CN101943519B - 砖坯自动调节装置 - Google Patents

砖坯自动调节装置 Download PDF

Info

Publication number
CN101943519B
CN101943519B CN2009100320691A CN200910032069A CN101943519B CN 101943519 B CN101943519 B CN 101943519B CN 2009100320691 A CN2009100320691 A CN 2009100320691A CN 200910032069 A CN200910032069 A CN 200910032069A CN 101943519 B CN101943519 B CN 101943519B
Authority
CN
China
Prior art keywords
roller
base frame
way base
adobe
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100320691A
Other languages
English (en)
Other versions
CN101943519A (zh
Inventor
王文庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Yongye New Building Materials Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100320691A priority Critical patent/CN101943519B/zh
Publication of CN101943519A publication Critical patent/CN101943519A/zh
Application granted granted Critical
Publication of CN101943519B publication Critical patent/CN101943519B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tunnel Furnaces (AREA)
  • Intermediate Stations On Conveyors (AREA)

Abstract

一种砖坯自动调节装置,由控制中心(1),监视单元,储存单元,收发单元(9),升降单元构成。当进入区(D)的砖坯(8)进入窑炉,控制中心(1)便调度等待区(B)的砖坯(8)输送到进入区(D)补充的同时,调度预备区(C)的砖坯(8)前行输入等待区(B)补充;当预备区(C)的空缺被补满,进入区(D)的砖坯还没有进入窑炉时,控制中心(1)便调度储发区(A)的辊道坯架(4)进入收发单元(9),将等待区(B)的砖坯(8)收储;当等待区(B)的砖坯(8)已送入进入区(D),预备区(C)的砖坯(8)仍未补满时,控制中心(1)调度储发区(A)有砖坯(8)在架的辊道坯架(4)进入收发单元(9),将辊道坯架(4)上的砖坯送入等待区(B)补充。

Description

砖坯自动调节装置
所属技术领域:
本发明涉及一种砖坯自动调节装置,具体指配套于瓷砖辊道窑生产流水线窑炉前,对入窑砖坯余缺的自动调节装置。
背景技术:
瓷砖辊道窑生产流水线的自动化程度很高。然而整条流水线的每一个节点都随时可能出现状况,油压机制坯、砖坯烘干、自动喷釉、自动印花的任何一个节点出状况,都会造成砖坯断供;而因煤气塔、釉水配方方面的原因而需要调整窑炉速度时,加快会造成断供,放慢会造成超供。断供时窑炉空烧是浪费,超供时砖坯要从窑炉前清扫下流水线从头做起也是浪费。
发明内容:
本发明提供一种瓷砖辊道窑砖坯自动调节装置,就是在流水线的入窑口节点上,实施对砖坯余缺自动调节,当砖坯超供时将砖坯储存起来,当砖坯断供时,将储存的砖坯发送出来。
技术方案:
本发明所采用的技术方案是:首先将砖坯入窑前的传输系统设定若干区段,设定在本装置位置的砖坯为储发区,储发区的前方、正前方、后方输送段分别设定为预备区,等待区,进入区三个区段;装置由控制中心,监视单元,储存单元,收发单元,升降单元构成。控制中心根据监视单元的信息,控制升降单元升或降、收发单元收或发;监视单元由储发区光传感器、预备区光传感器、等待区光传感器、进入区光传感器、定位光传感器构成,将收集到的各区段砖坯信息即时传输给控制中心;储存单元由井架、辊道坯架构成,为井式立体仓储;收发单元即为辊道坯架传动机,接受控制中心控制,根据指令将到达指定位置的砖坯收进或发出;升降单元由传动链条、电机变速器构成,根据控制中心的调度,通过传动链条带动辊道坯架升或降到规定位置。
本发明的有益效果是:自动调节砖坯供给余缺,最大限度避免窑炉空烧或扫掉砖坯的浪费。
附图说明:
下面结合附图对本发明进一步说明。
图1是砖坯入窑前各区段的平面示意图;
图2是自动调节装置截面示意图;
图3是升降单元截面示意图;
图4是辊道坯架传动轴和辊道坯架传动轮示意图;
图5是辊道坯架传动机平面示意图。
图中(1)、控制中心,(2)、储发区光传感器,(2)1、定位光传感器,(2)2、预备区光传感器,(2)3、等待区光传感器,(2)4、进入区光传感器,(3)、井架,(4)、辊道坯架,(5)、电机变速器,(6)、传动链条,(8)、砖坯,(9)、收发单元,(9)1、辊道坯架传动轴,(9)2、辊道坯架传动轮,(9)3、链条,(9)4、链轮,A、储发区,B、等待区,C、预备区,D、进入区,→、为砖坯移动方向,图中无代码线条为连接控制中心的控制电路。
具体实施方式:
在图1、2的实施例中,砖坯(8)由传输带传输进入窑炉之前,其区域设定为储发区(A)、等待区(B)、预备区(C)、进入区(D)。
动作1:当进入区(D)的砖坯(8)进入窑炉(→),进入区光传感器(2)4将信息传输给控制中心(1),控制中心(1)便调度等待区(B)的砖坯(8)输送到进入区(D)补充;当等待区(B)的光传感器(2)3发现等待区(B)的砖坯(8)为空时,控制中心(1)便调度预备区(C)的砖坯(8)前行(→)输入等待区(B),等待区(B)的砖坯(8)空缺便被补充。
正常情况下,流水线上的转坯(8)按一定的速度在不断递送,预备区(C)的空缺在一定的时间段内,由前方流水线不断地补充,当预备区(C)的空缺被补满时,进入区(D)的砖坯也已进入窑炉,“动作1”又重复一次。整个流程都按各自所必须的速度在有条不紊的进行。
当窑炉有情况需要调慢速度时,前方各个节点的速度不会因此而放慢。
动作2:当预备区(C)的空缺被补满,控制中心(1)通过进入区光传感器(2)4得知进入区(D)的砖坯还没有进入窑炉时,控制中心(1)便调度储发区(A)的辊道坯架(4)进入收发单元(9),指令收发单元(9)将等待区(B)的砖坯(8)收入储发区(A)储存,调度预备区(C)的砖坯(8)输入等待区(B)。当进入区(D)的砖坯进入窑炉时,系统重复“动作1”。
当前方的某个节点出现情况而无法按时供坯时,窑炉不会因此而调慢。
动作3:等待区(B)的砖坯(8)已送入进入区(D),控制中心(1)通过预备区光传感器(2)2得知预备区(C)的砖坯(8)仍未补满时,控制中心(1)根据储发区光传感器(2)的信息,调度储发区(A)有砖坯(8)在架的辊道坯架(4)进入收发单元(9),指令收发单元(9)将辊道坯架(4)上的砖坯送入等待区(B)补充。
当窑炉情况比较严重,进入区(D)的砖坯(8)一直为满时,系统重复“动作2”,直到储发区(A)的可储辊道坯架(4)全部储满为止;相反,当前方某个供砖坯(8)节点情况比较严重,预备区(C)的砖坯(8)一直为空时,系统重复“动作3”,直到储发区(A)储存的砖坯(8)被发空为止。
在图2、3的实施例中,储发区光传感器(2)由若干个组成,安装在井架(3)上,起监视辊道坯架(4)上砖坯(8)的储存情况功能。
当“动作2”启动时,控制中心(1)首先由储发区光传感器(2)的信息了解那个辊道坯架(4)为空,然后起动升降单元的电机变速器(5),电机变速器(5)通过传动链条(6)带动空的辊道坯架(4)移动到收发单元(9),由定位光传感器(2)1向控制中心(1)发出到位信息,控制中心(1)关闭升降单元的电机变速器(5),停止辊道坯架(4)的升降移动,起动收发单元(9),将等待区(B)的砖坯(8)收入储发区(A)储存;
当“动作3”启动时,控制中心(1)要调度的辊道坯架(4)为满,收发单元(9)的动作为发,其他动作一样。
在图4、5的实施例中,辊道坯架(4)接受收发单元(9)传动的一端设有辊道坯架传动轴(9)1,收发单元(9)的辊道坯架传动轮(9)2为弹性摩擦传动轮,通过轴连接链轮(9)4,链轮(9)4由链条(9)3驱动。
因为储存单元设有若干个辊道坯架(4),每一个辊道坯架(4)都与传动链条(6)连接,井式储存结构决定了辊道坯架(4)的移动只能为上下直线;而控制中心(1)调度辊道坯架(4)时,并非每一次辊道坯架传动轴(9)1与辊道坯架传动轮(9)2的接触,都只是为了收或发,更多的还是穿行通过。
当辊道坯架(4)到达收发位置,辊道坯架传动轴(9)1与辊道坯架传动轮(9)2接触,辊道坯架传动轴(9)1处于两个辊道坯架传动轮(9)2之间,在同一轴线。因辊道坯架传动轮(9)2为弹性轮,辊道坯架传动轴(9)1在两个辊道坯架传动轮(9)2之间被夹紧。动力通过链条(9)3、链轮(9)4、辊道坯架传动轮(9)2带动辊道坯架传动轴(9)1转动,辊道坯架(4)上面的砖坯(8)便被转动的辊道传递出去;当改变辊道的转动方向,辊道坯架(4)上面的砖坯(8)便被转动的辊道收进来。
当系统的“动作2”结束要换“动作3”或反过来,或是“动作2”、“动作3”的重复,处于收发位置的辊道坯架(4)都必须离开,无论是继续上行或下行,辊道坯架传动轴(9)1在传动链条(6)的带动下,穿过两个辊道坯架传动轮(9)2之间的空隙而脱离,由下一个或上一个辊道坯架(4)来接续。这种可穿越的传动设计,可确保控制中心(1)对辊道坯架(4)的调度自如和井式仓储的实现。

Claims (2)

1.砖坯自动调节装置,由控制中心,监视单元,储存单元,收发单元,升降单元构成,其特征是:监视单元通过安装在储发区、预备区、等待区、进入区的光传感器以及定位光传感器,监视砖坯的实时信息并即时传输给控制中心;控制中心根据监视单元的信息,控制升降单元和收发单元;升降单元根据控制中心的信息,通过传动链条带动储存单元的辊道坯架上升、下降、定位;收发单元根据控制中心的信息,由辊道坯架传动轮带动辊道坯架传动轴转动,对砖坯实施收储或发送。
2.根据权利要求1所述的砖坯自动调节装置,其特征是:所述的收发单元为辊道坯架可穿越的传动设计,由辊道坯架传动轮、链条、链轮构成并固定在井架,辊道坯架传动轮为弹性摩擦传动轮。
3、根据权利要求1所述的砖坯自动调节装置,其特征还在于:所述的收发单元,当需要对砖坯实施收、发时,辊道坯架传动轴移动到达与辊道坯架传动轮同一轴线并停止移动,辊道坯架传动轮转动,带动辊道坯架传动轴对砖坯实施收、发;当不需要对砖坯实施收、发时,辊道坯架传动轮停止转动,辊道坯架传动轴可以在辊道坯架传动轮之间穿越。
CN2009100320691A 2009-07-08 2009-07-08 砖坯自动调节装置 Active CN101943519B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100320691A CN101943519B (zh) 2009-07-08 2009-07-08 砖坯自动调节装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100320691A CN101943519B (zh) 2009-07-08 2009-07-08 砖坯自动调节装置

Publications (2)

Publication Number Publication Date
CN101943519A CN101943519A (zh) 2011-01-12
CN101943519B true CN101943519B (zh) 2012-08-08

Family

ID=43435642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100320691A Active CN101943519B (zh) 2009-07-08 2009-07-08 砖坯自动调节装置

Country Status (1)

