CN101858083A - Low spatial pile pulling construction method and device of steel pipe pile in water - Google Patents

Low spatial pile pulling construction method and device of steel pipe pile in water Download PDF

Info

Publication number
CN101858083A
CN101858083A CN 201010204794 CN201010204794A CN101858083A CN 101858083 A CN101858083 A CN 101858083A CN 201010204794 CN201010204794 CN 201010204794 CN 201010204794 A CN201010204794 A CN 201010204794A CN 101858083 A CN101858083 A CN 101858083A
Authority
CN
China
Prior art keywords
pontoon
pile
steel pipe
pipe pile
pulling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010204794
Other languages
Chinese (zh)
Inventor
张伟
董景强
乔建军
沈鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN NO 3 NUNICIPAL HIGHWAY ENGINEERING Co Ltd
Original Assignee
TIANJIN NO 3 NUNICIPAL HIGHWAY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN NO 3 NUNICIPAL HIGHWAY ENGINEERING Co Ltd filed Critical TIANJIN NO 3 NUNICIPAL HIGHWAY ENGINEERING Co Ltd
Priority to CN 201010204794 priority Critical patent/CN101858083A/en
Publication of CN101858083A publication Critical patent/CN101858083A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to low spatial pile pulling construction method and device of a steel pipe pile in water, belonging to the technical field of bridge construction. The low spatial pile pulling construction method of the steel pipe pile in the water is characterized in that a floating pontoon is used for pulling the pile; the floating pontoon is firstly regulated to sink; the buoyancy of the floating pontoon acts on the connected steel pipe pile; and the steel pipe pile is pulled out. The low spatial pile pulling construction device of the steel pipe pile the in water is characterized by comprising the floating pontoon, a vibrating hammer and a buoyancy generating mechanism; the vibrating hammer and the buoyancy generating mechanism are installed on the floating pontoon which is connected with the steel pipe pile subjected to pile pulling construction; and the vibrating hammer is installed in the position opposite to the steel pipe pile. The invention has the advantages of simple structure, compact assembly, large pile pulling load, safe operation, convenient construction, quick assembly, time saving, labor saving, low construction cost, high construction efficiency and the like.

