁穿钢绞线的工艺 |
CN108104479A (zh) * | 2018-01-24 | 2018-06-01 | 柳州欧维姆机械股份有限公司 | 一种预应力钢绞线整束牵引装置及其用于预应力钢绞线束整体牵引的施工方法 |
CN108149932A (zh) * | 2018-01-24 | 2018-06-12 | 中建八局第三建设有限公司 | 用于预应力钢绞线穿束的穿束装置及其穿束方法 |
CN111517170A (zh) * | 2020-04-07 | 2020-08-11 | 福建福清核电有限公司 | 一种倒u型预应力编束的布线装置 |
CN113387232A (zh) * | 2021-06-24 | 2021-09-14 | 金华市日昇建筑有限公司 | 一种用于建筑智能化安装工程的电线牵拉装置 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101004096A (zh) * | 2006-12-20 | 2007-07-25 | 北京城建集团有限公司 | 钢绞线牵引器 |
CN101173546A (zh) * | 2007-11-22 | 2008-05-07 | 广西壮族自治区公路桥梁工程总公司 | 钢绞线穿索器及其穿索的方法 |
CN101660354A (zh) * | 2009-09-11 | 2010-03-03 | 中铁大桥局集团第五工程有限公司 | 预应力钢绞线穿束装置 |
-
2010
- 2010-12-11 CN CN201010583097A patent/CN102003073B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101004096A (zh) * | 2006-12-20 | 2007-07-25 | 北京城建集团有限公司 | 钢绞线牵引器 |
CN101173546A (zh) * | 2007-11-22 | 2008-05-07 | 广西壮族自治区公路桥梁工程总公司 | 钢绞线穿索器及其穿索的方法 |
CN101660354A (zh) * | 2009-09-11 | 2010-03-03 | 中铁大桥局集团第五工程有限公司 | 预应力钢绞线穿束装置 |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758352A (zh) * | 2011-12-31 | 2014-04-30 | 常熟古建园林建设集团有限公司 | 预应力钢绞线张拉方法 |
CN102561204B (zh) * | 2012-03-08 | 2014-02-12 | 中铁二十一局集团有限公司 | 在桥梁体浇筑前穿入超长钢绞线的施工方法 |
CN102561204A (zh) * | 2012-03-08 | 2012-07-11 | 中铁二十一局集团有限公司 | 在桥梁体浇筑前穿入超长钢绞线的施工方法 |
CN102864747A (zh) * | 2012-10-26 | 2013-01-09 | 上海市城市建设设计研究总院 | 超高差、超长、超大吨位预应力钢束的施工方法 |
CN103952976A (zh) * | 2014-04-01 | 2014-07-30 | 中国建筑第六工程局有限公司 | 一种预应力管道疏通装置及其制作、使用方法 |
CN103938874B (zh) * | 2014-04-21 | 2016-08-24 | 中铁四局集团第二工程有限公司 | 预应力钢绞线穿束牵引装置及其穿送方法 |
CN103938874A (zh) * | 2014-04-21 | 2014-07-23 | 中铁四局集团第二工程有限公司 | 预应力钢绞线穿束牵引装置及其穿送方法 |
CN104846746A (zh) * | 2015-03-24 | 2015-08-19 | 交通运输部公路科学研究所 | 一种混凝土节段预制拼装中的波纹管定位和密封方法 |
CN104846746B (zh) * | 2015-03-24 | 2016-08-24 | 交通运输部公路科学研究所 | 一种混凝土节段预制拼装中的波纹管定位和密封方法 |
CN104847120A (zh) * | 2015-04-29 | 2015-08-19 | 中国建筑第二工程局有限公司 | 倒u形管道穿束用锚固块辅助定位安装装置及其施工方法 |
CN105649341A (zh) * | 2016-01-11 | 2016-06-08 | 中国建筑第二工程局有限公司 | 一种远距离钢绞线穿束装置及穿束施工方法 |
CN105970816A (zh) * | 2016-05-23 | 2016-09-28 | 中交第航务工程局有限公司 | 一种桥梁穿钢绞线的工艺 |
CN105970816B (zh) * | 2016-05-23 | 2018-10-09 | 中交第一航务工程局有限公司 | 一种桥梁穿钢绞线的工艺 |
CN108104479A (zh) * | 2018-01-24 | 2018-06-01 | 柳州欧维姆机械股份有限公司 | 一种预应力钢绞线整束牵引装置及其用于预应力钢绞线束整体牵引的施工方法 |
CN108149932A (zh) * | 2018-01-24 | 2018-06-12 | 中建八局第三建设有限公司 | 用于预应力钢绞线穿束的穿束装置及其穿束方法 |
CN108149932B (zh) * | 2018-01-24 | 2024-01-19 | 中建八局第三建设有限公司 | 用于预应力钢绞线穿束的穿束装置及其穿束方法 |
CN111517170A (zh) * | 2020-04-07 | 2020-08-11 | 福建福清核电有限公司 | 一种倒u型预应力编束的布线装置 |
CN113387232A (zh) * | 2021-06-24 | 2021-09-14 | 金华市日昇建筑有限公司 | 一种用于建筑智能化安装工程的电线牵拉装置 |
Also Published As
Publication number | Publication date |
---|---|
CN102003073B (zh) | 2012-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102003073B (zh) | 预应力结构钢绞线穿束的施工方法 | |
CN102383377A (zh) | 预应力结构施工中利用钢绞线穿束机快速穿束的施工方法 | |
CN102003072A (zh) | 一种钢绞线编束、穿束施工方法 | |
WO2023029647A1 (zh) | 一种超长预应力钢束施工方法 | |
CN106087759B (zh) | 一种预应力钢束穿线装置及预应力钢束的穿线方法 | |
CN201865249U (zh) | 预应力结构钢绞线穿束的连接锚固件 | |
CN201883382U (zh) | 预应力结构钢绞线穿束的连接接头 | |
CN201865359U (zh) | 预应力钢箱梁钢绞线穿束的连接装置 | |
CN210767891U (zh) | 一种后张法预应力波纹管内穿束器 | |
CN110184931B (zh) | 一种自锁式预应力钢绞线穿束辅助装置 | |
CN111305070B (zh) | 一种钢绞线整束穿束方法 | |
CN208933829U (zh) | 一种预应力钢绞线整束穿梭施工设备 | |
CN202899626U (zh) | 外箍式拉索张拉工装装置 | |
CN201972415U (zh) | 无粘结预应力钢绞线张拉后损伤的更换装置 | |
CN207919904U (zh) | 一种整体牵引夹具 | |
CN104005340B (zh) | 连续梁通长预应力钢绞线束穿束施工方法 | |
CN204754245U (zh) | 一种穿筋施工辅助工具 | |
CN2447466Y (zh) | 钢铰线束牵引器 | |
CN201232165Y (zh) | 一种钢绞线束穿索器 | |
CN210766402U (zh) | 一种钢绞线牵引装置 | |
CN218712250U (zh) | 一种辅助钢筋穿束装置 | |
CN107386126A (zh) | 连续梁桥预应力筋用接长锚 | |
CN205975368U (zh) | 一种预应力钢束穿线装置 | |
CN203547024U (zh) | 一种成品钢绞线束 | |
CN209292898U (zh) | 钢绞线辅助牵引头 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120926 Termination date: 20151211 |
|
EXPY | Termination of patent right or utility model |