CN101942903B - 预张拉碳纤维板加固混凝土梁板的装置及施工方法 - Google Patents
预张拉碳纤维板加固混凝土梁板的装置及施工方法 Download PDFInfo
- Publication number
- CN101942903B CN101942903B CN2010102593111A CN201010259311A CN101942903B CN 101942903 B CN101942903 B CN 101942903B CN 2010102593111 A CN2010102593111 A CN 2010102593111A CN 201010259311 A CN201010259311 A CN 201010259311A CN 101942903 B CN101942903 B CN 101942903B
- Authority
- CN
- China
- Prior art keywords
- stretch
- draw
- carbon fiber
- fiber board
- caulking groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种预张拉碳纤维板加固混凝土梁板的装置及施工方法,其特征是在混凝土梁板的底部表面的两端接近端部位置处,分别形成有固定端嵌槽和张拉端嵌槽;固定端锚具和张拉端底座钢板分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中;在张拉端底座钢板上、沿碳纤维板的走向分别设置张拉端固定锚具、千斤顶支座和张拉夹具,张拉夹具在张拉端底座钢板上沿张拉方向可移动;千斤顶沿碳纤维板的张拉方向顶推在张拉夹具上;碳纤维板的固定端持夹在固定端锚具中,碳纤维板的张拉端依次穿过张拉端锚具和千斤顶支座夹持在张拉夹具中。本发明装置和方法可有效缩短工期。
Description
技术领域
本发明涉及建筑施工领域,更具体地说是一种预张拉碳纤维板加固混凝土梁板的装置及施工方法。
背景技术
为了补强旧建筑的混凝土受弯构件,以杜绝安全隐患,延长使用寿命,现有技术是在混凝土梁板受拉面粘贴强度高、体积自重小的碳纤维片材。而为了提升碳纤维片材的使用强度,则需要将片材实施预张拉,使其在预应力碳纤维片材加固混凝土梁板,可有效提升构件的抗弯承载力和刚度。目前各种预张拉方法当中,以梁上张拉法所需设备较少且轻巧,但既有的数种设备若非液压设备过于庞大,就是零件数量太多而不适于操作。
因此在本申请之前,本申请中的发明人曾提出过“预张拉碳纤维布加固混凝土梁的施工方法(申请号:200510110733.1)”和“碳纤维布加固梁张拉锚固机构(申请号:200520046882.1)”的专利申请,其锚具体积小、张拉设备轻巧。但进一步研究发现采用碳纤维布,其质地柔软、厚度有限,施工时需要采用较宽的布料,且需要将碳纤维布粘贴及缠绕于锚具底板上,之后再养护一周让胶水达到应有的强度,如此所需施工步骤较多,且时间较长。再者,原有装置中需要在混凝土梁的两侧安装角钢,体积较大,且对混凝土梁有一定的破坏作用。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种更为轻巧、有效、可缩短工期的预张拉碳纤维板加固混凝土梁板的装置及施工方法。
本发明一种预张拉碳纤维板加固混凝土梁板的装置的结构特点是:
在混凝土梁板的底部表面的两端接近端部位置处,分别形成有固定端嵌槽和张拉端嵌槽;固定端锚具和张拉端底座钢板分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中;在所述张拉端底座钢板上、沿碳纤维板的走向分别设置张拉端固定锚具、千斤顶支座和张拉夹具,所述张拉夹具在所述张拉端底座钢板上沿张拉方向可移动;千斤顶沿碳纤维板的张拉方向顶推在所述张拉夹具上;碳纤维板的固定端持夹在所述固定端锚具中,碳纤维板的张拉端穿过千斤顶支座夹持在张拉夹具中,并在张拉完成后固定在所述张拉端固定锚具上。
本发明预张拉碳纤维板加固混凝土梁板的装置的结构特点也在于:
所述固定端嵌槽和张拉端嵌槽的深度使碳纤维板贴于混凝土梁板的底部表面。
在所述千斤顶的尾部设置载荷传感器。
本发明预张拉碳纤维板加固混凝土梁板的施工方法的特点是按如下方式进行:
a、在混凝土梁板的底部接近端部位置处,打磨形成固定端嵌槽和张拉端嵌槽;