Country Link
CN (1) CN101943519B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106628901B (zh) * 2016-11-30 2022-11-29 广东科达洁能股份有限公司 一种具有多个储坯器的储坯设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2410606Y (zh) * 2000-02-28 2000-12-13 华南理工大学 辊道窑输送制品速度自动调节装置
EP1500889A1 (en) * 2003-07-25 2005-01-26 Tck S.R.L. Monitoring system of a ceramics kiln
EP1884730A2 (en) * 2006-07-28 2008-02-06 Sacmi forni S.p.A. A tunnel kiln for ceramic products
CN201070732Y (zh) * 2007-07-20 2008-06-11 广东科达机电股份有限公司 一种磨边机推砖机构推砖速度和行程自适应控制装置
CN201555448U (zh) * 2009-07-08 2010-08-18 王文庭 砖坯自动调节装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2410606Y (zh) * 2000-02-28 2000-12-13 华南理工大学 辊道窑输送制品速度自动调节装置
EP1500889A1 (en) * 2003-07-25 2005-01-26 Tck S.R.L. Monitoring system of a ceramics kiln
EP1884730A2 (en) * 2006-07-28 2008-02-06 Sacmi forni S.p.A. A tunnel kiln for ceramic products
CN201070732Y (zh) * 2007-07-20 2008-06-11 广东科达机电股份有限公司 一种磨边机推砖机构推砖速度和行程自适应控制装置
CN201555448U (zh) * 2009-07-08 2010-08-18 王文庭 砖坯自动调节装置

Also Published As

Publication number Publication date
CN101943519A (zh) 2011-01-12

Similar Documents

Publication Publication Date Title
JP4979658B2 (ja) 搬送制御システム及び搬送制御方法
CN206622330U (zh) 一种转轮式自动快件分拣系统
CN102221292B (zh) 步进式加热炉板坯出料停止位动态调节装置及其使用方法
GB2419438B (en) Method and apparatus for providing load dispatch and pollution control optimization
JP2001106331A (ja) 搬送制御システム
CN205394802U (zh) 一种直角转弯装置
CN104555743B (zh) 面向半导体生产线搬运系统的轨道与天车协调控制方法
CN104635774B (zh) 一种为交叉带分拣机配套用的四段式供件台控制系统及方法
CN101943519B (zh) 砖坯自动调节装置
CN103693410A (zh) 物料输送系统控制方法及装置
CN103754596B (zh) 一种卷烟机组的喂丝机的烟丝输送控制装置
CN201555448U (zh) 砖坯自动调节装置
BR112022003626A2 (pt) Método de controle de despache de trem, plataforma, e sistema, vagão inteligente e meio
CN111392524B (zh) 一种agv与电梯通信对接实现跨楼层移动方法
CN205080649U (zh) 一种用链条实现货物输送的自动售卖机传动机构
CN102087521B (zh) 可远距离操控的混均物料取运设备及其取运方法
HRP20191650T1 (hr) Postupak za dopremanje jaja u aparat za razbijanje jaja i aparat za razbijanje jaja
CN203946633U (zh) 一种覆膜机的输纸装置
CN105417068A (zh) 一种积放滚筒输送机控制装置
CN103121242A (zh) 混凝土搅拌系统
JP2002012315A (ja) コンベアシステム
KR102219664B1 (ko) IoT기술을 이용한 지하 광산 및 폐쇄구역에서의 스마트통기시스템
CN210010462U (zh) 一种多工位铺粉激光选区熔化成型设备
CN113739578A (zh) 一种自动配加料冶炼钛渣的方法和系统
CN202556918U (zh) 大口径钢管喷标装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: QIDONG TIANFEN ELECTRIC TOOL TECHNOLOGY INNOVATION

Free format text: FORMER OWNER: WANG WENTING

Effective date: 20141118

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210029 NANJING, JIANGSU PROVINCE TO: 226241 NANTONG, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141118

Address after: Qidong City, Jiangsu province 226241 Nantong lvsigang Tianfen electric tools trade city comprehensive building

Patentee after: Qidong Tianfen Electric Tool Technology Innovation Center

Address before: Jianye District of Nanjing City, Jiangsu province 210029 4 Building No. 12 Nanyuan Qu Yuan Village

Patentee before: Wang Wenting

TR01 Transfer of patent right

Effective date of registration: 20200521

Address after: 226200 Fufeng village, Jiulong Town, Qidong City, Nantong City, Jiangsu Province

Patentee after: Nantong Yongye new building materials Co., Ltd

Address before: Qidong City, Jiangsu province 226241 Nantong lvsigang Tianfen electric tools trade city comprehensive building

Patentee before: QIDONG TIANFEN ELECTRIC TOOL TECHNOLOGY INNOVATION CENTER

TR01 Transfer of patent right