CN107386126A - 连续梁桥预应力筋用接长锚 - Google Patents

连续梁桥预应力筋用接长锚 Download PDF

Info

Publication number
CN107386126A
CN107386126A CN201710792968.6A CN201710792968A CN107386126A CN 107386126 A CN107386126 A CN 107386126A CN 201710792968 A CN201710792968 A CN 201710792968A CN 107386126 A CN107386126 A CN 107386126A
Authority
CN
China
Prior art keywords
anchor
back segment
anchor slab
leading portion
suo shu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710792968.6A
Other languages
English (en)
Inventor
陈宜强
钟智强
朱徐平
韩祥祥
夏磊
吴建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jinxing Prestressing Engineering Technology Co Ltd
Original Assignee
Anhui Jinxing Prestressing Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jinxing Prestressing Engineering Technology Co Ltd filed Critical Anhui Jinxing Prestressing Engineering Technology Co Ltd
Priority to CN201710792968.6A priority Critical patent/CN107386126A/zh
Publication of CN107386126A publication Critical patent/CN107386126A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供一种连续梁桥预应力筋用接长锚,包括用于夹持前段索束的锚垫板和前段锚板、用于夹持后段索束的挤压套和后段锚板,以及用于固定前段锚板与后段锚板的连接筒,所述前段锚板与单根索筋之间锚固有夹片,所述后段索束上套设有保护套,该保护套的末端通过约束环对后段索束进行夹紧。本发明使得两段钢绞线分别进行锚固,可以使得钢绞线锚固端成直线分布,消除传统连接器因钢绞线在锚固端扇形分布导致的应力不均匀,从而避免挤压套脱落或夹片滑丝事故的发生;设置接长锚可以使得施工的钢绞线分段,预加的拉应力不会因为波纹管道角度偏转和线形偏差带来的摩擦力而损失过大。

Description

连续梁桥预应力筋用接长锚
技术领域
本发明涉及桥梁施工锚具技术领域,具体涉及一种用于连续梁桥预应力筋的接长锚。
背景技术
在公路混凝土现浇连续梁桥普通预应力体系中,通常采用一整段预应力束,但由于纵桥向梁体跨度大(通常在150—200m),从头到尾只采用一整段的预应力束的话,预加的拉应力会因为波纹管道角度偏转和线形偏差带来的摩擦力而损失过大,钢绞线容易出现断丝,尤其在混凝土梁体的顶板、底板及翼缘等薄壁结构中,现有的产品无法保证梁体结构的强度、刚度和稳定性。
传统连接器因钢绞线在锚固端扇形分布,会导致应力不均匀,可能导致挤压套脱落或夹片滑丝事故的发生。
发明内容
为了保证预加的拉应力不会因为波纹管道角度偏转和线形偏差带来的摩擦力而损失过大,需要将预应力束分段张拉,彼此通过接长锚进行连接,本发明提供一种连续梁桥预应力筋用接长锚。
为解决上述技术问题,本发明采用如下技术方案:
一种连续梁桥预应力筋用接长锚,包括用于夹持前段索束的锚垫板和前段锚板、用于夹持后段索束的挤压套和后段锚板,以及用于固定前段锚板与后段锚板的连接筒,所述前段锚板与单根索筋之间锚固有夹片,所述后段索束上套设有保护套,该保护套的末端通过约束环对后段索束进行夹紧。
进一步地,所述锚垫板的前端同轴连接有螺旋筋。
优选地,所述后段锚板采用P型锚板。
优选地,所述连接筒上开设有通气孔。
由以上技术方案可知,本发明具有如下有益效果:
1、产品外形尺寸小,能够运用于混凝土梁体的顶板、底板及翼缘等薄壁结构中,提高梁体结构的强度、刚度和稳定性;
2、前后预应力束通过连接锚进行连接,消除了传统连接器与挤压套在根部位置的剪切应力,防止钢绞线出现断丝;
3、采用分段连接,钢绞线锚固端成直线分布,消除传统连接器因钢绞线在锚固端扇形分布导致的应力不均匀,从而避免挤压套脱落或夹片滑丝事故的发生。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面结合附图对本发明的一种优选实施方式作详细的说明。
如图1所示,所述连续梁桥预应力筋用接长锚包括依次同轴设置的锚垫板1、前段锚板2、后段锚板3,该前段锚板与后段锚板之间通过连接筒4连接,所述锚垫板和前段锚板用于夹持前段索束20,后段锚板用于夹持后段索束30,前段索束和后段索束是完全独立的两个钢绞线,分别进行锚固,可以使得钢绞线锚固端成直线分布,消除传统连接器因钢绞线在锚固端扇形分布导致的应力不均匀,从而避免挤压套脱落或夹片滑丝事故的发生。设置接长锚,可以使得施工的钢绞线分段,预加的拉应力不会因为波纹管道角度偏转和线形偏差带来的摩擦力而损失过大。
所述锚垫板1的前端同轴连接有螺旋筋5,在混凝土浇筑后,螺旋筋可以起到一定的缓冲作用,有效保护锚垫板的性能稳定性。所述前段锚板2与单根索筋之间锚固有夹片6,形成对前段索束的锚固力。所述后段索束30上套设有保护套7,该保护套的末端通过约束环8对后段索束进行夹紧,后段索束的起始端还套设有挤压套9。所述连接筒4上开设有通气孔41,便于混凝土浇筑时的排气。
所述前段锚板2、挤压套9和后段锚板3均为多孔结构,用于穿过索束的多个单根索筋。
以上所述实施方式仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明的权利要求书确定的保护范围内。