b、将固定端锚具和张拉端底座钢板分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中,在所述张拉端底座钢板上沿碳纤维板的走向分别设置张拉端锚具、千斤顶支座和张拉夹具;
c、将碳纤维板的固定端固定设置在固定端锚具中,并将碳纤维板的张拉端依次穿过张拉端锚具和千斤顶支座,夹持在张拉夹具中;
d、启动千斤顶即加压顶推张拉夹具进行碳纤维板的张拉作业,当顶推荷载达到设定值时停止加压;
e、将千斤顶的位置锁紧,并将碳纤维板的张拉端夹固在张拉端固定锚具中,卸下张拉夹具、千斤顶及千斤顶支座,完成张拉施工。
与已有技术相比,本发明有益效果体现在:
1、本发明采用碳纤维板,因板体本身具有一定的厚度,加固过程中不需要太宽的板条即可达到所需的碳纤维加固量;
2、由于碳纤维板的宽度较小,施工时不需要缠绕和长时间粘贴养护,且在固定端锚具、张拉夹具有效安装后,即可以及进行张拉,省却此前方法中需要粘贴养护时间而大幅缩短施工日期;
3、本发明所采用由两块夹板构成的板式夹具,且位于混凝土梁板同一侧,相对于此前方法中角钢外露于混凝土梁板两侧的缺点,具有体积小、轻巧的优点;
4、本发明中一部分机具可以反复使用,避免了材料的浪费。
附图说明
图1a为本发明固定端底面结构示意图。
图1b为本发明张拉端底面结构示意图。
图2a为本发明固定端立面结构示意图。
图2b为本发明张拉端立面结构示意图。
图3为本发明夹具结构示意图。
图中标号:1固定端锚具,2碳纤维板,3混凝土梁板、5张拉端固定锚具,6张拉端底座钢板,7千斤顶支座,8千斤顶,9荷载传感器,10张拉夹具。
具体实施方式
参见图1a、图1b、图2a图2b和图3,本实施例中的结构设置为:
在混凝土梁板3的底部表面的两端接近端部位置处,分别形成有固定端嵌槽和张拉端嵌槽;固定端锚具1和张拉端底座钢板6分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中;在张拉端底座钢板6上、沿碳纤维板2的走向分别设置张拉端固定锚具5、千斤顶支座7和张拉夹具10,张拉夹具10在张拉端底座钢板6上沿张拉方向可移动;千斤顶8沿碳纤维板2的张拉方向顶推在张拉夹具10上;碳纤维板2的固定端持夹在固定端锚具1中,碳纤维板2的张拉端依次穿过张拉端固定锚具5和千斤顶支座7夹持在张拉夹具10中。
具体实施中,固定端嵌槽和张拉端嵌槽的深度使碳纤维板贴于混凝土梁的底部表面,在千斤顶8的尾部设置载荷传感器9。
本实施例预张拉碳纤维板加固混凝土梁板的施工方法按如下方式进行:
a、在混凝土梁板3的底部表面的两端接近端部位置处,打磨形成固定端嵌槽和张拉端嵌槽;
b、将固定端锚具1和张拉端底座钢板6分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中,在张拉端底座钢板6上沿碳纤维板8的走向分别设置张拉端固定锚具5、千斤顶支座7和张拉夹具10;
c、将碳纤维板2的固定端固定设置在固定端锚具1中,并将碳纤维板2的张拉端依次穿过张拉端固定锚具5和千斤顶支座7,夹持在张拉夹具10中;
d、启动千斤顶即加压顶推张拉夹具10进行碳纤维板2的张拉作业,当顶推荷载达到设定值时停止加压;
e、将千斤顶8的位置进行锁紧,并将碳纤维板2的张拉端夹固在张拉端固定锚具5中,卸下张拉夹具10、千斤顶8及千斤顶支座7,完成张拉施工。
参见图3,本实施例中的碳纤维板夹具是由可以相合的两块夹板4形成板式夹持面,在两块夹板4之间以螺栓锚固。本实施例中的固定端锚、张拉端锚具和张拉夹具都是采用了这种夹具形式,为了提升锚具的锚固力,避免碳纤维板2在张拉时脱出,将两块夹板4形成的板式夹持面设置为波纹面。
具体实施中,相应的设置也包括:
为了保证在张拉过程中,碳纤维板的自由滑动,在千斤顶支座7中供碳纤维板穿过的中空位置应有足够大的尺寸,避免碳纤维板受到较大的摩擦阻力;同时,要保证千斤顶支座7具有足够的强度和刚度,千斤顶支座7上的空间尺寸可以恰当地摆放千斤顶8,并能有效提供千斤顶顶升时的所需的反力;千斤顶8尾部设置荷载传感器9,用于准确显示顶升力的大小;张拉夹具10上的碳纤维板要能被钢板用螺栓有效固定,保证与张拉夹具10协同伸缩。
Claims (4)
1.一种预张拉碳纤维板加固混凝土梁板的装置,其特征是:
