CN101999070A - 具有重心补偿的有效负载系统 - Google Patents
具有重心补偿的有效负载系统 Download PDFInfo
- Publication number
- CN101999070A CN101999070A CN2008801181952A CN200880118195A CN101999070A CN 101999070 A CN101999070 A CN 101999070A CN 2008801181952 A CN2008801181952 A CN 2008801181952A CN 200880118195 A CN200880118195 A CN 200880118195A CN 101999070 A CN101999070 A CN 101999070A
- Authority
- CN
- China
- Prior art keywords
- link member
- treatment facility
- service load
- computing system
- state
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25J—MANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
- B25J9/00—Programme-controlled manipulators
- B25J9/16—Programme controls
- B25J9/1628—Programme controls characterised by the control loop
- B25J9/1638—Programme controls characterised by the control loop compensation for arm bending/inertia, pay load weight/inertia
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/26—Indicating devices
- E02F9/264—Sensors and their calibration for indicating the position of the work tool
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Robotics (AREA)
- Mechanical Engineering (AREA)
- Operation Control Of Excavators (AREA)
Abstract
本发明涉及一种用于和具有至少两个链接部件(24)的作业机(18)一起使用的有效负载计算系统(42)。有效负载计算系统可具有配置为测量该至少两个链接部件状态的至少一个状态传感器(44)。有效负载计算系统还可具有和该至少一个状态传感器通信的处理设备(48)。处理设备可计算该至少两个链接部件每个的重心变化。处理设备还可配置为采用该至少一个状态传感器确定作业机所移动的有效负载质量。
Description
技术领域
本发明总体涉及一种有效负载计算系统,更特别是,涉及一种用于作业机链接部件重心变化的有效负载计算系统。
背景技术
各种类型的机器可采用作业机从工地转移材料并将该材料装载至运输车辆(例如卡车和有轨车)上。这些机器包括挖掘机、轮式装载机、锄耕机、和其它运送材料的机器。通过机器装载的运输车辆可具有由制造商的最大负载定额值和/或其它因素例如高速公路车辆的重量限制所决定的特定负载容量。为促使最大程度地利用运输车辆,期望尽可能接近其负载容量地装载每辆运输车辆。但是超载运输车辆具有负面后果。特别是,在运输车辆上放置过多重量将大大提高运输车辆的维护成本或者如果在运输之前去除超出的材料则造成昂贵的延迟。
为监控放置在每辆运输车辆上的材料重量,机器制造商开发了有效负载计算系统。有效负载计算系统可确定作业机当前运载的材料重量(例如挖掘机铲斗中的材料重量)、以及在特定循环或者时间段期间装载至运输车辆上的材料的总重量。为改进生产率,有效负载计算系统可在机器和/或作业机运动中确定机器和/或作业机运载的材料重量(而非进行静态计算)。
2003年2月11日授予Crane III等人的美国专利6,518,519('519专利)公开了确定作业机所运送质量的一种方法。'519专利公开了一种具有底架、和底架耦合的司机室、以及和司机室耦合的悬臂。第一致动器与悬臂和司机室耦合,并相对于司机室移动悬臂。该机器具有和悬臂耦合的操纵杆,和与操纵杆和悬臂耦合相对于悬臂移动操纵杆的第二致动器。机器还具有用于接收有效负载的铲斗。铲斗与操纵杆耦合,第三致动器与铲斗和操纵杆耦合并相对于操纵杆移动铲斗。
采用各种检测设备确定悬臂相对于司机室的第一接合角,操纵杆相对于悬臂的第二接合角,铲斗相对于操纵杆的第三接合角,施加至第一致动器的第一致动器力,施加至第二致动器的第二致动器力,以及施加至第三致动器的第三致动器力。例如还可通过访问存储器中的数据集确定机器的多个物理特征。处理设备及时地在至少两个距离从测量设备接收信号,并采用动态方程确定铲斗的质量或者重量以及其中的根据所接收的信号以及机器的预定物理特征的任何有效负载。在动态方程中,铲斗的质心位置以未知参数表示,但是操纵杆和悬臂的质心位置(在固定的xy坐标系统中)都假定为已知项。铲斗和有效负载的质量/重量的确定可在悬臂、操纵杆和铲斗中的一个或者全部处于运动状态时进行。
尽管现有技术机器可在悬臂、操纵杆、和铲斗的一个或者全部运动时确定有效负载的质量/重量,但是链接的质心位置的改变可产生所确定质量的误差。
所公开的机器系统旨在克服上面列出的一个或多个问题。
发明内容
一方面,本发明涉及一种和具有至少两个链接部件的作业机一起使用的有效负载计算系统。有效负载计算系统可具有至少一个配置为测量该至少两个链接部件的状态的状态传感器。有效负载计算系统还可具有和至少一个状态传感器通信的处理设备。处理设备可计算该至少两个链接部件每个的重心变化。处理设备还可配置为采用该至少一个状态传感器确定作业机所运送的质量。
另一方面,本发明涉及一种计算有效负载的方法。该方法包括致动至少两个链接部件的其中一个以移动有效负载并测量该至少两个链接部件上的力。该方法还可包括测量该至少两个链接部件的状态。该方法还可包括采用测量的力和测量的状态计算负载的质量,同时考虑该至少两个链接部件每个的重心变化。