Claims (4)

1.一种连续梁桥预应力筋用接长锚,其特征在于,包括用于夹持前段索束的锚垫板和前段锚板、用于夹持后段索束的挤压套和后段锚板,以及用于固定前段锚板与后段锚板的连接筒,所述前段锚板与单根索筋之间锚固有夹片,所述后段索束上套设有保护套,该保护套的末端通过约束环对后段索束进行夹紧。
2.根据权利要求1所述的连续梁桥预应力筋用接长锚,其特征在于,所述锚垫板的前端同轴连接有螺旋筋。
3.根据权利要求1所述的连续梁桥预应力筋用接长锚,其特征在于,所述后段锚板采用P型锚板。
4.根据权利要求1所述的连续梁桥预应力筋用接长锚,其特征在于,所述连接筒上开设有通气孔。
CN201710792968.6A 2017-09-05 2017-09-05 连续梁桥预应力筋用接长锚 Pending CN107386126A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710792968.6A CN107386126A (zh) 2017-09-05 2017-09-05 连续梁桥预应力筋用接长锚

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710792968.6A CN107386126A (zh) 2017-09-05 2017-09-05 连续梁桥预应力筋用接长锚

Publications (1)

Publication Number Publication Date
CN107386126A true CN107386126A (zh) 2017-11-24

Family

ID=60351361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710792968.6A Pending CN107386126A (zh) 2017-09-05 2017-09-05 连续梁桥预应力筋用接长锚

Country Status (1)

Country Link
CN (1) CN107386126A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570922A (zh) * 2018-06-12 2018-09-25 中交第四航务工程勘察设计院有限公司 一种多束接少束预应力钢束接长结构及施工方法
CN113403952A (zh) * 2021-06-25 2021-09-17 中铁十二局集团有限公司 一种铁路连续梁预应力施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362622Y (zh) * 1998-12-18 2000-02-09 柳州欧维姆建筑机械有限公司 平行钢丝束连接器
CH696037A5 (fr) * 2003-03-25 2006-11-30 Freyssinet Int Stup Dispositif pour raccorder bout à bout des premier et deuxième câbles.
CN201447878U (zh) * 2009-01-04 2010-05-05 万国强 套筒式钢绞线束预应力筋连接器
CN202298441U (zh) * 2011-07-05 2012-07-04 成都川锚路桥机械有限公司 一种桥梁预应力钢绞线连接器
CN203247503U (zh) * 2013-02-01 2013-10-23 黑龙江工程学院 道桥预应力用多根钢铰线连接器
CN205976231U (zh) * 2016-08-19 2017-02-22 中交第一公路工程局有限公司 钢绞线连接器工作系统
CN207259967U (zh) * 2017-09-05 2018-04-20 安徽金星预应力工程技术有限公司 连续梁桥预应力筋用接长锚