在混凝土梁板(3)的底部表面的两端接近端部位置处,分别形成有固定端嵌槽和张拉端嵌槽;固定端锚具(1)和张拉端底座钢板(6)分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中;在所述张拉端底座钢板(6)上沿碳纤维板(2)的走向分别设置张拉端固定锚具(5)、千斤顶支座(7)和张拉夹具(10),所述张拉夹具(10)在所述张拉端底座钢板(6)上沿张拉方向可移动;千斤顶(8)沿碳纤维板(2)的张拉方向顶推在所述张拉夹具(10)上;碳纤维板(2)的固定端持夹在所述固定端锚具(1)中,碳纤维板(2)的张拉端穿过千斤顶支座(7)夹持在张拉夹具(10)中,并在张拉完成后固定在所述张拉端固定锚具(5)上。
2.根据权利要求1所述的预张拉碳纤维板加固混凝土梁板的装置,其特征是所述固定端嵌槽和张拉端嵌槽的深度使碳纤维板(2)贴于混凝土梁板(3)的底部表面。
3.根据权利要求1所述的预拉碳纤维板加固混凝土梁板的装置,其特征是在所述千斤顶(8)的尾部设置载荷传感器(9)。
4.一种预张拉碳纤维板加固混凝土梁板的施工方法,其特征是按如下方式进行:
a、在混凝土梁板(3)的底部接近端部位置处,打磨形成固定端嵌槽和张拉端嵌槽;
b、将固定端锚具(1)和张拉端底座钢板(6)分别通过螺栓固定设置在固定端嵌槽和张拉端嵌槽中,在所述张拉端底座钢板(6)上沿碳纤维板(2)的走向分别设置张拉端锚具(5)、千斤顶支座(7)和张拉夹具(10);
c、将碳纤维板(2)的固定端固定设置在固定端锚具(1)中,并将碳纤维板(2)的张拉端依次穿过张拉端固定锚具(5)和千斤顶支座(7),夹持在张拉夹具(10)中;
d、启动千斤顶(8)即加压顶推张拉夹具(10)进行碳纤维板(2)的张拉作业,当顶推荷载达到设定值时停止加压;
e、将千斤顶(8)的位置锁紧,并将碳纤维板(2)的张拉端夹固在张拉端固定锚具(5)中,卸下张拉夹具(10)、千斤顶(8)及千斤顶支座(7),完成张拉施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102593111A CN101942903B (zh) | 2010-08-16 | 2010-08-16 | 预张拉碳纤维板加固混凝土梁板的装置及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102593111A CN101942903B (zh) | 2010-08-16 | 2010-08-16 | 预张拉碳纤维板加固混凝土梁板的装置及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101942903A CN101942903A (zh) | 2011-01-12 |
CN101942903B true CN101942903B (zh) | 2012-03-07 |
Family
ID=43435088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102593111A Expired - Fee Related CN101942903B (zh) | 2010-08-16 | 2010-08-16 | 预张拉碳纤维板加固混凝土梁板的装置及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101942903B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4215869A1 (en) * | 2022-01-21 | 2023-07-26 | Fundación Tekniker | Structural system design for the verification and calibration of measuring instruments |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103195255B (zh) * | 2013-03-29 | 2015-07-15 | 华北水利水电学院 | 一种预应力碳纤维布加固混凝土梁的施工方法 |
CN103215899B (zh) * | 2013-05-08 | 2015-09-16 | 中铁第一勘察设计院集团有限公司 | 一种预应力连续梁底板崩裂的加固方法 |
CN103741954A (zh) * | 2013-12-21 | 2014-04-23 | 广西科技大学 | 碳纤维板张拉支架 |