附图说明
图1图示了示例性公开的机器;
图2图示了可以和图1的机器一起使用的示例性公开的有效负载计算系统;
图3图示了示例性公开的作业机;以及
图4为描述在图2中所示出的有效负载系统示例性运行的流程图。
具体实施方式
图1示出了示例性机器10。机器10可以为进行某种和产业例如采矿、建筑、农业、运输或者任何其它本领域已知的产业相关的操作的作业机。例如,机器10可以为运土机器,例如挖掘机、轮式装载机、锄耕机、或者任何本领域已知的合适运土机器。机器10可包括平台12,底架14、电源16和作业机18。
平台12可以可旋转地设置在底架14上并且可提供与作业机18相连的底部部件(未示出)。平台12还可包括操作员可从其控制机器10的运行的操作员站20。
底架14可以为一个或多个牵引装置22的结构支架。牵引装置22可包括位于机器10每侧上配置为使得机器10可经工作面平移运动的轨道。可选地,牵引装置22可包括轮子、皮带或者本领域已知的其它牵引装置。任何牵引装置22都可驱动和/或可操控。
电源16可为机器10的运行提供电力。电源16可具体化为内燃机,例如柴油机、汽油机、气体燃料发动机(例如天然气发动机)、或者任何其它类型的本领域已知的内燃机。电源16可选择地具体化为电力的非燃烧式源,例如燃料电池或者耦合至电动机的其它电力储存设备。电源16可为驱动牵引装置22提供旋转输出,从而驱动机器10。电源16还可提供电力以相对于底架14旋转平台12。
作业机18可包括一个或多个设计为完成特殊任务的链接部件24。具体地,链接部件24可具体化为悬臂部件28、操纵杆部件30、和作业工具32。悬臂部件28的第一端可旋转连接至平台12,而悬臂部件28的第二端可旋转连接至操纵杆部件30的第一端。作业工具32可旋转连接至操纵杆部件30的第二端。认为作业工具32例如可具体化为铲斗、抓钩器、抓斗、吊钩或者任何其它本领域已知的合适作业工具。每个链接部件24可包括一个或多个致动器26并被其致动。认为链接部件24可在基本上与工作面正交的平面上平移或旋转。
如图2所示,每个致动器26可以为例如包括活塞组件36和管道38的液压缸。活塞组件36可包括两个液压表面,一个表面与第一腔室相连,另一个表面与第二腔室相连。第一和/或第二腔室可选择地供应加压流体并排出加压流体以在两个液压表面上产生力的不平衡。力的不平衡可造成活塞组件36在管道38内轴向移动。还认为致动器26可选择地具体为电动机、气动机、或者本领域已知的任何其它致动设备。
液压系统40可提供加压流体以驱动每个致动器26。具体地,液压系统40可包括泵(未示出)和多个控制阀(未示出)。泵(被电源16的旋转输出驱动)可对与多个控制阀连通的液压油加压。该多个控制阀可选择地经一条或者多条液压管路41向致动器26的第一和/或第二腔室提供加压流体,从而使得活塞组件36轴向移动。认为液压系统40可包括其它的或者不同的元件,例如蓄电池、止回阀、减压或者增压阀、压力补偿元件、限制孔口、以及本领域已知的其它液压元件。
还如图2所示,机器10可包括配置为计算或者评估作业机18所运送质量(或者重量)的有效负载计算系统42。有效负载计算系统42可包括一个或多个状态传感器44、方位传感器45、一个或多个力传感器46、和处理设备48。
状态传感器44可以为位于链接部件24的一个或多个接合点附近的角度检测设备(即作业工具32和操纵杆部件30之间的接合点、操纵杆部件30和悬臂部件28之间的接合点,和悬臂部件28和平台12之间的接合点)。状态传感器44可包括旋转编码器、电位计、或者其它角度或者位置检测设备(例如状态传感器44可位于线性致动器上并且可配置为采用致动器位置确定接合角度)。状态传感器44的输出信号可用于确定作业机18的状态,例如每个链接部件24的位置、速度、加速度、角度、角速度、或者角加速度。
力传感器46可配置为输出可用于确定致动器26和/或链接部件24所产生或者经受的力的信号。例如,力传感器46可具体为设置并配置为测量致动器26的第一和/或第二腔室中或者供应至其中的加压流体压力的压力传感器。认为处理设备可以使用测量的压力以及致动器26和链接部件24的物理尺寸以确定链接部件24的接合点扭矩。力传感器46可可选择地具体为应变计、压电换能器、或者其它位于链接点、致动器接合点、或者其它合适位置的力测量设备。
方位传感器45可测量机器10的斜度和滚动。方位传感器可位于机器10上的任何合适位置,例如操作员站20。方位传感器45可具体为一个或多个陀螺仪、加速度计、重力倾斜仪、或者其任意组合。
处理设备48可监视和/或更改机器10及其组件的性能。处理设备48可无线地或者经一条或多条通信线路43与状态传感器44、方位传感器45、和力传感器46通信。认为处理设备48还可与电源16、操作员站20、液压系统40、和/或机器10的其它元件通信(未示出)。
处理设备48可具体为单个微处理器或者多个微处理器。多种市场购买的微处理器可配置为执行处理设备48的功能,而且应当理解处理设备48可容易具体为能够监视和/或控制多种机器功能的通用机器微处理器。处理设备48可包括存储器、次存储设备、处理器、和任何其它运行应用的元件。各种其它电路可以和处理设备48相关,例如电源电路、信号调节电路、数据采集电路、信号输出电路、信号放大电路、和本领域已知的其它类型的电路。处理设备48可包括一个或多个存储在处理设备48的内存储器中的地图。这些地图每张都包括表格、图形和/或方程形式的数据收集。处理设备48可包括动态模型、校准步骤和评估步骤。
动态模型可包括使得接合点扭矩T和其它可测量和/或可计算项相关的方程。T可以为包括作业机18每个接合点例如Tbo、Tst和Twt上的接合点扭矩值的向量或者矩阵(参见图3)。认为动态模型可包括本领域已知的任何合适模型(例如基于数学或者逻辑的关系)。一个可接受的动态模型为:
参数向量Ψ的每个元素ψ可包括和链接部件的质量M、惯性力I、重心(“CG”)位置量度相关的项。例如参数向量可表示为:
其中,也如图3所示,α和r为定义指定链接部件的CG位置的角度和半径,r起始于链接部件接合点(指定的链接部件可以为悬臂部件28、操纵杆部件30、或者作业工具32),b为指定链接部件的长度,下标“wt”表示和作业工具32相关的项,“st”表示和操纵杆部件30相关的项,而“bo”表示和悬臂部件28相关的项。
返回到图2,校准步骤可用于校准有效负载计算系统42。处理设备48可通过收集计算参数向量Ψ的多组数据开始校准步骤。
例如,处理设备48可通过一定范围的值改变每个链接部件角θbo、θst、θwt(参见图3)(例如,θbo,1、θst,1、θwt,1;θbo,2、θst,2、θwt,2;θbo,3、θst,3、θwt,3……θbo,n、θst,n、θwt,n)。认为处理设备48可连续或者断续地改变θbo、θst和θwt。随着θbo、θst、θwt改变,处理设备48可从状态传感器44、方位传感器45、和/或力传感器46获得测量值(该测量值可包括或者可容易转换为例如与链接部件24或者链接部件接合点相关的角度、位置、力、和/或扭矩)。处理设备48可随着θbo、θst和θwt改变按照预定的角度或者预定的频率获得测量值。因此,用于校准的测量数据可包括在多个角度测量的接合点扭矩(例如Tθbo,1、θst,1、θwt,1、Tθbo,2、θst,2、θ wt,2、Tθbo,3、θst,3、θwt,3……Tθbo,n、θst,n、θwt,n)。处理设备48可采用多组测量数据结合预编程链接数据(例如链接部件24的物理尺寸)对多个角度的每个计算参数向量Ψ的值(例如,Ψθbo,1、θst,1、θwt,1、Ψθbo,n、θst,n、θwt,nθwt,2、Ψθbo,3、θ st,3、θwt,3……Ψθbo,n、θst,n、θwt,n)。处理设备48可采用例如方程(2)结合最小二乘算法计算每个参数向量。
动态模型,更具体地,计算的参数向量Ψθbo,1、θst,1、θwt,1、Ψθbo,2、θst,2、 θwt,2、Ψθbo,3、θst,3、θwt,3……Ψθbo,n、θst,n、θwt,n可进行可将所计算的参数向量转换为单个补偿参数向量Ψcomp的补偿。为获得Ψcomp,随着其值随预定链接部件角改变,处理设备48可将多项式函数拟合为一个或多个计算的参数向量元素Ψ。例如,处理设备48可将多项式拟合为作为θwt函数的第六参数向量元素Ψ(6),和作为θst函数的第八参数向量元素Ψ(8),等。
以通常的形式,每个补偿参数向量元素Ψcomp可表示为:
ψComp=k1θ+k2θ2+k3θ3, (5)
其中k1、k2、k3为从多项式曲线拟合获得的常数。认为补偿的参数向量可允许动态模型计算由于例如致动器26中受压流体的流入或流出、管道38中活塞组件36的轴心位移、致动器26离开链接部件24的任何运动、材料装载至作业工具32、和其它可能的CG变化原因造成的链接部件的CG变化。还认为处理设备48可补偿和链接部件24的任意一个或者任意组合相关的参数向量(例如仅仅和悬臂部件28相关的参数向量元素;悬臂部件28和操纵杆部件30;或者悬臂部件28、操纵杆部件30、和作业工具32)。在校准步骤中,处理设备48可根据预编程限值检查补偿的参数向量以确保补偿的参数向量处于预定范围内。处理设备48然后可存储补偿的参数向量。
评估步骤可用于评估作业机18所移动的有效负载质量(有效负载可以为材料、物体、或者任何其它质量)。为评估有效负载MPL的质量,方程(2)可写为:
其中为非线性函数的第二矩阵。在示例性操作中,操作员可命令作业机18捡起材料或者物体并将其移动至可将其卸载的新位置。当移动材料或者物体时,处理设备48可从状态传感器44和力传感器46接收数据。来自状态传感器44的数据(即状态数据)可包括例如每个链接部件24的位置、速度、加速度、角度、角速度、或者角加速度。处理设备48可利用所接收的传感器数据(即状态数据和接合点扭矩数据)和预编程链接数据确定和/或设置方程(6)的T、Ψcomp、和的值。换言之,接合点扭矩数据可用于设置T,可先验地(例如从校准)确定Ψcomp,并且可采用传感器数据和/或预编程链接数据确定和处理设备48然后可采用最小二乘法技术和/或适应评估技术(基于Lyapunov理论)计算MPL。
工业应用性
所公开的有效负载计算系统可适用于需要进行有效负载计算的任何机器上。对重心变化的补偿可提高有效负载测量的精度。改进的精度可提高其中涉及所公开机器的特定操作的生产率。现在将描述有效负载计算系统42的运行。
如图4所示,处理设备48可首先确定有效负载计算系统42的动态模型是否需要校准(步骤100)。处理设备48可要求固定周期地或者根据用户命令对动态模型进行校准。如果有效负载计算系统42的动态模型需要校准,则处理设备48可开始校准步骤(步骤110)。在校准步骤中,处理设备48可改变链接部件24的角度并从状态传感器44、方位传感器45和力传感器46接收测量值。传感器数据可用于计算动态模型的参数向量。计算的参数向量Ψ然后可被补偿以获得补偿的参数向量Ψcomp。如果已经对有效负载计算系统42进行了校准,则处理设备48可从前次校准再调用补偿的参数向量(步骤120)。
一旦进行了校准,有效负载计算系统42可计算作业机18移动的有效负载质量(步骤130)。例如,机器10(参见图1)可在向运输车辆(未示出)装载材料的地方进行装载操作。在装载操作中,操作员可命令作业机18拾起、运送并在其后向运输车辆倾倒装载材料。移动负载时,处理设备48可从状态传感器44和力传感器46接收数据。处理设备48采用所接收的传感器数据(即状态数据和接合点扭矩数据)和预编程连接数据确定或者设置方程(6)的T、Ψcomp、和的值。处理设备然后采用最小二乘法技术和/或适应性评估技术(基于Lyapunov理论)从方程(6)计算有效负载MPL的质量。
一旦有效负载评估步骤(即步骤130)完成,则处理设备48可显示和/或存储计算的有效负载质量(步骤140)。认为还可显示和/或存储累计的计算d有效负载质量(在指定时间段或者工作循环上)。
处理设备48然后对照地图检查所计算的有效负载质量以确定所计算的有效负载质量是否处于预定的可接收范围内(步骤150)。可接收的范围例如可限定作业机18在特定时间段内可移动的质量的合理范围。如果所计算的有效负载质量不在预定的可接收范围内,则处理设备48可重新计算有效负载质量(返回到步骤130)。如果有效负载质量处于可接受的范围内,则处理设备48可确定操作员是否经一个或多个位于操作员站20的操作员输入设备命令了对有效负载计算系统42进行了重置(步骤160)。如果已经命令了操作员重置,则处理设备48可断开有效负载测量路线。可选地,处理设备48可返回评估有效负载质量(返回到步骤130)。
可实现有效负载计算系统的若干优点。特别是,对每个链接部件重心的补偿可提高质量测量的精度。有效负载质量的改进测量可通过允许所公开的机器更接近于其最大容量地装载相关的运输车辆或者集装箱而改进生产率。通过更好地保证最大负载而非过载,所公开的有效负载计算系统还可降低相关运输车辆的维护成本或者在运输之前必须移除过量材料的情况下减少昂贵的延迟。
对本领域技术人员明显的是可对所公开的有效负载计算系统进行各种更改和改变而不偏离所公开的范围。有效负载计算系统的其它实施例将在本领域技术人员考虑到对这里所公开的有效负载计算系统的说明和实践而变得显而易见。期望的是说明和实例仅仅被看作是示例性的,真实的范围由附加的权利要求所表示。
Claims (10)
1.一种和具有至少两个链接部件(24)的作业机(18)一起使用的有效负载计算系统(42),包括:
至少一个状态传感器(44),其被配置为测量所述至少两个链接部件的状态;以及
处理设备(48),其与所述至少一个状态传感器通信,其中所述处理设备计算所述至少两个链接部件每个的重心变化,所述处理设备被配置为采用所述至少一个状态传感器确定由所述作业机运送的有效负载质量。
2.根据权利要求1的有效负载计算系统,其中所述至少两个链接部件的每个包括致动器(26)。
3.根据权利要求2的有效负载计算系统,还包括配置为测量所述致动器处的力的一个或多个力传感器(46),其中所述处理设备与所述一个或多个力传感器通信,并且所述处理设备被配置为采用一个或多个力传感器确定有效负载的质量。
4.根据权利要求4的有效负载计算系统,其中所述处理设备包括模型,并且所述处理设备利用该模型确定有效负载的质量。
5.根据权利要求5的有效负载计算系统,其中所述处理设备被配置为通过在从所述一个或多个力传感器和所述至少一个状态传感器接收测量值时改变所述至少两个链接部件的每个的角度而校准模型。
6.一种计算有效负载质量的方法,包括:
致动至少两个链接部件(24)的其中一个以移动负载;
测量所述至少两个链接部件处的力;
测量所述至少两个链接部件的状态;以及
采用所述测量的力和测量的状态计算负载的质量,同时考虑所述至少两个链接部件每个的重心变化。
7.如权利要求6的方法,其中所述至少两个链接部件包括悬臂部件(28)、操纵杆部件(30)和作业工具(32)。
8.如权利要求7的方法,其中所述状态包括角度、角速度、或者角加速度中的至少一个。
9.如权利要求8的方法,还包括校准,其中在移动负载之前进行校准,并包括在测量力和测量状态的同时改变所述至少两个链接部件每个的角度。
10.一种机器(10),包括作业机(18),所述作业机(18)具有悬臂部件(28)和如权利要求1-5任一项所述的有效负载计算系统。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US11/998,401 US8660758B2 (en) | 2007-11-30 | 2007-11-30 | Payload system with center of gravity compensation |
US11/998,401 | 2007-11-30 | ||
PCT/US2008/013077 WO2009073107A2 (en) | 2007-11-30 | 2008-11-24 | Payload system with center of gravity compensation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101999070A true CN101999070A (zh) | 2011-03-30 |
CN101999070B CN101999070B (zh) | 2013-12-11 |
Family
ID=40676559
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008801181952A Active CN101999070B (zh) | 2007-11-30 | 2008-11-24 | 具有重心补偿的有效负载系统 |
Country Status (5)
Country | Link |
---|---|
US (1) | US8660758B2 (zh) |
JP (1) | JP2011505509A (zh) |
CN (1) | CN101999070B (zh) |
DE (1) | DE112008003239T5 (zh) |
WO (1) | WO2009073107A2 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI568995B (zh) * | 2015-05-21 | 2017-02-01 | 修平學校財團法人修平科技大學 | 可行動量秤之裝置及方法 |
CN111595426A (zh) * | 2019-02-20 | 2020-08-28 | 卡特彼勒公司 | 用于自动有效负载目标提示的系统和方法 |
CN113175023A (zh) * | 2015-12-15 | 2021-07-27 | 久益环球地表采矿公司 | 用于估计工业机械的有效负载的系统和方法 |
Families Citing this family (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010062222A1 (en) * | 2008-11-26 | 2010-06-03 | Volvo Construction Equipment Ab | Method for calibrating an angle sensor and vehicle with an angle sensor |
DE102009018070A1 (de) * | 2009-04-20 | 2010-10-21 | Robert Bosch Gmbh | Mobile Arbeitsmaschine mit einer Positionsregeleinrichtung eines Arbeitsarms und Verfahren zur Positionregelung eines Arbeitsarms einer mobilen Arbeitsmaschine |