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2362622Y (zh) * 1998-12-18 2000-02-09 柳州欧维姆建筑机械有限公司 平行钢丝束连接器
CH696037A5 (fr) * 2003-03-25 2006-11-30 Freyssinet Int Stup Dispositif pour raccorder bout à bout des premier et deuxième câbles.
CN201447878U (zh) * 2009-01-04 2010-05-05 万国强 套筒式钢绞线束预应力筋连接器
CN202298441U (zh) * 2011-07-05 2012-07-04 成都川锚路桥机械有限公司 一种桥梁预应力钢绞线连接器
CN203247503U (zh) * 2013-02-01 2013-10-23 黑龙江工程学院 道桥预应力用多根钢铰线连接器
CN205976231U (zh) * 2016-08-19 2017-02-22 中交第一公路工程局有限公司 钢绞线连接器工作系统
CN207259967U (zh) * 2017-09-05 2018-04-20 安徽金星预应力工程技术有限公司 连续梁桥预应力筋用接长锚

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570922A (zh) * 2018-06-12 2018-09-25 中交第四航务工程勘察设计院有限公司 一种多束接少束预应力钢束接长结构及施工方法
CN108570922B (zh) * 2018-06-12 2023-12-05 中交第四航务工程勘察设计院有限公司 一种多束接少束预应力钢束接长结构及施工方法
CN113403952A (zh) * 2021-06-25 2021-09-17 中铁十二局集团有限公司 一种铁路连续梁预应力施工方法

Similar Documents

Publication Publication Date Title
CN203007856U (zh) 空心板梁桥的体外预应力加固系统
CN107386126A (zh) 连续梁桥预应力筋用接长锚
CN102852276B (zh) 一种大吨位预应力叠合吊车梁与施工方法
CN106320191A (zh) 预张拉钢丝‑聚合物砂浆外加层加固装置
CN102561204B (zh) 在桥梁体浇筑前穿入超长钢绞线的施工方法
AU2019286812A1 (en) System and method for destressing braces by incorporation of, or substitution by, improved filler material
CN106087759B (zh) 一种预应力钢束穿线装置及预应力钢束的穿线方法
CN207259967U (zh) 连续梁桥预应力筋用接长锚
CN110485639A (zh) 一种用于后张法预应力钢绞线的无回缩锚具及其使用方法
CN107034785A (zh) 一种可换式锚碇预应力锚固装置及其安装换索施工方法
CN105113781B (zh) 一种悬挑架梁侧全预埋安装搭设装置
CN102535861B (zh) 后浇带处有粘结和无粘结组合预应力混凝土梁的张拉方法
CN103266604A (zh) 一种抱箍型圆截面锚杆抗滑桩及其施工方法
CN106758824B (zh) 大跨径曲线梁桥预应力筋张拉方法
CN110725207A (zh) 一种高应力幅成品拉索及其制作方法
CN106948263A (zh) 一种斜拉桥混凝土索塔用锚拉板
CN205529907U (zh) 固定端p型锚具
CN110485631A (zh) 一种端部有锚头的先张法预应力预制梁
CN111456449A (zh) 梁体后张法保证每束钢绞线受力均匀的施工装置及方法
CN206071086U (zh) 预应力钢丝绳综合加固梁板柱的系统
CN102518042A (zh) T型混凝土简支组合桥梁横向连接预应力钢筋的施工方法
CN206052574U (zh) 预应力钢丝绳张拉系统
CN104005340B (zh) 连续梁通长预应力钢绞线束穿束施工方法
CN209779955U (zh) 一种现浇钢筋混凝土剪力墙
CN207295459U (zh) 一种公路桥梁施工用预应力锚具

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20171124

RJ01 Rejection of invention patent application after publication