CN103806673B (zh) * | 2014-02-19 | 2015-09-02 | 重庆交通大学 | 用于混凝土柱加固处治的碳纤维布张拉装置 |
CN104100100B (zh) * | 2014-07-14 | 2016-03-02 | 扬州大学 | 微曲张拉碳纤维板加固钢筋混凝土梁的方法 |
CN104264593B (zh) * | 2014-09-05 | 2016-10-12 | 华侨大学 | 一种表层嵌筋加固的预应力张拉方法及装置 |
CN106930549A (zh) * | 2015-12-30 | 2017-07-07 | 卡本复合材料(天津)有限公司 | 一种预应力碳纤维板加固方法 |
CN105604331B (zh) * | 2016-01-13 | 2018-05-08 | 同济大学 | 一种用于加固方钢管的碳纤维板预张拉装置 |
CN105569372B (zh) * | 2016-02-04 | 2017-05-03 | 广东工业大学 | 一种预应力纤维增强复合材料加固混凝土的装置及方法 |
CN108169020A (zh) * | 2018-01-22 | 2018-06-15 | 西安建筑科技大学 | 一种预应力碳纤维板加固钢梁的张拉锚固实验装置及方法 |
CN108374354A (zh) * | 2018-04-12 | 2018-08-07 | 中国十七冶集团有限公司 | 一种采用预应力碳纤维板加固桥梁的方法 |
CN110644382A (zh) * | 2019-10-18 | 2020-01-03 | 杭州悦为科技有限公司 | 一种变截面梁预应力碳纤维板多点锚固分段加固施工方法 |
CN112376447A (zh) * | 2020-11-24 | 2021-02-19 | 天津市公路工程总公司 | 一种预应力张拉锚固设备 |
CN113431367A (zh) * | 2021-06-30 | 2021-09-24 | 中国建筑第八工程局有限公司 | 用于加固构件的frp板结构及其加固方法 |
CN113431368B (zh) * | 2021-06-30 | 2023-03-28 | 中国建筑第八工程局有限公司 | 锚具的预紧力施加装置及其使用方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1827975A (zh) * | 2006-03-30 | 2006-09-06 | 尚守平 | 土木建筑工程用的碳纤维板锚具 |
CN2839431Y (zh) * | 2005-11-24 | 2006-11-22 | 同济大学 | 碳纤维布加固梁张拉锚固机构 |
CN1970974A (zh) * | 2005-11-24 | 2007-05-30 | 同济大学 | 预张拉碳纤维布加固混凝土梁的施工工艺 |
WO2009002268A1 (en) * | 2007-06-27 | 2008-12-31 | Mohammad Al-Emrani | Method |
US20090211194A1 (en) * | 2008-02-25 | 2009-08-27 | Fyfe Edward R | System and method for reinforcing structures |
CN101781936A (zh) * | 2009-12-10 | 2010-07-21 | 中国建筑科学研究院 | 一种采用预应力碳纤维板加固梁的方法及装置 |
CN201778500U (zh) * | 2010-08-16 | 2011-03-30 | 合肥工业大学 | 预张拉碳纤维板加固混凝土梁板的装置 |
-
2010
- 2010-08-16 CN CN2010102593111A patent/CN101942903B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2839431Y (zh) * | 2005-11-24 | 2006-11-22 | 同济大学 | 碳纤维布加固梁张拉锚固机构 |
CN1970974A (zh) * | 2005-11-24 | 2007-05-30 | 同济大学 | 预张拉碳纤维布加固混凝土梁的施工工艺 |
CN1827975A (zh) * | 2006-03-30 | 2006-09-06 | 尚守平 | 土木建筑工程用的碳纤维板锚具 |