FI122872B (fi) * | 2011-01-28 | 2012-08-15 | Ponsse Oyj | Menetelmä punnitusjärjestelmän tarkistuspunnituksessa ja ohjelmistotuote sekä järjestely punnitusjärjestelmän tarkistuspunnituksessa ja materiaalinkäsittelykone |
US8788155B2 (en) | 2012-07-16 | 2014-07-22 | Flanders Electric Motor Service, Inc. | Optimized bank penetration system |
US20140019015A1 (en) * | 2012-07-16 | 2014-01-16 | Flanders Electric Motor Service, Inc. | Payload management system |
US8812196B2 (en) * | 2012-09-14 | 2014-08-19 | Caterpillar Inc. | System and method for payload estimation |
US8838331B2 (en) * | 2012-09-21 | 2014-09-16 | Caterpillar Inc. | Payload material density calculation and machine using same |
US8909437B2 (en) * | 2012-10-17 | 2014-12-09 | Caterpillar Inc. | Payload Estimation system |
US8924094B2 (en) | 2012-10-17 | 2014-12-30 | Caterpillar Inc. | System for work cycle detection |
US20140237868A1 (en) * | 2013-02-28 | 2014-08-28 | Caterpillar Inc. | Load estimator for scraper |
US8977445B2 (en) * | 2013-06-18 | 2015-03-10 | Caterpillar Inc. | System and method for dig detection |
KR102040335B1 (ko) * | 2013-12-24 | 2019-11-04 | 두산인프라코어 주식회사 | 건설 기계의 적재물 무게 측정 장치 및 그 방법 |
JP6238294B2 (ja) * | 2014-02-21 | 2017-11-29 | キャタピラー エス エー アール エル | 積載部の外力算出方法およびその装置 |
CN103900669B (zh) * | 2014-03-20 | 2016-07-20 | 华侨大学 | 一种挖掘机铲斗物料动态称重装置及其方法 |
US10048154B2 (en) | 2014-04-17 | 2018-08-14 | Flanders Electric Motor Service, Inc. | Boom calibration system |
CA2893194C (en) * | 2014-07-30 | 2018-06-19 | Shigeru OHSUGI | Transporter vehicle and transporter vehicle control method |
US9822507B2 (en) * | 2014-12-02 | 2017-11-21 | Cnh Industrial America Llc | Work vehicle with enhanced implement position control and bi-directional self-leveling functionality |
US10866136B2 (en) * | 2014-12-24 | 2020-12-15 | Cqms Pty Ltd | System and method of calculating a payload weight |
JP6450268B2 (ja) * | 2015-06-24 | 2019-01-09 | 株式会社小松製作所 | ホイールローダと、当該ホイールローダの運搬作業情報の自動積算方法 |
JP6552916B2 (ja) | 2015-08-24 | 2019-07-31 | 株式会社小松製作所 | ホイールローダ |
US20170259433A1 (en) * | 2016-03-11 | 2017-09-14 | Seiko Epson Corporation | Robot control device, information processing device, and robot system |
US9785151B1 (en) | 2016-03-23 | 2017-10-10 | Caterpillar Inc. | Machine and navigation control strategy including velocity calculation |
US10145725B2 (en) * | 2016-04-21 | 2018-12-04 | Caterpillar Inc. | Method of calibration of weighing systems |
DE102016207200A1 (de) * | 2016-04-27 | 2017-11-02 | Deere & Company | Verfahren zur Ermittlung einer Masse eines Anbaugerätes für ein Nutzfahrzeug |
US10407879B2 (en) * | 2017-02-08 | 2019-09-10 | Deere & Company | System and method for remote work implement angular position display |
