CN104213559B - Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment - Google Patents
Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment Download PDFInfo
- Publication number
- CN104213559B CN104213559B CN201410460415.7A CN201410460415A CN104213559B CN 104213559 B CN104213559 B CN 104213559B CN 201410460415 A CN201410460415 A CN 201410460415A CN 104213559 B CN104213559 B CN 104213559B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe pile
- truss
- crossbeam
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410460415.7A CN104213559B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410460415.7A CN104213559B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment |
CN201310098693.8A CN103174141B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310098693.8A Division CN103174141B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104213559A CN104213559A (en) | 2014-12-17 |
CN104213559B true CN104213559B (en) | 2015-12-09 |
Family
ID=48634296
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410460415.7A Expired - Fee Related CN104213559B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment |
CN201310098693.8A Expired - Fee Related CN103174141B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310098693.8A Expired - Fee Related CN103174141B (en) | 2013-03-26 | 2013-03-26 | Intertidal zone beam lower supporting frame steel pipe pile pulling-out device |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104213559B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360521B (en) * | 2018-03-15 | 2021-07-06 | 中国石油大学(华东) | Method for dismounting offshore platform pile foundation by twisting and pulling up |
CN108894226A (en) * | 2018-09-28 | 2018-11-27 | 中国冶集团有限公司 | Pile pulling device under a kind of bridge |
CN109972621B (en) * | 2019-04-22 | 2024-03-26 | 中建三局基础设施建设投资有限公司 | Pile pulling device for steel pipe pile in small-clearance shallow water area and construction method of pile pulling device |
CN110306553B (en) * | 2019-04-28 | 2021-06-29 | 中国一冶集团有限公司 | Underwater steel pile dismantling device and method |
CN115075247A (en) * | 2022-05-24 | 2022-09-20 | 保利长大工程有限公司 | Pulling-out method for steel pipe pile of cross-river channel box girder bracket |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10168879A (en) * | 1996-12-10 | 1998-06-23 | Taisei Corp | Pulling method for steel sheet pile |
JPH10306443A (en) * | 1997-04-30 | 1998-11-17 | Nishimatsu Constr Co Ltd | Pile pull-out jig and pile pull-out method using jig |
CN2348010Y (en) * | 1998-05-15 | 1999-11-10 | 江苏金猴机械集团公司研究所 | Pile pulling mechanism |
CN101858083A (en) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | Low spatial pile pulling construction method and device of steel pipe pile in water |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3697576B2 (en) * | 2001-02-28 | 2005-09-21 | Jfeスチール株式会社 | Remaining pile drawing device and remaining pile drawing method |
CN102296610B (en) * | 2011-05-19 | 2013-05-08 | 中天建设集团有限公司 | Device for removing square pile and construction method thereof |
CN203129146U (en) * | 2013-03-26 | 2013-08-14 | 山东高速青岛公路有限公司 | Extraction device for under-beam supporting bracket steel pipe pile in beach area |
-
2013
- 2013-03-26 CN CN201410460415.7A patent/CN104213559B/en not_active Expired - Fee Related
- 2013-03-26 CN CN201310098693.8A patent/CN103174141B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10168879A (en) * | 1996-12-10 | 1998-06-23 | Taisei Corp | Pulling method for steel sheet pile |
JPH10306443A (en) * | 1997-04-30 | 1998-11-17 | Nishimatsu Constr Co Ltd | Pile pull-out jig and pile pull-out method using jig |
CN2348010Y (en) * | 1998-05-15 | 1999-11-10 | 江苏金猴机械集团公司研究所 | Pile pulling mechanism |
CN101858083A (en) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | Low spatial pile pulling construction method and device of steel pipe pile in water |
Also Published As
Publication number | Publication date |
---|---|
CN103174141B (en) | 2015-06-03 |
CN103174141A (en) | 2013-06-26 |
CN104213559A (en) | 2014-12-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104213559B (en) | Intertidal zone beam lower carriage steel pipe pile extracts the method for pulling out of equipment | |
CN201502061U (en) | Recoverable prestressing anchor rope with double anchor heads | |
CN102650118B (en) | Construction device and method for erecting prefabricated beam by slip method | |
CN104500075B (en) | Rope saw cuts the construction method of underground obstacle | |
CN106049281A (en) | Deep-water construction method of bridge at water pebble soil and argillaceous sandstone areas and auxiliary working platform | |
CN204266134U (en) | Heavy duty longspan steel truss girder walking type pushing device | |
CN101838988B (en) | Comprehensive construction method for extracting anchor cable | |
CN101705687B (en) | Deep foundation pit reinforced concrete waist rail detaching device and construction method | |
CN101851922A (en) | Method for eliminating underground anchor rope/rod by using all casing drill | |
CN203684099U (en) | Floating drag anchoring positioning system of high-pier large-span steel truss girder bridge | |
CN205529936U (en) | Hang basket displacement device | |
CN202672149U (en) | Height controller for underwater concrete grouting pile | |
CN107227862A (en) | The gliding construction method of building | |
CN215052994U (en) | Extraction and recovery device for steel pipe pile under bridge | |
CN203129146U (en) | Extraction device for under-beam supporting bracket steel pipe pile in beach area | |
CN206143823U (en) | Loess coombe district bridge substructure effect identification system | |
CN204738299U (en) | Device for quickly forming slag collecting platform on high and steep slope | |
CN105089058A (en) | Method and device for quickly forming slag collecting platform on high and steep slope | |
CN103306293A (en) | Reinforcement structure and construction method for water-rich landslide | |
CN203922510U (en) | A kind of simple and easy cable machine that is arranged in slope | |
CN204475350U (en) | Bored pile construction system under high-voltage line | |
CN204898696U (en) | Telescopic steel cofferdam | |
CN203924072U (en) | The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large | |
CN211898417U (en) | Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted | |
CN105672150B (en) | Sand-sliding slope cutting reinforcement protection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Dapeng Inventor after: Jia Shaoqiang Inventor after: Wang Chong Inventor after: Zhang Fujun Inventor after: Wang Lei Inventor after: Wang Dongliang Inventor after: Zhang Xufeng Inventor after: Wang Jianjun Inventor after: Zhang Lianrui Inventor after: Cui Hongwei Inventor after: Cai Tangtao Inventor after: Guo Baolin Inventor after: Li Ming Inventor after: Luan Guohua Inventor after: Li Jun Inventor after: Gao Jie Inventor after: Jin Xiaobo Inventor before: Guo Baolin |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20151111 Address after: 266520 Qingdao economic and Technological Development Zone, Shandong, No. 182 Jinshatan Road Applicant after: Qingdao Linchuan Engineering Technology Consulting Co., Ltd. Applicant after: CCCC Fourth Highway Engineering Co., Ltd. Address before: 266520 Qingdao economic and Technological Development Zone, Shandong, No. 182 Jinshatan Road Applicant before: Qingdao Linchuan Engineering Technology Consulting Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |