CN101922243B - 建筑物拆除内顶升方法及其设备 - Google Patents

建筑物拆除内顶升方法及其设备 Download PDF

Info

Publication number
CN101922243B
CN101922243B CN 200910067104 CN200910067104A CN101922243B CN 101922243 B CN101922243 B CN 101922243B CN 200910067104 CN200910067104 CN 200910067104 CN 200910067104 A CN200910067104 A CN 200910067104A CN 101922243 B CN101922243 B CN 101922243B
Authority
CN
China
Prior art keywords
jacking
jacking frame
leading truck
frame
monomer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910067104
Other languages
English (en)
Other versions
CN101922243A (zh
Inventor
班云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ban Yun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200910067104 priority Critical patent/CN101922243B/zh
Publication of CN101922243A publication Critical patent/CN101922243A/zh
Application granted granted Critical
Publication of CN101922243B publication Critical patent/CN101922243B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种楼房的拆除方法及其专用设备,具体的说是一种建筑物拆除内顶升方法及其设备,该建筑物拆除内顶升设备由顶升架、导向架、固定平台、拆卸设备主体、限位固定框、液压装置、基座、锁紧销构成,本发明由于采用内顶升的技术方法将拆卸设备主体提升至建筑物的顶端,解决了高层的建筑物拆除施工设备太重,无法达到施工地点的问题,拆除施工作业由上至下逐渐向下完成,具有劳动强度小、安全性好、拆除效率高等优点。

Description

建筑物拆除内顶升方法及其设备
技术领域
本发明涉及一种建筑物,特别是楼房的拆除方法及其专用设备,具体的说是一种建筑物拆除内顶升方法及其设备。
背景技术
目前随着我国经济建设的不断发展,很多的城市开始从新规划,拆迁修路,楼房改造,大规模的基础建设开始实施,大量的破旧老化楼房需要拆除,国内外现有的有关建筑物的拆除与解体技术主要有:爆破拆除法和机械拆除法,其中爆破拆除法应用最为广泛,爆破拆除法的缺点是前期准备复杂,有一定的风险,而且成本偏高;而机械机械拆除法受设备自身结构和重量的限制很难在建筑物的上层实施拆除,人们采用的办法通常是先将上层的一些建筑通过人工的方式拆除,在大型的拆除设备能够触及到的高度范围内再用大型的拆除设备实施拆除,缺点是劳动强度大,存在一定的风险,拆除的效率低。
发明内容
本发明的目的是要提供一种能够将大型的拆卸设备顶升到高层建筑上,由上至下对建筑物进行拆除,劳动强度小、安全性好、拆除效率高的建筑物拆除内顶升方法及其设备。
本发明的目的是这样实现的,该建筑物拆除内顶升设备包括顶升架、导向架、固定平台、拆卸设备主体、限位固定框、液压装置、基座、锁紧销,所述的顶升架是由多个顶升架单体叠加连接固定而成,固定平台设置在顶升架的顶端,拆卸设备主体设置在固定平台上,在顶升架的上端通过一个限位固定框进行限位,所述的导向架安装在基座上,在导向架的两侧分别设置一个液压装置,在液压装置的缸体上端带有锁紧销,顶升架下端套装在导向架内。
所述的导向架靠近液压装置一侧带有锁紧销的滑动轨道。
所述的顶升架单体是一个立方体框架结构,其立方体的顶角内部设置有连接端,对应的两个侧面带有销孔。
建筑物拆除步骤如下:
①、拆前准备,选择能够安装设备的合适的位置,将建筑物逐层打孔(孔的形状为长方形或正方形),孔的尺寸要大于拆卸设备主体的横截面积,对应上方的孔空在地面进行基座的施工,安装导向架,同时在导向架两侧分别设置一个液压装置。
②、顶升拆卸设备主体,首先将一个顶升架单体从导向架的开口处放入导向架,然后将两侧液压装置上的锁紧销插入顶升架单体的销孔,同步启动两侧的液压装置,这时第一个顶升架单体被提升,当导向架下面空出一个顶升架单体位置时停止液压装置,再在向导向架内装入一个顶升架单体,将第一个顶升架单体和第二个顶升架单体通过四个内部连接端用螺栓连接固定,取下液压装置上的锁紧销收回液压装置,将锁紧销再插入第二个顶升架单体的销孔,启动液压装置,重复上述的过程,提升安装多个顶升架单体,直到拆除施工的高度。
③、在安装2--4个顶升架单体后要将最上端的顶升架单体的上面安装固定上固定平台和拆卸设备主体,当完成顶升架的安装后拆卸设备主体已经被送到建筑物的顶端,拆装施工时要在顶升架的上面套装限位固定框,限位固定框与建筑物连接固定。
④、建筑物拆除施工由上至下进行,拆卸设备主体随着拆除的进度通过缩短顶升架的高度逐渐向下移动,顶升架缩短的步骤与②中所述的步骤相反。
⑤、当拆除施工达到地面设备能够进行拆除作业时就完成了全部的拆除施工作业。
本发明由于采用内顶升的技术方法将拆卸设备主体提升至建筑物的顶端,解决了高层的建筑物拆除施工设备太重,无法达到施工地点的问题,拆除施工作业由上至下逐渐向下完成,具有劳动强度小、安全性好、拆除效率高等优点。
附图说明
图1为本发明内顶升拆除设备整体结构示意图。
图2为本发明顶升架单体结构示意图。
图3为本发明限位固定框结构示意图。
图4为本发明导向架A向投影图。
具体实施方式
由附图1所示:该建筑物拆除内顶升设备包括顶升架1、导向架2、固定平台3、拆卸设备主体4、限位固定框5、液压装置6、基座7、锁紧销8,所述的顶升架1是由多个顶升架单体叠加连接固定而成,固定平台设置在顶升架1的顶端,拆卸设备主体4设置在固定平台3上,在顶升架1的上端通过一个限位固定框5进行限位,所述的导向架2安装在基座7上,在导向架2的两侧分别设置一个液压装置6,在液压装置6的缸体上端带有锁紧销8,顶升架1下端套装在导向架2内。
由附图2所示:所述的顶升架单体是一个立方体框架结构,其立方体的顶角内部设置有连接端10,对应的两个侧面带有销孔11。
由附图4所示:所述的导向架2正面带有顶升架单体进口12,靠近液压装置6一侧带有锁紧销8的滑动轨道9。
建筑物拆除步骤如下:
①、拆前准备,选择能够安装设备的合适的位置,将建筑物逐层打孔(孔的形状为长方形或正方形),孔的尺寸要大于拆卸设备主体的横截面积,对应上方的孔空在地面进行基座的施工,安装导向架,同时在导向架两侧分别设置一个液压装置。
②、顶升拆卸设备主体,首先将一个顶升架单体从导向架的进口12处放入导向架,然后将两侧液压装置上的锁紧销插入顶升架单体的销孔,同步启动两侧的液压装置,这时第一个顶升架单体被提升,当导向架下面空出一个顶升架单体位置时停止液压装置,再在向导向架内装入一个顶升架单体,将第一个顶升架单体和第二个顶升架单体通过四个内部连接端用螺栓连接固定,取下液压装置上的锁紧销收回液压装置,将锁紧销再插入第二个顶升架单体的销孔,启动液压装置,重复上述的过程,提升安装多个顶升架单体,直到拆除施工的高度。
③、在安装2--4个顶升架单体后要将最上端的顶升架单体的上面安装固定上固定平台和拆卸设备主体,当完成顶升架的安装后拆卸设备主体已经被送到建筑物的顶端,拆装施工时要在顶升架的上面套装限位固定框(附图3所示),限位固定框与建筑物连接固定。
④、建筑物拆除施工由上至下进行,拆卸设备主体随着拆除的进度通过缩短顶升架的高度逐渐向下移动,顶升架缩短的步骤与②中所述的步骤相反。
⑤、当拆除施工达到地面设备能够进行拆除作业时就完成了全部的拆除施工作业。

Claims (4)

1.一种建筑物内顶升拆除设备,其特征在于:设备包括顶升架(1)、导向架(2)、固定平台(3)、拆卸设备主体(4)、限位固定框(5)、液压装置(6)、基座(7)、锁紧销(8),所述的顶升架(1)是由多个顶升架单体叠加连接固定而成,固定平台设置在顶升架(1)的顶端,拆卸设备主体(4)设置在固定平台(3)上,在顶升架(1)的上端通过一个限位固定框(5)进行限位,所述的导向架(2)安装在基座(7)上,在导向架(2)的两侧分别设置一个液压装置(6),在液压装置(6)的缸体上端带有锁紧销(8),顶升架(1)下端套装在导向架(2)内。
2.根据权利要求1所述的一种建筑物内顶升拆除设备,其特征在于:所述的顶升架单体是一个立方体框架结构,其立方体的顶角内部设置有连接端(10),对应的两个侧面带有销孔(11)。
3.根据权利要求1所述的一种建筑物内顶升拆除设备,其特征在于:所述的导向架(2)正面带有顶升架单体进口(12),靠近液压装置(6)一侧带有锁紧销(8)的滑动轨道(9)。
4.一种建筑物内顶升拆除方法,其特征在于:所述的建筑物内顶升拆除步骤如下:
①、拆前准备,选择能够安装设备的合适的位置,将建筑物逐层打孔,孔的形状为长方形或正方形,孔的尺寸要大于拆卸设备主体的横截面积,对应上方的孔空在地面进行基座的施工,安装导向架,同时在导向架两侧分别设置一个液压装置;
②、顶升拆卸设备主体,首先将一个顶升架单体从导向架的进口处放入导向架,然后将两侧液压装置上的锁紧销插入顶升架单体的销孔,同步启动两侧的液压装置,这时第一个顶升架单体被提升,当导向架下面空出一个顶升架单体位置时停止液压装置,再在向导向架内装入一个顶升架单体,将第一个顶升架单体和第二个顶升架单体通过四个内部连接端用螺栓连接固定,取下液压装置上的锁紧销收回液压装置,将锁紧销再插入第二个顶升架单体的销孔,启动液压装置,重复上述的过程,提升安装多个顶升架单体,直到拆除施工的高度;
③、在安装2——4个顶升架单体后要将最上端的顶升架单体的上面安装固定上固定平台和拆卸设备主体,当完成顶升架的安装后拆卸设备主体已经被送到建筑物的顶端,拆装施工时要在顶升架的上面套装限位固定框,限位固定框与建筑物连接固定;
④、建筑物拆除施工由上至下进行,拆卸设备主体随着拆除的进度通过缩短顶升架的高度逐渐向下移动,顶升架缩短的步骤与②中所述的步骤相反;
⑤、当拆除施工达到地面设备能够进行拆除作业时就完成了全部的拆除施工作业。
CN 200910067104 2009-06-12 2009-06-12 建筑物拆除内顶升方法及其设备 Active CN101922243B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910067104 CN101922243B (zh) 2009-06-12 2009-06-12 建筑物拆除内顶升方法及其设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910067104 CN101922243B (zh) 2009-06-12 2009-06-12 建筑物拆除内顶升方法及其设备

Publications (2)

Publication Number Publication Date
CN101922243A CN101922243A (zh) 2010-12-22
CN101922243B true CN101922243B (zh) 2013-04-03

Family

ID=43337427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910067104 Active CN101922243B (zh) 2009-06-12 2009-06-12 建筑物拆除内顶升方法及其设备

Country Status (1)

Country Link
CN (1) CN101922243B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277980B (zh) * 2011-05-06 2013-01-02 河海大学 一种单层工业厂房屋盖整体顶升的装置及其施工方法
CN104153598A (zh) * 2014-08-06 2014-11-19 刘建国 一种烟囱类构筑物的自举式拆除方法
CN104196262B (zh) * 2014-09-24 2016-04-13 樊硕 内爬升式大高度建筑拆除机
CN104989121B (zh) * 2015-07-24 2017-07-14 武大巨成结构股份有限公司 一种钢滑道顶升建筑物增层装置
CN107269025B (zh) * 2017-06-01 2019-03-08 浙江省建筑设计研究院 建筑顶升控制侧向位移的套架式限位机构
CN108868194B (zh) * 2018-07-30 2023-12-22 威海新特重工股份有限公司 一种烟囱拆除装置及烟囱拆除方法
CN109025365B (zh) * 2018-07-30 2021-02-23 李树平 一种高层建筑的拆除方法
CN110453933B (zh) * 2019-08-14 2021-04-30 温州市鹿通建设有限公司 一种建筑物拆除内顶升设备及施工方法
CN110485752B (zh) * 2019-08-23 2021-11-09 广东祈大建设工程有限公司 一种高层建筑拆楼方法及拆楼机
CN111677334A (zh) * 2020-04-27 2020-09-18 中建科工集团有限公司 悬空措施材料拆除方法
CN112412153A (zh) * 2020-11-11 2021-02-26 国网山东省电力公司淄博供电公司 狭窄空间废旧电杆分段垂直拆除工具套装及其应用方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2990593B2 (ja) * 1996-10-03 1999-12-13 川崎重工業株式会社 建物構造体の解体工法及び解体装置
CN2679123Y (zh) * 2002-12-19 2005-02-16 胡建锋 新型内爬塔式起重机
JP2007297867A (ja) * 2006-05-02 2007-11-15 Total Kankyo:Kk 建物解体工法
CN101230750A (zh) * 2007-01-23 2008-07-30 上海海塔机械制造有限公司 穿心式自升全液压步进提升机及提升施工平台的方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2990593B2 (ja) * 1996-10-03 1999-12-13 川崎重工業株式会社 建物構造体の解体工法及び解体装置
CN2679123Y (zh) * 2002-12-19 2005-02-16 胡建锋 新型内爬塔式起重机
JP2007297867A (ja) * 2006-05-02 2007-11-15 Total Kankyo:Kk 建物解体工法
JP4180615B2 (ja) * 2006-05-02 2008-11-12 株式会社トータル環境 建物解体工法
CN101230750A (zh) * 2007-01-23 2008-07-30 上海海塔机械制造有限公司 穿心式自升全液压步进提升机及提升施工平台的方法

Also Published As

Publication number Publication date
CN101922243A (zh) 2010-12-22

Similar Documents

Publication Publication Date Title
CN101922243B (zh) 建筑物拆除内顶升方法及其设备
CN103669902B (zh) 现浇梁支撑桁架整体降落拆除工装及其施工方法
CN102251483B (zh) 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法
CN106812328B (zh) 带吊挂层的张弦预应力钢结构网架整体二步提升施工方法
CN206188316U (zh) 多级杠同步升降装置
CN202673195U (zh) 一种用于钻杆接立根的装置
CN203794498U (zh) 一种内置式自升塔吊装置
CN207048345U (zh) 建筑施工卸料平台装置
CN109747775A (zh) Fpso模块单元化平行建造工艺
CN202451040U (zh) 垂直高空爬梯
CN100526197C (zh) 底部升降塔式起重机
CN203081472U (zh) 向锚孔中安装锚固剂的装置
CN219031629U (zh) 一种室内板材安装起重设备
CN203669407U (zh) 现浇梁支撑桁架整体降落拆除工装
CN202785255U (zh) 钢筋混凝土管节的翻转吊装工具
CN202689489U (zh) 框架柱施工操作架
CN1987020B (zh) 附着爬升式高耸桅杆结构安装方法及施工装置
CN215164726U (zh) 一种用于现浇梁钢管桩支架快速拆除的整体卸落结构
CN213979839U (zh) 不穿墙可周转装配式悬挑工字钢梁作业装置
CN204662933U (zh) 一种电梯井操作架提升式钢平台
CN107059654A (zh) 单索面复合型超长前支点挂篮及其安装方法
CN208056658U (zh) 用于工业化建筑的空中造楼机
CN206800201U (zh) 单索面复合型前支点挂篮
CN204401619U (zh) 预制桩固定装置
CN203782579U (zh) 一种大跨度支撑系统的反拖拉拆除装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161011

Address after: 264200 No. 64, Guangzhou Road, Wendeng Economic Development Zone, Shandong, Weihai

Patentee after: WEIHAI NEW SPECIAL HEAVY INDUSTRY CO., LTD.

Address before: 135101 Huinan County of Jilin Province town of Chaoyang Hing a prosperous street committee five group

Patentee before: Ban Yun

TR01 Transfer of patent right

Effective date of registration: 20181127

Address after: 135100 First Committee and Five Groups of Xinggong Fuqiang Street, Chaoyang Town, Huinan County, Tonghua City, Jilin Province

Patentee after: Ban Yun

Address before: 264200 No. 64 Guangzhou Road, Wendeng Economic Development Zone, Weihai City, Shandong Province

Patentee before: WEIHAI NEW SPECIAL HEAVY INDUSTRY CO., LTD.

TR01 Transfer of patent right