EP3589790B1 (en) | 2017-03-03 | 2023-07-12 | CNH Industrial Belgium NV | System and method for estimating implement load weights for a work vehicle |
EP3589791B1 (en) | 2017-03-03 | 2022-06-29 | CNH Industrial Belgium NV | System and method for estimating implement load weights for a work vehicle with knowledge of operator-initiated control commands |
JP7123591B2 (ja) * | 2018-03-22 | 2022-08-23 | 株式会社小松製作所 | 作業機械、および作業機械を含むシステム |
DE102018126809A1 (de) * | 2018-10-26 | 2020-04-30 | Liebherr-France Sas | System und Verfahren zum Bestimmen der Masse einer von einem Arbeitsgerät bewegten Nutzlast |
KR102090409B1 (ko) * | 2018-12-27 | 2020-03-17 | 한양대학교 에리카산학협력단 | 과부하 방지를 위한 원격 제어 굴삭기의 제어 장치 및 방법 |
US11131083B2 (en) * | 2019-10-31 | 2021-09-28 | Deere & Company | Vehicle stability warning system |
US11680381B2 (en) | 2021-01-07 | 2023-06-20 | Caterpillar Underground Mining Pty. Ltd. | Variable system pressure based on implement position |
US11891772B2 (en) | 2021-03-29 | 2024-02-06 | Joy Global Surface Mining Inc | System and method for estimating a payload of an industrial machine |
CN114162358B (zh) * | 2022-02-11 | 2022-05-17 | 清华大学 | 一种体感微低重力模拟装置 |
Family Cites Families (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2635868A (en) | 1950-09-29 | 1953-04-21 | George C Reid | Load weighing device for hydraulic loaders |
US3061117A (en) | 1958-12-11 | 1962-10-30 | Marvin F Kruse | Weight gauge for hydraulic loader |
US4230196A (en) | 1978-09-22 | 1980-10-28 | Snead Edwin D | Load weighing and accumulating system and method for hydraulic loader |
DE3220143A1 (de) * | 1981-08-05 | 1983-03-24 | Mannesmann AG, 4000 Düsseldorf | Verfahren zur messung der lademenge bzw. ladeleistung von hydraulikbaggern oder dergl. |
EP0110399B1 (en) | 1982-12-01 | 1988-05-11 | Hitachi Construction Machinery Co., Ltd. | Load weight indicating system for load moving machine |
CA1248147A (en) | 1985-06-07 | 1989-01-03 | James R. Blair | Determining of the amount of material delivered each operational cycle of a shovel loader |
US4677579A (en) | 1985-09-25 | 1987-06-30 | Becor Western Inc. | Suspended load measurement system |
JPS63140923A (ja) | 1986-12-04 | 1988-06-13 | Komatsu Ltd | 建設機械の積載重量計測装置 |
US4792004A (en) | 1987-09-25 | 1988-12-20 | Richard Sheffield | Weight scale for a hydraulic loader and related method |
FR2647210A1 (fr) | 1989-05-17 | 1990-11-23 | Armef | Procede et dispositif de mesure dynamique d'une charge en mouvement dans un plan vertical |
US5070953A (en) | 1990-08-20 | 1991-12-10 | Caterpillar Inc. | Dynamic payload monitor |
US5082071A (en) | 1990-08-20 | 1992-01-21 | Caterpillar Inc. | Method and apparatus for monitoring payload |
US5067572A (en) | 1990-08-20 | 1991-11-26 | Caterpillar Inc. | Dynamic payload monitor |