Description

Steel pipe pile pile-pulling construction method and device in the low spatial water
Technical field
The invention belongs to technical field of bridge construction, particularly relate to steel pipe pile pile-pulling construction method and device in a kind of low spatial water.
Background technology
At present, steel pipe pile pile pulling construction in the low spatial water because the steel pipe pile basis is positioned at the bridge bottom, is subjected to steel case beam to make steel pipe pile not pulled out by disposable apart from the influence of water surface elevation.Because the bridge headroom is little, various plant equipment are difficult to obtain utilize in this type of construction; Simultaneously bury deeplyer because of pile foundation, pile side friction is big, makes that the pile pulling difficulty is bigger in water.General adopt the diver that the pipe stake of the part that leaks outside in the water is cut, the part of burying has caused the waste of lot of materials because the spatial altitude deficiency can't be extracted, technical problem such as cause that construction quality is poor, cost height and efficiency of construction are low.
Summary of the invention
The present invention provides steel pipe pile pile-pulling construction method and device in a kind of low spatial water for solving the technical problem that exists in the known technology.
One of purpose of the present invention provides a kind of group of pile and carries greatly, handling safety, and easy construction, assembling is quick, steel pipe pile pile-pulling construction method in the low spatial water of characteristics such as efficiency of construction height.
The technical scheme that the steel pipe pile pile-pulling construction method is taked in the low spatial water of the present invention is:
Steel pipe pile pile-pulling construction method in the low spatial water is characterized in: job practices is to dial stake with pontoon, adjusts earlier pontoon and sinks, and the buoyancy that relies on pontoon is in the steel pipe pile that connects, and steel pipe pile is transferred to.
The steel pipe pile pile-pulling construction method can also adopt following technical scheme in the low spatial water of the present invention:
Steel pipe pile pile-pulling construction method in the described low spatial water is characterized in: steel pipe pile is dialled a pulling force makes pontoon sink to adopting pontoon to install hoist engine, and hoist engine is dialled a pulling force and made pontoon sinking mode, and the pontoon of sinking produces buoyancy.
Steel pipe pile pile-pulling construction method in the described low spatial water is characterized in: adjust pontoon and sink to adopting the pontoon bearing mode that pontoon is sunk, alleviate the pontoon carrying and make pontoon produce buoyancy.
Steel pipe pile pile-pulling construction method in the described low spatial water is characterized in: the pontoon bearing mode is water tank water filling in the pontoon, and alleviating the pontoon carrying is cistern water-discharging in the pontoon.
Steel pipe pile pile-pulling construction method in the described low spatial water is characterized in: adopt shake hammer vibrations steel pipe pile when steel pipe pile is transferred to, with steel pipe pile surrounding soil shake pine.
Steel pipe pile pile-pulling construction method in the described low spatial water is characterized in: steel pipe pile is transferred to and is carried out according to the gradation of pontoon flying height.
Two of purpose of the present invention provides a kind ofly to be had simple in structurely, and assembling is compact, easy construction, and it is big to dial pile bearing capacity, steel pipe pile pile pulling construction equipment in the low spatial water of characteristics such as efficiency of construction height.
The technical scheme that steel pipe pile pile pulling construction equipment is taked in the low spatial water of the present invention is:
Steel pipe pile pile pulling construction equipment in the low spatial water, be characterized in: the pile pulling construction equipment comprises that pontoon, shake hammer and buoyancy produce mechanism, shake hammer and buoyancy produce mechanism and are installed on the pontoon, and pontoon connects the steel pipe pile of dialling pile driving construction, and the shake hammer is installed on relative steel pipe pile position.
Steel pipe pile pile pulling construction equipment can also adopt following technical scheme in the low spatial water of the present invention:
Steel pipe pile pile pulling construction equipment in the described low spatial water is characterized in: it is hoist engine, frame and pulley that buoyancy produces mechanism, and hoist engine, frame are installed on the pontoon, and pulley is installed on the frame, and the hoist engine wire rope connects steel pipe pile by pulley.
Steel pipe pile pile pulling construction equipment in the described low spatial water is characterized in: the shake hammer is housed on the frame.
Steel pipe pile pile pulling construction equipment in the described low spatial water is characterized in: pontoon is made of two hulls, between two hulls link is arranged.
Pile pulling device of the present invention is made up of pontoon, shake hammer, hoist engine and reaction frame etc., the buoyancy that makes full use of pontoon provides the pile pulling counter-force, utilize the vibration limits soil body of shake hammer to reduce pile side friction, change the direction of pile pulling power by reaction frame, provide pile pulling power to force down by hoist engine with the steel pipe pile lifting and with pontoon, the last hoist engine ship that quits work upwards floats because of stressed reducing, and directly pile tube is taken up, and solves two big difficult points of pile pulling construction by above means.
Pipe stake pile pulling invention is divided into pile pulling device and construction technology two parts in the whole low spatial water.
(1) pile pulling device:
1, pontoon structure design:
The effect of pontoon is for the pile pulling construction provides safe operating platform, utilizes buoyancy to provide pile pulling required uplift force simultaneously, makes pontoon become the key point in a whole set of technology.Designed for this reason pontoon also will guarantee the buoyancy that provides enough in the safety in guaranteeing the construction use.And finish and accurately to calculate, the draft of pontoon under the situation of bearing certain pressure in the pontoon making.
2, vibration hammer:
Vibration hammer as another one key equipment in the pile pulling construction is designed to the pile pulling space that tabular is utilized to reduce it.The draw-gear of the running blocks of three groups of wheels as the shake hammer is set in shake hammer both sides, the pulley below be provided with damping spring with reduce shaking force by wire rope transfers to the influence of pontoon and the loss of the power that impulses.Folder stake device is established in shake hammer bottom.Utilizing shake hammer pile pulling construction mainly is to utilize its high-frequency vibration to destroy the stake side soil body to reduce pile side friction.Vibration hammer links to each other with hoist engine through two groups of movable and fixed pulleys and horizontal steel I-beam by wire rope.