WO2009002268A1 (en) * | 2007-06-27 | 2008-12-31 | Mohammad Al-Emrani | Method |
US20090211194A1 (en) * | 2008-02-25 | 2009-08-27 | Fyfe Edward R | System and method for reinforcing structures |
CN101781936A (zh) * | 2009-12-10 | 2010-07-21 | 中国建筑科学研究院 | 一种采用预应力碳纤维板加固梁的方法及装置 |
CN201778500U (zh) * | 2010-08-16 | 2011-03-30 | 合肥工业大学 | 预张拉碳纤维板加固混凝土梁板的装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4215869A1 (en) * | 2022-01-21 | 2023-07-26 | Fundación Tekniker | Structural system design for the verification and calibration of measuring instruments |
Also Published As
Publication number | Publication date |
---|---|
CN101942903A (zh) | 2011-01-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101942903B (zh) | 预张拉碳纤维板加固混凝土梁板的装置及施工方法 | |
CN201778500U (zh) | 预张拉碳纤维板加固混凝土梁板的装置 | |
CN102644384B (zh) | 一种采用frp条带加固钢筋混凝土梁的锚固装置及使用方法 | |
JP4271146B2 (ja) | 引張り部材を支持フレームに取り付ける方法及びこの方法を実施する装置 | |
CN108824829B (zh) | 一种预应力碳纤维板张拉装置及加固钢梁的方法 | |
CN105835226A (zh) | 一种先张法预制梁台座 | |
CN2771387Y (zh) | 螺旋式碳纤布预应力张拉器 | |
CN107724258B (zh) | 一种预应力碳纤维张拉装置 | |
CN2806645Y (zh) | 一种纤维板材预应力张拉装置 | |
CN105926949B (zh) | 一体式预应力纤维板加固梁板的原位张拉系统及方法 | |
CN201874250U (zh) | 混凝土结构楼板加固装置 | |
CN107503527B (zh) | 一种预应力碳纤维板可拆卸锚具 | |
CN211312233U (zh) | 一种落梁施工用梁端辅助装置 | |
CN105672688A (zh) | 一种续接木结构的预应力增强装置及其施工方法 | |
JPH04285247A (ja) | プレストレス導入部材およびプレストレス導入方法 | |
CN112302257B (zh) | 一种frp用夹片型锚具的预夹紧装置 | |
CN112412096B (zh) | 中部顶升张拉预应力的无粘结预应力碳纤维板加固装置 | |
CN106703433B (zh) | 一种预应力纤维片材组合装配式张拉装置及其施工方法 | |
CN214461814U (zh) | 用于螺纹钢筋张拉的支撑台座及其张拉结构 | |
CN211571440U (zh) | 一种变截面梁预应力碳纤维板多点锚固分段加固结构 | |
CN113846868A (zh) | 一种基于多层纤维布预应力施加的加固装置及加固方法 | |
CN109339457B (zh) | 一种位移自约束式预应力frp片材张拉装置及其实施方法 | |
CN107964880B (zh) | 预应力碳纤维张拉装置 | |
CN106760607B (zh) | 一种预应力纤维板张拉端锚固装置及其锚固方法 | |
CN206158015U (zh) | 一种预应力碳纤维板锚固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120307 Termination date: 20160816 |