CA2032983C (en) * | 1990-12-21 | 1999-09-07 | Allan Bowman | Load measuring system for refuse trucks |
AU648367B2 (en) | 1991-01-10 | 1994-04-21 | Dresser Industries Inc. | A method for measuring the weight of a suspended load |
US5105896A (en) | 1991-03-05 | 1992-04-21 | Caterpillar Inc. | Dynamic payload monitor |
JPH0610378A (ja) | 1992-06-26 | 1994-01-18 | Komatsu Ltd | 掘削積込機の作業量検出装置 |
JPH0776490A (ja) | 1993-09-09 | 1995-03-20 | Komatsu Ltd | クレーンの旋回自動停止制御装置 |
JPH0783740A (ja) | 1993-09-14 | 1995-03-31 | Shin Caterpillar Mitsubishi Ltd | 重量物搬送積載装置 |
JPH07259137A (ja) | 1994-03-23 | 1995-10-09 | Caterpillar Inc | 掘削機械のペイロードを求める方法 |
USD362402S (en) | 1994-09-12 | 1995-09-19 | Hite Gil L | Weight scale for a loader |
US5509293A (en) | 1994-12-20 | 1996-04-23 | Caterpillar Inc. | Dynamic payload monitor |
JP3824715B2 (ja) | 1996-08-26 | 2006-09-20 | 日立建機株式会社 | 発破地面の掘削負荷計測装置 |
SE9700767D0 (sv) | 1997-03-04 | 1997-03-04 | Asea Brown Boveri | Förfarande för bestämning av lastparametrar hos en industrirobot |
US6052925A (en) | 1997-12-22 | 2000-04-25 | Caterpillar Inc. | Method for determining the front and rear axle weight of an earth moving machine |
US6072127A (en) | 1998-08-13 | 2000-06-06 | General Electric Company | Indirect suspended load weighing apparatus |
US6225574B1 (en) | 1998-11-06 | 2001-05-01 | Harnischfeger Technology, Inc. | Load weighing system for a heavy machinery |
US6211471B1 (en) | 1999-01-27 | 2001-04-03 | Caterpillar Inc. | Control system for automatically controlling a work implement of an earthmoving machine to capture, lift and dump material |
DE10138974A1 (de) | 2000-08-30 | 2002-04-18 | Caterpillar Inc | Verfahren und Vorrichtung zur Bestimmung eines Gewichtes einer Nutzlast |
US6518519B1 (en) | 2000-08-30 | 2003-02-11 | Caterpillar Inc | Method and apparatus for determining a weight of a payload |
US6552279B1 (en) | 2000-09-28 | 2003-04-22 | Caterpillar Inc | Method and apparatus configured to perform viscosity compensation for a payload measurement system |
US7350787B2 (en) * | 2001-04-03 | 2008-04-01 | Voss Darrell W | Vehicles and methods using center of gravity and mass shift control system |
JP2003073078A (ja) | 2001-09-05 | 2003-03-12 | Hitachi Constr Mach Co Ltd | 上部旋回式建設機械の吊り荷重誤差補正方法及び装置 |
JP3830151B2 (ja) | 2001-10-18 | 2006-10-04 | 日立建機株式会社 | 油圧ショベルの作業量検出装置及び作業量検出方法並びに作業量検出結果表示装置 |
US6789002B1 (en) * | 2003-05-19 | 2004-09-07 | Delphi Technologies, Inc. | Determination of vehicle payload condition |
US7082375B2 (en) | 2004-09-28 | 2006-07-25 | Caterpillar Inc. | System for detecting an incorrect payload lift |
NZ538885A (en) | 2005-03-15 | 2006-10-27 | Actronic Ltd | Weighing device for excavator payloads |