3, fixed pulley:
Fixed pulley mainly works the effect that turns to.And reduce the headroom that pulley takies pile pulling as far as possible.
4, pile pulling frame:
As the main force transfer system of pile pulling process, the rigidity of pile pulling frame and the stable safety that directly influences the pile pulling overall process.Pile pulling is set up meter and is adopted pipe as support column, on set up horizontal longeron, guarantee the stability and the rigidity of pile pulling frame.
5, hoist engine:
Two hoist engines are set are used for pile pulling, hoist engine is laid on the pontoon top board, and hoist engine is by turning to of fixed pulley group and subtracting the steel pipe pile that power can will be destroyed behind the soil body by high-frequency vibration and pulling out of movable pulley.
6, submersible pump:
Submersible pump is set on pontoon is used to regulate the pontoon underwater penetration.
7, link between the pontoon:
Link adopts the truss system to make, and utilizes self rigidity of link that two pontoons are connected into integral body, guarantees that the coordination of pontoon is stressed.
8, install the connected mode at each position
At first two pontoons connect into integral body by the mode of connector bolt, and hoist engine (being welded to connect), power transformation case are set at the pontoon top.The pile pulling frame adopts flange to be connected with pontoon panel and longeron, adopts between the horizontal longeron of pile pulling frame to be welded to connect.Hanger is set on the crossbeam to link to each other with the fixed pulley group and is provided with auxiliary hanger and be used for linking to each other with the pulley wire rope.Vibration hammer links to each other with hoist engine by pulley, and by the clip of self steel pipe pile is pulled out.
(2) construction technology:
1. utilize submersible pump water filling in the water tank that the pontoon front end is provided with, make pontoon keep anterior-posterior balance, and adjust the pontoon height, make it suitable tube drawing.
2. start the stake of shake hammer vibrations pipe, utilize the high frequency of shake hammer to hit brisance pipe stake surrounding soil shake pine.
3. starting the hoist engine traction provides pile pulling power, along with the raising of hoist engine tractive force, pontoon because of stressed will be to sinking.To such an extent as to (with reference to the buoyancy of measuring and calculating before and the relation of drinking water situation) stops hoist engine work when abundant pile tube can being pulled out of pontoon drinking water.Pile tube is extracted with the pontoon come-up.
Advantage that the present invention has and good effect:
Steel pipe pile pile-pulling construction method and device are owing to adopted brand-new technology scheme of the present invention in the low spatial water, compared with prior art, take into full account the influence of bridge headroom, solved pile foundation well and buried darker, pile side friction is big, technical barrier such as pile pulling operational difficulty in the water.The present invention has simple in structure, and assembling is compact, and dial pile and carry greatly, handling safety, easy construction, assembling is quick, and time saving and energy saving, construction cost is low, characteristics such as efficiency of construction height.
Description of drawings
Fig. 1 is a steel pipe pile pile pulling construction equipment structural representation in the low spatial water of the present invention;
Fig. 2 is a steel pipe pile pile pulling construction equipment plane structure schematic diagram in the low spatial water;
Fig. 3 is a steel pipe pile pile pulling construction equipment facade structures schematic diagram in the low spatial water;
Fig. 4 is the A-A cross-sectional view of Fig. 2.
Among the figure, 1. pontoon, 2. hoist engine, 3. shake hammer, 4. link, 5. frame, 6. crossbeam, 7. steel pipe pile, 8. power transformation case, 9. pulley.
The specific embodiment
For further understanding summary of the invention of the present invention, characteristics and effect, exemplify following examples now, and conjunction with figs. is described in detail as follows:
Consult accompanying drawing 1, Fig. 2, Fig. 3 and Fig. 4.
Embodiment 1
Steel pipe pile pile-pulling construction method in the low spatial water utilizes pontoon to dial stake, adjusts pontoon earlier and sinks, and steel pipe pile is dialled a pulling force makes pontoon sink to adopting pontoon to install hoist engine, and hoist engine is dialled a pulling force and made pontoon sinking mode, and the pontoon of sinking produces buoyancy.The buoyancy that relies on pontoon is in the steel pipe pile that connects, and steel pipe pile is transferred to.
Adjust to adjust pontoon and sink also and can pontoon be sunk, after the sinking pontoon and steel pipe pile are fixed, with pump water in the water tank is discharged again and alleviate pontoon and carry, make pontoon generation buoyancy and steel pipe pile is transferred to submersible pump water filling in the pontoon water tank.
When steel pipe pile is transferred to, adopt shake hammer vibrations steel pipe pile, make steel pipe pile surrounding soil shake pine, be beneficial to and dial stake.
Embodiment 2
Steel pipe pile pile pulling construction equipment in the low spatial water comprises pontoon 1, shake hammer 3, frame 5 and pulley 9, and pontoon 1 is made of two hulls, between two hulls link 4 is arranged.Each solid volume machine 2 of each pontoon, frame 5 is installed on two pontoons 1, and pulley 9 is installed on the centre of frame 5 crossbeams 6, and hoist engine 2 wire rope connect steel pipe pile 7 by pulley.Pontoon 1 connects the steel pipe pile 7 of dialling pile driving construction by hoist engine 7 wire rope, and shake hammer 3 contact vibrations steel pipe piles 7 make steel pipe pile 7 surrounding soils shake pine, are beneficial to and dial stake.
Concrete construction equipment of steel pipe pile pile pulling and construction technology are described in detail as follows in the low spatial water:
(1) pile pulling device:
1, pontoon structure:
1) design load:
Pontoon design bearing load comprises equipment self-weights such as pile pulling power, pontoon deadweight, two hoist engines and pile pulling frame, considers personnel and sundry miscellaneaus object load sum simultaneously.The steel pipe pile uplift force is designed to 40 tons, and the pontoon deadweight is 27 tons, and two hoist engines are conducted oneself with dignity about 6 tons, and the pile pulling frame is 3 tons, default 3 tons of operating personnel and miscellaneous load, and adding up to load is 79 tons.
2) structure design:
Two of pontoon designs, each long 8 meters, wide 4.5 meters, high 2-2.5 rice, 1 meter of two pontoon arrangement interval adopt link that two pontoons are connected to integral body at the pontoon front end.For satisfying the pontoon requirement of himself rigidity in use, the pontoon inner frame adopts No. 20 channel-section steels of Two bors d's oeuveres as main frame stressing rod members and be equipped with No. 10 channel-section steels, 10 bugle steel as auxiliary stressed member.
3) thin portion structure treatment:
The pontoon maximum displacement is 174 cubic metres, and it is 69 tons/meter that buoyancy can be provided.The deadweight of pontoon and plant equipment is 39 tons before pile pulling not, 56 centimetres of pontoon submergeds this moment, for guaranteeing that pontoon stablizing in water also needs to inject a certain amount of water in pontoon, reduce the pontoon center of gravity with this, therefore about 20 cubes of water filling in pontoon in advance, making pontoon submerged minimum-depth is 80 centimetres.
Because asymmetry of this body structure of pontoon and front end add the influence behind the link, the relative geometric center lines in both sides is a unsymmetric structure before and after the pontoon, and two parts weight differs 3.4t.For guaranteeing the balance of pontoon integral body, all add the counterweight water tank at the pontoon afterbody.For making the pontoon both sides keep the water filling of balance need in water tank, in the water flood operations process, can judge water injection rate according to the equilibrium depth of pontoon submerged.
2, shake hammer:
Vibration hammer as another one key equipment in the pile pulling construction is designed to the pile pulling space that tabular is utilized to reduce it.Highly be 78 centimetres, long 205 centimetres, wide 148 centimetres, 90 tons the power that impulses, 45 tons of pile pulling power can be provided.The draw-gear of the running blocks of three groups of wheels as the shake hammer is set in shake hammer both sides, the pulley below be provided with damping spring with reduce shaking force by wire rope transfers to the influence of pontoon and the loss of the power that impulses.Folder stake device is established in shake hammer bottom, and folder stake tool is designed to the pile pulling needs of different tube diameters pipe in the adjustable 600mm-800mm of the satisfying scope.Vibration hammer links to each other with hoist engine through two groups of movable and fixed pulleys and horizontal steel I-beam by wire rope.
3, fixed pulley:
Work the fixed pulley that turns to effect and adopt 32 tons of assembly pulleys of two groups of special three-wheels.400 millimeters of pulley height, 364 millimeters of length, 355 millimeters of width, 280 millimeters in main wheel wheel footpath.The fixing welding manner that adopts of pulley is connected with the crossbeam i iron, with the steel plate and the welding of i iron bottom surface frange plate of four 20 millimeters thick on the pulley.The two pairs of assembly pulley symmetric arrangement and crossbeam both sides, corresponding with the running block position on the shake hammer.
4, pile pulling frame:
Pile pulling is set up meter and is adopted φ 340mm pipe as support column, on set up vertical, horizontal Two bors d's oeuveres I360 steel I-beam, 300 centimetres of pipe height, long 600 centimetres of i iron longeron, long 300 centimetres of crossbeam.φ 340 pipes adopt flange to be connected with pontoon panel and longeron.The local processing of strengthening is done in the pipe relevant position on i iron.Hanger is set on the crossbeam links to each other with the fixed pulley group and be provided with auxiliary hanger and be used for linking to each other with the pulley wire rope, thus since fixed pulley stressed big on crossbeam the relevant position also should do local the reinforcement, auxiliary hanger is arranged on by the pulley.
5, hoist engine:
Two 5 tons of slow-speed hoist engines are set to be laid on the pontoon top board.The wire rope of hoist engine passes fixed pulley earlier by transfer and passes movable pulley again and twine in this way at last one of wire rope is connected with the auxiliary hanger that is provided with on the i iron.
6, submersible pump:
2 on submersible pump is set is used to regulate the pontoon underwater penetration.Submersible pump is 4 cun submersible pumps, and this pump displacement is 100 cubic metres/hour.Submersible pump is arranged at the pontoon rear end.
7, link between the pontoon:
Link adopts No. 20 channel-section steels to become the truss system with 10 bugle steel spellings, adopts welding manner to link to each other between the shaped steel, and totally three groups of truss adopt horizon bar to connect between truss, at last link and two pontoons are connected as one with φ 22mm bolt.
(2) construction technology:
1, preparation before the pile pulling:
1). utilize two submersible pumps about 40 centimetres height of water filling in the water tank that two pontoon front ends are provided with simultaneously, make pontoon keep anterior-posterior balance.
2). water filling makes pontoon sinking certain depth in pontoon again, the pontoon submerged degree of depth at the bottom of according to pile pulling frame apex distance steel case beam on the pontoon the safe altitude apart from 10-20 centimetre and decide.Maximum submergence depth is 150 centimetres, and minimum submergence depth is 80 centimetres.
3). before the pile pulling steel pipe pile is cut to 20 centimeters more than the water surface in advance.
4). at the bottom of putting pontoon under bridge, be located in pre-pile pulling position (pontoon is established link one side in bridge).
2, carry out the pile pulling construction:
1) utilize hoist engine will shake hammer and hang on the steel pipe pile top, and the unlatching oil pump makes the shake hammer clamp the steel pipe pile tube wall.
2) start the shake hammer and shake, after utilizing the high frequency of shake hammer to hit brisance to make about 10-20 centimetre of steel pipe pile sinking, starting the hoist engine traction provides pile pulling power.
3) along with the raising of hoist engine tractive force, pontoon because of stressed will be to sinking, will stop substantially after about 60 centimetres when pontoon sinks, the buoyancy that this moment, pontoon offered can satisfy the requirement of 40 tons of the required uplift forces of pile pulling.
4) stop traction when steel pipe pile is pulled out after support height allows length, loosen the shake hammer.This moment, pontoon upwards floated because of stressed reducing, and was removable pontoon after the lifting of shake hammer goes out the pipe height.
5) pontoon is left to carry out pile pulling with the next pre-pile pulling position of row and will have enough to meet the need cargo ship simultaneously and sail into, with gas cutting pipe is excised 20 centimetres of positions at surface of water at steel pipe pile with cutting equipment on the turnover cargo ship, the pipe after will cutting off with the Unwinding chain is transported to turnover cargo ship transportation disembarkation.

Claims (10)

1. steel pipe pile pile-pulling construction method in the low spatial water is characterized in that: job practices is to dial stake with pontoon, adjusts pontoon earlier and sinks, and the buoyancy that relies on pontoon is in the steel pipe pile that connects, and steel pipe pile is transferred to.
2. steel pipe pile pile-pulling construction method in the low spatial water according to claim 1 is characterized in that: steel pipe pile is dialled a pulling force makes pontoon sink to adopting pontoon to install hoist engine, and hoist engine is dialled a pulling force and made pontoon sinking mode, and the pontoon of sinking produces buoyancy.
3. steel pipe pile pile-pulling construction method in the low spatial water according to claim 1 is characterized in that: adjust pontoon and sink to adopting the pontoon bearing mode that pontoon is sunk, alleviate the pontoon carrying and make pontoon produce buoyancy.
4. steel pipe pile pile-pulling construction method in the low spatial water according to claim 3 is characterized in that: the pontoon bearing mode is water tank water filling in the pontoon, and alleviating the pontoon carrying is cistern water-discharging in the pontoon.
5. steel pipe pile pile-pulling construction method in the low spatial water according to claim 1 is characterized in that: adopt shake hammer vibrations steel pipe pile when steel pipe pile is transferred to, with steel pipe pile surrounding soil shake pine.
6. steel pipe pile pile-pulling construction method in the low spatial water according to claim 1 is characterized in that: steel pipe pile is transferred to and is carried out according to the gradation of pontoon flying height.
7. steel pipe pile pile pulling construction equipment in the low spatial water, it is characterized in that: the pile pulling construction equipment comprises that pontoon, shake hammer and buoyancy produce mechanism, shake hammer and buoyancy produce mechanism and are installed on the pontoon, and pontoon connects the steel pipe pile of dialling pile driving construction, and the shake hammer is installed on relative steel pipe pile position.
8. steel pipe pile pile pulling construction equipment in the low spatial water according to claim 7, it is characterized in that: it is hoist engine, frame and pulley that buoyancy produces mechanism, hoist engine, frame are installed on the pontoon, and pulley is installed on the frame, and the hoist engine wire rope connects steel pipe pile by pulley.
9. steel pipe pile pile pulling construction equipment in the low spatial water according to claim 7 is characterized in that: the shake hammer is housed on the frame.
10. according to steel pipe pile pile pulling construction equipment in claim 7, the 8 or 9 described low spatial water, it is characterized in that: pontoon is made of two hulls, between two hulls link is arranged.
CN 201010204794 2010-06-22 2010-06-22 Low spatial pile pulling construction method and device of steel pipe pile in water Pending CN101858083A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010204794 CN101858083A (en) 2010-06-22 2010-06-22 Low spatial pile pulling construction method and device of steel pipe pile in water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010204794 CN101858083A (en) 2010-06-22 2010-06-22 Low spatial pile pulling construction method and device of steel pipe pile in water

Publications (1)

Publication Number Publication Date
CN101858083A true CN101858083A (en) 2010-10-13

Family

ID=42944222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010204794 Pending CN101858083A (en) 2010-06-22 2010-06-22 Low spatial pile pulling construction method and device of steel pipe pile in water

Country Status (1)

Country Link
CN (1) CN101858083A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296610A (en) * 2011-05-19 2011-12-28 中天建设集团有限公司 Device for removing square pile and construction method thereof
CN103174141A (en) * 2013-03-26 2013-06-26 青岛宝基利工程技术咨询有限公司 Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method
CN105908744A (en) * 2015-02-09 2016-08-31 张继红 Pore pressure counterforce construction method, construction device and soil clearing device
CN108360521A (en) * 2018-03-15 2018-08-03 中国石油大学(华东) The method for removing offshore platform pile foundation is pulled out in a kind of torsion
CN108894226A (en) * 2018-09-28 2018-11-27 中国冶集团有限公司 Pile pulling device under a kind of bridge
CN109252522A (en) * 2018-10-31 2019-01-22 中国冶集团有限公司 Pile pulling device is adjusted in low spatial
CN110438993A (en) * 2019-08-16 2019-11-12 中建筑港集团有限公司 A kind of steel-pipe pile pile extractor and its construction technology
CN110886219A (en) * 2019-10-31 2020-03-17 安徽省路港工程有限责任公司 Construction method of in-water support dismantling system for cast-in-place bridge steel pipe pile
CN113123794A (en) * 2021-03-29 2021-07-16 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2597549Y (en) * 2003-02-21 2004-01-07 曹茂杰 Split-type pile extractor
CN2654688Y (en) * 2003-11-27 2004-11-10 中铁工程机械研究设计院 High frequency hydraulic vibration pile pulling sinker with pile picker

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2597549Y (en) * 2003-02-21 2004-01-07 曹茂杰 Split-type pile extractor
CN2654688Y (en) * 2003-11-27 2004-11-10 中铁工程机械研究设计院 High frequency hydraulic vibration pile pulling sinker with pile picker

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《铁道标准设计》 20090228 朱胜军 拼组式拔桩船的设计与施工 第98-101页第2,3节、图1 1-10 , 第2期 2 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296610A (en) * 2011-05-19 2011-12-28 中天建设集团有限公司 Device for removing square pile and construction method thereof
CN102296610B (en) * 2011-05-19 2013-05-08 中天建设集团有限公司 Device for removing square pile and construction method thereof
CN103174141A (en) * 2013-03-26 2013-06-26 青岛宝基利工程技术咨询有限公司 Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method
CN104213559A (en) * 2013-03-26 2014-12-17 青岛林川工程技术咨询有限公司 Pull-out method for pull-out equipment of bracket steel pipe pile under girder in beach area
CN104213559B (en) * 2013-03-26 2015-12-09 青岛林川工程技术咨询有限公司 Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment
CN105908744A (en) * 2015-02-09 2016-08-31 张继红 Pore pressure counterforce construction method, construction device and soil clearing device
CN105908744B (en) * 2015-02-09 2018-04-24 张继红 Pore pressure counter-force construction method
CN108360521A (en) * 2018-03-15 2018-08-03 中国石油大学(华东) The method for removing offshore platform pile foundation is pulled out in a kind of torsion
CN108894226A (en) * 2018-09-28 2018-11-27 中国冶集团有限公司 Pile pulling device under a kind of bridge
CN109252522A (en) * 2018-10-31 2019-01-22 中国冶集团有限公司 Pile pulling device is adjusted in low spatial
CN110438993A (en) * 2019-08-16 2019-11-12 中建筑港集团有限公司 A kind of steel-pipe pile pile extractor and its construction technology
CN110886219A (en) * 2019-10-31 2020-03-17 安徽省路港工程有限责任公司 Construction method of in-water support dismantling system for cast-in-place bridge steel pipe pile
CN110886219B (en) * 2019-10-31 2021-04-30 安徽省路港工程有限责任公司 Construction method of in-water support dismantling system for cast-in-place bridge steel pipe pile
CN113123794A (en) * 2021-03-29 2021-07-16 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device
CN113123794B (en) * 2021-03-29 2022-08-05 北京中煤矿山工程有限公司 Horizontal freezing pipe drawing device

Similar Documents

Publication Publication Date Title
CN101858083A (en) Low spatial pile pulling construction method and device of steel pipe pile in water
CN105926628B (en) One kind is floated, fixed convertible pile foundation in water construction platform device
CN103510529B (en) Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof
CN106759340A (en) Steel-pipe pile pile-pulling construction method and device in low spatial water
CN201857618U (en) Floating guide platform and steel casing supported drilling platform deepwater pile foundation
CN201962661U (en) Offshore movable lifting multifunctional working platform
CN102251530A (en) Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN101666101A (en) Movable prefabricated multi-barrel type gravity mixed foundation
CN102116017B (en) Foam platform for drilling on waterways
CN202298591U (en) Shallow water tremie frame platform
CN106697189A (en) Installation method for float-dragging method offshore type ocean booster station
CN108755644B (en) Transfer platform for cable traction in intertidal zone login and installation method thereof
CN115788782A (en) Floating type fan offshore installation process
CN202023182U (en) Waterborne drilling foam platform
CN104746525A (en) Lifting platform system for placing large caisson in water
CN103498420B (en) Large-scale steel box beam ashore construction method
CN210917364U (en) Steel pipe pile positioning platform for crane ship
CN102206938A (en) Novel method for installing upper part block of offshore platform
KR101164604B1 (en) Balancing type marine column structure construction apparatus
CN101900224A (en) Seafloor pipeline bracket
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN204456106U (en) Waters pile sinking mobile guide station keeping ship
CN110758662A (en) Movable free-rising and sinking storm platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101013