CN100464036C (zh) * | 2005-03-28 | 2009-02-25 | 广西柳工机械股份有限公司 | 用于液压挖掘机工作装置的轨迹控制系统及方法 |
JP2007138504A (ja) | 2005-11-17 | 2007-06-07 | Shin Caterpillar Mitsubishi Ltd | 作業機械における作業アームデータ補正方法および作業機械 |
-
2007
- 2007-11-30 US US11/998,401 patent/US8660758B2/en active Active
-
2008
- 2008-11-24 JP JP2010535991A patent/JP2011505509A/ja active Pending
- 2008-11-24 WO PCT/US2008/013077 patent/WO2009073107A2/en active Application Filing
- 2008-11-24 DE DE112008003239T patent/DE112008003239T5/de not_active Withdrawn
- 2008-11-24 CN CN2008801181952A patent/CN101999070B/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TWI568995B (zh) * | 2015-05-21 | 2017-02-01 | 修平學校財團法人修平科技大學 | 可行動量秤之裝置及方法 |
CN113175023A (zh) * | 2015-12-15 | 2021-07-27 | 久益环球地表采矿公司 | 用于估计工业机械的有效负载的系统和方法 |
CN113175023B (zh) * | 2015-12-15 | 2022-11-08 | 久益环球地表采矿公司 | 用于估计工业机械的有效负载的系统和方法 |
CN111595426A (zh) * | 2019-02-20 | 2020-08-28 | 卡特彼勒公司 | 用于自动有效负载目标提示的系统和方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2009073107A3 (en) | 2009-11-19 |
CN101999070B (zh) | 2013-12-11 |
WO2009073107A2 (en) | 2009-06-11 |
US8660758B2 (en) | 2014-02-25 |
JP2011505509A (ja) | 2011-02-24 |
US20090143896A1 (en) | 2009-06-04 |
DE112008003239T5 (de) | 2010-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101999070B (zh) | 具有重心补偿的有效负载系统 | |
CN101999069B (zh) | 补偿旋转力的有效负载系统 | |
US8909437B2 (en) | Payload Estimation system | |
US8924094B2 (en) | System for work cycle detection | |
US9091586B2 (en) | Payload determination system and method | |
US10539451B2 (en) | Load weighing method and system for wheel loader | |
CN110431388A (zh) | 轮式装载机以及铲斗装载载重运算方法 | |
CN102134909A (zh) | 主动控制关节臂的振动以泵送混凝土的装置 | |
CN111104729A (zh) | 用于确定由作业设备移动的有效载荷质量的系统和方法 | |
US8700274B1 (en) | Method of determining when a bed of a hauling machine is empty | |
CN110793694B (zh) | 一种装载机铲装机构的载荷测量方法 | |
US20160160472A1 (en) | System for Determining a Position of a Component | |
US9194791B2 (en) | System for determining coefficients of seal friction | |
JP2018154976A (ja) | 作業機械 | |
WO2013088816A1 (ja) | 油圧ショベルの荷重計測装置 | |
Nabulsi et al. | High-resolution indirect feet–ground interaction measurement for hydraulic-legged robots | |
EP3978889A1 (en) | Dynamic load center-of-gravity detection | |
CN106458076A (zh) | 具有移动式车体的自动化控制的车辆 | |
Ferlibas et al. | Load weight estimation on an excavator in static and dynamic motions | |
WO2023281893A1 (ja) | 制御システムおよび制御方法 | |
US11585072B2 (en) | System and method for estimating the weight of a load carried by an implement of a work vehicle | |
Choung et al. | Study on the Structural Analysis Method of Wheel Loaders Based on Static and Dynamic Measurements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |